STATE OF HIMACHAL PRADESH v. M/S. OASYS CYBERNATICS PVT. LTD.
State of Himachal Pradesh & Anr. v. M/s OASYS Cybernatics Pvt. Ltd.
Civil Appeal No. _________/2025 (Arising out of SLP (C) No. 6531/2025), decided on 24.11.2025
Factual and Procedural Background
The State of Himachal Pradesh, through its Department of Food, Civil Supplies and Consumer Affairs, had since 2017 engaged the respondent, M/s OASYS Cybernatics Pvt. Ltd. (and its earlier arrangement), on a rental model for supply and maintenance of electronic Point-of-Sale (ePoS) devices at Fair Price Shops under the Public Distribution System (PDS).
In the financial year 2021-22, the State decided to upgrade to enhanced ePoS devices with biometric and IRIS-scanning facilities, capable of integration with electronic weighing scales, to implement an Aadhaar-enabled PDS (AePDS). An Expression of Interest was issued on 23.04.2021, followed by a series of tender processes in 2021–2022.
The first tender (20.12.2021) and second tender (28.01.2022) were cancelled after no bidder, including the respondent, was found technically qualified. In the third tender (from 23.02.2022), only the respondent met the technical criteria, but the Department scrapped the process (24.03.2022) to avoid a single-vendor situation and to afford equal opportunity to all bidders. A fourth tender (25.03.2022) again yielded the respondent as the sole technical qualifier. Given the pressing need to ensure continuity in ration distribution after repeated failed attempts, Government approval was obtained (24.05.2022) to open the respondent’s financial bid. After negotiations, the monthly rental rate was settled at ₹1,050 per Fair Price Shop for each upgraded ePoS device, inclusive of IRIS scanner and related hardware.
On 02.09.2022, a Letter of Intent (LoI) was issued to the respondent for supply, installation and maintenance of upgraded ePoS devices for five years, on a rental basis. The LoI was expressly conditional, requiring, among others: (i) compatibility testing of devices with NIC software at NICSI, Hyderabad; (ii) a live demonstration with NIC’s application at the Directorate at Shimla; (iii) execution of a formal agreement only after successful demonstration; and (iv) indication of MRP/landing cost of devices and major components.
The respondent acknowledged the LoI on 07.09.2022 and gave a broad cost estimate. The Department, by message dated 19.09.2022, asked the respondent to start providing new devices and training to Fair Price Shop dealers to facilitate transition after expiry of the 2017 contract in December 2022. Correspondence continued, with the Department on 28.09.2022 and 22.12.2022 reiterating requests for a complete cost break-up. The earlier 2017 rental contract remained in force, and the respondent continued to receive payments under it.
On 03.01.2023, an unsuccessful bidder, M/s Linkwell Telesystems Pvt. Ltd., complained that the respondent (and its predecessor entity) had been blacklisted in Andhra Pradesh and Madhya Pradesh for poor performance and losses to the public exchequer, alleging suppression of these facts. The complaint was received and placed before higher authorities but no formal inquiry or order was passed at that time.
Due to delay, the Department on 18.04.2023 demanded an action plan for installation of new devices within a week and directed expeditious implementation as per Government of India directions. The respondent submitted a deployment schedule (25.04.2023), reported successful testing and demonstration of integration of weighing scales with ePoS devices (12.05.2023), and asserted on 23.05.2023 that its entire stock of devices and accessories was ready for dispatch, complaining of financial burden due to continuing delay.
On 06.06.2023, the Department cancelled the LoI “with immediate effect”, stating only that the Government had decided to invite a fresh tender. No reasons were mentioned in the Cancellation Letter itself. Internal noting dated 12.05.2023 recorded a direction by the Chief Minister to call a new tender “keeping in view of irregularities”. An Expression of Interest was issued afresh within days.
The respondent’s representation dated 16.06.2023 seeking withdrawal of the Cancellation Letter was not accepted. The respondent then filed a writ petition before the High Court of Himachal Pradesh on 21.06.2023, challenging the Cancellation Letter and seeking implementation of the LoI. The High Court issued notice on 27.06.2023, permitting the State to proceed with fresh tendering but directing that no final decision be taken without its leave.
By judgment dated 30.05.2024, the High Court allowed the writ petition, quashed the Cancellation Letter as arbitrary, unreasoned and violative of natural justice, and directed the State to proceed on the basis of the LoI dated 02.09.2022, expecting both sides to complete necessary actions within six weeks given the public interest and earlier failed tenders.
Aggrieved, the State of Himachal Pradesh filed the present civil appeal in the Supreme Court. The Court condoned delay and issued notice on 03.03.2025, and by interim orders dated 21.04.2025 and 13.05.2025, stayed execution of the High Court’s order pending final adjudication. The Supreme Court judgment dated 24.11.2025 resolves this appeal.
Legal Issues Presented
- The Nature of the Letter of Intent: Whether the Letter of Intent dated 02.09.2022 created any binding or enforceable rights in favour of the respondent-company, or remained a conditional, pre-award communication subject to fulfilment of stipulated pre-requisites.
- The Legality of the Cancellation Letter: Whether the State’s decision dated 06.06.2023, cancelling the Letter of Intent, was arbitrary, unreasoned, or violative of the principles of natural justice, thereby warranting judicial interference.
Arguments of the Parties
Appellants' (State of Himachal Pradesh & Department) Arguments
- The High Court erred in treating the LoI as a concluded contract. By its terms, the LoI was conditional, subject to fulfilment of specific pre-requisites: compatibility testing with NIC software at Hyderabad; a live demonstration before the Directorate at Shimla; and execution of a formal agreement only after successful verification. These conditions remained unfulfilled, and the respondent’s inaction for over thirty-four weeks delayed a project of considerable public importance.
- Under settled law, a Letter of Intent merely indicates intention to enter into a contract and creates no enforceable obligation until a Letter of Acceptance or formal contract is executed. The Department therefore retained full discretion to cancel the LoI in the absence of compliance with its conditions.
- Despite repeated reminders (19.09.2022, 28.09.2022, 22.12.2022), the respondent failed to furnish the required MRP and cost break-up, did not complete testing at NIC Hyderabad, and did not produce a certified live demonstration. Persistent default compelled cancellation of the LoI on 06.06.2023.
- Communications from NIC Hyderabad in November 2024 confirmed that the respondent’s Android-based ePoS devices were incompatible with the NIC application and did not meet updated technical specifications. Allowing deployment of such devices would compromise integration with the national AePDS and expose the State to financial risk.
- The respondent suppressed material facts. A complaint from Linkwell Telesystems revealed that the respondent’s predecessor, M/s Omneagate Systems Pvt. Ltd., had been blacklisted in Andhra Pradesh and Madhya Pradesh. Non-disclosure of this in the eligibility declaration violated Clause 5.13.1 of the tender document, amounting to misrepresentation justifying cancellation.
- The decision to cancel was taken after due consideration by competent authority, including the Chief Minister, as a conscious policy choice to re-tender the project in the interest of transparency, competition, and technological reliability.
- Judicial review in public tenders is limited. Courts do not sit in appeal over administrative decisions unless they are patently arbitrary or mala fide. By directing enforcement of a provisional LoI, the High Court exceeded the limited scope of review recognised in Tata Cellular v. Union of India and subsequent precedents.
- The respondent’s claim of financial loss is misconceived. Any manufacturing or preparatory expenditure was undertaken at its own risk before formal award; no compensation is due for self-assumed pre-contractual risks.
- Public interest in uniformity with national AePDS infrastructure and prudent use of public funds must prevail over a bidder’s private expectations. Upholding the High Court’s judgment would fetter the State’s discretion in welfare schemes and undermine procurement discipline.
Respondent's (M/s OASYS Cybernatics Pvt. Ltd.) Arguments
- The cancellation of the LoI was arbitrary, unreasoned and violative of natural justice. The respondent emerged as sole qualified bidder after four tender rounds, obtained an LoI following approvals and financial negotiations, and was directed by the State to commence phased deployment, signifying that the contract had effectively attained finality.
- All LoI requirements were complied with: MRP and cost details were provided; technical meetings with NIC were attended; integration software for weighing scales was developed; and training for Fair Price Shop owners was organised. Departmental and District Controller correspondence acknowledged receipt and testing of devices, contradicting later allegations of non-performance.
- Having issued letters on 19.09.2022, 18.04.2023, and 16.05.2023 directing supply and implementation, the Department cannot justify sudden cancellation. After inducing performance for eight months, abrupt withdrawal without cause or notice was unfair and arbitrary.
- The blacklisting complaint was stale and irrelevant. It related to a different entity (M/s Omneagate Systems Pvt. Ltd.), whose merger with the respondent occurred long after the debarment period ended. The tender required disclosure of blacklisting “as on the date of bid submission”; the affidavit was, therefore, accurate. No inquiry was held into the complaint, which originated from a rival bidder whose prior challenge to the tender had already been dismissed by the High Court.
- The respondent made substantial monetary investments relying on the LoI, including manufacturing over 5,000 devices, procuring SIM connectivity, and setting up logistics infrastructure. Cancellation after such performance caused serious financial prejudice and disrupted the State’s own modernisation programme.
- The Cancellation Letter of 06.06.2023, cancelling the LoI “with immediate effect”, was a non-speaking order, issued without prior notice or hearing, thereby offending Article 14 and the principles of natural justice.
- The two subsequent grounds advanced by the State (blacklisting and non-compliance) are mutually destructive and contradicted by the record. The complaint of 03.01.2023 lay dormant while the respondent was directed to continue work; letters on record acknowledge progress. The sequence suggests the cancellation was predetermined and possibly politically motivated.
- The High Court’s intervention merely ensured lawful and fair exercise of governmental power. Its direction to proceed on the basis of the LoI restored the status quo ante and did not amount to specific performance. The State’s invocation of “public interest” was an afterthought; devices designed for Himachal Pradesh matched NIC-supervised devices in other States, and no technical deficiency was raised at the relevant time. The incompatibility plea surfaced only after litigation.
- Principles of administrative fairness and estoppel bar the State from acting contrary to its own representations. Having consistently treated the LoI as operative and induced reliance, the Department was estopped from withdrawing it without justification. Upholding such conduct would erode confidence in public procurement.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Rajasthan Cooperative Dairy Federation Ltd. v. Maha Laxmi Mingrate Marketing Service (P) Ltd., (1996) 10 SCC 405 | An LoI does not create a “binding legal relationship” until an offer is accepted unconditionally and preconditions are satisfied. | Cited as part of a line of decisions establishing that a Letter of Intent is ordinarily only a precursor to a contract and not the contract itself, supporting the conclusion that the LoI here did not create enforceable rights. |
| Dresser Rand S.A. v. Bindal Agro Chem Ltd., (2006) 1 SCC 751 | A Letter of Intent merely indicates a party’s intention to enter into a contract in future and is not intended to bind either party ultimately to enter into any contract. | Relied upon to reaffirm that the LoI issued to the respondent was a conditional expression of intent, not a concluded, binding contract. |
| Level 9 Biz Pvt. Ltd. v. HP Housing & Urban Development Authority, 2024 SCC OnLine SC 480 | Part of the consistent jurisprudence that an LoI is, in the ordinary course, a precursor to a contract and not the contract itself. | Used to reinforce the doctrinal position that no vested contractual right arises from an LoI until final and unconditional acceptance. |
| Tata Cellular v. Union of India, (1994) 6 SCC 651 | Defines the contours of judicial review in tender matters: courts review the decision-making process, not the decision itself; the State has “freedom of contract”; review is confined to illegality, irrationality, mala fides, and procedural impropriety. Also recognises that a decision to cancel or restart a tender may itself be an aspect of public interest. | Invoked to emphasise the limited scope of judicial interference in public procurement and to underline that the State’s decision to cancel the LoI and re-tender falls within its discretionary domain, absent clear arbitrariness or mala fides. |
| Jagdish Mandal v. State of Orissa, (2007) 14 SCC 517 | A writ court should not interfere in tender matters unless State action is so arbitrary that “no responsible authority acting reasonably and in accordance with relevant law could have reached it.” | Cited to caution against routine interference with procurement decisions and to frame the high threshold of irrationality required for judicial intervention, which the Court held was not met here. |
| M.P. Power Management Co. Ltd. v. Sky Power Southeast Solar India Pvt. Ltd., (2023) 2 SCC 703 | Judicial review in contract matters operates only where the action is “palpably unreasonable or absolutely irrational and bereft of any principle”; also recognises the public interest dimension of decisions to cancel tenders. | Applied to hold that the State’s cancellation of the LoI and decision to re-tender, based on non-compliance and compatibility concerns, could not be characterised as palpably unreasonable or irrational. |
| Subodh Kumar Singh Rathour v. Chief Executive Officer, 2024 SCC OnLine SC 1682 | Reaffirms that judicial review in contractual matters is attracted only where administrative action is palpably unreasonable, absolutely irrational, and devoid of principle. | Referred to consolidate the standard of review, which the Court used to assess and ultimately uphold the State’s decision to cancel the LoI. |
Court's Reasoning and Analysis
Issue I – Nature and Legal Effect of the LoI
The Court first analysed whether the LoI dated 02.09.2022 created enforceable rights. Drawing on a “catena of decisions” including Rajasthan Cooperative Dairy Federation, Dresser Rand, and Level 9 Biz, it reiterated that, as a general rule, a Letter of Intent is a precursor to a contract and not the contract itself. In Dresser Rand, it had been clearly stated that a letter of intent merely indicates an intention to enter into a contract in future and is not intended to bind either party. In Rajasthan Cooperative Dairy Federation, this Court had held that until unconditional acceptance of the offer and satisfaction of preconditions, “no binding legal relationship” arises.
From these authorities, the Court distilled the doctrine that an LoI creates no vested right until final, unconditional acceptance occurs; it is “a promise in embryo”, capable of maturing into a contract only upon fulfilment of stipulated preconditions or issuance of a Letter of Acceptance. A bidder’s expectation that a contract will follow may be commercially genuine but is not a juridical entitlement.
Applying this doctrine, the Court examined the specific LoI. It identified four express preconditions: compatibility testing of devices at NICSI Hyderabad; a live demonstration with NIC’s application at the Directorate in Shimla; execution of a formal agreement only after successful completion of those steps; and furnishing detailed MRP and landing costs. The LoI itself stated that a “final award letter” would issue only after successful demonstration. The Court found this language unambiguous and indicative of a sequential tender architecture: testing, demonstration, acceptance, then execution. It held that it was never contemplated that the LoI would operate as the contract.
The Court therefore concluded that the LoI was a provisional communication signifying intent to enter into a formal arrangement upon fulfilment of technical and procedural conditions. Acceptance of the tender and formation of a binding contract were contingent upon satisfaction of these prerequisites. The respondent’s reliance on the LoI as a source of vested contractual rights was held to be misplaced, and Issue I was answered in the negative: the LoI did not create binding or enforceable rights in favour of the respondent.
Nonetheless, the Court clarified that even in the absence of contractual rights, the State’s administrative discretion to rescind or cancel an LoI remains subject to constitutional discipline, particularly the requirement that State action must not be arbitrary, unreasonable, or actuated by mala fides. This led into the examination of Issue II.
Issue II – Legality of the Cancellation of the LoI
The Court next considered whether the State’s cancellation of the LoI by letter dated 06.06.2023 was arbitrary, mala fide, or procedurally unjust. It recalled the settled framework of judicial review in tender matters from Tata Cellular, which mandates that courts review the decision-making process rather than the merits of the decision, that the State enjoys “freedom of contract”, and that review is confined to illegality, irrationality, mala fides, and procedural impropriety. This framework was further refined in Jagdish Mandal, which cautioned that courts should not interfere unless the State’s action is so arbitrary that “no responsible authority acting reasonably and in accordance with relevant law could have reached it.” Subsequent decisions, including M.P. Power Management and Subodh Kumar Singh Rathour, reaffirmed that interference is warranted only where the action is “palpably unreasonable or absolutely irrational and bereft of any principle.”
The Court acknowledged that the Cancellation Letter was laconic and did not state reasons on its face, thereby appearing prima facie arbitrary. However, it noted that administrative orders may be read in light of the contemporaneous record, and reasons need not be repeated verbatim in the communication so long as they can be discerned from the files and are not post-hoc inventions. It cautioned, however, against post-facto rationalisation that fabricates or supplements reasons after the fact; only contemporaneous reasoning traceable on record is legitimate.
The Court observed that the High Court had, in substance, treated the initial absence of reasons as fatal and dismissed the State’s subsequent explanations based on selected factual contradictions, without fully engaging with the broader administrative context. It opined that a more appropriate course at first instance would have been: (i) to hold the cancellation vitiated for lack of stated reasons, and (ii) to remit the matter to the competent authority for reconsideration with cogent reasons and due opportunity to the affected bidder. However, given the considerable passage of time (nearly two years since cancellation; over four years since the initial Expression of Interest) and the critical public function of the PDS, the Court considered remand impracticable and proceeded itself to evaluate the substantive validity of the State’s justifications.
The record revealed two principal strands of contemporaneous reasoning for cancellation: (1) complaints from competing bidders alleging suppression of prior blacklisting and raising vendor integrity concerns; and (2) persistent non-compliance with LoI preconditions over more than eight months, despite reminders. The Court assessed each in turn.
Blacklisting Complaint
The first ground stemmed from the complaint dated 03.01.2023 by Linkwell Telesystems alleging that the respondent, previously operating as M/s Omne Agate Systems Pvt. Ltd., had been blacklisted by certain State undertakings. The complaint was placed before the Chief Minister, who directed the calling of a fresh tender.
The Court held that this ground could not withstand scrutiny. An identical contention by Linkwell Telesystems had already been raised and rejected by the High Court in CWP No. 5562 of 2022 by order dated 12.12.2022. The State had not challenged that judgment, which thus attained finality. Having defended its tender process at that stage, the State could not adopt an inconsistent stance later and rely on the very complaint previously contested. As a continuing juristic entity, the State is bound by its own prior representations; its legal position cannot shift with political changes.
Substantively, the Court noted that Clause 5.13.1 of the tender required bidders to declare that they were not blacklisted “as on the date of bid submission”. The respondent’s affidavit satisfied this requirement because the alleged blacklisting incidents, even if assumed, pertained to an earlier period and had ceased by the bid date. The clause demanded disclosure of subsisting disqualifications, not past, exhausted ones. To treat earlier blacklisting as a perpetual bar would extend the disqualification beyond its textual and purposive limits. Accordingly, the Court held that reliance on this superseded event was factually misplaced and legally untenable. The blacklisting complaint, by itself, could not validly justify rescinding the LoI and reflected a lack of administrative consistency and due process.
Non-compliance with LoI Preconditions
The second ground related to the respondent’s alleged failure to comply with LoI preconditions and inadequate performance thereafter. The Court reiterated that the LoI explicitly required, among other things, compatibility testing with NIC software, live demonstration at the Directorate, and completion of codal formalities including detailed itemised cost disclosure. These were substantive preconditions aimed at ensuring technical integrity and fiscal transparency before award of a public contract.
Examining the record, the Court found that these preconditions remained unfulfilled. The Department had repeatedly requested depreciation policies and cost details, with letters dated 28.09.2022 and 22.12.2022 evidencing such demands, yet no itemised cost breakup as mandated by Clause 4.9(m) of the RFP was provided. Compatibility testing at NIC Hyderabad was not shown to have been completed, nor was the live demonstration certified.
While the respondent had manufactured and stocked more than 5,000 devices, activated SIM cards, and commenced preparatory training, the Court characterised these steps as unilateral actions undertaken before the LoI conditions were met—“commercial impatience rather than contractual compliance”. Performance in anticipation, it held, cannot create legal rights where the parties themselves have prescribed a structured sequence of steps.
The Department’s conduct was found to be consistent with the conditional nature of the LoI: its letters were largely reminders; no Letter of Acceptance was issued; no formal agreement was executed; and no payments were released under the new arrangement. The Government’s record thus did not depart from the understanding that the LoI was conditional.
The Court considered that the High Court had conflated the respondent’s taking of “steps” with taking the “right steps”. The respondent’s diligence in producing hardware or training personnel did not equate to the specific compliance demanded by the LoI. Legal compliance must be with the governing document, not with a bidder’s self-chosen course of conduct. Equating unilateral readiness with contractual fulfilment would undermine the discipline of tender law.
Additionally, the Court highlighted that the respondent, having accepted and acted upon the LoI, could not later disclaim its conditions. It could not “approbate and reprobate” by enforcing benefits of the LoI while denying its burdens. Having agreed that testing, demonstration, and cost disclosure were preconditions, the respondent could not assert that the LoI was already complete despite the absence of those acts.
Assessment of Arbitrariness and Mala Fides
Applying the Article 14 test—whether the decision was uninformed by reason or guided by irrelevant considerations—the Court held that the State’s action withstood scrutiny. The Department’s correspondence reflected repeated efforts to secure compliance, followed by genuine concern over deploying devices not certified compatible with NIC’s national software. These were germane considerations.
The Court rejected the argument that continued communication alongside contemplation of cancellation was indicative of duplicity. It held that administrative deliberation can legitimately occur in parallel with attempts to obtain compliance; the law requires that the final decision be traceable to reason, not whim, and the record met that threshold.
The Court also found no evidence of improper motive. There was no allegation or proof of favouritism or collateral purpose; cancellation merely led to a fresh tender open to all, not to a closed-door award to another bidder. Where administrative action enhances openness and restores competition, courts are “doubly cautious” before imputing mala fides.
The respondent’s argument based on lapse of time—namely, that eight months of operation effectively crystallised rights—was rejected. Time alone does not convert a provisional arrangement into a vested right. The constitutional guarantee against arbitrariness safeguards against irrationality, not commercial expectations. The Court reiterated that the State’s decision to cancel a tender or restart the process is itself an aspect of public interest, as recognised in Tata Cellular and M.P. Power Management, and found that the decision to re-tender, prompted by non-compliance and the desire to ensure NIC compatibility, fell squarely within permissible discretion.
The doctrine of legitimate expectation was also held inapplicable. It presupposes a clear and unambiguous representation by the State followed by reliance and detriment. Here, the conditional terms of the LoI negated the existence of any clear assurance; instead, they expressly signalled a provisional process. To invoke legitimate expectation against an explicit disclaimer would distort the doctrine.
On this basis, the Court answered Issue II in the negative. It held that the cancellation of the LoI did not suffer from arbitrariness, mala fides, or breach of natural justice warranting quashing, and that the High Court’s interference was unsustainable. The Department had tangible grounds for dissatisfaction, followed a discernible process, and acted within the liberty reserved to it under the tender framework.
Equitable Relief and Public Interest Considerations
In an epilogue, the Court underscored that the tender was an instrument of social welfare, integral to the PDS and the delivery of subsidised foodgrains to vulnerable citizens. Delays or derailments in such projects due to procedural lapses ultimately harm beneficiaries at the last mile. It emphasised the need for seriousness, coherence, foresight, and accountability by all stakeholders in welfare-related procurement.
While upholding the cancellation, the Court crafted equitable directions recognising the respondent’s partial performance and the State’s utilisation of certain assets during pilot or demonstration stages. It directed a fact-finding enquiry, in association with the respondent, to ascertain the details of ePoS machines, components, or allied services produced or supplied under the cancelled LoI and actually utilised or taken over by the Department. The State must then assess the value and installation costs of such items and reimburse the verified costs on the principle of quantum meruit, within three months, to make good losses to that extent.
The Court further directed that all machinery, devices, technology, or software infrastructure handed over, integrated, or used during pilot/demonstration pursuant to the LoI would vest in the State free of encumbrances, subject to payment or reimbursement as above. The State may retain and deploy such assets for public use or dispose of them in accordance with applicable policy. It clarified that no further claim for loss of profit, expectation, or consequential damages would survive; relief is confined to equitable reimbursement for tangible assets or work actually appropriated by the State.
Holding and Implications
Holding: The Supreme Court held that:
- The LoI dated 02.09.2022 did not culminate into a concluded contract and created no binding or enforceable rights in favour of the respondent.
- The cancellation of the LoI on 06.06.2023 was a lawful exercise of administrative discretion, not vitiated by arbitrariness, mala fides, or violation of natural justice under the applicable standard of judicial review.
- Accordingly, the appeal was ALLOWED; the High Court’s judgment in CWP No. 4081 of 2023 directing continuation of the LoI was SET ASIDE, and the State’s decision cancelling the LoI was UPHELD.
The Court, however, issued additional directions:
- The Expression of Interest issued immediately after cancelling the LoI in favour of the respondent was set aside.
- The State is at liberty to issue a fresh tender for supply, installation and maintenance of ePoS devices for Fair Price Shops, in accordance with law, financial and procurement rules, and requisite technical specifications. The respondent is free to participate in such tender, subject to uniform eligibility and compliance with prescribed conditions.
- The State must conduct a Fact-Finding Enquiry (in association with the respondent) to determine the ePoS machines, components, and allied services produced or supplied and utilised or taken over during pilot/demonstration stages. The State must then assess their value and installation costs and reimburse verified costs on a quantum meruit basis within three months.
- All machinery, devices, technology, and software infrastructure handed over, integrated, or used during pilot/demonstration pursuant to the LoI shall vest in the State free of encumbrances, subject to payment or reimbursement as directed. The State may retain or dispose of such assets according to applicable policy.
- No further claims for loss of profit, expectation, or consequential damages shall survive; relief is confined to equitable reimbursement for work or assets actually appropriated by the State.
Implications: The direct consequence of the decision is that the respondent cannot enforce the LoI as a concluded contract and cannot claim expectation or consequential damages, but may receive reimbursement for assets or services actually utilised by the State during pilot or demonstration stages. The State is free to re-tender the project, with the respondent able to participate on equal terms.
The judgment applies established principles that: (i) Letters of Intent are ordinarily non-binding precursors to contracts; and (ii) judicial review of tender decisions is limited to addressing illegality, irrationality, mala fides, and procedural impropriety. The opinion focuses on resolving the dispute between the parties and does not expressly articulate broader doctrinal changes beyond these applications.
2025 INSC 1355 REPORTABLE
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
Civil Appeal No. _________/2025 (Arising out of SLP (C) No. 6531/2025) State of Himachal Pradesh & Anr. …Appellants versus
M/s OASYS Cybernatics Pvt. Ltd. …Respondent
J U D G M E N T
SURYA KANT, CJI.
Leave granted.
2. The instant appeal, emanating from a dispute concerning government tenders, brings into sharp focus the delicate balance between considerations of public interest and the constitutional prohibition on arbitrariness in State action.
3. To briefly explicate, the State of Himachal Pradesh (Appellant- State) is in appeal against a Division Bench judgment of the High Court of Himachal Pradesh at Shimla (High Court) dated 30.05.2024 (Impugned Judgment), whereby the cancellation of a Letter of Intent (LoI) issued to M/s OASYS Cybernetics Pvt. Ltd. (Respondent-company) in connection with a tender for the supply, installation, and maintenance of electronic Point-of-Sale
Page 1 of 40
(ePOS) devices for use in the Appellant-State's Fair Price Shops, has been set aside with consequential restoration of contractual obligations.
A. FACTS
4. Prior to proceeding with charting out the competing submissions and the questions of law that arise for determination, it is necessary to first demarcate the relevant facts in some detail, as they form the quintessential setting against which the present controversy must be considered.
5. The dispute essentially emanates from the endeavour of the Appellant-State to modernise the functioning of its Public Distribution System (PDS). To that end, in 2017, the Appellant- State's Department of Food, Civil Supplies and Consumer Affairs (the Department)—which is the second Appellant before us— had engaged the Respondent-company for the supply and maintenance of ePoS devices at Fair Price Shops across the State. The said arrangement, being a rental model, continued in operation for several years and formed the technological base for the State's PDS till its expiry.
5.1. In the financial year 2021-22, the State Government resolved to upgrade this ostensibly obsolete system by introducing enhanced ePoS devices equipped with biometric and IRIS-scanning
Page 2 of 40
facilities, making them inter alia capable of integration with electronic weighing scales. The reform was intended to allow an Aadhaar-enabled Public Distribution System (AePDS) to ensure transparency and better service to the beneficiaries. Pursuant thereto, the Department on 23.04.2021 invited an Expression of Interest from eligible manufacturers and system integrators to supply and maintain such upgraded devices. Several agencies participated in that process, one of which was the Respondent- company itself.
5.2. The Department thereafter initiated a series of tendering exercises throughout 2021 and 2022. Although the first tender was floated on 20.12.2021 and bids were opened on 21.01.2022, none of the bidders, including the Respondent-company, were deemed technically qualified. As a result, the process was cancelled.
5.3. A second tender was published on 28.01.2022, wherein five companies participated, but a technical evaluation again revealed deficiencies in documentation and non-conformity with the requisite specifications. This tender, too, was cancelled on
22.02.2022.
5.4. The process for the third tender commenced on 23.02.2022. Once again, the same set of five companies, including the Respondent-company and one M/s Linkwell Telesystems Pvt. Ltd. (brand name Visiontek) (Linkwell Telesystems), participated in the process. Upon evaluation, only the Respondent-company was found to have satisfied the technical criteria. The Department nonetheless elected to scrap the process yet again in order to afford equal opportunity to all bidders and to avoid a single-
Page 3 of 40
vendor situation. The tender accordingly stood cancelled on
24.03.2022.
5.5. The Department consequently notified a fourth tender on 25.03.2022. Four conglomerates, including the Respondent- company and Linkwell Telesystems, again participated; and on evaluation, the Respondent-company was yet again the sole technical qualifier. However, on this occasion, in view of the pressing need to maintain continuity in ration distribution and given the repeated failure of earlier rounds, the Department sought and obtained Government approval on 24.05.2022 to consider and open the Respondent-company's financial bid. The same was opened on 07.06.2022, and negotiations ensued.
5.6. After discussions were held on 16.07.2022, the monthly rental rate for each ePoS device, inclusive of the IRIS scanner and related hardware, was settled at ₹1,050 per Fair Price Shop. In furtherance of this beleaguered process, an LoI was ultimately issued to the Respondent-company on 02.09.2022, for the supply, installation and maintenance of upgraded ePoS devices for five years. It is illuminating to note that the arrangement between the Appellant-State and the Respondent-company was a service contract premised on rental payments rather than outright purchase, similar to the arrangement that had subsisted before.
5.7. It may also be recorded, for the sake of completeness, that the LoI itself was not unconditional. Instead, it required the Respondent-company to fulfil several pre-requisites before any agreement could be executed or work formally awarded. These conditions inter alia pertained to certain technical benchmarks
Page 4 of 40
and demonstrations, apart from the provision of landing costs. The mandate contemplated in the LoI is reproduced below:
"…your agency has been selected to supply, install, maintain ePoS devices with IRIS integration and developing SLA/ePoS monitoring tool, etc. to implement Aadhaar enabled Public Distribution System in HP for five years at Rs. 1050/- (Rupees One thousand fifty only) per FPS per month inclusive of all taxes as per the tender document (RFP) subject to fulfilment of pre-requisites and compatibility of proposed devices with the NIC software.
It is further intimated that NIC HP is the technical partner of the department for the implementation of ePDS project in the State. Therefore certain pre- requisite condition is required to be complied by your agency in coordination with NIC before onboarding upgraded ePDS project as discussed in the meeting held on 26.07.2022 in the Directorate.
In view of above, you are requested to ensure following compliances immediately in co-ordination with NIC, HP.
1. Testing compatibility test, etc. of proposed devices. preferably at Hyderabad in the office of NICSI, as discussed in the meeting held on 26.07.2022.
2. After completing all codal formality at point No. 1, the live demo of the upgraded ePOS device with the software and application of NIC will be given by your agency at the Directorate of FCS&CA, HP.
3. After the successful demonstration of the upgraded ePOS devices as per the specification mentioned in the tender document, the agreement will be signed with your agency and final award letter will be issued.
4. Also, as mentioned in the tender document, please indicate the MRP/Landing cost of the ePOS device and other major components.
Hence, in view of above, it is requested to co- ordinate with the NIC, HP for the requisite
Page 5 of 40
compliances on top priority so that the agreement is executed accordingly."
[Emphasis supplied]
5.8. The Respondent-company acknowledged the LoI on 07.09.2022, furnishing a broad cost estimate of the device. Meanwhile, vide a message dated 19.09.2022, the Department requested the Respondent-company to start providing new ePoS devices and impart training to Fair Price Shop dealers, so that it might smoothly transition to the upgraded system after December 2022 (when the previous contract would expire).
5.9. In reply to the same, the Respondent-company on 20.09.2022 stated that a pilot deployment of 250 devices was scheduled in Bilaspur District and also sought clarity on certain technical aspects of the LoI.
5.10. In the months that followed, correspondence between the Department and the Respondent-company continued with the former reiterating its request for the submission of a complete cost break-up of the devices on 28.09.2022 and 22.12.2022.
5.11. It merits noticing that during this period, the earlier 2017 contract remained in force, and the Respondent-company continued to receive rental payments for those machines from the Department.
Page 6 of 40
5.12.That being the status, one of the unsuccessful bidders, Linkwell Telesystems, on 03.01.2023 addressed a complaint to the Department alleging that the Respondent-company had suppressed material facts which would render it unfit for participation in the tendering process. Specifically, they alleged that the Respondent-company and its predecessor entity had been blacklisted in the States of Andhra Pradesh and Madhya Pradesh for allegedly causing losses to the public exchequer due to poor performance. The complaint was received and placed before higher authorities for consideration. No formal inquiry or order was passed at that stage.
5.13. In the interregnum, due to mounting delay, the Department on 18.04.2023 asked the Respondent-company for an action plan within a week for the installation of new devices, and directed that the implementation be completed expeditiously in accordance with the directions from the Government of India. 5.14.The Respondent-company, by letter dated 25.04.2023, submitted a deployment schedule. It informed the Department on 12.05.2023 that the integration of weighing scales with ePoS devices had been successfully tested and demonstrated. On 23.05.2023, the Respondent-company reiterated that its entire stock of devices and accessories had been manufactured and
Page 7 of 40
kept ready for dispatch, and that continuing delay on the part of the Department was causing it additional financial burden.
5.15. It is in this factual backdrop that on 06.06.2023, the Department sent the Respondent-company a letter cancelling the LoI with immediate effect, stating that a fresh tender would be invited. The operative part thereof stated as follows:
"…it is informed that the Government of HP has taken a decision to invite a new/fresh tender. Therefore, the 'Letter of Intent (LoI)' issued to your company vide this office letter no. eGS-FCS&CA-9984 dated 2nd September, 2022 is hereby cancelled with immediate effect.
A new tender/bid in this regard will be published afresh shortly."
5.16.Notably, the Cancellation Letter precluded any reasons for issuance of the same. However, the Departmental record indicates that the cancellation was followed by internal noting dated 12.05.2023 wherein the Chief Minister of the State, being the Minister-in-Charge, directed that a new tender be called
"keeping in view of irregularities".
5.17. In any case, within days of issuing the Cancellation Letter to the Respondent-company, an Expression of Interest was published afresh, inviting new bids.
5.18.Being aggrieved by the Cancellation Letter, the Respondent- company submitted a representation to the Department on
Page 8 of 40
16.06.2023 seeking withdrawal of the same, which was not accepted. It thus approached the High Court on 21.06.2023, challenging the Cancellation Letter and seeking directions to the Appellant-State to implement the LoI.
5.19.The High Court issued notice on 27.06.2023 and permitted the Appellant-State to proceed with the fresh tendering, but directed that no final decision be taken without its leave. 5.20.As already iterated, the High Court vide the Impugned Judgment allowed the writ petition. It inter alia made the following observations:
i. The Respondent-company had cleared both the technical and financial stages of evaluation, and the LoI had subsisted for almost eight months, during which period the Department maintained active correspondence and issued instructions to the company for carrying out implementation;
ii. At no point during this period did the Department indicate that it was contemplating cancellation. The grounds now relied upon by the Appellant-State, concerning the receipt of a complaint about past blacklisting and the alleged non- fulfilment of LoI obligations, do not appear in the Cancellation
Page 9 of 40
Letter dated 06.06.2023 and are contradicted by the Department's correspondence;
iii. The complaint from an unsuccessful bidder was received as early as 03.01.2023, yet the Department not only refrained from holding any inquiry but continued to direct the Respondent-company to proceed with integration and training. Moreover, if the authorities genuinely intended to act on the complaint, it ought to have been done promptly, and not after allowing the Respondent-company to expend its resources in furtherance of the LoI;
iv. Equally, the second ground of alleged non-performance was contradicted by letters showing that the Respondent-company had supplied pilot batches, developed integration software, and furnished MRP and cost details;
v. The two grounds cited by the Appellant-State were thus mutually irreconcilable—one imputing disqualification at inception and the other alleging breach during performance. In this context, the State appeared "bent upon cancelling the Letter of Intent and cultivating reasons for it."; 5.21.The Cancellation Letter was accordingly held to be arbitrary, devoid of reasons, and in violation of the principles of natural
Page 10 of 40
justice, and consequently quashed. The Appellant-State was directed to proceed further in the matter on the basis of the LoI dated 02.09.2022. Considering the public interest involved in the project, which had already been tendered four times, both sides were expected to complete all necessary actions expeditiously, i.e. within six weeks.
5.22.Being aggrieved, the Appellant-State has preferred the instant appeal, wherein we had initially condoned the delay and issued notice on 03.03.2025. Subsequent interim orders dated 21.04.2025 and 13.05.2025 stayed the execution of the High Court's order pending final adjudication.
B. CONTENTIONS
6. Having adequately dealt with the contextual background, we now proceed to delineate the contentions advanced by the parties before us.
7. Mr. P. Chidambaram, learned Senior Counsel appearing on behalf of the Appellant-State, sought to negate the High Court's conclusions vis-à-vis alleged arbitrariness. In support thereof, he submitted the following:
a) The High Court erred in treating the LoI dated 02.09.2022 as a concluded contract. The LoI was, by its terms, a
Page 11 of 40
conditional communication subject to the Respondent- company's fulfilment of specified pre-requisites, namely: (i) successful compatibility testing of the proposed ePoS devices with the National Informatics Centre (NIC) software at Hyderabad; (ii) live demonstration of the upgraded devices before the Directorate at Shimla; and (iii) execution of a formal agreement only after successful verification. These conditions remained unfulfilled, and the Respondent-company's inaction for over thirty-four weeks frustrated timely implementation of a project of considerable public importance.
b) The LoI could not by itself confer any contractual right. Under settled law, a Letter of Intent merely conveys the Government's intention to enter into an agreement and creates no enforceable obligation until a Letter of Acceptance (LoA) or contract is executed. The Department, therefore, retained complete discretion to cancel the LoI in the absence of compliance with its pre-conditions.
c) Despite repeated reminders dated 19.09.2022, 28.09.2022, and 22.12.2022, the Respondent-company failed to furnish the requisite MRP and cost break-up of the devices, did not complete testing at NIC Hyderabad, and did not produce a
Page 12 of 40
live demonstration. This persistent default compelled the State to cancel the LoI on 06.06.2023.
d) Subsequent communications from NIC Hyderabad in November 2024 confirmed that the Respondent-company's Android-based ePoS devices were not compatible with the NIC application and failed to meet the updated technical specifications. Allowing the deployment of such devices would have compromised integration with the national Aadhaar-enabled PDS and exposed the State to avoidable financial risk.
e) The Respondent-company also suppressed material facts. A complaint received from another participant, Linkwell Telesystems, disclosed that the Respondent-company's predecessor entity, M/s Omneagate Systems Pvt. Ltd., had been blacklisted in Andhra Pradesh and Madhya Pradesh. This information was not revealed in the eligibility declaration, thereby violating Clause 5.13.1 of the tender document. Non-disclosure of such antecedents constituted misrepresentation sufficient to justify cancellation.
f) The Appellant-State's decision was taken after due consideration by the competent authority, including the
Page 13 of 40
Chief Minister, and it reflected a conscious policy choice to re-tender the project in the interest of transparency, competition, and technological reliability.
g) Judicial interference in matters of public tender is circumscribed. Courts do not sit in appeal over administrative decisions unless they are patently arbitrary or mala fide. The High Court, in directing the enforcement of a provisional LoI, exceeded the limited scope of review recognised in Tata Cellular v. Union of India,1and subsequent precedents.
h) The Respondent-company's claim of financial loss is misconceived. Any manufacturing or preparatory expenditure was undertaken at its own peril, before the formal award of contract. No compensation lies for self- assumed risks at the pre-contractual stage.
i) Public interest in ensuring uniformity with the national AePDS infrastructure and prudent utilisation of public funds must prevail over a bidder's private expectation. The Impugned Judgment, if sustained, would fetter the Appellant-State's discretion in executing welfare schemes and undermine established procurement discipline.
1 (1 994) 6 SCC 651 .
Page 14 of 40
8. On the other hand, the Respondent-company represented by Mr. Sanjeev Bhushan, learned Senior Counsel, ardently urged that the High Court recognised the true form of the LoI. Additionally, he posited that the Respondent-company must be awarded the tender and consequent contract—given the advanced nature of its investment and expenditure. In this regard, he canvassed the following submissions:
a) The cancellation of the LoI was arbitrary, unreasoned, and violative of the principles of natural justice. The Respondent-company had emerged as the sole qualified bidder after four successive rounds of tendering and was issued the LoI following approval and financial negotiations. The Appellant-State itself thereafter directed the Respondent-company to commence phased deployment, thereby acknowledging that the contract had attained finality in substance.
b) All requirements enumerated in the LoI were complied with. The Respondent-company furnished its MRP and cost details, participated in technical meetings with NIC, developed integration software for electronic weighing scales, and organised training for Fair Price Shop owners. Correspondence from departmental officers and District
Page 15 of 40
Controllers acknowledged receipt and testing of devices, contradicting the subsequent plea of non-performance.
c) After having repeatedly directed the Respondent-company, through letters dated 19.09.2022, 18.04.2023, and 16.05.2023, to supply machines and carry forward implementation, the Department cannot now be allowed to justify the sudden cancellation of the LoI. Having itself induced performance for eight months, the State's abrupt withdrawal without cause or notice was plainly arbitrary and devoid of fairness.
d) The complaint of blacklisting relied upon by the Appellant- State was both stale and irrelevant. The debarment concerned a separate entity—M/s Omneagate Systems Pvt. Ltd.—whose merger with the Respondent-company had taken place long after the period of debarment ended. The tender required disclosure of blacklisting "as on the date of bid submission"; the affidavit filed was therefore factually accurate. No inquiry was ever held into the complaint, which emanated from a rival bidder whose earlier challenge to the same tender had already been dismissed by the High Court.
Page 16 of 40
e) The Respondent-company made substantial monetary investments, having relied upon the veracity of the LoI, manufacturing over five thousand ePoS devices, procuring SIM connectivity, and establishing logistic support infrastructure. The cancellation after such performance inflicted serious financial prejudice and disrupted the Appellant-State's own modernisation programme.
f) The communication dated 06.06.2023, cancelling the LoI
"with immediate effect," was devoid of reasons and issued without any notice or opportunity of hearing. Such a non- speaking order issued by the Department offends Article 14 of the Constitution of India and the principles of natural justice.
g) The two grounds subsequently pleaded by the Appellant- State, i.e. blacklisting and non-compliance, were mutually destructive and belied by its own record. The complaint of 03.01.2023 was allowed to remain dormant while the Respondent-company was directed to continue work; and the charge of non-performance is contradicted by letters acknowledging progress. The sequence of events reveals that the cancellation was predetermined and possibly politically motivated.
Page 17 of 40
h) The High Court's intervention was thus justified. It merely ensured that governmental power was exercised fairly and in accordance with law. The direction to proceed on the basis of the LoI did not amount to specific performance but only restored the legal equilibrium that existed before the arbitrary cancellation. Whereas the Appellant's State's invocation of "public interest" was an afterthought. The devices designed for Himachal Pradesh were of the same specification as those used in other States under NIC's supervision, and no technical deficiency was ever communicated at the relevant time. The plea of incompatibility surfaced only after litigation commenced.
i) Administrative fairness requires the Appellant-State not to act contrary to its own representations. Having consistently treated the LoI as operative and induced reliance, the Department was estopped from withdrawing it without justification. Upholding such action would erode confidence in public procurement processes.
9. In sum, the Appellant-State maintains that the LoI was a conditional, non-binding expression of intent that could be cancelled for non-compliance and in public interest. Whereas the Respondent-company asserts that the LoI represented the
Page 18 of 40
culmination of a concluded process, which had been substantially acted upon under State supervision, and that its abrupt withdrawal was arbitrary and contrary to law.
C. ISSUES
10. After perusing the rival contentions, the voluminous record, the statutory framework, and the factual environment colouring these appeals, we find that the twin issues that fall for our consideration are the following:
i. The Nature of the Letter of Intent Whether the Letter of Intent dated 02.09.2022 created any binding or enforceable rights in favour of the Respondent- company, or remained a conditional, pre-award communication subject to fulfilment of stipulated pre- requisites?
ii. The Legality of the Cancellation Letter Whether the Appellant-State's decision dated 06.06.2023, cancelling the Letter of Intent, was arbitrary, unreasoned, or violative of the principles of natural justice, thereby warranting interference?
D. ANALYSIS
Page 19 of 40
D. 1. Issue No . I: Whether the LoI created enforceable rights in favour of the Respondent-company?
11. The first issue that falls for our determination concerns the legal character of the LoI dated 02.09.2022 and the nature of rights, if any, accrued to the Respondent-company thereunder.
12. This question goes to the root of the matter, and is not one of mere semantics, i.e. ascertaining whether the issuance of the LoI created a concluded contract capable of enforcement, or whether it remained a conditional and inchoate expression of intent, leaving the Government free to reassess its position prior to formal acceptance. The answer defines the legal threshold for the Appellant-State's power to cancel and the Respondent-company's entitlement to protection.
13. The jurisprudence on the subject is neither nascent nor unsettled. A catena of decisions starting from Rajasthan Cooperative Dairy Federation Ltd. v. Maha Laxmi Mingrate Marketing Service (P) Ltd.,2through Dresser Rand S.A. v. Bindal Agro Chem Ltd.,3to Level 9 Biz Pvt. Ltd. v. HP Housing & Urban Development Authority,4this Court has
2 (1996) 10 SCC 405.
3 (2006) 1 SCC 751.
4 2024 SCC OnLine SC 4 80.
Page 20 of 40
consistently held that an LoI is, in the ordinary course, a precursor to a contract and not the contract itself.
14. In Dresser Rand (supra), it was re-stated with clarity that "a letter of intent merely indicates a party's intention to enter into a contract with the other party in future. A letter of intent is not intended to bind either party ultimately to enter into any contract." The same principle animated Rajasthan Cooperative Dairy Federation (supra), where this Court observed that until the offer is accepted unconditionally and the preconditions are satisfied, "no binding legal relationship" comes into existence. The rationale is thus simple but fundamental: the law of contract distinguishes between a promise to make a promise and a promise performed. The former is not legally binding until its contingencies are fulfilled.
15. These authorities collectively articulate a coherent doctrine: an LoI creates no vested right until it passes the threshold of final and unconditional acceptance. It is but a "promise in embryo,"
capable of maturing into a contract only upon the satisfaction of stipulated preconditions or upon the issue of an LoA. A bidder's expectation that such a contract will follow may be commercially genuine, but it is not a juridical entitlement. To hold otherwise would be to bind the State in contract before it has consciously
Page 21 of 40
chosen to be bound—a proposition foreign to both contract law and public administration.
16. Turning then to the LoI before us, its conditionality is beyond doubt. As noticed heretofore in para 5.7, it required the Respondent-company to:
(i) undertake compatibility testing of its proposed ePoS devices at NICSI, Hyderabad;
(ii) provide a live demonstration of the devices with NIC's application before the Directorate at Shimla;
(iii) execute a formal agreement only after successful completion of the aforesaid steps; and
(iv) furnish a detailed MRP and landing cost of the devices and their major components.
17. Each requirement was framed as a condition precedent; the LoI itself stated that a "final award letter" would issue only after the successful completion of these tasks. This language admits of no ambiguity. The tender architecture was sequential: testing, demonstration, acceptance, then execution. It was never contemplated that the LoI would operate as the contract itself.
Page 22 of 40
18. The cumulative effect of the foregoing analysis is that the LoI was no more than a provisional communication signifying the Appellant-State's intent to enter into a formal arrangement upon fulfilment of certain technical and procedural conditions. The acceptance of tender and the consequential formation of a binding contract were contingent upon satisfaction of these prerequisites. The Respondent-company's reliance upon the LoI as a source of vested contractual rights is, therefore, wholly misplaced.
19. As a result, the First Issue is answered in the negative. We have no difficulty in holding that the LoI did not give rise to any binding or enforceable rights in favour of the Respondent- company.
20. Be that as it may, even when contractual rights are absent, the State's administrative discretion in rescinding or cancelling an LoI is not unfettered. It remains subject to constitutional discipline, particularly the requirement that State action must not be arbitrary, unreasonable, or actuated by mala fides. In this respect, we deem it necessary to examine the Second Issue touching upon the legality and propriety of the Cancellation Letter.
Page 23 of 40
D.2 . Issue No. II: Whether the Cancellation Letter was arbitrary or procedurally unjust?
21. Having held that that the LoI did not create binding rights, the enquiry narrows to whether the decision of the State Government to cancel it, vide its communication dated 06.06.2023, suffered from arbitrariness, mala fides, or procedural unfairness so grave as to warrant intervention.
22. The contours of judicial review in contractual matters were defined nearly three decades ago in Tata Cellular (supra), where this Court held that the exercise of judicial power over administrative action in tenders is directed not at correcting the decision, but the decision-making process. The Court emphasised that the State must have the "freedom of contract,"
and that the scope of review is confined to testing administrative action against the touchstones of illegality, irrationality, mala fides, and procedural impropriety.
23. This framework was refined in Jagdish Mandal v. State of Orissa,5which cautioned that a Writ Court should not interfere unless the action of the State is so arbitrary that "no responsible authority acting reasonably and in accordance with relevant law could have reached it."
5 (2007) 14 SCC 5 17.
Page 24 of 40
24. Since then, it has been reaffirmed that judicial review in contract matters operates only where the action is "palpably unreasonable or absolutely irrational and bereft of any principle."6
25. These principles are neither ornamental nor abstract. They arise from the nuanced understanding that government contracting, unlike private commerce, is an instrument of governance. The Rule of Law demands that Executive discretion be rational and fair, but it equally demands that Courts respect the autonomy necessary for effective administration. Public interest requires not judicial micro-management but judicial assurance that power has been exercised within lawful bounds.
D.2.1. Prima facie arbitrariness & attached consequences
26. Turning then to the factual record, the Cancellation Letter at first blush appears to be laconic; as it does not list the grounds that weighed upon the Department while issuing the same.
27. That being said, it is equally true that this Court has consistently held that administrative orders must be read in light of the concomitant record, and that reasons need not be stated
6 M.P. Power Management Co. Ltd. v. Sky Power Southeast Solar India Pvt. Ltd., (2023) 2 SCC 703; Subodh Kumar Singh Rathour v. Chief Executive Officer, 2024 SCC OnLine SC 1682.
Page 25 of 40
in haec verba in the communication, so long as they can be discerned from the file and are not post-hoc justifications.
28. This Court has, however, cautioned against the practice of post- facto rationalisation, whereby authorities attempt to supplement or fabricate reasons after the decision has already been taken. Such afterthoughts cannot cure an inherently arbitrary action. The legitimacy of administrative reasoning must be tested with reference to the material that existed at the time the decision was made, not by subsequent embellishment. To simplify: what is permissible is elucidation of contemporaneous reasoning already traceable on record; what is impermissible is the invention of fresh grounds to retrospectively justify an otherwise unreasoned order.
29. That is to say that when such an exercise is found to be prima facie unreasonable, the correct course of action — which the High Court also employed — was to proceed to test the justifications subsequently offered by the Appellant-State in its pleadings. However, on a holistic reading of the Impugned Judgment before us, we find that the exercise undertaken by the High Court was somewhat hurried and limited.
Page 26 of 40
30. We say so, as we find that the High Court treated the initial absence of reasons as fatal, and thereafter dismissed the explanations advanced by the Appellant-State on the basis of select factual contradictions, without engaging with the broader administrative context in which the decision was taken. The resulting analysis, though earnest, remained incomplete.
31. The more appropriate course, in our considered view, would have been to adopt a two-step approach: first, to hold the cancellation vitiated for want of reasoning; and second, to remit the matter to the Competent Authority to reconsider the question upon recording cogent reasons and affording due opportunity to the affected bidder. Such a calibrated remedy would have preserved both the evolving constitutional discipline of fair procedure and the administrative necessity of efficiency in public procurement.
32. However, the substantial passage of time now renders remand impracticable. Nearly two years have elapsed since the impugned cancellation, and over four years have passed since the Expression of Interest was initially invited by the Department. What is even more disconcerting is the admitted fact that the tender pertains to the deployment of ePoS devices integral to the functioning of the PDS—an exercise that directly touches the lives of economically weaker citizens. To prolong uncertainty
Page 27 of 40
through further procedural cycles would defeat the very public purpose underlying the tender.
33. Consequently, in these peculiar circumstances, it is both necessary and appropriate for us to evaluate whether the Appellant-State's reasons tendered before the High Court and this Court withstand judicial enquiry.
34. The enquiry that follows is therefore confined not to the procedural lapse of the unreasoned cancellation, but to the substantive validity of the justifications subsequently advanced by the Appellant-State.
D.2.2. Appellant-State's proffered reasons for the Cancellation Letter
35. A thorough examination of the record reveals two broad strands of contemporaneous reasoning adopted by the Appellant-State:
(i) receipt of complaints from competing bidders alleging suppression of prior blacklisting and concerns regarding vendor integrity; (ii) persistent non-compliance with the LoI's preconditions for over eight months, despite reminders. We shall now test each of these rationales on the anvil of the jurisprudence laid out above.
Page 28 of 40
D.2.2.1. Black-listing complaint by Linkwell Telesystems
36. The first ground relied upon by the Appellant-State to justify the withdrawal of the LoI rests on a complaint dated 03.01.2023, addressed by Linkwell Telesystems, an unsuccessful bidder, alleging that the Respondent-company had previously operated under the name M/s Omne Agate Systems Pvt. Ltd. and had been blacklisted by certain State undertakings. This complaint was subsequently placed before the Chief Minister, who ultimately directed that a fresh tender be invited.
37. At the outset, this ground cannot sustain closer inspection. The record reveals that an identical contention raised by Linkwell Telesystems had already been considered and repelled by the High Court in CWP No. 5562 of 2022, decided on 12.12.2022. It is incontrovertible that the Appellant-State did not assail that judgment, which therefore attained finality. Having defended its tender process at that stage, the Appellant-State cannot take an inconsistent position before this Court and rely upon the very complaint that it had earlier contested.
38. The State, as a continuing juristic entity, is bound by its own representations in prior proceedings; its legal stance cannot oscillate with changes in political leadership.
Page 29 of 40
39. Further, even on substance, the complaint does not withstand scrutiny when tested against the tender conditions themselves. Clause 5.13.1 required each bidder to declare that it was not blacklisted as on the date of bid submission. The Respondent- company's affidavit satisfied this stipulation, since the alleged blacklisting incidents, even if assumed to have occurred, related to an earlier period and had ceased to operate by the time the bid was submitted. In other words, the clause demanded a disclosure of subsisting disqualifications, not of past and exhausted ones.
40. Seen in this light, the tender condition could not be read as creating a perpetual bar for a bidder once blacklisted. To construe it in this manner would extend the disqualification beyond its textual and purposive limits. The Appellant-State's reliance on such a superseded event was therefore both factually misplaced and legally untenable.
41. We thus find no merit in this ground. The blacklisting complaint, by itself, could not constitute a valid basis for rescinding the LoI, and its invocation betrays a want of administrative consistency and adherence to due process.
D.2.2.2. Non-compliance with LoI preconditions
Page 30 of 40
42. The second justification advanced by the Appellant-State is that the Respondent-company failed to comply with the pre-requisites stipulated in the LoI and exhibited inadequate performance during the months that followed. This contention requires closer examination, as it pertains to the Respondent-company's actual conduct and capacity in fulfilling the stipulated conditions.
43. As mentioned previously, the LoI explicitly required the Respondent-company to fulfil at least four conditions including:
testing and compatibility assessment of its proposed ePoS devices with NIC software; live demonstration(s) at the Directorate; codal formalities, including disclosure of itemised cost details etc. It is abundantly clear that these were not perfunctory steps; they were preconditions designed to ensure technical integrity and fiscal transparency before the award of a public contract.
44. The factual record confirms that these preconditions remained unfulfilled. The Department repeatedly called upon the Respondent-company to furnish its depreciation policy and cost details, as evidenced by letters dated 28.09.2022 and 22.12.2022. However, no itemised cost breakup, as mandated by Clause 4.9(m) of the RFP, was provided. The compatibility testing at NIC Hyderabad was not shown to have been completed, nor
Page 31 of 40
was the live demonstration certified. Despite these omissions, the Respondent-company purportedly proceeded to manufacture and stock more than five thousand devices, activate SIM cards, and commence preparatory training.
45. These actions, though industrious, were undertaken unilaterally and before the conditions of the LoI were satisfied. In our considered view, such actions exemplify commercial impatience rather than contractual compliance—an instance of putting the cart before the horse. Of course, there is no gainsaying that performance in anticipation cannot metamorphose into a legal right where the parties themselves have prescribed a structured order of steps.
46. It is equally important to note that the Department's conduct remained consistent with this understanding. Its letters were replete with reminders and verifications; no LoA was issued; no agreement was executed; and nor were payments released. The Government's record therefore never departed from its position that the LoI was conditional.
47. In arriving at its contrary view, the High Court appears to have proceeded on an erroneous conflation of 'taking steps' with 'taking the right steps'. The Respondent-company's diligence in
Page 32 of 40
producing hardware or training personnel was taken as evidence of compliance, though these were not the steps demanded by the LoI. Compliance in law must be with the document that governs the relationship, not with the bidder's self-chosen course of conduct. To equate unilateral readiness with contractual fulfilment is to disregard the essential discipline of tender law, which binds both sides to the terms they themselves framed.
48. The High Court also overlooked a second infirmity in the Respondent-company's case. Having accepted the LoI and acted upon it, the Respondent cannot now disclaim the very conditions that the LoI imposed. It cannot approbate and reprobate— seeking to hold the Appellant-State to the document's benefits while denying its burdens. In simpler terms, where a bidder has agreed that testing, demonstration, and cost disclosure are preconditions to finalisation, it cannot later assert that the LoI was already complete, notwithstanding the absence of those acts.
D.2.3. Whether the Cancellation Letter suffers from arbitrariness?
49. Having found some weight in one of the twin grounds relied upon by the Appellant-State, we must now examine the charge of arbitrariness against its actions.
Page 33 of 40
50. The test for arbitrariness under Article 14 is whether the decision is uninformed by reason or guided by irrelevant considerations. When examined through that lens, the Appellant-State's action withstands scrutiny. We say so, being mindful of the reality that the Department's correspondence shows repeated efforts to secure compliance, followed by mounting concern about the feasibility of deploying devices that had not been certified for compatibility with NIC's national software. These concerns were germane; they were neither whimsical nor pretextual.
51. It is also apposite to note that the Respondent-company's grievance regarding the Department's inconsistent conduct—that it continued to correspond even as it contemplated cancellation— does not advance its case. Administrative deliberation does not amount to duplicity. It is entirely natural that a department exploring compliance would keep lines of communication open while simultaneously assessing whether continuation was tenable. The law does not demand that the State speak only after it has made up its mind; it demands only that its final decision be traceable to reason, not to whim. The record before us meets that threshold.
Page 34 of 40
52. Further, we cannot hold that the decision to cancel was actuated by any improper motive. There is no allegation, nor any evidence, of favouritism or collateral purpose. The cancellation led only to a fresh tender, open to all, rather than an award to another bidder behind closed doors. Where the effect of administrative action is to enhance openness and restore competition, Courts are doubly cautious before imputing mala fides.
53. The Respondent-company's plea that the Appellant-State was bound, having allowed the process to run for eight months, is equally misconceived. Lapse of time does not convert a provisional arrangement into a vested right. The expectation that the Government will ultimately formalise an LoI may be legitimate in the commercial sense, but it is not enforceable in law unless the conditions for formal acceptance are met. The constitutional guarantee against arbitrariness is not a charter of commercial expectations; it is a safeguard against irrationality, and none is established in this record.
54. This Court has consistently recognised that the State's decision to cancel a tender or restart the process is itself an aspect of public interest.7The present decision to re-tender—prompted by
7 Tata Cellular v. Union of India, (1994) 6 SCC 651; M.P. Power Management Co. Ltd. v. Sky Power Southeast Solar India Pvt. Ltd., (2023) 2 SCC 703.
Page 35 of 40
non-compliance and the desire to ensure NIC compatibility—falls squarely within that zone of permissible discretion.
55. In this vein, the principle of legitimate expectation also does not come to the aid of the Respondent-company. That doctrine presupposes a clear and unambiguous representation by the State, followed by reliance and detriment. The conditional terms of the LoI negate the existence of any clear assurance; rather, they expressly warned that the process was still provisional. To invoke legitimate expectation against an explicit disclaimer would be to transform the doctrine from a shield against arbitrariness into a sword against caution — a proposition no Court can endorse.
56. Accordingly, we find that the Second Issue must also be answered in the negative. The cancellation of the LoI dated 02.09.2022 does not suffer from arbitrariness, mala fides, or breach of natural justice, and the High Court's interference therewith cannot be sustained. The Department had tangible grounds for dissatisfaction; it followed a discernible process; and it acted within the contractual liberty reserved to it. The reasons for cancellation were antecedent, bona fide, and germane to the public purpose of ensuring a reliable, uniform, and lawfully procured ePoS infrastructure.
Page 36 of 40
D. EPILOGUE
57. Before we part with the instant appeal, it bears reminding that the tender in question was not a commercial exercise in isolation but an instrument of social welfare, intended to secure efficient and transparent delivery of subsidised foodgrains to the most vulnerable citizens. The Public Distribution System remains, for millions, the thin line between sustenance and deprivation. When projects of such public importance are delayed or derailed by procedural lapses, the ultimate cost is borne not by the contracting parties but by those at the last mile of governance.
58. It is therefore incumbent upon every stakeholder—the Government, its technical partners, and private participants—to treat such undertakings with the seriousness their human impact demands. Administrative caution and technological innovation must work hand in hand to ensure that reform does not lose sight of its moral anchor: service to the poorest. Future exercises in public procurement, particularly those that underpin welfare delivery, must thus be executed with greater institutional coherence, foresight, and accountability—so that legality, efficiency, and compassion operate in concert, and the constitutional promise of equitable distribution finds tangible expression.
Page 37 of 40
E. CONCLUSION AND DIRECTIONS
59. In light of the foregoing discussion, we find that the LoI dated 02.09.2022 did not culminate into a concluded contract and that its cancellation on 06.06.2023 was a lawful exercise of administrative discretion. Consequently, the Impugned Judgment of the High Court, directing continuation of the LoI, is unsustainable in law as well as on facts. We, thus, deem it appropriate to issue the following directions:
i. The appeal is allowed. The Impugned Judgment and order passed by the High Court in CWP No. 4081 of 2023 is set aside. The decision of the Appellant-State cancelling the Letter of Intent dated 02.09.2022 stands upheld. However, the Expression of Interest issued immediately after cancelling the LoI in favour of Respondent-company is set aside;
ii. The Appellant-State shall be at liberty to issue a fresh tender for supply, installation and maintenance of ePoS devices for Fair Price Shops across the State forthwith, in accordance with law and the applicable financial and procurement rules, apart from the requisite technical specifications. The Respondent-company shall be free to
Page 38 of 40
participate in such tender process, subject to uniform eligibility and compliance with the prescribed conditions;
iii. The Appellant-State is further directed to hold a Fact- Finding Enquiry in association with the Respondent- company and ascertain the details of the ePoS machines, components, or allied services produced or supplied under the cancelled LoI and their utilisation or taking over by the Department during the pilot or demonstration stages. Thereafter, the Appellant-State shall assess the value and costs of installation of such machines, components or services and reimburse such verified cost and expenses on the principle of quantum meruit, to make good the losses suffered by the Respondent-company. This entire exercise is directed to be complied with in a period of three months;
iv. All machinery, devices, technology, or software infrastructure handed over, integrated, or otherwise used during such pilot or demonstration stages pursuant to the LoI upon shall vest in the Appellant-State free of encumbrances, subject to payment of cost and installation expenditure to the Respondent-company, and/or
Page 39 of 40
subject to any reimbursement payable as above. The State may retain and deploy such assets for public use or dispose of them in accordance with the applicable policy; and
v. It is clarified that no further claim for loss of profit, expectation, or consequential damages shall survive. The relief granted herein is confined to equitable reimbursement for tangible assets or work actually appropriated by the Appellant-State.
60. The instant appeal stands allowed in the above terms.
61. Consequently, pending interlocutory applications, if any, are also disposed of.
62. Ordered accordingly. ……………………...CJI.