GRAY v. LECHASE CONS. SER. LLC

Appellate Division of the Supreme Court of New York, Third Department.
Jul 20, 2006
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

Plaintiff, an electrical and communications contractor with a longstanding relationship of over 40 years with the Knolls Atomic Power Laboratory (KAPL), entered discussions with defendants—affiliated business entities from Rochester, New York—regarding a construction project in the Town of Niskayuna, Schenectady County. Plaintiff alleges that in September 2001, the parties reached an oral "exclusivity agreement" whereby plaintiff agreed to refrain from working with other general contractors pursuing the KAPL contract, to maintain confidentiality regarding defendants' provided documentation, and not to engage with the successful contractor if defendants were not awarded the project. In return, defendants promised to use plaintiff as the exclusive subcontractor for electrical and teledata work if awarded the prime contract.

The alleged exclusivity agreement was never reduced to writing, and no formal subcontract was executed, although the parties agreed to negotiate outstanding subcontract details if defendants won the contract. Plaintiff submitted bid proposals, but defendants ultimately put the electrical and teledata subcontract portions out to competitive bidding, excluding plaintiff. Plaintiff then commenced this action seeking damages for lost profits and revenues.

Defendants moved for summary judgment dismissing the complaint, and plaintiff cross-moved for summary judgment on liability. The Supreme Court denied both motions. Both parties cross-appealed that order and also cross-appealed an order partially granting defendants' motion to compel plaintiff's disclosure in discovery.

Defendants LeChase Data/Telecom Services, LLC and LeChase Construction Corporation were found uninvolved in the underlying events, and summary judgment dismissing the complaint against them was granted. The remaining defendant is LeChase Construction Services, LLC.

Legal Issues Presented

  1. Whether the alleged oral exclusivity agreement between plaintiff and defendant is enforceable as a matter of law.
  2. Whether plaintiff stated viable causes of action for breach of contract, promissory estoppel, unjust enrichment, equitable estoppel, and fraud.
  3. Whether the trial court properly denied defendants' motion for summary judgment dismissing the complaint.
  4. Whether the trial court abused its discretion in supervising discovery and partially granting defendants' motion to compel disclosure.

Arguments of the Parties

Defendants' Arguments

  • The exclusivity agreement is unenforceable because it lacks definiteness in material terms, constituting merely an agreement to agree.
  • Defendants contend that some defendants were uninvolved and seek dismissal as to them.
  • Defendants assert they never promised plaintiff the subcontract and challenge plaintiff’s reliance on any such promise.
  • Defendants argue that plaintiff waived objections to discovery demands.

Plaintiff's Arguments

  • Plaintiff contends the exclusivity agreement was valid and that defendants promised to use plaintiff as the exclusive subcontractor.
  • Plaintiff claims reliance on defendants’ promise, refraining from working with other contractors.
  • Plaintiff seeks damages for lost profits based on breach of contract and promissory estoppel.
  • Plaintiff opposes dismissal of claims for fraud, unjust enrichment, equitable estoppel, and breach of contract.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Spectrum Research Corp. v Inter-science, Inc., 242 AD2d 810 Contracts must be definite in material terms to be enforceable; agreements to agree are unenforceable. The court found the exclusivity agreement unenforceable as it was indefinite and amounted to an agreement to agree.
Cobble Hill Nursing Home v Henry Warren Corp., 74 NY2d 475 Contracts require definiteness; parties must reduce material terms to certainty. Supported the conclusion that the exclusivity agreement lacked sufficient definiteness to be enforceable.
Joseph Martin, Jr., Delicatessen v Schumacher, 52 NY2d 105 Agreement to agree on material terms is unenforceable; no binding contract without certainty. Used to reinforce that the alleged exclusivity agreement was not binding due to absence of agreed material terms.
Marraccini v Bertelsmann Music Group, 221 AD2d 95 Contracts must have definite terms; agreements to negotiate in the future are unenforceable. Supported the court’s finding that the oral agreement was too indefinite to enforce.
Bunkoff Gen. Contrs. v Dunham Elec, 300 AD2d 976 Elements of promissory estoppel require a clear and unambiguous promise and reasonable detrimental reliance. The court found issues of fact precluded summary judgment on the promissory estoppel claim.
Deerfield Communications Corp. v Chesebrough-Ponds, Inc., 68 NY2d 954 Fraud in the inducement can be a separate cause of action from breach of contract. Dismissed fraud claim because it related to an unenforceable contract.
Held v Kaufman, 91 NY2d 425 No fraud in inducement claim if underlying contract is unenforceable. Supported dismissal of fraud claim tied to unenforceable exclusivity agreement.
Michaels v Travelers Indem. Co., 257 AD2d 828 Equitable estoppel requires scienter and is used to prohibit certain conduct, not for money damages. Dismissed equitable estoppel claim because plaintiff sought monetary damages, an unavailable remedy under equitable estoppel.
Cruz v McAneney, 29 AD3d 512 Elements of unjust enrichment: enrichment at plaintiff's expense and inequity in allowing retention. Dismissed unjust enrichment claim for lack of evidence that defendant possessed plaintiff's money or property.
Bohlke v General Elec. Co., 27 AD3d 924 Trial court has broad discretion in supervising discovery. Affirmed trial court's discovery order as within its discretion.
Mora v RGB, Inc., 17 AD3d 849 Broad discretion in discovery supervision. Supported affirmance of discovery order.
Di Mascio v General Elec. Co., 307 AD2d 600 Trial court's discretion over discovery matters. Upheld trial court’s decision on discovery motions.

Court's Reasoning and Analysis

The court analyzed the enforceability of the alleged exclusivity agreement, emphasizing the necessity for definiteness in material contract terms. It held that the oral agreement was an unenforceable "agreement to agree" because essential terms such as the precise scope of subcontract work, pricing, payment, and timing were left for future negotiation. The court rejected plaintiff's argument that bid proposals could supply missing terms, noting the absence of evidence that defendant agreed to those prices or that the agreement provided an objective method to fix terms.

Regarding plaintiff's claims, the court dismissed breach of contract and fraud causes of action based on the unenforceability of the underlying agreement. The fraud claim was further barred because fraud in inducement cannot be predicated on an unenforceable contract. The unjust enrichment claim was dismissed due to lack of evidence that defendant possessed plaintiff’s money or property.

The promissory estoppel claim was allowed to survive summary judgment because plaintiff presented admissible evidence of a clear and unambiguous promise by defendants and reasonable detrimental reliance, while defendants submitted conflicting evidence. This created issues of material fact unsuitable for summary judgment.

The equitable estoppel claim was dismissed since plaintiff sought monetary damages, a remedy unavailable under equitable estoppel, which is a defensive doctrine to prevent certain conduct rather than a basis for damages.

On discovery issues, the court found no abuse of discretion in the trial court's conditional order requiring a confidentiality agreement for disclosure and denial of other disclosure demands. The court also rejected defendants' argument that plaintiff waived discovery objections.

Holding and Implications

The court modified and affirmed the lower court’s orders by granting summary judgment to defendants on all causes of action except the second cause of action for promissory estoppel, which remains pending against defendant LeChase Construction Services, LLC only. The complaint was dismissed against the other defendants as unopposed.

This decision directly affects the parties by narrowing the claims to be tried, dismissing claims based on the unenforceability of the alleged exclusivity agreement, and confirming the trial court’s discretion in discovery matters. The court did not establish new precedent but applied established contract principles and procedural standards to the facts of this case.

Show all summary ...

Plaintiff is an electrical and communications contractor that has provided services to the Knolls Atomic Power Laboratory (hereinafter KAPL) for more than 40 years. Defendants are affiliated business entities from the City of Rochester, Monroe County, that were seeking to win a contract for the design and construction of a building in the Town of Niskayuna, Schenectady County (hereinafter the project). After attending a meeting about the project, defendants learned of plaintiffs relationship with KAPL and the parties began to discuss plaintiffs potential involvement in the project. Plaintiff alleges that in September 2001, the parties reached an agreement, which plaintiff denominates an "exclusivity agreement." Pursuant thereto, plaintiff agreed to the following three conditions: (1) to refrain from participating with any other general contractors who were seeking the KAPL contract; (2) to refrain from sharing with any third party any documentation or drawings provided by defendants to plaintiff in connection with defendants' proposal; and (3) if defendants were not awarded the project, plaintiff would not deal in any manner with the successful contractor. Plaintiff alleges that in exchange for its agreement to these conditions, defendants promised to use plaintiff as the exclusive subcontractor for all electrical and teledata work if defendants were awarded the prime contract. The exclusivity agreement was never reduced to writing, nor did the parties execute a subcontract. Although plaintiff asserts that they agreed upon a contract form, it concedes that the parties never fully agreed on the details of a subcontract and agreed only that the outstanding details of the subcontract would be discussed if defendants were ultimately awarded the KAPL contract.

Plaintiffs estimators traveled from Schenectady County to Rochester to meet with defendants' design team in September 2001. During and subsequent to this meeting, information about the project and KAPL flowed mutually between the parties. Over the next few months, plaintiff submitted various bid proposals to defendants, who were ultimately awarded the contract. Notwithstanding the parties' alleged oral agreement to use plaintiff as the exclusive subcontractor for the electrical and teledata portions of the contract, defendants put those aspects of the contract out to competitive bidding, and plaintiff was not awarded the subcontract that it claims was due under the exclusivity agreement. Plaintiff thereafter commenced this action, seeking damages for lost profits and other revenues it would have earned if it had been given the subcontract. Defendants moved for summary judgment dismissing the complaint and plaintiff cross-moved for summary judgment on liability. Following oral argument, Supreme Court denied both motions. Defendants and plaintiff cross appeal from that order and both parties cross appeal from a separate order that partially granted a motion by defendants to compel plaintiff to respond to certain interrogatories.

Defendants contend that defendant LeChase Data/Telecom Services, LLC and defendant LeChase Construction Corporation were uninvolved in the events giving rise to this action, and they sought summary judgment dismissing the complaint against them. Plaintiff did not oppose that request before Supreme Court, and does not oppose it upon appeal. Accordingly, it will be granted. Therefore, further references to defendant in this decision shall pertain to the remaining defendant, LeChase Construction Services, LLC.

The complaint in this action asserts five causes of action, sounding in breach of contract, promissory estoppel, unjust enrichment, equitable estoppel and fraud. For the reasons that follow, we conclude that only the second cause of action, asserting promissory estoppel, survives defendant's motion for summary judgment.

Defendant contends that the exclusivity agreement is unenforceable as a matter of law, and we agree. "It is well settled that a contract must be definite in its material terms in order to be enforceable" ( Spectrum Research Corp. v Inter-science, Inc., 242 AD2d 810, 811; see Cobble Hill Nursing Home v Henry Warren Corp., 74 NY2d 475, 482, cert denied 498 US 816; Marraccini v Bertelsmann Music Group, 221 AD2d 95, 97, lv denied 89 NY2d 809). Thus, an "agreement to agree, in which a material term is left for future negotiations, is unenforceable" ( see Joseph Martin, Jr., Delicatessen v Schumacher, 52 NY2d 105, 109; Spectrum Research Corp. v Interscience, Inc., supra; Marraccini v Bertelsmann Music Group, supra; Bower v Atlis Sys., 182 AD2d 951, 952-953, lv denied 80 NY2d 758). Viewing the exclusivity agreement as defined by plaintiff, the parties agreed that if plaintiff refrained from having contact with any other contractor that was seeking the project, and if defendant was awarded the prime contract, the parties would enter into a subcontract for the electrical and teledata work on the project. This is merely an agreement to later agree upon the "precise nature of the work to be subcontracted, price and manner of payment and time of performance" ( Spectrum Research Corp. v Interscience, Inc., supra at 811).

Plaintiffs contention that the pricing information for the subcontract is ascertainable by reference to the proposals that plaintiff submitted to defendant does not satisfy the requirement that the material terms of the agreement be definite. While it is true that application of the definiteness doctrine is not absolutely rigid ( see Matter of 166 Mamaroneck Ave. Corp. v 151 E. Post Rd. Corp., 78 NY2d 88, 91; Cobble Hill Nursing Home v Henry Warren Corp., supra at 482-483), there must be "an objective method for supplying a missing term" ( Matter of 166 Mamaroneck Ave. Corp. v 151 E. Post Rd. Corp., supra at, 91). Here, although the exclusivity agreement contemplates the parties' execution of a subcontract, that implicit provision cannot be viewed as a binding formula for supplying a missing term ( see Joseph Martin, Jr., Delicatessen v Schumacher, supra at 110-111), nor does it "invite recourse to an objective extrinsic event, condition or standard" ( id. at 110; see Matter of 166 Mamaroneck Ave. Corp. v 151 E. Post Rd. Corp., supra [agreement provided for arbitration]; Cobble Hill Nursing Home v Henry Warren Corp., supra [agreement provided that price was to be determined by the Department of Health in accordance with applicable statutes, rules and regulations]). Rather, it requires further expressions by the parties and therefore fails to "reduc[e] uncertainty to certainty" ( Cobble Hill Nursing Home v Henry Warren Corp., supra at 483). To the extent that the bid proposals are utilized to determine pricing as a matter of commercial practice ( see Henri Assoc, v Saxony Carpet Co., 249 AD2d 63, 66), the record is wholly devoid of evidence that defendant agreed to the prices proposed by plaintiff ( compare id.; see T. Moriarty Son v Case Contr., 287 AD2d 390). In sum, the exclusivity agreement that is the basis for plaintiffs first cause of action for breach of contract is unenforceable as a matter of law, and defendant's motion for summary judgment dismissing that cause of action should have been granted.

Plaintiff correctly contends that it is possible to state a cause of action for fraud in the inducement separate and apart from a claim for breach of the contract ( see Deer field Communications Corp. v Chesebrough-Ponds, Inc., 68 NY2d 954, 956; Sabo v Delman, 3 NY2d 155, 162). To the extent, however, that plaintiffs fifth cause of action may be construed as such, it must also be dismissed because there can be no viable claim for fraudulent inducement to enter an unenforceable contract ( see Held v Kaufman, 91 NY2d 425, 431-432).

Plaintiffs second cause of action asserts a claim sounding in promissory estoppel. A party relying upon promissory estoppel must demonstrate that there was a clear and unambiguous promise upon which it reasonably and detrimentally relied ( see BunkoffGen. Contrs. v Dunham Elec, 300 AD2d 976, 978; Fourth Branch Assoc. Mechanicville v Niagara Mohawk Power Corp., 235 AD2d 962, 964; R. Freedman Son v A.I. Credit Corp., 226 AD2d 1002, 1003). Plaintiff has submitted evidence in admissible form that defendants promised to give plaintiff the project subcontract, and that plaintiff refrained from working with other general contractors who were seeking the project in reliance on that alleged but ultimately unfulfilled promise. Defendants submit evidence that they never promised plaintiff the subcontract, and that plaintiff did, in fact, seek to work with another general contractor who was pursuing the project. Clearly, the parties' submissions create issues of material fact regarding whether defendant made the alleged promise and whether plaintiff reasonably relied thereon, and Supreme Court properly denied the motions for summary judgment on the promissory estoppel cause of action.

Plaintiffs fourth cause of action sounds in equitable estoppel. In support of the cause of action, plaintiff alleges facts similar to those underlying its promissory estoppel claim, along with allegations of the scienter that is an element to be established by a party seeking equitable estoppel ( see Michaels v Travelers Indem. Co., 257 AD2d 828, 829; State Bank of Albany v Fioravanti, 70 AD2d 1011, 1012-1013, affd 51 NY2d 638). The fundamental and fatal flaw in this cause of action is plaintiffs demand for money damages upon it; equitable estoppel is invoked to prohibit a party from engaging in certain conduct ( see e.g. Matter of Hession v New York State Local Employees' Retirement Sys., 24 AD3d 1008, 1010 [the petitioner sought to equitably estop the respondent from denying tier 1 retirement status]; Doe v Holy See [State of Vatican City], 17 AD3d 793, 794-795, lv denied 6 NY3d 707 [the plaintiffs sought to estop the defendants from asserting statute of limitations defense]; Matter of Sarah S. v James T., 299 AD2d 785 [equitable estoppel invoked to prevent denial of paternity]; McKay v Healthcare Underwriters Mut. Ins. Co., 295 AD2d 686, 688, lv denied 99 NY2d 503 [equitable estoppel sought to prevent denial of insurance coverage]). Here, because plaintiff does not seek the type of remedy that would be available upon a successful invocation of equitable estoppel, the fourth cause of action should have been dismissed. To the extent that equity may provide plaintiff with a remedy in damages in this particular case, plaintiffs avenue of recovery rests on its promissory estoppel claim ( see Bunkoff Gen. Contrs. v Dunham Elec, supra at 976-977).

Plaintiffs third cause of action generally alleges that defendant was unjustly enriched by plaintiffs experience with KAPL as well as plaintiffs direct contributions to defendant's successful proposal for the prime contract. A cause of action for unjust enrichment requires a showing that (1) the defendant was enriched, (2) at the expense of the plaintiff, and (3) that it would be inequitable to permit the defendant to retain that which is claimed by the plaintiff ( see Cruz v McAneney, 29 AD 3d 512, 512; Mente v Wenzel, 178 AD2d 705, 706). The essence of such a cause of action is that one party is in possession of money or property that rightly belongs to another ( see Paramount Film Distrib. Corp. v State of New York, 30 NY2d 415, 421, cert denied 414 US 829; Town of Butternuts v National Grange of Patrons of Husbandry, 20 AD3d 637; George S. May Intl. Co. v Thirsty Moose, Inc., 19 AD3d 721; Anesthesia Group of Albany v State of New York, 309 AD2d 1130, 1131-1132; Mente v Wenzel, supra). Here, plaintiffs submissions on the parties' competing motions for summary judgment make only conclusory allegations that defendant benefitted from plaintiffs involvement in the bid formulation process, and plaintiff asserts no facts suggesting that defendant is in possession of money or property belonging to plaintiff. Thus, there is no issue of fact requiring a trial on this cause of action ( see Hamlin Beach Camping, Catering, Concessions Corp. v State of New York, 303 AD2d 849, 853; Absher Constr. Corp. v Colin, 233 AD2d 279, 280), and defendant's motion for summary judgment dismissing plaintiffs cause of action for unjust enrichment should have been granted.

Turning to defendant's appeal and plaintiffs cross appeal from Supreme Court's order addressed to defendant's discovery motion, it is well settled that the trial court has broad discretion in supervising discovery ( see Bohlke v General Elec. Co., 27 AD3d 924; Mora v RGB, Inc., 17 AD3d 849, 851; Di Mascio v General Elec. Co., 307 AD2d 600, 601). Upon our review of the record and supplemental record, we find that the order directing and conditioning plaintiffs disclosure of certain allegedly confidential information upon the execution of a court-approved confidentiality agreement and denying other aspects of defendant's motion to compel disclosure was rendered well within the bounds of Supreme Court's discretion. Further, in the context of this protracted and contentious discovery dispute, we find no merit in defendant's contention that plaintiff waived its objections to defendant's demands for interrogatories.

Ordered that the order entered October 24, 2005 is affirmed, without costs. Ordered that the order entered January 26, 2006 is modified, on the law, without costs, by reversing so much thereof as denied defendants' motion for summary judgment (1) dismissing the complaint against defendants LeChase Data/Telecom Services, LLC and LeChase Construction Corporation and (2) dismissing the first, third, fourth and fifth causes of action against defendant LeChase Construction Services, LLC; motion granted to that extent, summary judgment awarded to defendants and all causes of action dismissed except the second cause of action which remains against LeChase Construction Services, LLC only; and, as so modified, affirmed.