HIGHLANDS AND ISLANDS ENTERPRISE AGAINST GALLIFORD TRY INFRASTRUCTURE LTD

Scottish Court of Session
Mar 10, 2023
Smart Summary (Beta)

Factual and Procedural Background

The Plaintiff entered into contractual arrangements beginning in 1999 for the design and construction of a funicular railway, known as the Cairngorm Mountain Railway, near Aviemore. The Plaintiff contracted with the Defendant One for construction and with Defendant Two, acting as project civil and structural engineer. Defendant One was also contractually obliged to coordinate, supervise, and administer Defendant Two's design work. The railway, approximately two kilometres long and rising about 600 metres, began operations on 24 December 2001. After certain defects were identified, operations were suspended in October 2018.

The Plaintiff claims the defects stem from breaches of contract and delictual duties by the Defendants in design and construction, resulting in significant repair costs. Between completion and 2008, Defendant Two carried out inspections and reported no significant concerns. From 2008, the Plaintiff directly engaged Defendant Two for regular inspections until 2014, when another company replaced Defendant Two. In 2015, the replacement company reported potentially serious structural issues, escalating until the railway's suspension in 2018.

The Plaintiff initiated a commercial action seeking joint and several payment of damages exceeding £11.5 million. The case is scheduled to proceed to proof before answer later in the year. Meanwhile, Defendant One sought determination by debate of its contention that the claim against it is prescribed. Defendant Two did not participate in the debate.

Legal Issues Presented

  1. Whether the Plaintiff's claim against Defendant One is extinguished by prescription under the Prescription and Limitation (Scotland) Act 1973, particularly section 6(1), given the claim was not raised within five years of the obligation becoming enforceable.
  2. Whether the Plaintiff can successfully invoke statutory provisions, notably sections 6(4) and 11(3) of the 1973 Act, to postpone the commencement of the prescriptive period due to induced error or delayed awareness of loss, injury, or damage.
  3. The proper application and interpretation of the "reasonable diligence" requirement in sections 6(4) and 11(3) of the 1973 Act in the context of the Plaintiff's claims.
  4. The materiality and effect of the Plaintiff's actual knowledge of cracking to scarf joints prior to 2014 on the prescription defence.

Arguments of the Parties

Defendant One's Arguments

  • Any claim against Defendant One became enforceable by 24 December 2001, the date the railway was completed and entered service.
  • Accordingly, under section 6(1) of the Prescription and Limitation (Scotland) Act 1973, the claim prescribed by 24 December 2006, as the action was commenced in 2019.
  • The Plaintiff's attempts to defer prescription under sections 6(4) and 11(3) fail because the Plaintiff could, with reasonable diligence, have discovered the defects by 2008 through inspections conducted by Defendant Two.
  • The "reasonable diligence" proviso excludes suspension of the prescriptive period after the Plaintiff could with reasonable diligence have discovered the error inducing it not to make a claim.
  • The Plaintiff was aware of certain cracking to scarf joints well before the prescriptive period, and the costs incurred in repairing those were not immaterial; thus, section 11(3) does not apply to that element of loss.
  • The Plaintiff's own pleadings and expert reports demonstrate that defects were discoverable by 2008, rendering the claim against Defendant One irrelevant.

Plaintiff's Arguments

  • The Plaintiff accepts that, prima facie, prescription would extinguish the claim by 2006 but relies on sections 6(4) and 11(3) to postpone the start of prescription until late 2015.
  • The Plaintiff contends it was unaware of material defects until notified in 2015, and prior reports of cracking were immaterial and part of normal maintenance.
  • The Plaintiff claims it was induced to refrain from making a claim due to an erroneous belief, induced by Defendant One's conduct, that the railway was free from material defects.
  • The Plaintiff denies offering inconsistent factual scenarios and maintains consistent pleading that it had no actual knowledge of material defects before 2015.
  • The Plaintiff asserts that reasonable diligence required no more than instructing the inspections it did, but does not specify what would constitute reasonable diligence.
  • The Plaintiff argues that the question of reasonable diligence and the postponement of prescription can only be properly determined after proof.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
David T Morrison & Co Ltd v ICL Plastics Ltd [2014] UKSC 48 Prescription begins when the obligation becomes enforceable; reasonable diligence standard in limitation law. Used to establish the prima facie date when prescription would extinguish the claim and to support interpretation of reasonable diligence.
Adams v Thorntons WS (No. 3) 2005 1 SC 30 Requirement for the creditor to plead and prove circumstances for postponing prescription under section 6(4), including reasonable diligence. Referenced to clarify burden of proof and pleading requirements on Plaintiff regarding postponement of prescription.
Gordon's Trs v Campbell Riddell Breeze Paterson LLP [2017] UKSC 75 Materiality of loss for prescription to start running; loss must be more than minimal. Applied to assess the materiality of the cracking and costs incurred by the Plaintiff.
BP Exploration Operating Co Ltd v Chevron Shipping Co [2001] UKHL 50 Burden of proof on debtor to aver reasonable diligence; principles of statutory construction for prescription. Supported the court's approach to onus and the need for specific averments on reasonable diligence.
Heather Capital Ltd (In Liquidation) v Levy & McRae [2017] CSIH 19 Reasonable diligence is a value judgment requiring evidence; burden of proof and factual complexity in prescription cases. Used to discuss the complexity of reasonable diligence and the necessity of proof in this case.
Rowan Timber Supplies (Scotland) Ltd v Scottish Water Business Streams Ltd [2011] CSIH 26 Effect of demands for payment on induced error and prescription. Supported the Plaintiff's claim that payment demands without indication of defects induced error.
ANM Group Ltd v Gilcomston North Ltd [2008] CSOH 90 Interpretation of reasonable diligence and induced error in postponing prescription. Cited regarding the effect of reasonable diligence and ignorance on the running of prescription.
Royal Bank of Scotland v Halcrow Waterman Ltd [2013] CSOH 173 Similar to ANM Group on reasonable diligence and prescription. Referenced for the proposition that reasonable diligence and ignorance affect prescription timing.
Huntaven Properties Limited v Hunter Construction (Aberdeen) Limited and Ors [2017] CSOH 57 Materiality threshold for loss or damage to trigger prescription. Supported Plaintiff's argument on the necessity of material loss for prescription to commence.

Court's Reasoning and Analysis

The court acknowledged that, prima facie, the Plaintiff's claim was extinguished by prescription as of 24 December 2006, five years after the railway's completion and entry into service. The Plaintiff bore the burden to aver specific circumstances under sections 6(4) or 11(3) of the Prescription and Limitation (Scotland) Act 1973 to postpone prescription, including the "reasonable diligence" proviso.

The Plaintiff averred it was induced to refrain from making a claim due to an erroneous belief that the railway was free from material defects, based on Defendant One's conduct in handing over the railway and requesting payment without indication of defects. This averment was not challenged as irrelevant or insufficient.

Defendant One challenged the Plaintiff's claim by asserting that the defects were discoverable by reasonable diligence no later than 2008, through inspections by Defendant Two, and that the Plaintiff had actual knowledge of some defects (notably cracking) well before 2014. The court found that the question of what constitutes reasonable diligence is a factual matter requiring evidence and was not sufficiently pleaded or determined at debate.

The court noted that the Plaintiff's pleadings did not clearly specify what reasonable diligence would have entailed, only that the Plaintiff acted responsibly by instructing regular inspections and that reasonable diligence required no more than that. The court rejected Defendant One's "weaker alternative" argument as the Plaintiff did not offer inconsistent factual scenarios.

Regarding the scarf joint cracking, the court found the Plaintiff's pleadings insufficiently specific on the materiality of the loss and damage, as the descriptions of the cracking and repair costs were conclusory and lacked factual detail. Consequently, the Plaintiff's claim concerning the scarf joint cracking was not apt to proceed to proof under section 11(3).

The court emphasized that the burden of pleading and proof lies with the Plaintiff to establish entitlement to postpone prescription and that the Defendant bears the burden to aver the operation of the reasonable diligence proviso. The court also clarified that while reasonable diligence is often a complex factual inquiry requiring evidence, some minimum features can be determined without proof in straightforward cases. However, in this case, the pleadings did not support such a determination.

Ultimately, the court concluded that the Plaintiff's averments suffice to proceed to proof before answer with the prescription plea standing, except for the section 11(3) claim relating to scarf joint cracking, which will not form part of the proof.

Holding and Implications

The court's final decision is to allow the action to proceed to proof before answer with the prescription plea of Defendant One standing.

The Plaintiff's claim is not dismissed at debate stage despite the prescription defence; instead, issues regarding the postponement of prescription, reasonable diligence, and induced error are remitted to proof.

The Plaintiff's section 11(3) claim related to scarf joint cracking is excluded from proof due to insufficient specificity regarding materiality and awareness of loss.

The decision means that the substantive issues concerning prescription and the merits of the claim will be determined at trial, with no new legal precedent established by this interlocutory ruling.