Login
  • Bookmark
  • PDF
  • Share
  • CaseIQ

BISWAJIT CHATTERJEE AND ANR v. RAM PUJAN AND ORS

Calcutta High Court
Apr 5, 2024
Smart Summary (Beta)

Legal Opinion Summary

Factual and Procedural Background

This appeal arises from an order dated 1 August 2023 of a Single Judge of the High Court directing the State Transport Authority (STA), West Bengal and the STA, Jharkhand to take a "conscious decision" within three months concerning formalities under the Motor Vehicles Act, 1988 in relation to counter-signature on inter-State permits. The present appeal (IA GA 2 of 2024, among several consolidated APO/WPO matters) was filed by respondent No. 7 of the writ petition impugning that Single Judge's order.

The writ petitioner (arranged as respondent No. 8 in the appeal) was the permanent permit holder issued by the STA, Jharkhand for an inter-State route between Jamshedpur and Durgapur. After the permit was issued by Jharkhand, a counter-signature from the reciprocating State (West Bengal) was required. The State of West Bengal had repeatedly shown reluctance to put the counter-signature; this led to multiple writ petitions and related proceedings before the High Court, including contempt proceedings. At the time of the last renewal, West Bengal again refused the counter-signature and a writ petition was filed seeking a mandamus to compel the STA to issue the counter-signature/letter so the permit-holder could continue plying the vehicle.

The Single Judge's impugned order directed the two STAs to decide the issue within three months, publish the decision on their official websites, notify parties within two weeks of publication, and continued an interim order (to 21 August 2023) until four weeks from communication of the decision. The High Court (Harish Tandon, J., with agreement of Madhuresh Prasad, J.) delivered judgment on 5 April 2024.

Legal Issues Presented

  1. Whether an inter-State permit may be given counter-signature by the reciprocating State where the route for which the permit was granted does not appear to be included in a duly published reciprocal transport agreement required under Section 88(5) of the Motor Vehicles Act, 1988.
  2. Whether discrepancies between different language versions (Hindi versus English) of a published reciprocal transport agreement permit recognition of a route in one version but not the other, and the legal consequence of such variance for counter-signature of permits.
  3. Whether a State Transport Authority may unilaterally counter-sign or recognize permits where mutual agreements (and publication under Sections 88(5) and 88(6)) have not been completed or correctly published.

Arguments of the Parties

Appellant's Arguments

  • The appellant is an existing operator on an inter-State route (Jamshedpur to Durgapur via Purulia, Hura, Kamalpur, Bankura) since 1988 with renewable permits.
  • The appellant argued that the finally published reciprocal transport agreement(s) contain inconsistent routes: the State of West Bengal's published route differs from Jharkhand's Hindi-version publication. The Hindi version, as published by Jharkhand, effectively included a different/new route that does not tally with the English version nor with West Bengal's published route.
  • Because Section 88(5) mandates that reciprocal agreements be entered into and published (including publication in regional languages), any permit for a route not included in the reciprocal agreement is illegal; therefore West Bengal's refusal to put a counter-signature on such permits is justified.
  • Relied on Supreme Court authority (Ashwani Kumar and A. Venkatakrishnan) for the proposition that existence of a route by mutual agreement/published reciprocal agreement is a condition precedent to granting inter-State permits; permits granted without such agreement are without jurisdiction.

Writ Petitioner / Respondent's Arguments

  • The writ petitioner contended that the route permit had been granted long ago and that earlier orders of this Court had accepted the route as part of the reciprocal agreement, directing the counter-signature to be placed on the permit.
  • The writ petitioner argued the objection raised by the appellant and the State of West Bengal was untenable and that the Single Judge's direction for the STAs to take a conscious decision was intended to remove confusion and complete the statutory formalities.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Ashwani Kumar & Anr. v. Regional Transport Authority, Bikaner & Anr., (1999) 8 SCC 364 Held that existence of an inter-State route by virtue of reciprocal agreements is a condition precedent for exercise of powers under Section 88; a State cannot unilaterally grant permits where reciprocal agreement does not exist. The court relied on this authority to affirm that a reciprocal agreement and mutual approval between States is mandatory before permits for an inter-State route can validly be granted or counter-signed.
A. Venkatakrishnan v. State Transport Authority, Kerala, (2004) 11 SCC 207 Reiterated and accepted Ashwani Kumar: a purposive construction requires mutual consent and publication (read sub-sections (4), (5) and (6) of Section 88 together) and agreements are contemplated for creation of inter-State routes. The court relied upon this Three-Judge Bench authority to support the statutory interpretation that mutual agreement, published as required, is necessary and that absence of proper publication/consensus prevents valid exercise of permitting powers.

Court's Reasoning and Analysis

The court began by identifying the statutory framework: Sections 88(5) and 88(6) of the Motor Vehicles Act, 1988 require that proposals for inter-State routes and the number of permits be fixed by agreement between reciprocating States and published in the Official Gazette and in regional languages circulating in the area of the route. The court regarded the existence of a route, fixed by mutual agreement and publication, as a condition precedent to the exercise of power under Section 88.

The court examined the publication history of the reciprocal transport agreements by West Bengal and Jharkhand. It found a variance in the Hindi version published by Jharkhand compared to the English version and to West Bengal's published route. Because Section 88(5) requires publication in a regional language, such discrepancies are material and permit the respective STAs to address and resolve the variance by a conscious decision.

The court noted that during the appeal the State's counsel produced STAs' decisions (taken on 5 and 6 December 2023) which amended or incorporated the route in the reciprocal agreement, thereby rectifying the route discrepancy. The court observed it may take note of subsequent events and that if the authorities have acted within statutory purview, those actions cannot be held to be infirm.

However, the court emphasized that any change, correction, addition or deletion in the reciprocal agreement takes effect only after being duly published in the Official Gazette of the respective States. The State's counsel did not inform the court that the amendments had been so published. Consequently, the court modified the Single Judge's order to require that counter-signature to permits can only be made after the amendment in the reciprocal agreement is duly published in the Official Gazette, strictly in terms of Sections 88(5) and 88(6).

Holding and Implications

Holding: With the modification described below, all the appeals are disposed of.

The court's operative modification required that counter-signature to the inter-State permits may be affixed only after the amendment or incorporation rectifying the route is duly published in the Official Gazette of the respective States, strictly in accordance with Sections 88(5) and 88(6) of the Motor Vehicles Act, 1988.

Direct consequences for the parties:

  • Permits for the route in question cannot be validly counter-signed by the reciprocating State until the amended reciprocal agreement is published in the Official Gazette as required by statute.
  • The STAs of West Bengal and Jharkhand were required by the Single Judge (and the High Court reiterated the expectation) to take a conscious decision and publish it; the High Court additionally insisted upon statutorily mandated Gazette publication as a condition for counter-signature.

Broader implications: The opinion applies and follows existing Supreme Court authorities (Ashwani Kumar and A. Venkatakrishnan) about the mandatory nature of reciprocal agreements and statutory publication; the judgment itself does not set out any new legal principle beyond applying those precedents and requiring Gazette publication before counter-signature. No order as to costs was made.

Administrative/Procedural Notes from the Opinion

Judgment delivered on: 05.04.2024. Bench: Harish Tandon, J. (with agreement of Madhuresh Prasad, J.). The court directed that urgent certified Photostat copies of the judgment, if applied for, be made available to the parties subject to compliance with requisite formalities.

Show all summary ...

1

APO 148/23

IN THE HIGH COURT AT CALCUTTA

CIVIL APPELLATE JURISDICTION

ORIGINAL SIDE

Present:

THE HON'BLE JUSTICE HARISH TANDON &

THE HON'BLE JUSTICE MADHURESH PRASAD APO 133 of 2023

With

WPO 530 of 2022

IA GA 1 of 2023

Biswajit Chatterjee & Anr. Vs.

Ram Pujan & Ors.

APO 134 of 2023

With

WPO 531 of 2022

IA GA 1 of 2023

Biswajit Chatterjee & Anr. Vs.

Sheo Pujan & Ors.

APO 135 of 2023

With

WPO 532 of 2022

IA GA 1 of 2023

Biswajit Chatterjee & Anr. Vs.

Shashi Pujan & Ors.

APO 148 of 2023

With

WPO 530 of 2022

IA GA 2 of 2024

Om Prakash Gupta

Vs.

The State of West Bengal & Ors. APO 149 of 2023

With

WPO 531 of 2022

2

IA GA 2 of 2024 Om Prakash Gupta Vs.

The State of West Bengal & Ors. APO 150 of 2023

With

WPO 532 of 2022

IA GA 2 of 2024

Om Prakash Gupta

Vs.

The State of West Bengal & Ors. Appearance:

For the Petitioners(1 to 3) : Mr. Aurobinda Chatterjee, Sr. Adv. Mr. Arkadipta Sengupta, Adv.

Ms. Aayushi Mukherjee, Adv.

For the Appellant (4 to 6) : Mr. Sattwik Bhattacharyya, Adv. Mr. Aashutosh Bhattacharyya, Adv.

For the State (4 to 6) : Mr. Amal Kumar Sen, Adv. Mr. Lal Mohan Basu, Adv.

For the Respondent(1 to 6) : Mr. Debabrata Saha Roy, Adv. Mr. Debabrata Chakraborty, Adv.

For the STA Jharkhand (1 to 6): Ms. Aishwarya Rajyashree, Adv.

Judgment On : 05.04.2024 Harish Tandon, J.:

The instant appeal is filed by the respondent No. 7 of the writ petition assailing a judgment and order dated 1stAugust, 2023 passed by the Single Bench disposing of the writ petition with the direction that the State Transport Authority, West Bengal and the State Transport Authority, Jharkhand will take a conscious decision within 3 months in relation to all

3

formalities which appears to have not been followed in terms of the provisions of the Motor Vehicles Act, 1988.

The salient facts involved in the instant case are required to be narrated in order to determine the questions raised in the instant appeal. The writ petitioner who is arraigned as respondent no. 8 in the instant appeal was the permanent permit holder issued by the State Transport Authority, Jharkhand for a route between Jamshedpur and Durgapur. After the issuance of the permit by the State of Jharkhand, the counter signature is required to be put in by the reciprocating State i.e., State of West Bengal which appears to have been a subject matter of several litigations between the parties. It appears that there was reluctance on the part of the State Transport Authority, West Bengal in putting a counter-signature and for every fresh permit or the renewal thereof, the approaches were made to the High Court and orders were passed to put a counter-signature. The writ petitioner/respondent No.1 has vividly reflected various writ petitions filed before this Court and the contempt application in violation of such order passed in the writ petition which were ultimately disposed of. At the time of the last renewal, the same stand was taken by the State of West Bengal showing their dormant attitude in not putting a counter signature and the writ petition was filed by the said respondent No. 4 seeking a mandamus commanding the State Transport Authority to issue counter-signature/letter so that the said respondent would continue plying the vehicle on the basis of the permit granted by the State Transport Authority, Jharkhand. The record would further reveal that an objection

4

was raised by the appellant before the Authority and order was passed by the writ Court to add the appellant as party respondent in the said writ petition. By the impugned order the learned Single Judge passed the following direction:

"It is expected that the STA, West Bengal and the STA, Jharkhand will come to a decision within three months from today which is considered to be a reasonable period for completion of all exercises in terms of the order passed by this Court. Fixing a reasonable period is necessary since the added respondents have expressed their continued grievance in face of the discrepancy in the two routes. The STA, West Bengal and the STA, Jharkhand will publish the decision pursuant to the discussion in their respective websites and also give notices to the parties in the present writ petition within two weeks from the date of publication of the decision in the official website. It is also made clear that there should not be any unreasonable delay on the part of the two authorities since one of the parties before the court is continuing to enjoy interim protection. The interim order which is till 21st August, 2023 will continue until four weeks from the communication of the decision to the parties."

It is a specific stand of the appellant petitioner that he is an old existing operator in respect of an inter-State route i.e., Jamshedpur to Durgapur via Purulia, Hura, Kamalpur, Bankura since 1988 and the said permit was renewed from time to time. The objection is raised by the appellant that a draft state reciprocal agreement was published in the official gazette of State of West Bengal on 4.9.2002 which includes one inter- State route i.e., Jamshedpur to Durgapur via Barrage, Bankura, Burdwan, Kating, Patamda for inviting objections under Section 88(5) of the Motor

5

Vehicles Act, 1988. Correspondingly, the State of Jharkhand also published the said draft reciprocal transport agreement for the said route on 27.1.2003 both in Hindi as well as in English version. Subsequently, the said draft reciprocal transport agreement was finally published by the State of West Bengal on 29.3.2004 revising the said inter-State route and subsequently, the State of Jharkhand also published the same on 8.3.2006 both in Hindi as well as English version.

It is a specific case of the appellant that there is a variance in a finally published inter-State Reciprocal Transport Agreement published by the Jharkhand in Hindi version with the English version. It is categorically stated that the inter-State permit issued by the State of Jharkhand on the basis of the Hindi version of the Reciprocal agreement is, in effect, a new route which does not tally with the English version nor in tune with the route finally published by the State of West Bengal and, therefore, there is no question of any counter-signature to be put thereupon. Noticing the discrepancy as projected by the appellant, the writ petitions filed by the respective respondent no. 8 were disposed of on the directions as quoted hereinabove. The appellant have taken us to the various provisions of the reciprocal agreement published both by the state of West Bengal and the State of Jharkhand to support its contention that the route which does not form part of the said reciprocal agreement, no permit can be granted for such route by the reciprocating State in view of the mandatory provisions contained under Section 88(5) of the said Act. It is submitted that any permit granted without being included in the said

6

reciprocal agreement is illegal and therefore, the objection of the State of West Bengal in declining to put the counter-signature cannot be faulted with. In support of aforesaid contention, the reliance is placed upon the judgment in case of Ashwani Kumar & Anr. Vs. Regional Transport Authority, Bikaner & Anr., reported in (1999)8 SCC 364 and A. Venkatakrishnan vs. State Transport Authority, Kerala, reported in

(2004) 11 SCC 207. It is sought to be contended that Section 88(5) of the said Act mandates an agreement to be entered into between the States for the purpose of fixing the numbers of the permit proposed to be granted or counter-signed in respect of each route or area to be published by each of such State in the Official Gazette. It is thus, submitted that the route for which the counter-signature is sought for is not included in the said reciprocal agreement and because of a discrepancy having arisen in the Hindi version published by the State of Jharkhand it would not be presumed that the said route forms part of the said reciprocal agreement. On the other hand, the writ petitioner/respondent submits that the route permit was granted to the petitioner since long and the objection raised by the appellant and the State of West Bengal is untenable. The counsel for petitioner reliance upon the various orders passed in connection with the writ petition concerning the said route and submits that this court all along accepted the route to be a part of the reciprocal agreement and directed the State Authority to put the counter-signature on the permit. It is thus, submitted that the objection so raised is untenable and in order to eradicate any confusion, the Single Bench has directed both the State

7

Transport Authorities of the reciprocating State to take a conscious decision which cannot be faulted with.

Such being the short question involved in the instant appeal, our attention was drawn to the interim order passed in the instant appeal whereby the writ petitioner/respondent was permitted to continue to ply the vehicle in the said route and a decision to be taken by the reciprocating States so that the matter can be brought to its logical end. Since a legal point was raised by the appellant, we intend to deal with the same as we feel that non-consideration thereof would tantamount to failure in discharge of a solemn duty entrusted upon the Court.

In Ashwani Kumar (supra), the Apex Court has concerned with the matter relating to a route passing through the State of Rajasthan, Haryana and UT Delhi. The regional Transport Authority of Bikaner took a conscious decision to open the route i.e., Bhadra to Delhi but granted permit in favour of only one person. The application of the other applicants were rejected. The approach was made by one of the applicants, whose application was rejected, to the Tribunal which was disposed of directing a RTA, Bikaner to grant stage carriage permit in respect of its bus for daily one single trip with the condition that the permit would be valid on obtaining counter-signature from the other State concerned. Subsequently, the said permit was cancelled by the RTA, Bikaner and the challenge was made to the High Court of Rajasthan and ultimately the matter reached to the Supreme Court. The Apex Court held that the existence of a route is a condition precedent for exercise of powers under Section 88(1) of the said Act and the

8

scheme of the aforesaid Section would indicate that one State cannot take an unilateral decision unless a reciprocal agreement is entered into and published in the Official Gazette in the following:

"7. Accepting the submissions made on behalf of the appellants would result in frustration of the objective sought to be achieved by the Act. The interpretation put by the High Court is rational, legal and proper. In the absence of the existence of an inter-State route, the authorities under the Act were not justified in granting the permits to the appellants. The existence of permit depends upon the reciprocal agreements between the States covered by the route which, admittedly, did not exist in the instant case. The orders of the authority granting permit in favour of the appellants were thus without jurisdiction."

The judgment rendered in A. Venkatakrishnan (supra) by the Three- Judge Bench of the Apex Court have reiterated and accepted the ratio of the decision rendered in Ashwani Kumar (supra) in the following:

"13. A purposive and meaningful construction, it is trite, must be given to a statute, so that it is made workable. A statute should not be construed in such a manner, which would create a vacuum. In the absence of any route being fixed in terms of an agreement, in the event it be held that an application for grant of permit for inter-State route can be entertained, the same would lead to a futile exercise. A mutual approval of the States concerned, in the matter, therefore, must be held to be mandatory. In other words, the proviso, appended to sub-section (4) of Section 88 of the Act, must be read conjointly with sub-sections (5) and (6) of Section 88 thereof and consequently, it must be held that by necessary implication agreements are contemplated for creation of inter-State routes.

9

14. We are in agreement with the view taken by this court in the case of Ashwani Kumar case."

It admits no ambiguity that the scheme of the Act concerning the inter-State route bestowed power upon the respective States to create an inter-State route and to get it finalized by virtue of Sections 88(5) and 88 (6) of the said Act. The Sub-Section (5) of Section 88 postulates that every proposals for inter-State route or permit has to be entered into by the reciprocating State and, therefore, to limit or fix the number of permits, the same is to be published in the Official Gazette of the respective State in any one or more of the Newspaper in regional language circulating in the area or the route proposed to be covered by the said agreement. The object underline the aforesaid provision is explicit that there should not be the congestion in the said route as the intention for such permit is to facilitate the services to the commuters and a comfortable journey in the specified route. By the advancement of the technologies several committees were set up and the recommendations were made to encourage the adoption of the technologies in the automotive sector in order to facilitate the greater flow of passengers and also to control the freight. Apart from the same, the road safety Standards and the parameters are required to be set up to avoid any accident to occur. The scheme of the Act manifests several roles of the Route Transport Authorities and imposing the conditions differently in relation to a permit to ply the vehicle inter-Region, intra-Region and inter- State.

We are concerned with the inter-State permit and therefore it has to pass through a muster of Sub-Section (5) of Section 88 of the said Act. We

10

have been taken to the publication of the reciprocal agreement in the official gazette of the West Bengal and the Jharkhand and we find that so far as the Hindi version of the said reciprocal agreement published by the State of Jharkhand there appears to be same variance. Section 88(5) of the Act requires the publication of the said reciprocal agreement in a regional language circulating the area or the route proposed to be covered and if any discrepancies is found, we do not find any fetter on the part of the respective States to take a conscious decision in this regard. It cannot be said that the route for which the permit was granted to the respondent no. 8 of the respective appeals that the said route is covered within the said reciprocal agreement published in the Hindi version and, therefore, the Trial Court directed the RTA of both the States to resolve the said dispute by removing the discrepancies if therebe any.

During the hearing of the instant appeal, the counsel for the State hands over the decision taken by the RTA of the respective States wherein the route for which the respondent no.8 was granted permit has been rectified by amending and/or incorporating in the reciprocal agreement. The aforesaid decision has been taken on 5thDecember, 2023 and 6th December, 2023 by the respective States and, therefore, the contention of the appellant cannot faulted that the route for which the permit was granted to the respondent no. 8 by the State of Jharkhand has been rectified. There is no fetter on the part of the Court to take note of the subsequent events and in the event, the authorities have acted strictly within the purview of the statutory provision, the same cannot be said to be infirmed and/or illegal. In this regard, we further find that the reciprocal agreement contains a

11

specific provision that any change or the correction in any Clause of the agreement or any addition or deletion of the routes, any correction or changes in the alignment of routes may be done by a mutual consent after discussion. By virtue of the said Clause, the mutual discussion has taken place and the discrepancies have been removed but such alteration or the incorporation can only take effect after the same is duly published in the official gazette in the respective States. We have not been informed by the counsel for the State that the same has been published in the official gazette and, therefore, we modify the order impugned in the instant appeal to the extent that the counter-signature to the permits can only be made after, the amendment in the reciprocal agreement is duly published in the official gazette strictly in terms of Sections 88(5) and 88(6) of the said Act. With this observation, all the appeals are disposed of.

No order as to costs.

Urgent Photostat certified copies of this judgment, if applied for, be made available to the parties subject to compliance with the requisites formalities.

(Harish Tandon, J.)

I agree.

(Madhuresh Prasad, J.)