Login

18 CFR 154.309 : Conservation Of Power And Water Resources (§ 1.101 To Parts 1318-1399) — (§ 1.101 To Parts 391-399) — Federal Energy Regulatory Commission, Department Of Energy (§ 1.101 To Parts 391-399) — Regulations Under Natural Gas Act (§ 152.1 To § 158.12) — Rate Schedules And Tariffs (§ 154.1 To § 154.603) — Material To Be Filed With Changes (§ 154.301 To § 154.315) — Incremental expansions.

4 Aug 2016

(a) For every expansion for which incremental rates are charged, the company must provide a summary with applicable cross-references to § 154.312 and § 154.313, of the costs and revenues associated with the expansion, until the Commission authorizes the costs of the incremental facilities to be rolled-in to the pipeline's rates. For every expansion that has an at-risk provision in the certificate authorization, the costs and revenues associated with the facility must be shown in summary format with applicable cross-references to § 154.312 and § 154.313, until the Commission removes the at-risk condition.

(b) The summary statements must provide the formulae and explain the bases used in the allocation of common costs to each incremental facility.

18 CFR 154.309