40 CFR 60.5 : Protection Of Environment (§ 1.1 To Parts 1851-1899) — (§ 60.1 To § 60.496) — Environmental Protection Agency (Continued) (§ 60.1 To § 60.496) — Air Programs (Continued) (§ 60.1 To § 60.496) — Standards Of Performance For New Stationary Sources (§ 60.1 To § 60.496) — General Provisions (§ 60.1 To § 60.19) — Determination of construction or modification.

4 Aug 2016

(a) When requested to do so by an owner or operator, the Administrator will make a determination of whether action taken or intended to be taken by such owner or operator constitutes construction (including reconstruction) or modification or the commencement thereof within the meaning of this part.

(b) The Administrator will respond to any request for a determination under paragraph (a) of this section within 30 days of receipt of such request.

40 CFR 60.5
[40 FR 58418, Dec. 16, 1975]