ENERGIEKONTOR UK LTD FOR JUDICIAL REVIEW
Factual and Procedural Background
The Petitioner is a developer of commercial wind farms who applied for planning permission for a wind farm within the consultation zone surrounding the Eskdalemuir Seismic Array ("the Array"). The Ministry of Defence ("MOD") objected to the application based on a policy designed to protect the operational capabilities of the Array by managing seismic vibrations caused by wind farms. The Petitioner challenged the lawfulness of the MOD's policy and its operation through judicial review.
The petition initially involved an application for permission to proceed outwith the usual three-month time limit, which was granted by the court. Subsequently, the petition progressed to a substantive hearing held remotely due to Covid-19 restrictions, where affidavit evidence from all parties was accepted as credible and reliable.
The Array is an international monitoring facility designed to detect seismic vibrations from nuclear tests and is protected by UK government policy, led by the MOD, despite the related Treaty lacking domestic legal force. The MOD established exclusion and consultation zones around the Array and uses a noise budget threshold (0.335 nanometres ground displacement) to regulate wind farm developments.
The MOD allocates noise budget on a first come first served basis using a Noise Budget Tool spreadsheet that assesses cumulative seismic impact of existing and proposed wind farms. Developments exceeding 50 megawatts (MW) require Scottish Ministers' consent under section 36 of the Electricity Act 1989, while smaller developments require planning permission from local authorities. The MOD's policy allocates noise budget at different stages for larger (>50MW) and smaller (≤50MW) developments, creating a distinction challenged by the Petitioner.
The Petitioner’s application for a 14 turbine wind farm at Little Hartfell (≤50MW) was added to a waiting list after the noise budget was deemed fully allocated, and the MOD objected. The local planning authority granted permission subject to a mitigation scheme condition. Meanwhile, CWL Energy Limited ("CWL"), another developer, had a larger proposed development at Faw Side (>50MW) allocated noise budget earlier in the process following a scoping request, leading to an MOD objection due to exceeding the noise budget.
Legal Issues Presented
- Whether the MOD's policy of allocating noise budget at different stages for larger (>50MW) and smaller (≤50MW) wind farm developments within the consultation zone is lawful, reasonable, and rational.
- Whether the MOD's decision allocating noise budget to CWL's proposed Faw Side development and the resulting waiting list should be reduced (quashed).
Arguments of the Parties
Petitioner's Arguments
- The MOD's policy is irrational, unreasonable, and unlawful because it discriminates without rational basis between larger and smaller developments by allocating noise budget at different procedural stages.
- The policy fails to treat like cases alike and creates an unjustifiable preference for larger developments, hampering proper planning within the consultation zone.
- The MOD's role is solely to protect the Array, not to promote wind farm proposals, and the policy's effects go beyond what is necessary for protection.
- The Petitioner sought a declarator that the policy is unlawful and reduction of the MOD’s allocation decision regarding CWL’s Faw Side development and the waiting list.
- Reduction is appropriate to clear the ground for a lawful reconsideration of noise budget allocation and to ensure equal treatment of the Petitioner’s and CWL’s proposals.
MOD's Arguments
- The MOD conceded that its current approach is unlawful due to lack of recorded reasons and insufficient publicity but opposed reduction as unnecessary and potentially prejudicial to the forthcoming consultation process.
- The MOD argued that objections to planning applications would remain regardless of reduction and that the declarator alone was sufficient to clear the ground for policy review.
- The MOD emphasized that it intends to consult on a new approach and that reduction would not restrict this process but might prejudice it.
CWL's Arguments
- CWL opposed both declarator and reduction, arguing the petition's real target was the allocation of noise budget to their Faw Side development.
- CWL highlighted the public interest in maximizing renewable energy capacity and noted substantial financial investments in their projects.
- CWL submitted that UK law does not recognize equal treatment as a distinct administrative law principle and that inequality must be irrational to be justiciable.
- The existing policy had been operated since 2005 without explanation but was not irrational; distinctions between larger and smaller developments align with existing planning consent procedures.
- CWL contended that the Petitioner’s criticisms related to timing and removal from the noise budget queue, not the allocation timing itself, and that the Petitioner failed to show irrationality.
- CWL argued that reduction would cause prejudice to them and other developers on the waiting list who were not parties to the proceedings.
- CWL maintained that the petition was late and that the Petitioner’s change of position showed the real target was the Faw Side allocation, which was too late to challenge.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Matadeen v Pointu [1999] AC 98 | Equality of treatment as a principle of rational behaviour and its justiciability | Confirmed that equality means distinctions must be rational; used to frame the irrationality test of the MOD's policy. |
| R (G) v Nottinghamshire Healthcare NHS Trust [2010] PTSR 674 (CA) | Equality principle as an application of Wednesbury rationality | Supported the court’s approach to assess the MOD's policy under the rationality standard. |
| R (Gallaher Group Ltd) v Competition and Markets Authority [2019] AC 96 | Equality and rationality in administrative decisions | Reinforced the rationality test applied to the MOD's policy. |
| Council of the Law Society of Scotland v Scottish Legal Complaints Commission 2017 SC 718 | Power of decision-maker to revisit and correct unlawful decisions without court action | Supported granting reduction to allow MOD to revisit noise budget allocations practically. |
| Anderson Strathern LLP v Scottish Legal Complaints Commission 2017 SC 120 | Quashing unlawful categorisations in judicial review | Provided authority for granting reduction (quashing) of unlawful decisions in the present case. |
| Salvesen v Riddell 2013 SC (UKSC) 235 | Opportunity to rectify unlawful acts without immediate court intervention | Used to argue that declarator alone might suffice and that the MOD could rectify its policy through consultation. |
Court's Reasoning and Analysis
The court applied the established principle that administrative policies must be rational and treat like cases alike. The principle of equality in administrative law is a subset of Wednesbury rationality, requiring distinctions to have a rational basis. The MOD’s policy was scrutinized on this basis.
The court found that the MOD’s policy, which allocates noise budget to larger developments based on the date of a scoping request but allocates it to smaller developments based on the date of planning application notification, lacked any rational justification. The capacity threshold (>50MW or ≤50MW) is irrelevant to the MOD’s protective role, which focuses solely on preventing interference with the Array via seismic vibrations.
The policy’s effect is to afford larger developments an earlier opportunity to secure noise budget allocation, thereby disadvantaging smaller developments. The court rejected the explanations suggested by CWL as primarily planning considerations unrelated to the MOD’s statutory function, and thus insufficient to justify the policy distinction.
While the court acknowledged that the policy’s practical effects—such as the “logjam” caused by large developments like Faw Side—are unfortunate, these consequences alone do not define irrationality. The court emphasized that it does not prescribe what the new policy should be but only declares the current policy unlawful due to irrationality.
The court further held that a mere declarator of unlawfulness would be insufficient. Drawing on prior case law, it reasoned that a practical remedy—decree of reduction quashing the MOD’s decision allocating noise budget to Faw Side and the related waiting list—was appropriate to clear the ground for lawful reconsideration and consultation.
The court rejected the MOD’s and CWL’s arguments against reduction, concluding that granting reduction would not prejudice other developments with planning permission or constructed turbines and would assist in good public administration by rectifying the consequences of the unlawful policy. The court noted that the Faw Side development had not yet received section 36 consent or commenced construction, and that objections based on noise budget would likely continue under any lawful policy.
Holding and Implications
The court's final decision was to grant both the declarator and the decree of reduction sought by the Petitioner.
Holding: The MOD's policy allocating noise budget differently for larger and smaller wind farm developments is irrational and unlawful. The court granted a declarator to that effect and reduced (quashed) the MOD’s decision allocating noise budget to CWL's Faw Side development and the associated waiting list, as applied quoad the Petitioner.
Implications: This decision removes the unlawful policy option from consideration and clears the way for the MOD to consult and formulate a new lawful policy on noise budget allocation. The ruling does not set new precedent beyond confirming the application of Wednesbury rationality to administrative decisions involving equality of treatment. It affects the parties by requiring reconsideration of prior allocations and ensuring equal treatment in future allocations but does not disturb noise budget allocations concerning developments already constructed or with granted planning permission. Questions of expenses are reserved.