Login

40 CFR 52.50 : Protection Of Environment (§ 1.1 To Parts 1851-1899) — (§ 52.01 To §§ 52.1000-52.1018) — Environmental Protection Agency (Continued) (§ 52.01 To §§ 52.1000-52.1018) — Air Programs (Continued) (§ 52.01 To §§ 52.1000-52.1018) — Approval And Promulgation Of Implementation Plans (§ 52.01 To §§ 52.1000-52.1018) — Alabama (§ 52.50 To § 52.69) — Identification of plan.

4 Aug 2016
Link to an amendment published at 81 FR 49901, July 29, 2016.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for Alabama under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 1, 2008, for Alabama was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 1, 2008, for Alabama will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street, SW., Atlanta, GA 30303 the Air and Radiation Docket and Information Center, EPA Headquarters Library, Infoterra Room (Room Number 3334), EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742. For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA Approved Alabama Regulations.

EPA Approved Alabama Regulations

State citation Title/subject State effective date EPA approval date Explanation
Chapter No. 335-3-1 General Provision
Section 335-3-1-.01 Purpose 6/22/89 3/19/90; 55 FR 10062
Section 335-3-1-.02 Definitions 9/24/13 6/10/14; 79 FR 33116
Section 335-3-1-.03 Ambient Air Quality Standards 10/13/98 3/01/99; 64 FR 9918
Section 335-3-1-.04 Monitoring, Records, and Reporting 10/15/96 6/06/97; 62 FR 30991
Section 335-3-1-.05 Sampling and Test Methods 6/22/89 3/19/90; 55 FR 10062
Section 335-3-1-.06 Compliance Schedule 10/15/96 6/06/97; 62 FR 30991
Section 335-3-1-.07 Maintenance and Malfunctioning of Equipment; Reporting 10/15/89 3/19/90; 55 FR 10062
Section 335-3-1-.08 Prohibition of Air Pollution 8/10/00 12/8/00; 65 FR 76940
Section 335-3-1-.09 Variances 10/15/96 6/6/97; 62 FR 30991
Section 335-3-1-.10 Circumvention 6/22/89 3/19/90; 55 FR 10062
Section 335-3-1-.11 Severability 10/15/96 6/6/97; 62 FR 30991
Section 335-3-1-.12 Bubble Provision 6/22/89 3/19/90; 55 FR 10062
Section 335-3-1-.13 Credible Evidence 4/13/99 11/3/99; 64 FR 59633
Section 335-3-1-.14 Emissions Reporting Requirements Relating to Budgets for NOX Emissions 4/6/01 7/16/01; 66 FR 36921
Section 335-3-1-.15 Emissions Inventory Reporting Requirements 4/3/03 4/24/03; 68 FR 20077
Chapter No. 335-3-2 Air Pollution Emergency
Section 335-3-2-.01 Air Pollution Emergency 6/22/89 3/19/90; 55 FR 10062
Section 335-3-2-.02 Episode Criteria 8/10/00 12/8/00; 65 FR 76940
Section 335-3-2-.03 Special Episode Criteria 6/22/89 3/19/90; 55 FR 10062
Section 335-3-2-.04 Emission Reduction Plans 6/22/89 3/19/90; 55 FR 10062
Section 335-3-2-.05 Two Contaminant Episode 6/22/89 3/19/90; 55 FR 10062
Section 335-3-2-.06 General Episodes 6/22/89 3/19/90; 55 FR 10062
Section 335-3-2-.07 Local Episodes 6/22/89 3/19/90; 55 FR 10062
Section 335-3-2-.08 Other Sources 10/15/96 6/6/97; 62 FR 30991
Section 335-3-2-.09 Other Authority Not Affected 6/22/89 3/19/90; 55 FR 10062
Chapter No. 335-3-3 Control of Open Burning and Incineration
Section 335-3-3-.01 Open Burning 4/4/06 6/22/06; 71 FR 35801
Section 335-3-3-.02 Incinerators 6/22/89 3/19/90; 55 FR 10062
Section 335-3-3-.03 Incineration of Wood, Peanut, and Cotton Ginning Waste 8/10/00 12/8/00; 65 FR 76940
Chapter No. 335-3-4 Control of Particulate Emissions
Section 335-3-4-.01 Visible Emissions 10/15/96 4/6/2011; 76 FR 18870
Section 335-3-4-.02 Fugitive Dust and Fugitive Emissions 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.03 Fuel Burning Equipment 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.04 Process Industries - General 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.05 Small Foundry Cupola 6/22/89 3/19/90; 55 FR 10062
Section 335-3-4-.06 Cotton Gins 6/22/89 3/19/90; 55 FR 10062
Section 335-3-4-.07 Kraft Pulp Mills 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.08 Wood Waste Boilers 8/10/00 12/8/00; 65 FR 76940
Section 335-3-4-.09 Coke Ovens 8/10/00 12/8/00; 65 FR 76940
Section 335-3-4-.10 Primary Aluminum Plants 6/22/89 3/19/90; 55 FR 10062
Section 335-3-4-.11 Cement Plants 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.12 Xylene Oxidation Process 6/22/89 3/19/90; 55 FR 10062
Section 335-3-4-.13 Sintering Plants 6/22/89 3/19/90; 55 FR 10062
Section 335-3-4-.14 Grain Elevators 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.15 Secondary Lead Smelters 10/15/96 6/6/97; 62 FR 30991
Section 335-3-4-.16 Reserved
Section 335-3-4-.17 Steel Mills Located in Etowah County 10/15/96 6/6/97; 62 FR 30991
Chapter No. 335-3-5 Control of Sulfur Compound Emissions
Section 335-3-5-.01 Fuel Combustions 10/15/96 6/6/97; 62 FR 30991
Section 335-3-5-.02 Sulfuric Acid Plants 10/15/96 6/6/97; 62 FR 30991
Section 335-3-5-.03 Petroleum Production 8/10/00 12/8/00; 65 FR 76940
Section 335-3-5-.04 Kraft Pulp Mills 8/10/00 12/8/00; 65 FR 76940
Section 335-3-5-.05 Process Industries - General 6/22/89 3/19/90; 55 FR 10062
Section 335-3-5-.06 State Clean Air Interstate Rule (CAIR) SO2 Trading Program General Provisions 4/3/07 10/1/07; 72 FR 55659
Section 335-3-5-.07 CAIR Designated Representative for CAIR SO2 Sources 4/3/07 10/1/07; 72 FR 55659
Section 335-3-5-.08 Permits 04/3/07 10/1/07; 72 FR 55659
Section 335-3-5-.11 CAIR SO2 Allowance Tracking System 04/3/07 10/1/07; 72 FR 55659
Section 335-3-5-.12 CAIR SO2 Allowance Transfers 4/3/07 10/1/07; 72 FR 55659
Section 335-3-5-.13 Monitoring and Reporting 4/3/07 10/1/07; 72 FR 55659
Section 335-3-5-.14 CAIR SO2 Opt-in Units 4/3/07 10/1/07; 72 FR 55659
Chapter No. 335-3-6 Control of Organic Emissions
Section 335-3-6-.01 Applicability 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.02 VOC Water Separation 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.03 Loading and Storage of VOC 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.04 Fixed-Roof Petroleum Liquid Storage Vessels 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.05 Bulk Gasoline Plants 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.06 Bulk Gasoline Terminals 8/10/00 12/8/00; 65 FR 76940
Section 335-3-6-.07 Gasoline Dispensing Facilities - Stage I 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.08 Petroleum Refinery Sources 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.09 Pumps and Compressors 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.10 Ethylene Producing Plants 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.11 Surface Coating 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.12 Solvent Metal Cleaning 10/15/96 06/6/97; 62 FR 30991
Section 335-3-6-.13 Cutback Asphalt 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.14 Petition for Alternative Controls 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.15 Compliance Schedules 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.16 Test Methods and Procedures 8/10/00 12/8/00; 65 FR 76940
Section 335-3-6-.17 Manufacture of Pneumatic Tires 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.18 Manufacture of Synthesized Pharmaceutical Products 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.19 Reserved
Section 335-3-6-.20 Leaks from Gasoline Tank Trucks and Vapor Collection Systems 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.21 Leaks from Petroleum Refinery Equipment 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.22 Graphic Arts 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.23 Petroleum Liquid Storage in External Floating Roof Tanks 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.24 Applicability 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.25 VOC Water Separation 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.26 Loading and Storage of VOC 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.27 Fixed-Roof Petroleum Liquid Storage Vessels 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.28 Bulk Gasoline Plants 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.29 Gasoline Terminals 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.30 Gasoline Dispensing Facilities Stage 1 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.31 Petroleum Refinery Sources 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.32 Surface Coating 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.33 Solvent Metal Cleaning 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.34 Cutback Asphalt 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.35 Petition for Alternative Controls 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.36 Compliances Schedules 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.37 Test Methods and Procedures 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.38 Manufacture of Pneumatic Tires 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.39 Manufacture of Synthesized Pharmaceutical Products 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.40 Reserved
Section 335-3-6-.41 Leaks from Gasoline Tank Trucks and Vapor Collection Systems 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.42 Leaks from Petroleum Refinery Equipment 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.43 Graphic Arts 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.44 Petroleum Liquid Storage in External Floating Roof Tanks 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.45 Large Petroleum Dry Cleaners 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.46 Aerospace Assembly and Component and Component Coatings Operation 6/22/89 6/6/97; 62 FR 30991
Section 335-3-6-.47 Leaks from Coke by-Product Recovery Plant Equipment 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.48 Emissions from Coke by-Product Recovery Plant Coke Oven Gas Bleeder 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.49 Manufacture of Laminated Countertops 6/22/89 3/19/90; 55 FR 10062
Section 335-3-6-.50 Paint Manufacture 10/15/96 6/6/97; 62 FR 30991
Section 335-3-6-.53 List of EPA Approved and Equivalent Test Methods and Procedures for the Purpose of Determining VOC Emissions 6/26/91 9/27/91; 58 FR 50262
Chapter No. 335-3-7 Carbon Monoxide Emissions
Section 335-3-7-.01 Metals Productions 6/22/89 3/19/90; 55 FR 10062
Section 335-3-7-.02 Petroleum Processes 6/22/89 3/19/90; 55 FR 10062
Chapter No. 335-3-8 Nitrogen Oxides Emissions
Section 335-3-8-.01 Standards for Portland Cement Kilns 4/6/01 7/17/01; 66 FR 36921
Section 335-3-8-.02 Nitric Acid Manufacturing 10/15/96 6/6/97; 62 FR 30991
Section 335-3-8-.03 NOX Emissions from Electric Utility Generating Units 10/24/00 11/7/01; 66 FR 56223
Section 335-3-8-.04 Standards for Stationary Reciprocating Internal Combustion Engines (Reserved) 3/22/05 12/28/05; 70 FR 76694
Section 335-3-8-.05 NOX Budget Trading Program 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.06 Authorized Account Representative for NOX Budget Sources 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.07 Permits 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.08 Compliance Certification 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.09 NOX Allowance Allocations 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.10 NOX Allowance Tracking System 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.11 NOX Allowance Transfers 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.12 Monitoring and Reporting 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.13 Individual Unit Opt-ins 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.14 New Combustion Sources 4/6/01 7/16/01; 66 FR 36921
Section 335-3-8-.16 CAIR NOX Annual Budget Trading Program 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.17 CAIR Designated Representative for CAIR NOX Sources 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.18 CAIR Permits 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.20 CAIR NOX Allowance Allocations 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.21 CAIR NOX Allowance Tracking System 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.23 CAIR Monitoring and Reporting 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.24 CAIR NOX Opt-in Units 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.25 CAIR NOX Ozone Season Trading Program 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.26 CAIR Designated Representative for CAIR NOX Ozone Season Sources 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.27 CAIR NOX Ozone Season Permits 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.29 CAIR NOX Ozone Season Allowance Allocations 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.30 CAIR NOX Ozone Season Allowance Tracking System 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.32 CAIR NOX Ozone Season Monitoring and Reporting 4/3/07 10/1/07; 72 FR 55659
Section 335-3-8-.33 CAIR NOX Ozone Season Opt-in Units 4/3/07 10/1/07; 72 FR 55659
Chapter No. 335-3-9 Control of Emissions from Motor Vehicles
Section 335-3-9-.01 Visible Emission Restriction for Motor Vehicles 10/15/96 6/6/97; 62 FR 30991
Section 335-3-9-.02 Ignition System and Engine Speed 8/10/00 12/8/00; 65 FR 76940
Section 335-3-9-.03 Crankcase Ventilation Systems 8/10/00 12/8/00; 65 FR 76940
Section 335-3-9-.04 Exhaust Emission Control Systems 6/22/89 3/19/90; 55 FR 10062
Section 335-3-9-.05 Evaporative Loss Control Systems 6/22/89 3/19/90; 55 FR 10062
Section 335-3-9-.06 Other Prohibited Acts 8/10/00 12/8/00; 65 FR 76940
Section 335-3-9-.07 Effective Date 10/15/96 6/6/97; 62 FR 30991
Chapter No. 335-3-12 Continuous Monitoring Requirements for Existing Sources
Section 335-3-12-.01 General 6/22/89 3/19/90; 55 FR 10062
Section 335-3-12-.02 Emission Monitoring and Reporting Requirements 2/17/98 9/14/98; 63 FR 49005
Section 335-3-12-.03 Monitoring System Malfunction 6/22/89 3/19/90; 55 FR 10062
Section 335-3-12-.04 Alternate Monitoring and Reporting Requirements 6/22/89 3/19/90; 55 FR 10062
Section 335-3-12-.05 Exemptions and Extensions 6/22/89 3/19/90; 55 FR 10062
Chapter No. 335-3-13 Control of Fluoride Emissions
Section 335-3-13-.01 General 10/15/96 6/6/97; 62 FR 30991
Section 335-3-13-.02 Superphosphoric Acid Plants 10/15/96 06/6/97; 62 FR 30991
Section 335-3-13-.03 Diammonium Phosphate Plants 10/15/96 6/6/97; 62 FR 30991
Section 335-3-13-.04 Triple Superphosphoric Plants 10/15/96 6/6/97; 62 FR 30991
Section 335-3-13-.05 Granular Triple Superphosphoric Storage Facilities 10/15/96 6/6/97; 62 FR 30991
Section 335-3-13-.06 Wet Process Phosphoric Acid Plants 10/15/96 6/6/97; 62 FR 30991
Chapter No. 335-3-14 Air Permits
Section 335-3-14-.01 General Provisions 2/17/98 9/14/98; 63 FR 49008
Section 335-3-14-.02 Permit Procedures 10/15/96 6/6/97; 62 FR 30991
Section 335-3-14-.03 Standards for Granting Permits 5/23/11 9-26-12; 77 FR 59100.
Section 335-3-14-.04 Air Permits Authorizing Construction in Clean Air Areas [:prevention of Significant Deterioration (PSD)] 5/23/11 9-26-12; 77 FR 59100. As of Sept. 26, 2012 Section 335-3-14-.04 does not include Alabama's revision to adopt the PM2.5 SILs threshold and provisions (as promulgated in the October 20, 2010 PM2.5 PSD Increment-SILs-SMC Rule at 40 CFR 1.166(k)(2) and the term “particulate matter emissions” (as promulgated in the May 16, 2008 NSR PM2.5 Rule (at 40 CFR 51.166(b)(49)(vi)).
Section 335-3-14-.05 Air Permits Authorizing Construction in or Near Nonattainment Areas 5/23/2011 1/11/2016; 81 FR 1124 With the exception of: The portion of 335-3-14-.05(1)(k) stating “excluding ethanol production facilities that produce ethanol by natural fermentation”; and 335-3-14-.05(2)(c)3 (addressing fugitive emission increases and decreases). Also with the exception of the state-withdrawn elements: 335-3-14-.05(1)(h) (the actual-to-potential test for projects that only involve existing emissions units); the last sentence at 335-3-14-.05(3)(g), stating “Interpollutant offsets shall be determined based upon the following ratios”; and the NNSR interpollutant ratios at 335-3-14-.05(3)(g)1-4.
Chapter No. 335-3-15 Synthetic Minor Operating Permits
Section 335-3-15-.01 Definitions 10/15/96 6/6/97; 62 FR 30991
Section 335-3-15-.02 General Provisions 8/10/00 12/8/00; 65 FR 76940
Section 335-3-15-.03 Applicability 11/23/93 10/20/94; 59 FR 52916
Section 335-3-15-.04 Synthetic Minor Operating Permit Requirements 10/15/96 6/6/97; 62 FR 30991
Section 335-3-15-.05 Public Participation 10/15/96 6/6/97; 62 FR 30991
Chapter No. 335-3-17 Conformity of Federal Actions to State Implementation Plans
Section 335-3-17.01 Transportation Conformity 5/23/11 9-26-12; 77 FR 59100.
Section 335-3-17-.02 General Conformity 5/23/11 9-26-12; 77 FR 59100.
Chapter No. 335-3-20 Reserved
Section 335-3-20-.01 Reserved 4/3/12 4/20/12; 77 FR 23619.
Section 335-3-20-.02 Reserved 4/3/12 4/20/12; 77 FR 23619.
Section 335-3-20-.03 Reserved 4/3/12 4/20/12; 77 FR 23619.

(d) EPA approved Alabama source specific requirements.

EPA Approved Alabama Source-Specific Requirements

Name of source Permit No. State effective date EPA approval date Explanation
Lafarge Cement Kiln AB70004_1_01 2/6/2008 7/30/2009; 74 FR 37945 Certain provisions of the permit.
Lehigh Cement Kiln 4-07-0290-03 2/6/2008 7/30/2009; 74 FR 37945 Certain provisions of the permit.

(e) EPA Approved Alabama Non-Regulatory Provisions.

EPA Approved Alabama Non-Regulatory Provisions

Name of nonregulatory SIP provision Applicable geographic or nonattainment area State submittal date/effective date EPA approval date Explanation
Attainment Plan for the Alabama Portion of the Chattanooga 1997 Annual PM2.5 Nonattainment Area A portion of Jackson County, Alabama 10/07/09 10/05/12; 77 FR 60904
Birmingham 1990 Baseline Emissions Inventory Birmingham Ozone Nonattainment Area 11/13/92 6/4/99; 64 FR 29961
Alabama Interagency Transportation Conformity Memorandum of Agreement 1/20/00 5/11/00; 65 FR 30362
Alabama Fuel Waiver Request - Appendix II of Attainment Demonstration of the 1-hour NAAQS for Ozone for the Birmingham Nonattainment Area Birmingham Ozone Nonattainment Area 12/1/00 11/7/01; 66 FR 56220
Attainment Demonstration of the 1-hour NAAQS for Ozone for the Birmingham Nonattainment Area Birmingham Ozone Nonattainment Area 12/1/00 11/7/01; 66 FR 56224
Maintenance Plan for the Birmingham area Jefferson County and Shelby County 1/30/04 3/12/04; 69 FR 11800
8-Hour Ozone Maintenance plan for the Birmingham area Jefferson County and Shelby County 1/26/06 5/12/06
Conformity SIP for Birmingham and Jackson County Jefferson County, Shelby County, Jackson County 12/12/08 3/26/09; 74 FR 13118
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards Alabama 12/10/07 7/13/11; 76 FR 41088 For the 1997 8-hour ozone NAAQS.
Chattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory Jackson County 7/31/09 2/8/12; 77 FR 6467
Regional haze plan Statewide 7/15/08 6/28/12 77 FR 38515.
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/08 10/1/12; 77 FR 59755 With the exception of sections 110(a)(2)(D)(i) and 110(a)(2)(E)(ii).
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/09 10/1/12; 77 FR 59755 With the exception of sections 110(a)(2)(D)(i) and 110(a)(2)(E)(ii).
1997 Annual PM2.5 Maintenance Plan for the Birmingham Area Birmingham PM2.5 Nonattainment Area 5/2/11 1/22/13, 78 FR 4341
2006 24-hour PM2.5 Maintenance Plan for the Birmingham Area Birmingham PM2.5 Nonattainment Area 6/17/10 1/25/13, 78 FR 5306
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/08 4/12/13, 78 FR 21841 Addressing element 110(a)(2)(D)(i)(II) prong 3 only
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/09 4/12/13, 78 FR 21841 Addressing element 110(a)(2)(D)(i)(II) prong 3 only
2008 Lead Attainment Demonstration for Troy Area Troy Area 11/9/12 1/28/14, 79 FR 4407
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Alabama 7/25/2008 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only.
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Alabama 9/23/2009 5/7/2014, 79 FR 26143 Addressing prong 4 of section 110(a)(2)(D)(i) only.
1997 Annual PM2.5 Maintenance Plan for the Alabama portion of the Chattanooga TN-GA-AL Area Portion of Jackson County in the Chattanooga TN-GA-AL Area 04/23/13 12/22/14, 79 FR 76235
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Alabama 11/4/2011 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Alabama 8/20/2012 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Alabama 4/23/2013 3/18/2015, 80 FR 14019 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
Non-interference Demonstration for Federal Low-Reid Vapor Pressure Requirement for the Birmingham Area Jefferson and Shelby Counties 11/14/2014 4/17/2015, 80 FR 21170
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards 7/17/2012 4/2/2015 80 FR 17689 With the exception of PSD permitting requirements for major sources of sections 110(a)(2)(C) and (J); interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II), 110(a)(2)(E)(ii), and the visibility requirements of section 110(a)(2)(J).
Cross State Air Pollution Rule - State-Determined Allowance Allocations for the 2016 control periods Alabama 3/27/2014 9/22/2015
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Alabama 8/20/2012 8/12/2015, 80 FR 48258 Addressing the visibility requirements of 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards Alabama 11/4/2011 10/9/2015, 80 FR 61111 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), 110(a)(2)(J); and section 110(a)(2)(E)(ii).

Editorial Note:

For Federal Register citations affecting § 52.50, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.

40 CFR 52.50
[63 FR 70672, Dec. 22, 1998]