COOK v. SULLIVAN
Cook et al. v. Sullivan et al., No. 2002-080 (N.H. Supreme Court, Aug. 22, 2003)
Factual and Procedural Background
The plaintiffs (Janice J. Cook and others) have owned property on Lake Winnipesaukee since 1946. In 1996 the defendants (John and Diane Sullivan) purchased an adjoining parcel, placed a three-bedroom modular house on the lot, and used substantial fill in the construction area. Beginning in 1997 the plaintiffs experienced substantially increased wetness on their property (including standing water in the garage and under a chalet) that they attributed to the defendants' filling and regrading of jurisdictional wetlands and construction activities. The plaintiffs filed a petition for injunctive relief in July 2000 alleging common law nuisance, water diversion, trespass, and negligence per se under RSA chapter 482-A, and also filed a complaint with the New Hampshire Department of Environmental Services Wetlands Bureau (wetlands bureau).
The wetlands bureau investigated the complaint and approved a remediation plan requiring the defendants to remove some fill; the plaintiffs were not permitted on the defendants' property during that investigation and were not part of the remedial negotiations and later sought reconsideration, which was denied. Prior to trial the defendants moved in limine asserting res judicata and collateral estoppel and later sought to introduce the entire wetlands bureau file; the trial court denied both requests. The superior court (T. Nadeau, J.) found that the defendants' construction created a private nuisance and ordered removal of fill and foundation from jurisdictional wetlands, necessitating moving the house. The trial court referenced (and later marked for identification) a chart used at trial. The defendants appealed; the Supreme Court affirmed.
Legal Issues Presented
- Whether the plaintiffs' claims are barred by res judicata because of the wetlands bureau's prior investigation and remediation plan.
- Whether collateral estoppel precludes the plaintiffs from litigating the nuisance and related claims in superior court.
- Whether the trial court erred by excluding the entire wetlands bureau file at trial.
- Whether the trial court erred in referring to a chart not admitted into evidence to describe jurisdictional wetlands.
- Whether there was sufficient evidence to support the trial court's finding of a private nuisance caused by the defendants' activities.
- Whether the trial court abused its discretion in fashioning the remedy (removal of fill and foundation and moving the defendants' house).
Arguments of the Parties
Defendants' Arguments
- The plaintiffs are precluded from litigating whether the defendants violated RSA chapter 482-A or seeking a remedy different from the wetlands bureau remediation plan under res judicata and collateral estoppel.
- The issue whether the defendants violated RSA chapter 482-A is moot (an argument not raised below and thus not preserved on appeal).
- The trial court erred by refusing to admit the entire wetlands bureau file into evidence at trial; the file would support their res judicata and collateral estoppel defenses.
- The trial court erred by relying on a chart that was not in evidence to locate jurisdictional wetlands on the defendants' property.
- The evidence was insufficient to support a finding of nuisance, and the court erred in ordering the severe remedy of removing the house rather than a lesser remedy.
Plaintiffs' Positions (as reflected in the opinion)
- The defendants' filling and regrading of jurisdictional wetlands and construction caused appreciable and tangible harm to the plaintiffs' property (increased standing water and interference with use), constituting a private nuisance.
- The wetlands bureau's remediation plan did not remedy the damage to the plaintiffs' property; plaintiffs were not included in those proceedings and thus retained the right to pursue superior court claims and remedies.
- The appropriate remedy to fully abate the nuisance is removal of the fill and foundation from the jurisdictional wetlands, which would require moving the defendants' house.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Eastern Marine Const. Corp. v. First Southern Leasing, 129 N.H. 270 (1987) | Explains the policies behind res judicata and collateral estoppel (judicial economy, finality). | Quoted for the general purpose of preclusion doctrines as background for analyzing res judicata/collateral estoppel claims. |
| West Gate Village Assoc. v. Dubois, 145 N.H. 293 (2000) | States that a final judgment by a court of competent jurisdiction is conclusive upon the parties in a subsequent litigation involving the same cause of action (res judicata). | Cited to define res judicata; the court then analyzed whether an administrative decision met requirements to preclude later litigation. |
| Hallisey v. DECA Corp., 140 N.H. 443 (1995) | Whether a claim is barred by res judicata is determined on a case-by-case basis. | Used to frame that res judicata application requires case-specific analysis of the administrative proceedings here. |
| Meserve v. State, 119 N.H. 149 (1979) | Res judicata may be applicable to some administrative proceedings. | Cited to show that administrative determinations can, in some circumstances, have preclusive effect, prompting the court to examine whether the wetlands bureau acted in a judicial capacity. |
| Morin v. J.H. Valliere Co., 113 N.H. 431 (1973) | Res judicata applied to administrative decisions rendered in a judicial capacity resolving disputed issues properly before it where parties had opportunity to litigate. | Compared the wetlands bureau's function here to truly adjudicative administrative proceedings and supported the conclusion that res judicata did not apply because essential adjudicative elements were lacking. |
| Gray v. Seidel, 143 N.H. 327 (1999) | Authority of wetlands board to regulate does not include power to determine relative rights of property owners. | Used to support the point that the wetlands bureau's focus was regulatory enforcement (not adjudicating private rights), undermining the preclusive effect of its proceedings on plaintiffs' private claims. |
| Gephart v. Daigneault, 137 N.H. 166 (1993) | Sets out collateral estoppel elements and emphasizes requirement of a full and fair prior opportunity to litigate. | Provided the governing test for collateral estoppel; the court applied these elements and found them unmet here. |
| Daigle (cited as Daigle, 129 N.H. at 571) | Describes privity as virtual representation or substantial identity and circumstances when privity exists (control, authorization). | Used to determine that plaintiffs were not in privity with the wetlands bureau because they neither controlled nor authorized the bureau's actions, so collateral estoppel did not bar their claims. |
| McKenzie v. City of Berlin, 145 N.H. 467 (2000) | An argument not raised below is not preserved for appellate review. | Applied to reject the defendants' assertion that the RSA 482-A issue was moot because that argument was not raised at trial. |
| Petition of Haines, 148 N.H. 380 (2002) | Addresses harmless error—whether a trial court's evidentiary ruling was clearly untenable or unreasonable to the party's prejudice. | Relied upon in concluding that, even if admitting the entire wetlands bureau file was error, it was not prejudicial and thus not reversible error. |
| Patch v. Arsenault, 139 N.H. 313 (1995) | Refers to nonprejudicial use of evidence not properly entered—reliance on descriptive items that are cumulative may not be reversible error. | Applied to hold that the trial court's reference to a chart not formally admitted did not prejudice the defendants because the chart was cumulative of other testimony and the court's view. |
| In the Matter of Levreault and Levreault, 147 N.H. 656 (2002) | Standard that appellate court will uphold trial court's findings unless they lack evidential support or are legally erroneous. | Framed the standard of review for the sufficiency of the evidence supporting the nuisance finding. |
| Tennessee Gas Pipeline Co. v. Town of Hudson, 145 N.H. 598 (2000) | Trial court has province to accept or reject evidence, including expert testimony. | Supported deference to the trial court's resolution of conflicting expert testimony in finding a nuisance. |
| Hawthorne Trust v. Maine Savings Bank, 136 N.H. 533 (1992) | Standard of review: whether a reasonable person could have reached the same decision based on the evidence. | Used to emphasize appellate deference to the trial court's factual determinations. |
| McCabe v. Arcidy, 138 N.H. 20 (1993) | Deference to trial court on resolving conflicts in testimony and credibility. | Supported the court's reliance on the trial court's credibility determinations regarding experts and witnesses. |
| Dunlop v. Daigle, 122 N.H. 295 (1982) | Defines private nuisance as substantial and unreasonable interference with use and enjoyment of property. | Provided the substantive definition applied by the court to hold the defendants' construction constituted a private nuisance. |
| Treisman v. Kamen, 126 N.H. 372 (1985) | Court must balance gravity of plaintiff's harm against utility of defendant's conduct when deciding nuisance and injunctive relief. | Used as the balancing test framework for both liability and the appropriateness of injunctive relief. |
| Robie v. Lillis, 112 N.H. 492 (1972) | When evaluating injunctive relief, the balance must weigh more heavily in plaintiff's favor due to the extraordinary nature of injunctive relief. | Applied to the remedial inquiry, supporting a stricter standard for granting the extraordinary remedy ordered. |
| Geiss v. Bourassa, 140 N.H. 629 (1996) | Propriety of equitable relief rests in trial court's sound discretion. | Supported deference to the trial court's choice of remedy unless it was an unsustainable exercise of discretion. |
| State v. Lambert, 147 N.H. 295 (2001) | Explains the unsustainable exercise of discretion standard. | Used in assessing whether the trial court abused its discretion in ordering removal of fill and the house. |
| Urie v. Franconia Paper Co., 107 N.H. 131 (1966) | Removal of a structure is justified when there is no other way to abate a private nuisance. | Applied to support the remedy ordering removal of fill and foundation and moving the defendants' house where no other remedy would ensure full abatement. |
Court's Reasoning and Analysis
The court proceeded through the defendants' contentions sequentially and grounded its analysis in established preclusion and nuisance law:
- Res judicata: The court recognized that res judicata can apply to administrative decisions in some circumstances but only when the administrative officer or board acted in a judicial capacity and the proceeding entailed essential elements of adjudication. The wetlands bureau's investigation here was regulatory and enforcement-focused (ensuring compliance with RSA chapter 482-A), not an adjudicative proceeding resolving private parties' rights. The plaintiffs were not parties to the wetlands enforcement action, did not participate in negotiations, and were not given an opportunity to present evidence of their damages to the bureau. Thus the bureau's actions did not operate as a final adjudication binding the plaintiffs under res judicata.
- Collateral estoppel: The court applied the three-element test (identity of issue, final resolution on the merits, and party/privity in the earlier action), emphasizing the underlying requirement of a full and fair opportunity to litigate. It analyzed privity as "virtual representation" or substantial identity; privity requires, at minimum, that the non-party's interests were actually represented, for example by control or authorization. Because the plaintiffs neither controlled nor authorized the wetlands bureau proceedings and lacked a full and fair prior opportunity to litigate, collateral estoppel did not bar their superior-court claims.
- Preservation/Mootness: The defendants' assertion that the RSA 482-A issue was moot was not raised below; the court therefore declined to consider it on appeal as not preserved.
- Evidentiary rulings — wetlands bureau file: The trial court allowed parts of the wetlands file to be marked for identification and admitted certain exhibits and testimony from the file, but declined to admit the entire file. Given that (a) portions were admitted and (b) material from the file was presented through witness testimony, and (c) the court rejected the preclusion defenses that the file would support, any error in excluding the whole file was harmless and not prejudicial to the defendants.
- Evidentiary rulings — chart: The trial court referenced a chart used at trial but not formally admitted. The appellate court concluded reliance on that chart was not reversible error because the chart was descriptive and cumulative of lay and expert testimony and the court's view of the property; defendants suffered no prejudice.
- Sufficiency of evidence for nuisance: The court reviewed the record under the applicable deferential standards. Witness testimony established that portions of the defendants' lot were swampy pre-construction and that the defendants' activities altered elevations and subsurface flows, increasing wetness on plaintiffs' property. Plaintiffs' expert (Randall Shuey) conducted testing and opined that defendants' activities interfered with jurisdictional wetlands and diverted subsurface water to plaintiffs' land. The trial court was entitled to credit Shuey's testing and weigh the differing expert testimony; Bollinger (defendants' expert) had not conducted soil testing to detect wetlands. Plaintiffs provided testimony of repeated, seasonally recurring wetness and concrete examples of interference with use. Under the preponderance standard and deference to trial-court factfinding, the evidence supported the nuisance finding.
- Appropriateness of remedy: Applying the balancing test (gravity of harm vs. utility of defendant's conduct) with the heightened consideration required for injunctive relief, the court evaluated the remedy proposed by plaintiffs (removal of fill/foundation and moving the house) against less intrusive measures offered by defendants (limited fill removal and a discharge ditch). The plaintiffs' expert testified only removal of the house and fill out of the jurisdictional area would guarantee full abatement; defendants offered no expert showing their proposed remedy would restore plaintiffs' property. The trial court considered hardships to both parties (including an on-site view before and after testimony) and concluded the extraordinary remedy was warranted because no other remedy assured full abatement. The appellate court found this within the trial court's sound discretion and supported by the evidence.
Holding and Implications
Holding: The Supreme Court of New Hampshire affirmed the superior court's decision. Affirmed.
Direct effect on the parties: The superior court's finding that the defendants' construction activities constituted a private nuisance was upheld, as was the remedy requiring removal of the fill and foundation from the jurisdictional wetlands — a remedy that necessitates moving the defendants' house. The defendants' arguments that the plaintiffs were precluded by res judicata or collateral estoppel, that admission of the wetlands bureau file was required, that the trial court's reference to a non-admitted chart was reversible error, and that the evidence was insufficient or the remedy an abuse of discretion were all rejected.
Broader implications: The opinion applies existing New Hampshire law on administrative preclusion doctrines, collateral estoppel/privity, evidentiary harmless-error principles, the elements of private nuisance, and the standards for injunctive relief. The opinion does not articulate or announce a novel rule of statewide precedent beyond application of those existing principles to the facts at hand.
Disposition: Judgment of the superior court affirmed.
1. Judgments — Res Judicata — Applicability of Doctrine
In order for res judicata to apply to an administrative decision, the officer or board must have been acting in a judicial capacity.
2. Judgments — Res Judicata — Particular CasesBecause the wetlands bureau was not acting in a judicial capacity when it investigated plaintiff's complaint against defendants for creating a nuisance on plaintiffs' property by filling and regrading jurisdictional wetlands and constructing a home on their property, and because plaintiffs were not parties to the underlying enforcement action, plaintiffs were not barred from bringing their claims under the doctrine of res judicata.
3. Judgments — Collateral Estoppel — Particular CasesPlaintiffs were not collaterally estopped from proceeding in superior court with their claims against defendants for creating a nuisance on their property where, because they neither controlled the underlying wetlands bureau enforcement action nor authorized the wetlands bureau to act on their behalf, their interests were not adequately represented for purposes of privity, and, in addition, they were not afforded a full and fair prior opportunity to litigate the issues and facts in question.
4. Evidence — Generally — Harmless ErrorIn an action by plaintiffs against defendants for creating a nuisance on their property, where the wetlands bureau had investigated the complaint and eventually approved a remediation plan, even assuming that the trial court erred in failing to admit the entire wetlands bureau file at trial, such decision was not clearly untenable or unreasonable to the prejudice of their case.
5. Evidence — Generally — Harmless ErrorIn an action by plaintiffs against defendants for creating a nuisance on their property, the trial court did not commit reversible error by referring to a chart that was not in evidence to describe the location of jurisdictional wetlands on defendants' property, because the chart referred to was used merely for descriptive purposes and was cumulative when considered in conjunction with the lay and expert testimony introduced at trial and the trial court's view of the property.
6. Nuisance — Types of Nuisances — Private Nuisance 7. Nuisance — Generally — Basis of Liability
To constitute a nuisance, defendants' activities must cause harm that exceeds the customary interferences with land that a land user suffers in an organized society, and be an appreciable and tangible interference with a property interest; in determining whether an act interfering with the use and enjoyment is so unreasonable and substantial as to amount to a nuisance and warrant an injunction, a court must balance the gravity of the harm to the plaintiff against the utility of defendant's conduct, both to himself and to the community.
8. Nuisance — Practice and Procedure — Burden of ProofIt is the plaintiffs' burden to prove the existence of a nuisance by a preponderance of the evidence.
9. Nuisance — Practice and Procedure — Sufficiency of EvidenceIn action by plaintiffs against defendants for creating a nuisance on plaintiffs' property by filling and regrading jurisdictional wetlands and constructing a home on their property, evidence supported the trial court's finding of nuisance based on testimony that large portions of the defendants' lot were swampy and had pools of standing water prior to construction and that plaintiffs' property was substantially wetter after the defendants built their house.
10. Nuisance — Scope of Remedy — GenerallyIn evaluating the appropriateness of injunctive relief, the court utilizes the same balancing test that is used to first identify whether a nuisance exists, although the scales must weigh more heavily in plaintiff's favor because of the extraordinary nature of this form of relief.
11. Nuisance — Scope of Remedy — GenerallyThe propriety of affording equitable relief in a particular case rests in the sound discretion of the trial court to be exercised according to the circumstances and exigencies of the case.
12. Nuisance — Scope of Remedy — Particular CasesIn action by plaintiffs against defendants for creating a nuisance on plaintiffs' property by filling and regrading jurisdictional wetlands and constructing a home on their property, the gravity of harm to plaintiffs resulting from defendants' nuisance was significant enough to support the trial court's remedy requiring removal of the fill and foundation from the jurisdictional wetlands, necessitating the moving of defendants' house.
DALIANIS, J.
The defendants, John and Diane Sullivan, appeal a decision of the Superior Court (T. Nadeau, J.) finding that they created a nuisance on the plaintiffs' property by filling and regrading jurisdictional wetlands and constructing a home on their property. We affirm.
Since 1946, the plaintiffs, Janice J. Cook, Vanessa Cook Jacobsohn, Cecil D. Driver, individually and as trustee of the John Cook Driver Trust, Carole Evans Sands, Susan Evans Burkley, Liane Evans Gigas, Melissa Evans Voteur, and Jonathan Richard Evans, have owned property on Lake Winnipesaukee in Moultonboro. Over the years, they have built various structures on the property, including a main house, a garage and a guest house/chalet. In 1996, the defendants purchased an abutting parcel of property.
At the time of the purchase, the defendants obtained a building plan for the construction of a septic system for a four-bedroom house, prepared by Charles Bollinger, a certified wetlands scientist. In late 1996, the defendants had a three-bedroom modular house placed on their property. Defendant John Sullivan testified that his modular house was primarily pre-built at a factory, then driven to the site and placed on the foundation with a crane. In the course of construction, the defendants used large quantities of fill in the area where they were building the house. In 1997, the plaintiffs began experiencing increased wetness, which they claim lasted for extended periods of time, on their property. Specifically, the plaintiffs claimed, among other things, that, since the construction, standing water accumulated in their garage and underneath the chalet, and that the water has interfered with their ability to use their property as they had in the past. They also claimed that this condition persisted each summer from 1997 to 2001. In 1998, however, the lake reached its highest level in one hundred years, which worsened the wetness on the plaintiffs' property.
In 1999, the plaintiffs complained to the defendants, who attempted to remedy the problem by removing some fill along the parties' common boundary line, digging a drainage ditch and moving a wall. The plaintiffs, however, claimed that the condition of their land did not change. They filed a petition for injunctive relief in July 2000 alleging: 1) common law nuisance; 2) water diversion; 3) trespass; and 4) negligence per se based upon a violation of RSA chapter 482-A. In addition, the plaintiffs filed a complaint with the New Hampshire Department of Environmental Services Wetlands Bureau (wetlands bureau).
The wetlands bureau investigated the complaint and eventually approved a remediation plan, which required the defendants to remove some of the fill placed on the property during construction. The plaintiffs were not allowed to go on the defendants' property during the investigation to observe and were not included in the remedial plan negotiations. According to the wetlands bureau, the defendants satisfactorily complied with the remediation plan. The plaintiffs maintained, however, that the defendants' actions did not remedy the water damage to their property and requested reconsideration of the wetlands bureau decision, which was denied. Prior to trial, the defendants filed a motion in limine arguing that the plaintiffs were precluded, under the doctrines of res judicata and collateral estoppel, from claiming that the defendants failed to comply with RSA chapter 482-A or that the defendants should be subject to a remedy different from that required by the wetlands bureau remediation plan.
The trial court denied the motion. The defendants subsequently sought to introduce the entire wetlands bureau file at trial, which the court also denied.
The trial court ruled that the defendants' construction activities constituted a nuisance that damaged the plaintiffs' property, and that the remedy was to remove the fill and foundation from the jurisdictional wetlands, which would necessarily require the defendants' house to be moved. In its order, the trial court referred to a chart prepared by the plaintiffs' expert and used during trial but not admitted into evidence, as illustrating the area where the defendants' house encroached upon jurisdictional wetlands. By way of clarification, the court subsequently allowed the chart to be marked for identification and incorporated into its order. The trial court denied the defendants' motion to reconsider and this appeal followed.
The defendants first argue that the plaintiffs should be barred, under the doctrines of res judicata and collateral estoppel, from litigating the issue of whether the defendants violated RSA chapter 482-A and what the appropriate remedy should be for such a violation.
"Spurred by considerations of judicial economy and a policy of certainty and finality in our legal system, the doctrines of res judicata and collateral estoppel have been established to avoid repetitive litigation so that at some point litigation over a particular controversy must come to an end." Eastern Marine Const. Corp. v. First Southern Leasing, 129 N.H. 270, 273 (1987) (quotation omitted). Under res judicata, a final judgment by a court of competent jurisdiction is conclusive upon the parties in a subsequent litigation involving the same cause of action. West Gate Village Assoc. v. Dubois, 145 N.H. 293, 296 (2000). Whether a claim is barred by res judicata is determined on a case-by-case basis. Hallisey v. DECA Corp., 140 N.H. 443, 445 (1995).
We have stated previously that the reasons underlying the doctrine of res judicata are fully applicable to some administrative proceedings.Meserve v. State, 119 N.H. 149, 154 (1979). Res judicata has been applied to a decision of an administrative agency, such as the labor commissioner or his deputy, which was rendered in a judicial capacity, resolved disputed issues properly before it and which the parties had an opportunity to litigate. Morin v. J.H. Valliere Co., 113 N.H. 431, 434 (1973). In order for res judicata to apply to an administrative decision, however, the officer or board must have been acting in a judicial capacity. See 46 Am. Jur.2d Judgments § 580 (1994); see also Restatement (Second) of Judgments § 83 (1982) (decision of administrative tribunal is conclusive under res judicata so long as proceeding resulting in determination entailed essential elements of adjudication).
A review of the record in this case reveals that the wetlands bureau was not acting in a judicial capacity when it investigated the plaintiffs' complaint. As the trial court correctly found, the plaintiffs did not actively participate in the proceedings before the wetlands bureau and were not included in the negotiations between the wetlands bureau and the defendants regarding the remediation plan. Thus, unlike a typical adjudicative proceeding, the plaintiffs were not afforded the opportunity to present evidence of their damages and could not rebut the defendants' remediation plan prior to its acceptance. The focus of the wetlands bureau was to investigate and enforce the wetlands regulations under RSA chapter 482-A to ensure compliance, not to protect the plaintiffs' rights. Cf. Gray v. Seidel, 143 N.H. 327, 330 (1999) (authority of wetlands board to regulate does not include the power to determine the relative rights of property owners).
Nor were the plaintiffs parties to the underlying enforcement action. In situations such as this, where the victim of a statutory wrong complains to the appropriate agency but is not given control over the enforcement proceeding, it is the agency rather than the victim that is the party to whom the rules of res judicata apply. See Restatement (Second) of Judgments § 83 comment c at 272. As a result, the plaintiffs were not barred from bringing their claims under the doctrine of res judicata.
Nor do we agree that the doctrine of collateral estoppel precludes the plaintiffs from litigating claims before the superior court.
[T]he doctrine of collateral estoppel bars a party to a prior action, or a person in privity with such a party, from relitigating any issue or fact actually litigated and determined in the prior action. Three basic conditions must, then, be satisfied before collateral estoppel will arise: the issue subject to estoppel must be identical in each action, the first action must have resolved the issue finally on the merits, and the party to be estopped must have appeared as a party in the first action, or have been in privity with someone who did so. These conditions must be understood, in turn, as particular elements of the more general requirement, that a party against whom estoppel is pleaded must have had a full and fair prior opportunity to litigate the issue or fact in question.Gephart v. Daigneault, 137 N.H. 166, 172 (1993) (quotation and citation omitted).
"The relationship between party and non-party implied by a finding of privity in the estoppel context has been described as one of virtual representation, and substantial identity." Daigle, 129 N.H. at 571 (quotations omitted). These phrases imply not a formal, but a functional, relationship, in which, at a minimum, the interests of the non-party were in fact represented and protected in the prior litigation. Id. Thus, privity is found to exist, for example, when a person controls or substantially participates in controlling the presentation or if a non-party authorizes a party in litigation to represent his or her interests. Id. at 571-72. There is no evidence in the record that the plaintiffs either controlled the underlying wetlands bureau enforcement action or authorized the wetlands bureau to act on their behalf. Thus, we conclude that the plaintiffs' interests were not adequately represented for purposes of privity. In addition, as noted in our discussion of res judicata, the plaintiffs were not afforded a full and fair prior opportunity to litigate the issues and facts in question. The plaintiffs, therefore, were not collaterally estopped from proceeding in superior court.
The defendants assert, alternatively, that the issue of whether they violated RSA chapter 482-A is moot. The defendants did not raise this argument below, however, and thus have not preserved it for our review on appeal. See McKenzie v. City of Berlin, 145 N.H. 467, 471-72 (2000).
The defendants also argue that the trial court erred by failing to admit the entire wetlands bureau file at trial. We disagree. While not admitting the entire file, the trial court did allow it to be marked for identification, and allowed the defendants to enter certain exhibits from the file individually. In addition, some of the information included in the file was introduced through trial testimony. Finally, the defendants argue that one of the central purposes of introducing the file was to bolster their res judicata and collateral estoppel arguments. Since we have already rejected these arguments, the significance of the wetlands bureau file is diminished. Even assuming, therefore, that the trial court erred in failing to admit the entire wetlands bureau file at trial, we conclude that such decision was not clearly untenable or unreasonable to the prejudice of their case. See Petition of Haines, 148 N.H. 380, 381 (2002).
The defendants next argue that the trial court erred by referring to a chart that was not in evidence to describe the location of jurisdictional wetlands on their property. They also assert that the trial court failed to cure this error by marking the chart for identification in its clarification order. We disagree. In its order, the court stated that
the evidence demonstrates that the jurisdictional wetland boundary runs through the lower portion of the Sullivan home along the red jurisdictional boundary line, closest to the lake, as depicted on the chart the petitioners used during trial and as delineated by Randall Shuey, and just below the boulder slope.
"A review of the entire record leads us to conclude that even if the [chart] was never properly entered as an exhibit, the trial court's reliance upon it resulted in no prejudice to the [defendants] and did not affect the outcome." Patch v. Arsenault, 139 N.H. 313, 320 (1995). The chart referred to was used merely for descriptive purposes and was cumulative when considered in conjunction with the lay and expert testimony introduced at trial and the trial court's views of the property. Thus, the trial court's reference to the chart does not constitute reversible error.
We now consider whether there was sufficient evidence to support the trial court's decision that the defendants' construction activities constituted a nuisance, thereby causing damage to the plaintiffs' property. We will uphold the trial court's findings and rulings unless they lack evidential support or are legally erroneous. In the Matter of Levreault and Levreault, 147 N.H. 656, 657 (2002). It is within the province of the trial court to accept or reject, in whole or in part, whatever evidence was presented, including that of the expert witnesses.See Tennessee Gas Pipeline Co. v. Town of Hudson, 145 N.H. 598, 602 (2000). Our standard of review is not whether we would rule differently than the trial court, but whether a reasonable person could have reached the same decision as the trial court based upon the same evidence.Hawthorne Trust v. Maine Savings Bank, 136 N.H. 533, 536 (1992). Thus, we defer to the trial court's judgment on such issues as resolving conflicts in the testimony, measuring the credibility of witnesses, and determining the weight to be given evidence. McCabe v. Arcidy, 138 N.H. 20, 24 (1993).
"A private nuisance exists when an activity substantially and unreasonably interferes with the use and enjoyment of another's property."Dunlop v. Daigle, 122 N.H. 295, 298 (1982). To constitute a nuisance, the defendants' activities must cause harm that exceeds the customary interferences with land that a land user suffers in an organized society, and be an appreciable and tangible interference with a property interest. Id. "In determining whether an act interfering with the use and enjoyment is so unreasonable and substantial as to amount to a nuisance and warrant an injunction, a court must balance the gravity of the harm to the plaintiff against the utility of the defendant's conduct, both to himself and to the community." Treisman v. Kamen, 126 N.H. 372, 375 (1985) (quotation omitted). It is the plaintiffs' burden to prove the existence of a nuisance by a preponderance of the evidence. Dunlop, 122 N.H. at 295.
The evidence supports the trial court's finding of nuisance. At trial, witnesses testified that large portions of the defendants' lot were swampy and had pools of standing water prior to construction. The plaintiffs' expert, Randall Shuey, a certified soil scientist, testified that he conducted extensive testing of the defendants' property subsequent to their construction and opined that the defendants' activities had interfered with jurisdictional wetlands and had caused subsurface waters to divert to the plaintiffs' property. The defendants argue that the trial court unreasonably ignored the testimony of their expert, Charles Bollinger, who was the only person to have tested the defendants' property prior to construction and who stated that the defendants' house was not built upon jurisdictional wetlands. Bollinger admitted, however, that he did not perform specific soil testing to detect the presence of wetlands and that his findings were based primarily upon visual examination.
Further, the plaintiffs testified that their property was substantially wetter after the defendants built their house. The defendants assert that there was insufficient evidence to support this finding, or that the wetness problems continued to exist at the time of final hearing, because the plaintiffs' property was wet before construction. While there was evidence that portions of the plaintiffs' property were wet prior to the defendants' construction, numerous witnesses testified that the water levels increased following the defendants' construction. This testimony was corroborated by Shuey's statement that the defendants' construction altered the elevation of the defendants' land as well as the flow of subsurface waters, causing increased wetness on the plaintiffs' property. While there was evidence introduced of flooding in 1998, Shuey stated that, while having a short-term effect, the flooding did not cause the prolonged wetness the plaintiffs experienced in later years. Moreover, the plaintiffs testified that this condition on their property repeated each spring and early summer from 1997 to 2001.
The defendants contend that the trial court ignored the testimony of Paul Fluet, a civil engineer, when it found that the defendants did not remedy the water diversion problem. Fluet admitted, however, that he was not a wetlands scientist, and that he visited the defendants' property for the purpose of finding any problems with surface water drainage.
The plaintiffs also illustrated various problems associated with the increased wetness. For example, they testified that following the construction, there was standing water on their property, both on a large portion of the lawn, including the backyard between the chalet and the garage, and under the garage and chalet. They explained that because of the increased wetness, they were forced to move dog pens that they traditionally kept in the lower part of their property, and that they could no longer hang a clothesline or stack firewood in the backyard, or use the backyard for recreational activities. Plaintiff Jonathan Evans testified that he had trouble mowing the lawn because of the water. The plaintiffs also explained that they could no longer store things directly on their garage floor due to standing water in the spring and early summer months. Further, they testified that there was a strong, musty odor in the chalet after water began collecting under the foundation, which prevented them from using the chalet during those months when the windows are closed.
Given the evidence in the record, we cannot hold that the trial court erred in finding that the defendants' construction created a nuisance resulting in damages to the plaintiffs' property.
Having concluded that there was sufficient evidence to support the trial court's findings that the defendants' activities constitute a nuisance, we now must determine whether the remedy was appropriate. In evaluating the appropriateness of injunctive relief, the court utilizes the same balancing test that is used to first identify whether a nuisance exists, "although the scales must weigh more heavily in the [plaintiff's] favor because of the extraordinary nature of this form of relief." Robie v. Lillis, 112 N.H. 492, 497 (1972). The propriety of affording equitable relief in a particular case rests in the sound discretion of the trial court to be exercised according to the circumstances and exigencies of the case. Geiss v. Bourassa, 140 N.H. 629, 631 (1996). We will uphold a trial court's equitable order unless its decision constitutes an unsustainable exercise of discretion. See id.; see also State v. Lambert, 147 N.H. 295, 296 (2001) (explaining unsustainable exercise of discretion standard). If the defendants' activity can be carried on without causing unreasonable interference to the plaintiffs, then they should not be required to remove their house. See Dunlop, 122 N.H. at 300. On the other hand, an order requiring such removal is justified if there is no other way to abate the private nuisance. See Urie v. Franconia Paper Co., 107 N.H. 131, 134 (1966).
The defendants challenge the ordered remedy, arguing that the trial court neglected to balance the hardships between the parties and that there was insufficient evidence to support its decision.
With regard to remedying the nuisance, Shuey stated specifically that "the only way to guarantee that we're not going to have any additional impacts on the Cook/Evans property, or to restore it to what it was previously, is to move that house and all that fill out of the jurisdictional area, out of the jurisdictional wetlands." He also stated that this could be accomplished by moving the defendants' house and foundation back forty or fifty feet on the property. In its order, the trial court acknowledged the severity of the remedy, but stated that:
The credible evidence, including the observations made on the view, demonstrates that the Sullivan lot, before it was developed, was obviously marshy and swampy below the clearly delineated boulder slope. Notwithstanding the apparent wetlands located on the lot, the respondents brought in significant fill without contacting the abutters for approval and without obtaining a permit from the wetlands board.
The plaintiffs have prevailed on their claim of nuisance and are entitled under the law to an order requiring the respondents to fully abate the nuisance. The testimony presented from the plaintiff's [ sic] expert indicates that the only remedy certain to guarantee a full abatement is removal of the home and fill. The plaintiffs should not be required to accept an alternate remedy, the efficacy of which is questionable, simply because full abatement appears harsh.
The defendants did propose a less stringent remedy to the trial court, which involved removing fill within twenty feet of the plaintiffs' boundary and constructing a ditch near the boundary for water discharge. Shuey testified, however, that he could not guarantee that the plaintiffs' property would be restored to its condition prior to the defendants' construction. The defendants did not offer any expert testimony at trial in support of their proposed remedy nor did they offer any other alternate remedies.
The record reflects that the trial court took the hardships of both parties into consideration when deciding the remedy. For example, the trial court explained in its final verdict that it was prepared to decide what remedy "would be equitable and fair under all the circumstances." Further, the court told the parties during trial that it was considering the equities of both parties when considering the appropriate remedy. Moreover, the court adopted the unusual procedure of viewing the property both before and after it took testimony and reviewed the exhibits. Having considered the evidence before the trial court, we agree that the gravity of harm to the plaintiffs resulting from the defendants' nuisance is significant enough to support the trial court's remedy.
Consequently, we find sufficient evidentiary support for the trial court's remedy and uphold its decision.
Affirmed.
DUGGAN, J., concurred; MURPHY, C.J., and SMITH and McHUGH, JJ., superior court justices, specially assigned under RSA 490:3, concurred.