| The following event . . . |
Has priority use of the following area . . . |
At the following time . . . |
| (A) Lighting of the National Christmas Tree and Christmas Pathway of Peace |
Northern half of the oval portion of the Ellipse |
The last four weeks in December as well as necessary set-up and take-down between October 1 through February 1. |
| (B) Cherry Blossom Festival |
Park areas adjacent to the Tidal Basin and the sidewalk areas adjacent to Constitution Avenue, between 15th & 17th Streets NW |
Two weeks usually in late March or early April as well as the an additional two weeks for the necessary set-up and take-down. |
| (C) Fourth of July Celebration |
Washington Monument Grounds and the Lincoln Memorial Reflecting Pool area |
Time required for necessary staging and fireworks set-up and take-down, totaling three weeks in late June and early July. |
| (D) Smithsonian Folklife Festival |
The area bounded on the south by Jefferson Drive NW; on the north by Madison Drive, NW; on the east by 7th Street, NW; on the west by 14th Street, NW |
For a two-week period in approximately late June and early July and an additional eight weeks for the necessary set-up and take-down. |
| (E) Columbus Day Commemorative Wreath-Laying |
At the Columbus statue on the Union Plaza |
On Columbus Day. |
| (F) Presidential Inaugural Ceremonies |
See paragraph (g)(4)(iii) of this section |
See paragraph (g)(4)(iii) of this section. |