FIELD SYSTEMS DESIGNS LTD AGAINST MW HIGH TECH PROJECTS UK LTD
Factual and Procedural Background
On or about 27 November 2015, Company A and Company B entered into a contract for the design and construction of electrical, control, and instrumentation works at a waste plant. Disputes arose leading to a Supplemental Agreement on or about 22 January 2018, which valued works completed as at 3 December 2017 at £9,600,000 and set out valuation bases for remaining works under Schedule 19. Two valuation methods were agreed: a schedule of rates (Table 19.2) applied to staff and labour employed by Company A, and a "cost plus" basis (Table 19.3) applied to third-party supplies and services.
On 28 May 2019, Company A submitted an interim payment request valuing works at £15,083,510.21, including claims for work by two entities, referred to as Cepha and Anord. Both parties had previously applied Table 19.2 rates to these works. Company B issued a payment notice on 21 June 2019 valuing the works at £14,008,181.86, creating a shortfall of £1,075,328.35.
Following these events, an adjudicator was appointed. The adjudication process involved multiple rounds of submissions and evidence between the parties, culminating in a hearing on 10 September 2019. The adjudicator identified twenty-five disputed issues, including two specific issues related to Cepha and Anord support and panel modifications, with deductions made by Company B. During the hearing, Company B raised a new argument that Cepha and Anord were subcontractors and thus the cost plus basis (Table 19.3) should apply rather than the schedule of rates (Table 19.2). Company A countered that Cepha and Anord were joint venture partners, a position allegedly known to Company B.
The adjudicator issued a decision on 4 October 2019, awarding in favor of Company A and rejecting the deductions proposed by Company B on the disputed issues. Company B challenged enforcement of this decision, arguing failure by the adjudicator to address a material defence and inadequate reasoning. Company A sought enforcement and recovery of half the adjudicator’s fees from Company B.
Legal Issues Presented
- Whether the adjudicator failed to exhaust his jurisdiction regarding the "Joint Venture/Subcontract" issue and/or failed to provide adequate reasons for his decision.
- Whether the adjudicator's decision is severable in respect of issues unaffected by any such failure.
- Whether Company B is required to pay Company A half of the adjudicator's fees if the decision is set aside.
Arguments of the Parties
Company A's Arguments
- The adjudicator addressed the valuation dispute and preferred Company A’s valuation approach over Company B’s.
- Both parties had consistently applied Table 19.2 rates to Cepha and Anord works in prior payment requests and certifications.
- Company B’s argument that Cepha and Anord were subcontractors was known and raised during adjudication but did not affect the validity of the adjudicator’s decision.
- The adjudicator carefully considered all documents and submissions, and the presumption of regularity applies to his decision.
- Failure, if any, to address the subcontractor/joint venture point was not material and did not affect the enforceability of the decision.
- Company A is entitled to recover half the adjudicator’s fees from Company B.
Company B's Arguments
- The adjudicator failed to address a material line of defence, the subcontractor/joint venture point, thus failing to exhaust jurisdiction and rendering the decision unenforceable.
- The adjudicator gave no reasons or inadequate reasons for rejecting the subcontractor/joint venture defence.
- The adjudicator’s failure was deliberate and material, particularly as he had directed Company B to file a discrete reply on this point.
- The decision should not be severed; if part is set aside, the entire decision should be set aside.
- If the decision is set aside, Company B is not liable to pay half the adjudicator’s fees; Company A’s remedy lies against the adjudicator.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| SW Global Resourcing Limited v Morris & Spottiswood Limited [2012] CSOH 200 | Presumption of regularity in adjudicator's decision and enforcement policy. | Applied to support the presumption that the adjudicator considered all submissions and that enforcement should be granted unless clear error. |
| Integrated Building Services Engineering Consultants Ltd v Pihl UK Ltd [2010] BLR 622 | Policy behind adjudication is to provide swift dispute resolution preserving cash-flow. | Referenced to emphasize court reluctance to refuse enforcement except in obvious cases. |
| Carillion Construction Ltd v Devonport Royal Dockyard Ltd [2006] BLR 15 | Requirement that adjudicator addresses all material issues raised. | Used to assess whether adjudicator failed to exhaust jurisdiction. |
| Pilon Ltd v Breyer Group plc [2010] EWHC 837 (TCC) | Distinction between deliberate and inadvertent failure to consider a defence; materiality test for unenforceability. | Applied extensively to analyze whether adjudicator’s failure was deliberate or inadvertent and whether it was material. |
| Gillies Ramsay Diamond v PJW Enterprises Limited 2004 SC 430 | Failure to address material line of defence may invalidate adjudicator’s decision. | Referenced in relation to adjudicator’s jurisdiction and natural justice. |
| Morgan Sindall Construction and Infrastructure Ltd v Westcrowns Contracting Services Ltd 2018 S.C.L.R. 471 | Materiality requirement for failure to address a defence in adjudication. | Applied to determine whether failure affected the overall result. |
| DC Community Partnerships Limited v Renfrewshire Council [2017] CSOH 145 | Adjudicator need not expressly address every point; failure to exhaust jurisdiction only in plain cases. | Used to support view that adjudicator implicitly addressed the subcontractor/joint venture issue. |
| AMEC Group v Thames Water Utilities Ltd [2010] EWHC 419 | Adjudicator must reach a decision responsive to issues referred. | Referenced by Company B to argue adjudicator’s failure to address subcontractor/joint venture point. |
| Construction Centre Group v Highland Council 2002 SLT 1274 | Scope of adjudicator’s jurisdiction defined by notice and defences raised. | Applied to assess adjudicator’s jurisdiction over subcontractor/joint venture defence. |
| RGB Ltd v SGL Carbon Fibres Ltd [2010] CSOH 77 | Failure to address material defence renders adjudicator’s decision unenforceable. | Used by Company B to support failure to exhaust jurisdiction argument. |
| NKT Cables A/S v SP Power Systems Ltd 2017 SLT 494 | Requirement for adjudicator to address all material defences and provide reasons. | Applied to analyze adequacy of adjudicator’s reasons and consideration of subcontractor/joint venture point. |
| Ballast plc v The Burrell Co (Construction Management) [2001] BLR 529 | Deliberate failure by adjudicator to address issue invalidates decision. | Referenced in context of deliberate failure to exhaust jurisdiction. |
| AWG Construction Services Ltd v Rockingham Motor Speedway Ltd [2004] EWHC 888 (TCC) | Adjudicator must respond to issues referred in adjudication. | Used to illustrate deliberate failure to address issues. |
| Dawnus Construction Holdings Ltd v Marsh Life Ltd [2017] EWHC 1066 (TCC) | Court will not scrutinize adjudicator’s decision for every point; broad-based approach applies. | Applied to support that non-address of sub-issues does not breach natural justice. |
| RGB P&C Limited v Victory House General Partner Limited [2019] EWHC 1188 (TCC) | Rarity of successful challenge for inadvertent failure to address issue; materiality and deliberate failure tests. | Referenced to explain when inadvertent failure may invalidate decision. |
| KNN Coburn LLP v GD Holdings Ltd 2013 EWHC 2879 (TCC) | Materiality and burden of proof in failure to consider material line of defence. | Applied to confirm burden lies with party asserting failure and materiality. |
| PC Harrington Contractors Ltd v Systech International Ltd [2012] EWCA Civ 1371 | Effect of setting aside adjudicator’s decision on liability for fees. | Referenced to address responsibility for adjudicator’s fees if decision set aside. |
| Stork Technical Services (RBG) v Ross's Executor 2015 SLT 160 | Joint and several liability for adjudicator’s fees. | Applied to uphold liability for fees despite challenge to decision. |
Court's Reasoning and Analysis
The court examined whether the adjudicator failed to exhaust jurisdiction or provide adequate reasons regarding the subcontractor/joint venture ("Subcontract/JV") issue. It acknowledged the absence of explicit reference to this point in the adjudicator’s decision but found some implicit consideration given the adjudicator’s detailed review of submissions, including the defender’s reply on the issue, and the context of the dispute.
The court noted that both parties had applied Table 19.2 rates consistently and that the disputed sum was limited to the difference over certain deductions certified by Company B. The adjudicator’s role was to assess the validity of these deductions, not to override the certified valuation or radically alter the dispute’s scope.
The court applied established legal principles distinguishing deliberate from inadvertent failure to address a defence. It found no evidence of deliberate failure by the adjudicator. Even if there was inadvertent failure or inadequate reasons on the Subcontract/JV point, the court concluded the failure was not material because it could only affect a limited part of the dispute and the point lacked substantive evidence.
Regarding severability, the court held that because the failure was not material, severability did not arise. However, it endorsed a flexible approach to severability should that issue become relevant.
On the adjudicator’s fees, the court held that the parties were jointly and severally liable to pay them, rejecting the argument that liability depended on enforceability of the decision.
Holding and Implications
The court REJECTED Company B’s arguments that the adjudicator’s decision was unenforceable due to failure to exhaust jurisdiction or inadequate reasons. It sustained Company A’s pleas and granted decree in accordance with the summons.
The decision enforces the adjudicator’s award in favor of Company A, confirming that the disputed valuation and payment are due. Company B is liable to pay half of the adjudicator’s fees. No new precedent was established; the ruling applies existing principles affirming the enforceability of adjudicators’ decisions absent material failure to address issues.