Mole Valley District Council v Secretary of State for Housing, Communities and Local Government & Anor
Anonymized Summary of Judgment
Factual and Procedural Background
This judgment follows a rolled-up hearing to determine whether the Plaintiff should be granted permission, and if so the relief claimed, in respect of a planning statutory review under s.288 Town and Country Planning Act 1990 and an appeal under s.289 of that Act. The decisions under challenge are decisions of the First Defendant (the Secretary of State) made by one of her inspectors.
The dispute concerns the use of a rural parcel of land within the Green Belt (hereafter "the Site") for the stationing of residential and touring caravans for residential purposes together with ancillary operational development (the "development"). The Site is owned by the Second Defendant. The Plaintiff issued a temporary stop notice (5 April 2024), and on 15 April 2024 the Second Defendant sought retrospective planning permission for a two‑pitch gypsy accommodation and associated works. The Plaintiff refused planning permission on 10 June 2024 (principal reasons included the visual and spatial impact on Green Belt openness). An enforcement notice was issued shortly thereafter with a six‑month compliance period.
The Second Defendant appealed to the First Defendant (Secretary of State) under the statutory appeal procedures (appeal lodged 11 July 2024). The appeals were determined by an Inspector and recorded in a decision letter dated 18 February 2025. The Inspector quashed the enforcement notice and granted planning permission. The Plaintiff seeks permission for judicial review under s.288 and permission to appeal under s.289 to challenge the Inspector's decisions.
Procedural and contextual timeline points relevant to issues before the court:
- The Plaintiff had prepared and adopted a Local Plan (adopted 15 October 2024) and produced a Gypsy and Traveller Accommodation Assessment (GTAA 2021).
- On 12 December 2024 the First Defendant published new versions of the National Planning Policy Framework ("NPPF 2024") and the Planning Policy for Traveller Sites ("PPTS"). NPPF 2024 introduced an exception for certain forms of development in the Green Belt (see NPPF 2024 [155]) and amended the weight to be given to harm to openness (NPPF 2024 [153] with Footnote 55).
- A hearing before the Inspector was held on 15 January 2025. The Plaintiff was represented by its planning officers. The Second Defendant was represented by Attorney Whale.
The Inspector framed the planning issues to include whether the development was "inappropriate" in the Green Belt having regard to the NPPF 2024, the effect on Green Belt openness, conformity with local and national gypsy and traveller accommodation policy, the effect on character and appearance, the sustainability of the location, and whether, if inappropriate, the development was justified by very special circumstances ("VSC").
Applying the NPPF 2024, the Inspector concluded that the Site qualified as "grey belt" and satisfied the relevant parts of the Local Plan and NPPF 2024 [155]; he held that development which is "not inappropriate" does not, under the applicable policy framework, give rise to harm to Green Belt openness for the purposes of weighing the need for VSC. He found some harm to local character and appearance (conflict with particular local policies) but concluded that the local authority could not demonstrate a five‑year supply of deliverable traveller pitches; on the planning balance he determined that the adverse impacts did not significantly and demonstrably outweigh the benefits and therefore granted planning permission.
Legal Issues Presented
- Whether permission should be granted for the Plaintiff to seek a statutory review under s.288 and to appeal under s.289 against the Inspector's decision to quash the enforcement notice and to grant planning permission.
- Ground 1 — whether the Inspector erred in law by misinterpreting Green Belt policy in the NPPF 2024 (notably provisions at [153], [155], and Footnote 55) so as to exclude consideration of harm to Green Belt openness where development is found to be "not inappropriate".
- Ground 2 — whether the Inspector misinterpreted the PPTS (and its footnote 4) such that sites subject to live planning applications were treated as not "deliverable" for the purpose of assessing a five‑year supply of traveller sites.
- Ground 3 — whether the Inspector failed to give legally adequate reasons and/or reach a rational conclusion on the evidence about the five‑year supply of deliverable traveller pitches, including by failing to take account of the Examining Inspector's ("EI") report on the Local Plan.
Arguments of the Parties
Plaintiff's Arguments (as advanced by Attorney Goodman)
- Ground 1: The Inspector misread NPPF 2024 [153] and Footnote 55. The footnote, the Plaintiff said, removes only the obligation to give "substantial weight" to harm to openness, not the requirement to consider any harm at all. The Inspector's statement that "the aim of preserving the openness of the Green Belt cannot be compromised by development that is 'not inappropriate'" therefore excluded consideration of any harm and was legally incorrect. The Plaintiff argued that this interpretation rendered Footnote 55 otiose.
- Ground 1 (submissions on precedent): The Plaintiff argued that the Court of Appeal decision relied on by the Defendants (Case A in this summary) was decided under an earlier version of the NPPF and should not be given controlling weight for the 2024 framework; alternatively, the Plaintiff said parts of that decision were wrongly decided (an argument developed by Attorney Goodman relying on perceived errors in the way "openness" had been analysed).
- Ground 2: The Inspector erred in concluding that sites for which planning applications had been made were not deliverable. The Plaintiff's case was that the Inspector had effectively applied a self‑directed legal test (that planning permission had to be in place) rather than assessing deliverability in the light of the PPTS definition.
- Ground 3: The Inspector failed to take account of the Examining Inspector's report on the Local Plan (the EI Report), which the Plaintiff contended contained obvious and material findings on deliverability and the GTAA that should have been considered. The Plaintiff relied on authorities that an Inspector should either take into account or explain departure from relevant prior decisions/reports.
Defendants' Arguments (First Defendant and Second Defendant)
- All Grounds: Both Defendants submitted that the grounds were unarguable and that the application for permission should be refused.
- Ground 1: The Defendants relied on the judgment in Case A (Court of Appeal, 2016) as correctly interpreting the earlier NPPF and, they submitted, applicable to the NPPF 2024. They argued Case A (and related authority) establishes that development which is "not inappropriate" is treated as not giving rise to harm to openness; Footnote 55 confirms the approach applies to the newly articulated categories (including grey belt) in NPPF 2024.
- Ground 2: The Defendants submitted that the Claimant misreads the decision letter (DL 31) and that the Inspector did not treat pending applications as automatically undeliverable; rather, the Inspector considered deliverability as a matter of planning judgment in DL 31–36 and Wainhomes/St Modwen and related authority were engaged to explain the applicable tests.
- Ground 3: The Defendants emphasised that the EI Report had not been drawn to the Inspector's attention at the hearing, it was not relied upon by the Plaintiff before the Inspector, and the Inspector was entitled to assume that parties would place before him any material they wished him to consider. They submitted it was neither unreasonable nor obligatory for the Inspector to seek out the EI Report of his own motion in the circumstances of this case.
Table of Precedents Cited
All precedent names are anonymized in the left column; the rule/principle and the court's application are stated only from material contained in the provided opinion.
| Precedent | Rule or Principle Cited For | Application by the Court in this Judgment |
|---|---|---|
| Case A (2016 CA) | Established that, read in context, development that is "not inappropriate" in the Green Belt (including categories listed as exceptions) is not to be regarded as harmful to the openness of the Green Belt or to the purposes of including land within it; the distinction between "inappropriate" and "not inappropriate" governs the approach to openness and the requirement for VSC. | The court held that Case A remains good law and provides a complete answer to the Plaintiff's primary contention under Ground 1. The Inspector's approach (treating "not inappropriate" development as not giving rise to policy harm to openness) was consistent with Case A and therefore not legally erroneous. |
| Case B (2007 HC) | At first instance, a judge observed that "openness" can be described as the absence of buildings (distinct from visual impact), and that visual impact may be treated separately when assessing matters such as VSC. | The court treated the relevant passages as supporting the proposition that visual impact may be relevant to assessments (for example VSC) though not inconsistent with the contextual analysis in Case A. |
| Case C (2014 HC) | A first‑instance judgment that drew a strong conceptual distinction between openness and visual impact and stated it was wrong to determine openness solely by reference to visual impact; parts of that reasoning were later criticised. | The court noted that parts of Case C were disapproved in Case D; it concluded that the passages from Case C that were relied on by the Plaintiff were either not determinative or had been judicially criticised and therefore did not undermine Case A. |
| Case D (2017 CA) | The Court of Appeal disapproved the aspects of Case C that sought to exclude visual impact from the concept of openness, emphasising that visual impact is implicitly part of the concept of "openness" in the NPPF context. | The court relied on Case D to explain why the specific parts of Case C cannot be followed; it used Case D to situate the relationship between visual impact and openness, while maintaining that Case A's contextual reading remains applicable. |
| Case E (2020) | Confirmed the disapproval in Case D and discussed the relationship between openness and visual impact; observed that prior statements like those in Case A are "to similar effect" and do not exclude consideration of visual impact in all contexts. | The court relied on Case E to show that later authority supports Case A's approach and that Lindblom LJ's earlier statements were not wrongly decided in the way the Plaintiff suggested. |
| Case F (2017 SC) | Sets out the correct approach to interpretation of development plans and national planning policy: policies should be read objectively in their language and context; they are policy statements not statutes; interpretation is a matter for the court but application is for the decision‑maker. | The court invoked Case F as the foundational approach to interpreting NPPF 2024 and the Local Plan: read policies objectively in context and avoid treating guidance as if it were statute. |
| Case G (2012) | Establishes that the meaning of a development plan is a matter to be determined objectively by the court and not left to individual planning authorities alone. | The court cited Case G (through Case F) to support the proposition that planning policy must be interpreted objectively and in context. |
| Case H (2025 CA) | Reiterates principles governing interpretation of planning policy: distinguish interpretation (judicial) from application (administrative); avoid imposing a judge's own gloss; interpret in a straightforward, common‑sense way. | The court relied on Case H to emphasise restraint in interpretation and to support the view that it should not adopt an interpretation tailored to the particular facts that would make the policy unstable. |
| Case I (2022 CA) | Authority for the proposition that interpreting planning policy should be straightforward and not involve statutory‑style linguistic precision; policies should be practical and understood in context. | Cited to support the court's approach to reading NPPF 2024 and Footnote 55 in a practical, non‑technical way. |
| Case J (2020 HC; 2021 CA) | Warns against courts over‑refining policy interpretation to fit facts of a particular case and thereby weakening policy consistency. | Used as a cautionary authority: the court should avoid an interpretation that expands judicial role into policy‑making. |
| Case K (2021 CA) | Observed (obiter) that national policy permits forms of development where justified by VSC and describes exceptions as "not inappropriate"; also commented that even in such cases the planning authority should give "substantial weight" to any harm to the Green Belt. | The court treated the reference in Case K as obiter and not directly helpful to the Plaintiff; Case A remained determinative on the proper construction of the relevant Green Belt provisions. |
| Case L (2021) | Emphasises practical, non‑technical reading of planning policy language and the need to interpret in the context of decision‑making. | Cited in support of a practical reading of Footnote 55 and the NPPF changes rather than a highly legalistic interpretation advanced by the Plaintiff. |
| Case M (2015) | Example of contextual policy interpretation in the Green Belt; referenced in Case A reasoning as supportive authority. | The court noted the use of Case M in Case A and accepted that it forms part of the background to the Court of Appeal's reasoning upheld in this judgment. |
| Case N (2013 HC) | Authorities that explain deliverability for five‑year supply assessments do not require that planning permission be in place; deliverability is a matter of evidence and realistic prospect. | The court acknowledged Case N when considering Ground 2, but concluded the Inspector's assessment of deliverability proceeded beyond a narrow reading of DL 31 and involved lawful planning judgment informed by the available evidence. |
| Case O (2018) | Addresses the criteria and evidence relevant to deliverability and five‑year supply assessments. | The court accepted that Case O supports the legal proposition that deliverability is not solely dependent on planning permission, and found the Inspector's broader analysis lawful. |
| Case P (1993) | Authority that where an inspector proposes to depart from an earlier decision which is materially indistinguishable he ought to have regard to the need for consistent decisions and give reasons for departure. | The Plaintiff relied on this authority; the court distinguished the present circumstances and held that the EI Report here was not a directly comparable "earlier decision" requiring automatic examination or departure‑reasons in the decision letter. |
| Case Q (2018 CA) | Court of Appeal held there may be circumstances where it is unreasonable for a decision‑maker not to have regard to an earlier appeal decision even if none of the parties relied on it. | The court considered Case Q but found it distinguishable: the EI Report here was a report on plan soundness (not an earlier appeal decision on the same site/type of development) and the circumstances did not make it "obviously material". |
| Case R (2005) | Confirms the adversarial principle: in an adversarial hearing it is incumbent on the parties to place before the inspector the material on which they rely. | The court relied on Case R to support the proposition that the Inspector was entitled to rely on the parties to draw his attention to relevant materials; the EI Report was not put before the Inspector and so there was no duty to hunt it down. |
| Case S (2008) | Upholding aspects of Case B: the loss of openness in Green Belt is harmful to policy objectives and visual intrusiveness can increase the harm. | The court used Case S to underline that visual impact can be relevant to harm assessments (e.g., character/appearance and VSC) even while accepting Case A's contextual conclusions about "not inappropriate" development. |
| Case T (1995) | (Earlier Tesco authority cited in the development of interpretive principles.) Encourages objective interpretation of planning policy documents. | Cited in the court's discussion of interpretive approach via Case F and Case G; used to underpin the approach to reading policy contextually. |
Court's Reasoning and Analysis
The court's analysis proceeded by setting out general principles for the interpretation of planning policy and then applying those principles to each ground of challenge.
Principles of policy interpretation applied
- The court began from established authorities that policy statements such as the NPPF must be read objectively in accordance with their language, read in context, and should not be treated like statutory or contractual provisions (authority summarized at Case F and Case G). Policy interpretation is a judicial function, but the exercise of planning judgment in applying policy is for the decision‑maker (Case H in the summary).
- The court emphasised that interpretation should be straightforward, practical and avoid imposing a gloss that would make policy less usable or unworkable in decision‑making (Case I and Case J).
Ground 1 — Green Belt policy and "openness"
- The Plaintiff argued that the Inspector misread NPPF 2024 [153] and Footnote 55 by effectively excluding consideration of any harm to openness when a development is "not inappropriate". The court identified that this contention required a close analysis of Case A (the Court of Appeal decision relied on by the Defendants) and related authorities on the meaning of "openness".
- The court examined the reasoning in Case A and the subsequent authorities (Cases C, D and E) which had considered the relationship between "openness" and "visual impact". It concluded that:
- Case A's core analysis was not limited to a narrow category (e.g. only agricultural buildings) but applies generally to development found to be "not inappropriate" — such development is, as a matter of policy, treated as not harmful to openness.
- Although some first‑instance passages in Case C sought to separate visual impact from openness in a way later disapproved, the passages in Case A relied upon by the Defendants were not the parts disapproved and were consistent with later appellate commentary (Case D and Case E).
- The court rejected the Plaintiff's argument that the Lee Valley approach rendered Footnote 55 otiose. The court explained that Footnote 55 provides practical clarification that development on previously developed land or on grey belt land is included among forms of development to be treated as "not inappropriate" for policy purposes; it therefore performs a practical role rather than being redundant.
- The court also addressed the Plaintiff's textual argument that NPPF 2024 [153] required "substantial weight" to be given to any harm in "any planning application". The court concluded that this must be read in context: if the development falls within an exception and is therefore "not inappropriate", the policy context (as explained in Case A) treats such development as not harmful to the Green Belt for the purposes of applying the VSC test. The Claimant's more literal reading would, in the court's view, negate the purpose of the exceptions and undermine the policy change introduced by NPPF 2024 (in particular the grey belt exception).
- In light of that analysis the court held that the Inspector's approach — treating grey belt development found to be "not inappropriate" as not giving rise to policy harm to openness and therefore not requiring VSC — was consistent with Case A and other authorities; Ground 1 was dismissed as unarguable.
Ground 2 — Deliverability of sites
- The Plaintiff contended the Inspector misinterpreted Footnote 4 of the PPTS by effectively treating sites with live planning applications as not "deliverable". The court examined the Inspector's decision letter, noting DL 31 in context and the further discussion at DL 32–36.
- The court acknowledged the established legal propositions that planning permission is not invariably a necessary precondition for deliverability and that deliverability is an evidential question (see Case N and Case O). However, it found that the Inspector did not truncate his analysis at DL 31: he went on to consider the evidence about the sites, the status of planning applications, occupancy of approvals, and the lack of specific evidence about allocations or windfalls.
- The court concluded that the Inspector's finding (that the Plaintiff could not demonstrate a deliverable five‑year supply) was a planning judgment open to him on the evidence before him and that there was no error of law in the approach taken. Ground 2 was therefore judged unarguable.
Ground 3 — Failure to consider the Examining Inspector's report
- The Plaintiff argued in the alternative that the Inspector ought to have considered the Examining Inspector's ("EI") report on the Local Plan (published shortly before the decision) or at least explained any departure from its conclusions about deliverability.
- The court analysed the context: the EI Report was a long report on plan soundness; only a small portion of it (six paragraphs) related to the GTAA and deliverability; the EI Report had not been drawn to the Inspector's attention and was not included in the Statement of Common Ground.
- The court applied the adversarial hearing principle (Case R) that it is incumbent on parties to place material before an Inspector. It also considered authorities (including Case Q and Case P) that in some circumstances earlier decisions may be material even if not relied upon by the parties, but emphasised that those authorities did not create a general obligation on an Inspector to seek out and apply wide‑ranging documents not placed before him.
- The court concluded that, in the particular factual and evidential circumstances, the EI Report was not so obviously material that the Inspector was required, of his own motion, to search it out and either apply it or explain a departure. The EI had been conducting a different exercise (plan soundness) based on different material and timeframes, and the Plaintiff itself had not presented the EI Report to the Inspector. The Inspector therefore did not err in this respect and Ground 3 was unarguable.
Overall conclusion on reasoning
Applying established interpretive principles to the NPPF 2024 and the PPTS, and reviewing the Inspector's decision in its context and in the light of the evidence he considered, the court found all three grounds advanced by the Plaintiff to be unarguable. The Inspector's approach to Green Belt policy (in light of Case A and related authority), his assessment of deliverability, and his treatment of the evidential material before him (including the absence of the EI Report from the hearing material) did not disclose an error of law requiring permission to proceed.
Holding and Implications
Holding: The court refused permission on all grounds. In the court's words: permission to seek statutory review and/or to appeal is refused on all Grounds.
Implications:
- Direct effect: The Plaintiff's applications for permission for statutory review under s.288 and for an appeal under s.289 are refused. The Inspector's decision quashing the enforcement notice and granting planning permission therefore stands pending any alternative procedural route available to the Plaintiff (none of which were granted by this court in these proceedings).
- Authoritative reading of policy: The court reaffirmed that the interpretation of NPPF policy adopted in Case A (as applied by the Inspector here) continues to be authoritative for present purposes: where development falls within categories classed as "not inappropriate" by the Framework, it is to be treated (in policy terms) as not giving rise to harm to openness such that VSC are required. Footnote 55 in NPPF 2024 was held to have a practical clarifying role rather than to create a novel residual duty to attribute some undefined weight to harm in such cases.
- Deliverability and evidence: On deliverability the court confirmed that established tests (availability, suitability, realistic prospect of delivery) remain relevant; whether sites meet the definition of "deliverable" is a matter of evidence and planning judgment for the decision‑maker.
- On the duty of an inspector to consider earlier reports or decisions: the court reaffirmed the adversarial principle that parties should present material they wish to be considered; an Inspector is not generally required to hunt down potentially relevant material that the parties have not relied upon unless the material is plainly and obviously material in the particular circumstances.
- Precedent: The decision does not purport to create new legal principle beyond applying and reaffirming existing authorities; it rejects the Plaintiff's attempt to establish a novel construction of the NPPF 2024.
The court recorded its gratitude to counsel for the concise and helpful manner in which the case was presented.