Dromada Windfarm (ROI) Ltd v Cremins (Approved)

High Court of Ireland
Jul 14, 2023
Smart Summary (Beta)

Factual and Procedural Background

This case concerns high voltage cables servicing the Plaintiff's windfarm, laid in the grass verge alongside a public road abutting the Defendant's land. The Plaintiff now accepts that the cables are laid on ground belonging to the Defendant. The primary issue is whether the Court should order the Defendant to refrain from interfering with the cables and allow them to remain in situ (with compensation payable to the Defendant for trespass) or order the Plaintiff to remove the cables, which the Plaintiff submits would cause disproportionate loss given the lack of material interference with the Defendant's use of the land.

The cables were laid around 2009. The Defendant first raised the issue of trespass in 2016 through solicitors. The Plaintiff denied trespass, leading to proceedings issued by the Defendant in 2017, which were not pursued. From June 2019, the Defendant engaged in extensive correspondence, threatening to remove the cables himself and warning of potential injuries or fatalities for which the Plaintiff would be responsible.

After unsuccessful negotiations, the Plaintiff issued proceedings in May 2021 and obtained an interim injunction restraining the Defendant from interfering with the cables. The Defendant responded with a self-drafted defence and counterclaim seeking removal of the cables and damages for interference.

The parties agreed on the facts and legal principles but diverged on the inferences and appropriate relief. The Plaintiff is part of a large renewable energy group operating multiple windfarms, and the Defendant is a farmer owning the land in question since around 2006. Planning permission for the windfarm was obtained in 2004, initially including turbines on the Defendant's land under an option agreement which expired without renewal.

The windfarm has operated since 2010, connecting to the national grid via approximately 3 km of 110 KV cables, with about 250m crossing the Defendant's land. The cables were laid in the grass verge between a fenced boundary and the public road. The Plaintiff initially believed the cables were not on the Defendant's land but now concedes trespass.

Correspondence and meetings from 2016 onwards reveal the Defendant's persistent claims of trespass and threats to remove the cables, culminating in the Plaintiff's injunction application to prevent interference. The Defendant's conduct included exposing cables in December 2020, prompting safety measures by the Plaintiff.

Both parties presented evidence and legal submissions, including expert reports and references to relevant case law. The Defendant seeks removal of the cables and compensation, while the Plaintiff seeks to keep the cables in place with compensation payable to the Defendant for trespass.

Legal Issues Presented

  1. Whether the Defendant is entitled to an injunction ordering the removal of the cables from his land.
  2. Whether the Plaintiff should be allowed to keep the cables in situ and compensate the Defendant for trespass.
  3. The appropriate exercise of the court's discretion in granting an injunction or awarding damages in lieu thereof in the context of a technical trespass.
  4. The legal consequences of the Defendant's conduct, including threats and interference with the cables.
  5. The implications of planning and statutory provisions regarding laying cables alongside public roads.

Arguments of the Parties

Plaintiff's Arguments

  • The cables were laid in good faith, believing no trespass occurred, relying on planning exemptions and a road opening licence.
  • Technical trespass is admitted, but the Defendant's remedy is limited to monetary compensation rather than removal.
  • Removal of the cables would cause disproportionate loss, including disruption to the windfarm's operation and breach of contractual obligations.
  • The Defendant's delay in asserting rights and failure to progress earlier proceedings constitutes laches, weakening his claim for removal.
  • The Defendant's threats and interference with the cables were dangerous, unjustified, and aimed at coercing the Plaintiff into a monetary settlement.
  • Legal principles and precedent support awarding damages in lieu of an injunction where the injury is small and compensable.
  • Offers to resolve compensation disputes by arbitration or mediation have been made in good faith.

Defendant's Arguments

  • The cables were laid on his land without consent, constituting trespass.
  • He is prima facie entitled to an injunction ordering removal of the cables and restoration of the land.
  • The Plaintiff's concession of trespass supports his claim for removal rather than mere compensation.
  • The cables interfere with his property rights, and monetary compensation alone is insufficient.
  • The Plaintiff's initial denial of trespass and equivocal stance undermines its position.
  • The Defendant's conduct, including threats and partial removal of safety markers, was aimed at compelling the Plaintiff to negotiate and acknowledge trespass.
  • The Defendant seeks substantial compensation and insists on removal if planning permission for retention is not obtained within a specified timeframe.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Patterson v Murphy [1978] ILRM 85 Principles governing injunctions in cases of nuisance and trespass, including when damages may be awarded in lieu of injunction. Provided the framework for assessing whether to grant an injunction or award damages, emphasizing the prima facie right to injunction unless exceptional circumstances exist.
Shelfer v City of London Electric Lighting Company [1895] 1 Ch 287 Established criteria for awarding damages instead of an injunction where injury is small and compensable. Guided the court in balancing property rights against practical considerations, confirming damages may substitute injunctions in exceptional cases.
Daly v Kilronan Windfarm Limited [2017] IEHC 308 Clarified that a road opening licence does not confer a right to enter private land and that trespass may occur despite such licence. Supported the Plaintiff's concession of technical trespass and informed the legal context of cable laying alongside public roads.
McKeever v Hay & Ors [2008] IEHC 145 Application of Patterson principles in trespass involving pipes laid on land, considering compulsory purchase and injunction timing. Illustrated the court's approach to trespass with a focus on compensation and timing of injunctive relief, influencing the court's discretion here.
Jaggard v Sawyer [1995] 1 WLR 269 Discretionary nature of injunctions and damages in nuisance and trespass cases. Emphasized that case law provides illustrations rather than binding rules on discretion, guiding the court's flexible approach.
Allied Irish Banks plc v Diamond [2012] 3 IR 549 Protection of property rights and reluctance to substitute damages for injunctions when property rights are invaded. Reinforced the principle that damages are not always an adequate remedy and that injunctions protect property rights, informing the court's balancing exercise.
Arthur v Anker [1997] QB 564 and Vine v Waltham Forest LBC [2000] 1 WLR 2383 Prohibition of self-help remedies by trespassers and unlawful interference with property. Supported the Plaintiff's submission that the Defendant had no right to interfere with the cables despite trespass.

Court's Reasoning and Analysis

The Court acknowledged the Plaintiff's admitted technical trespass and the Defendant's prima facie right to an injunction ordering removal of the cables. However, the Court emphasized its discretion in granting such relief, guided by established principles from Patterson v Murphy and Shelfer, among others.

The conduct of both parties was critically examined. The Defendant delayed asserting his rights for several years, did not progress earlier proceedings, and engaged in a campaign of threatening and unsafe conduct aimed at coercing the Plaintiff into negotiation. The Plaintiff initially denied trespass and was less than forthright in its affidavits but ultimately conceded trespass at trial.

The Court found that the Defendant suffered no material interference with his use or enjoyment of the land, which was largely afforested or unused. The Plaintiff's trespass was not willful or reckless but based on a genuine, though mistaken, belief in entitlement. Removal of the cables would cause disproportionate harm to the Plaintiff, including operational disruption and potential contractual breaches, as well as broader implications for similar cases involving cables laid alongside public roads.

The Court rejected the Defendant's self-help threats and actions as unjustified and dangerous. It recognized the Defendant's right to compensation but concluded that damages rather than removal was the appropriate remedy. The Court noted the absence of evidence on adequate compensation and indicated that a further procedural module or alternative dispute resolution would be necessary to resolve this issue.

Accordingly, the Court decided that the cables should remain in situ, subject to compensation to be determined, and that the interlocutory injunction restraining interference with the cables should continue. The Court invited the parties to make submissions on the form of final orders, access arrangements, compensation mechanisms, mediation or arbitration, and costs within a limited timeframe.

Holding and Implications

The Court's final decision was to refuse an order requiring removal of the cables and instead allow the cables to remain in place with the Plaintiff liable to compensate the Defendant for the trespass.

The interlocutory injunction preventing the Defendant from interfering with the cables remains in force pending further orders. The Court emphasized that the Defendant is entitled to compensation, but the amount and terms are to be determined through further procedural steps, including possible arbitration or mediation.

This decision directly affects the parties by permitting the continuation of the current cable installation while providing a pathway to resolve compensation. The Court did not establish new legal precedent but applied established principles of trespass, injunctions, and damages in a nuanced factual context involving renewable energy infrastructure and public roads.