Login

40 CFR 63.1181 : Protection Of Environment (§ 1.1 To Parts 1851-1899) — (§ 63.600 To Appendix A To Subpart Ddd Of Part 63) — Environmental Protection Agency (Continued) (§ 63.600 To Appendix A To Subpart Ddd Of Part 63) — Air Programs (Continued) (§ 63.600 To Appendix A To Subpart Ddd Of Part 63) — National Emission Standards For Hazardous Air Pollutants For Source Categories (Continued) (§ 63.600 To Appendix A To Subpart Ddd Of Part 63) — National Emission Standards For Hazardous Air Pollutants For Mineral Wool Production (§ 63.1175 To Appendix A To Subpart Ddd Of Part 63) — Compliance With Standards (§ 63.1181 To § 63.1183) — How do I comply with the particulate matter standards for existing, new, and reconstructed cupolas?

4 Aug 2016

To comply with the PM standards, you must meet all of the following:

(a) Install, adjust, maintain, and continuously operate a bag leak detection system for each fabric filter.

(b) Do a performance test as specified in § 63.1188 of this subpart and show compliance with the PM emission limits while the bag leak detection system is installed, operational, and properly adjusted.

(c) Begin corrective actions specified in your operations, maintenance, and monitoring plan required by § 63.1187 of this subpart within one hour after the alarm on a bag leak detection system sounds. Complete the corrective actions in a timely manner.

(d) Develop and implement a written QIP consistent with compliance assurance monitoring requirements of 40 CFR 64.8(b) through (d) when the alarm on a bag leak detection system sounds for more than five percent of the total operating time in a six-month reporting period.

40 CFR 63.1181