W M MORRISON SUPERMARKETS PLC AGAINST (FIRST) LEM ESTATES LTD (IN LIQUIDATION) and KEITH ANDERSON, the liquidator thereof; (SECOND) STRUER CONSULTING ENGINEERS LTD; (THIRD) MUIR CONSTRUCTION LTD
Factual and Procedural Background
The Plaintiff is a supermarket operator and tenant of a supermarket located at 295-301 Gallowgate, The City. In 2010, the first Defendant was a developer who agreed with the Plaintiff under an Agreement for Lease to develop the supermarket, which the Plaintiff would lease upon completion. The second Defendant is a consulting civil and structural engineering firm, and the third Defendant is a building contractor. In June 2011, the first and third Defendants entered into a building contract for the design and construction of the supermarket, incorporating amendments to a standard Design and Build Contract. Around the same time, the first and second Defendants entered into an Appointment Agreement for the second Defendant to provide engineering services related to the Works. The rights and obligations under this Appointment Agreement were later novated to the third Defendant, with the second Defendant undertaking to complete the services for the third Defendant.
Collateral warranties were executed between the Plaintiff and the second and third Defendants respectively, obliging them in relation to their services and works. Practical completion of the Works occurred in December 2012, and the Plaintiff commenced trading. In December 2013, significant ponding and surface damage appeared in the car park, which the Plaintiff attributed to breaches by all Defendants under their respective agreements and warranties, seeking redress for resulting loss and damage.
The action was raised in December 2016 but was not called until a year later. After a period of sist and adjustments to pleadings, the case was transferred to the commercial roll in March 2019. A debate was allowed on issues raised by the Plaintiff and the second and third Defendants concerning design responsibility and personal bar, with submissions made by the Plaintiff and the second and third Defendants. The Court then proceeded to consider the relevant contractual terms, the relevancy of certain averments, and prescription issues.
Legal Issues Presented
- Whether the second Defendant is contractually responsible to the Clients for the design of the car park surface course under the Appointment Agreement.
- Whether the third Defendant is contractually responsible to the first Defendant for the design of the car park surface course under the Building Contract.
- Whether the averments of personal bar made by the third Defendant are relevant and admissible.
- Whether certain claims and averments made by the Plaintiff have prescribed under the Prescription and Limitation (Scotland) Act 1973.
Arguments of the Parties
Plaintiff's Arguments
- The second Defendant was contractually responsible for the design of the car park surface under the Appointment Agreement, which imposed a "one-stop shop" liability for all design services.
- The third Defendant was contractually responsible for the design under the Building Contract as the design and build main contractor.
- The involvement of the Plaintiff's consultant in suggesting the use of the TarmacDry system does not absolve the Defendants of responsibility, as the contractual terms clearly allocate design responsibility.
- The averments by the Defendants that they are not responsible for the design or that the Plaintiff is personally barred from asserting claims are irrelevant.
- The claims made in the adjusted pleadings do not constitute new claims but are specifications of the original claims and thus have not prescribed.
Second Defendant's Arguments
- The third Defendant had sole contractual responsibility for designing and building the car park.
- The second Defendant's design responsibility was effectively curtailed or varied by the inclusion of the TarmacDry system in the Employer's Requirements, which was instructed by the first Defendant and instigated by the Plaintiff's consultant.
- The second Defendant denies negligence and asserts there was no duty to warn about difficulties arising from the use of TarmacDry.
- The pleas-in-law include a plea to relevancy and prescription, seeking dismissal of the action against the second Defendant.
Third Defendant's Arguments
- Not all design and build contracts impose responsibility on the Contractor for every part of the design; responsibility depends on contract construction.
- Clause 2.1 of the Contract conditions does not impose design obligations on the third Defendant for matters specified in the Employer's Requirements.
- The third Defendant's contractual responsibility for design, including the TarmacDry system, should be determined after proof.
- The third Defendant avers personal bar, asserting that the Plaintiff, through its agent, represented that TarmacDry was suitable, and the third Defendant acted to its prejudice by agreeing to its inclusion, barring the Plaintiff from claiming breach based on TarmacDry.
- Personal bar is applicable even if the representation predates the existence of the rights claimed to be barred, contrary to some prior authorities.
- Some averments relating to the Plaintiff's failure to clean and maintain the surface properly should be excluded from probation.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Dunlop v McGowans 1980 SC (HL) 73 | Requirement of concurrence of injuria and damnum for delictual claims. | Used to establish timing for prescriptive period starting point. |
| David T Morrison & Co Ltd t/a Gael Home Interiors v ICL Plastics Ltd 2014 SC (UKSC) 222 | Principles on prescription and relevant claims. | Applied in assessing whether claims were relevant and within prescriptive period. |
| J G Martin Plant Hire Ltd v Ballantyne Copland France & Co 1996 SC 105 | Distinguishing between new claims and specifications of existing claims for prescription purposes. | Applied to determine if amended pleadings introduced new claims or not. |
| Classic House Developments Ltd v GD Lodge & Partners and Others (Unreported, 1998) | Prescription and amendment of pleadings. | Referenced regarding the effect of adjustments on prescription. |
| Cole v Lonie 2001 SC 610 | Prescription and relevancy of claims. | Used to support the analysis of prescription issues. |
| Musselburgh & Fisherrow Co-operative Society Ltd v Mowlem Scotland Ltd 2004 SCLR 412 | Prescription in construction claims. | Applied in the context of prescription of construction-related claims. |
| Huntaven Properties Limited v Hunter Construction (Aberdeen) Limited & Ors [2017] CSOH 57 | Pleadings and prescription in construction claims. | Referenced for approach to prescription and pleadings. |
| McClure Naismith LLP, Thistle Property Holding Company Limited v Harley Haddow Partnership 2018 SCLR 257 | Prescription and amendment of pleadings. | Applied in assessing whether amendments introduced new claims. |
| Ben Cleuch Estates Limited v Scottish Enterprise [2006] CSOH 35, 2008 SC 252 | Reliance and reasonableness in personal bar. | Used to reject personal bar defence on the facts. |
| Electricity Supply (Nominees) (Scotland) Limited v Combined Capital Limited 1987 SC 303 | Personal bar requires existing right and inconsistent conduct. | Applied to assess personal bar averments. |
| William Grant & Sons Limited v Glen Catrine Bonded Warehouse Limited 2001 SC 901 | Principles of personal bar and waiver. | Referenced regarding timing and authority for representations. |
| Gatty v Maclaine 1921 SC (HL) 1 | Classic statement of requirements for personal bar. | Applied to determine irrelevance of personal bar averments. |
| Nairn v South-East Lancashire Insurance Co Limited 1930 SC 606 | Personal bar requires pre-existing rights to be affected. | Used to reject personal bar where rights did not pre-exist. |
| British Overseas Bank Nominees Ltd & Others v Stewart Milne Group Ltd 2019 SLT 1253, [2019] PNLR 2 | Construction of design responsibility in building contracts. | Distinguished on facts; used for comparison of contract clauses. |
| MT Højgaard A/S v E.ON Climate & Anor [2017] UKSC 59, [2018] 2 All ER 22, [2017] BLR 477 | Design responsibility and liability in construction contracts. | Referenced in arguments and for principles on design responsibility. |
| A M Gillespie & Co v James Howden & Co (1885) 12 R 800, (1885) 22 SLR 527 | Principles of contract construction in building contracts. | Referenced in submissions on contract interpretation. |
| N V Devos Gebroeder v Sunderland Sportswear Ltd 1990 SC 291 | Prescription and relevant claims. | Referenced in the Court's analysis of prescription. |
| Assuranceforeningen Skuld v International Oil Pollution Compensation Fund (No 2) 2000 SLT 1348 | Prescription and limitation principles. | Referenced in submissions on prescription. |
| Safdar v Devlin 1995 SLT 530 | Prescription and pleadings. | Referenced in submissions on prescription. |
| Eadie Cairns v Programmed Maintenance Painting Ltd 1987 SLT 777 | Fair notice in pleadings and expert reports. | Referenced regarding incorporation of expert reports into pleadings. |
| The Royal Bank of Scotland plc v Holmes 1999 SLT 563 | Fair notice and pleadings. | Referenced in relation to pleadings and expert evidence. |
Court's Reasoning and Analysis
The Court first interpreted the Appointment Agreement and the Building Contract to determine the contractual responsibilities for the design of the car park surface course. It concluded that, on proper construction, the second Defendant remained fully responsible to the Clients for all services, including the design of the car park surface, despite liaison with other consultants. The suggestion that the second Defendant's design responsibility was curtailed or varied by the inclusion of the TarmacDry system was rejected due to the absence of a formal variation and lack of basis for any effective variation.
Similarly, the Court held that the third Defendant was responsible to the first Defendant for the design of the car park surface course under the Building Contract. This conclusion was supported by specific contract clauses, including acceptance of full responsibility for the Employer's Requirements and Contractor's Proposals, and the express allocation of design responsibility to the third Defendant.
Regarding the third Defendant's averments of personal bar, the Court found them irrelevant. It reasoned that the alleged representation by the Plaintiff's consultant was an opinion, not a fact, and thus insufficient to ground personal bar. Moreover, at the time of the representation, the relevant contractual rights had not yet come into existence, negating the required inconsistency with pre-existing rights. The Court also considered it unreasonable for the third Defendant to have relied on the representation, given the contractual context and the warranties provided by the third Defendant.
On the issue of prescription, the Court examined whether the Plaintiff's adjusted pleadings sought to enforce new obligations or were specifications of the original claims. It found that most of the adjustments, including those specifying breaches of particular clauses in the Employer's Requirements and claims related to the unsuitability of TarmacDry and failure to warn, were not new claims and thus had not prescribed. However, the claim alleging poor workmanship in the installation of TarmacDry by the third Defendant was deemed a new and different case introduced after the prescriptive period, and therefore prescribed.
The Court also emphasized the importance of including references to all obligations sought to be enforced within the pleadings to satisfy the requirements for interrupting prescription, noting that expert reports alone are insufficient unless incorporated or referenced in the pleadings.
Holding and Implications
The Court held that:
- The second Defendant is contractually responsible to the Clients for the design of the car park surface course under the Appointment Agreement.
- The third Defendant is contractually responsible to the first Defendant for the design of the car park surface course under the Building Contract.
- The third Defendant’s averments of personal bar are irrelevant and inadmissible.
- The majority of the Plaintiff’s claims, including those concerning the unsuitability of TarmacDry and failure to warn, have not prescribed.
- The Plaintiff’s claim alleging poor workmanship by the third Defendant introduced after the prescriptive period has prescribed and is not enforceable.
Implications: The decision confirms the allocation of design responsibility under the respective contracts and rejects the personal bar defence raised by the third Defendant. It clarifies the application of prescription in construction claims, emphasizing the necessity for claims to be clearly pleaded within the prescriptive period. No new precedent was established; the ruling applies the existing principles of contract interpretation, personal bar, and prescription to the facts of this case. The case proceeds with the claims that remain relevant and not prescribed, with further procedural directions to be determined.