Executive Engineer, Knnl v. Subhashchandra And Others

Supreme Court Of India
Mar 12, 2024
Smart Summary (Beta)

Factual and Procedural Background

The State of Karnataka acquired approximately 13,000 acres of land for five irrigation and drinking-water projects executed by Karnataka Neeravari Nigam Limited (KNNL). The present civil appeals relate to three of those projects—Bennethora, Amarja and Lower Mullamari—covering roughly 179 acres distributed over multiple villages in Kalaburagi District.

For each project, the acquisition followed the classic sequence under the Land Acquisition Act, 1894: Section 4 notifications, Section 6 declarations, awards by the Special Land Acquisition Officer (SLAO), enhancement by the Reference Court, further enhancement by the District Court, and finally substantial enhancement by the High Court of Karnataka at its Kalaburagi Bench. The High Court’s compensation ranged from Rs. 83,500 to Rs. 2,46,334 per acre, depending on the project and whether the land was dry or wet.

KNNL, the beneficiary corporation, challenged these High Court enhancements before the Supreme Court. A previous Supreme Court judgment (Executive Engineer, KNNL v. Annarao @ Anveerappa, 10 May 2022) had already set aside comparable High Court awards and remanded them for fresh consideration. The present appeals concern High Court orders that relied on those very decisions now under reconsideration.

Legal Issues Presented

  1. Whether the High Court erred in uniformly enhancing compensation without conducting the notification-wise, village-wise analysis mandated by Supreme Court precedent.
  2. Whether, in light of the earlier remand in Annarao @ Anveerappa, the impugned High Court judgments—based on the same reasoning—should likewise be set aside and remanded.
  3. How to reconcile disparities where some landowners have already received enhanced compensation that has attained finality while others’ claims are still pending.

Arguments of the Parties

Appellant – Karnataka Neeravari Nigam Limited

  • Contends that the High Court awards mirror earlier decisions already remanded by the Supreme Court for lack of proper analysis.
  • Submits that, after the previous remand, some matters are only partly heard by the High Court; uniform enhancement without individual scrutiny is unjustified.
  • Disputes the respondents’ plea for parity, asserting that earlier payments related to different villages and cannot govern the present claims.

Respondents – Land Owners

  • Argue that many similarly placed landowners have already been paid the enhanced High Court rates, and those judgments have reached finality.
  • Seek parity in compensation to avoid discriminatory treatment among landowners affected by the same broad acquisition.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Executive Engineer, KNNL v. Annarao @ Anveerappa, C.A. No. 2591/2022 (SC, 10 May 2022) High Court must examine each acquisition case separately—notification-wise and village-wise—and apply settled parameters for determining just compensation. Supreme Court noted that the impugned High Court orders relied on decisions already remanded in Annarao; therefore, the same reasoning compelled remand of the present appeals.
Rajshekhar v. SLAO, MSA No. 200020/2018 (Karnataka HC) Enhanced compensation of Rs. 1,64,223 per acre for dry land (relied on internal precedent). High Court’s reliance on this case was criticised because Rajshekhar itself had been remanded in Annarao.
Kalappa v. SLAO, MSA No. 200014/2018 (Karnataka HC) Adopted compensation fixed in Malkajappa @ Mallikarjun. Cited by the High Court in several impugned orders; its authority is uncertain after Annarao.
Motibee v. SLAO, MSA No. 200147/2017 (Karnataka HC) Followed Malkajappa @ Mallikarjun for compensation figure. Similarly relied upon in impugned judgments and now subject to reconsideration.
Malkajappa @ Mallikarjun v. SLAO, MSA No. 200055/2016 (Karnataka HC, 13 Mar 2017) Primary High Court decision fixing higher compensation rates. This decision was directly remanded in Annarao; its use as a benchmark is therefore in question.

Court's Reasoning and Analysis

The Supreme Court observed that:

  • The impugned High Court orders rest entirely on earlier Karnataka High Court decisions (Malkajappa, Rajshekhar, Kalappa, Motibee) that were themselves remanded in Annarao for want of proper case-by-case analysis.
  • A holistic and uniform approach is necessary because all appeals arise from the same broad acquisition programme, even though they involve different villages or projects.
  • Maintaining consistency requires that these appeals also be remitted so the High Court can evaluate them notification-wise and village-wise, applying the parameters outlined in Annarao and other Supreme Court jurisprudence.
  • While remanding, the Court safeguarded landowners who have already received and retained higher compensation: the High Court may not reduce compensation amounts that have attained finality and been paid.
  • The Supreme Court expressly refrained from addressing the merits of valuation, keeping all substantive contentions open for the parties to raise afresh in the High Court.

Holding and Implications

DISPOSED OF – Appeals allowed to the extent that the impugned High Court judgments are set aside and the matters are remanded to the High Court of Karnataka, Kalaburagi Bench, for fresh adjudication.

Implications:

  • The High Court must rehear all remanded cases together, project-wise, and strive for uniformity while respecting compensation already paid and finalised.
  • Parties are directed to appear before the High Court on 18 March 2024; the High Court is requested to dispose of the matters preferably within three months.
  • No new legal precedent on valuation was set; the decision primarily realigns procedure to ensure principled assessment of compensation.
Show all summary ...

Surya Kant, J.:— Permission to file special leave petition is granted in Diary No. 12213/2023.

2. Delay condoned.

3. Leave granted.

4. These civil appeals impugn the judgments dated 28.02.2017, 28.11.2017, 15.02.2018, 20.02.2018, 21.02.2018, 02.03.2018, 22.03.2018, 06.04.2018, 13.04.2018, 26.04.2018, 07.12.2018, 12.12.2018, 14.01.2020, 24.01.2020 and 03.03.2021, passed by the High Court of Karnataka at Kalaburagi Bench, whereby compensation for the acquired land was enhanced. The appellant-Karnataka Neeravari Nigam Limited (in short, “Corporation”) claims to be the beneficiary of the subject-acquisition.

5. The Corporation has been entrusted with the assignment to plan, execute and operate drinking water and irrigation projects and schemes in the State of Karnataka. About 13000 acres of land was acquired by the State of Karnataka for the appellant-Corporation for various projects like (1) Bennethora Project (2) Gandori Nala Project (3) Lower Mullamari Project and (4) Amarja Project. Certain civil appeals also refer to a fifth project, namely, the Upper Tunga Project. This huge chunk of land measuring 13000 acres also included the parcels of lands owned by the respondent-land owners of different villages. The acquisition was carried under the Land Acquisition Act, 1894 (in short, “Act”). The present civil appeals pertain to the Bennethora Project, Lower Mullamari Project and Amarja Project situated in Kalaburagi, Karnataka.

6. The acquisition proceedings in these appeals, as per the project-wise classification, progressed as follows-

(i) Bennethora Project

a) Civil Appeal Nos. 4053, 4054, 4055, 4956, 4061, 4064, 4065, 4066, 4067, 4068, 4069, 4070, 4071, 4072, 4073, 4074, 4075, 4076, 4077, 4078, 4079, 4080, 4081, 4082, 4083, 4085, 4086, 4087 of 2024 pertain to this project. In this batch of civil appeals coming under the Bennethora Project, land measuring a consolidated total of 131 acres and 451 guntas (Approx. 142 acres) was acquired through different notifications issued under Section 4 of the Act followed by declarations under Section 6 of the Act. The Section 4 notifications and the Section 6 declarations were issued on the following dates-

Date of Section 4 Notification Date of Section 6 Notification 18.02.1982 10.05.1984 17.03.1983 23.02.1984 05.04.1990 22.11.1990 05.07.1990 09.05.1991 23.08.1990 04.04.1991 07.02.1991 28.11.1991 16.05.1991 26.03.1992 13.06.1991 20.12.1991 19.06.1991 17.12.1992 11.07.1991 27.08.1997 06.08.1992 13.01.1994

b) The Special Land Acquisition Officer (in short, “SLAO”) passed the awards for the acquired lands on different dates, whereby compensations were granted at the following rates-

Date of SLAO award Compensation granted by SLAO (Rupees/acre) 23.01.1985 3,167 28.02.1985 3,500 08.01.1991 5,400 20.05.1991 6,000 for wet lands 15.06.1992 9,800 30.01.1993 28,000 for dry lands & 42,000 for wet lands 03.02.1993 15,000 22.11.1993 15,000 27.11.1993 15,000 24.12.1993 15,000 31.05.1994 9,000

c) The rates of compensation awarded by the SLAO were enhanced by the Reference Court, keeping in view the year when the acquisition process commenced. The enhanced compensation amounts granted by the Reference Court was further enhanced, upon appeal, by the District Court.

d) The dissatisfied landowners further approached the High Court for a higher compensation, which was subsequently granted vide the impugned judgments. The original rates of compensation awarded by the SLAO, the enhanced compensation amounts granted by the Reference Court, the compensation amounts as further enhanced by the District Court and impugned compensation amounts granted by the High Court, vide the impugned judgments, can be understood as follows-

Amount granted by SLAO (Rupees/acre) Amount granted by Reference Court (Rupees/acre) Amount granted by District Court (Rupees/acre) Amount granted by the High Court (Rupees/acre) 3,167 11,000 19,000 1,09,034 3,500 11,000 26,100 83,500 5,400 25,500 50,500 1,52,059 15,000 28,500 74,000 1,64,223 15,000 32,000 74,000 1,64,223 9,000 32,000 67,000 1,76,388 15,000 32,000 81,400 1,76,388 6,000 36,000 Rs. 90,200 2,28,088 for wet lands 28,000 for dry lands & 42,000 for wet lands 42,000 for limited extent of land instead of 28,000 55,888 for dry lands 83,832 for wet lands 1,52,059 for dry lands 2,28,088 for wet lands 9,800 42,000 75,750 1,64,223 for dry lands 2,46,334 for wet lands

(ii) Amarja Project

a) Civil Appeal Nos. 4057, 4058, 4059, 4060 & 4062, 4084 of 2024 pertain to this Project. In the batch of civil appeals coming under the Amarja Project, land measuring a consolidated total of 15 acres 83 guntas (Approx. 17 acres) was acquired through a notification issued under Section 4 of the Act followed by a declaration under Section 6 of the Act. The Section 4 notification and the Section 6 declaration were issued on the following dates-

Date of Section 4 Notification Date of Section 6 Notification 07.04.1988 06.07.1989

b) Thereafter, the SLAO passed the award for the acquired lands whereby compensations was granted at the following rate-

Date of SLAO award Compensation granted by SLAO (Rupees/acre) 06.03.1990 7,000

c) The rate of compensation awarded by the SLAO was enhanced by the Reference Court, keeping in view the year when the acquisition process commenced. The enhanced compensation amount granted by the Reference Court was further enhanced, upon appeal, by the District Court.

d) The dissatisfied landowners further approached the High Court for a higher compensation, which was subsequently granted vide the impugned judgments. The original rate of compensation awarded by the SLAO, the enhanced compensation amount granted by the Reference Court, the compensation amount as further enhanced by the District Court and impugned compensation amount granted by the High Court, vide the impugned judgments, can be understood as follows-

Amount granted by SLAO (Rupees/acre) Amount granted by Reference Court (Rupees/acre) Amount granted by District Court (Rupees/acre) Amount granted by the High Court (Rupees/acre) 7,000 30,000 79,200 1,78,429

(iii) Lower Mullamari Project

a) Civil Appeal Nos. 4063, 4088, 4089 of 2024 pertain to this Project. In the batch of civil appeals coming under the Lower Mullamari Project, land measuring a consolidated total of 19 acres 59 guntas (Approx. 20 acres) was acquired through notifications under Section 4 of the Act followed by declarations under Section 6 of the Act, which were issued on different dates. The Section 4 notifications and the Section 6 declarations were issued on the following dates-

Date of Section 4 Notification Date of Section 6 Notification 30.05.1991 11.05.1992/03.09.1992 14.01.1993 07.04.1994 04.03.1993 07.04.1994

b) Thereafter, the SLAO passed the awards for the acquired lands on different dates, whereby compensations were granted at the following rates-

Date of SLAO award Compensation granted by SLAO (Rupees/acre) 04.05.1983 8,000 for dry lands & 10,000 for wet lands 18.11.1995 10,000 for dry lands & 15,000 for wet lands 01.01.1996 8,000

c) The rates of compensation awarded by the SLAO were enhanced by the Reference Court, keeping in view the year when the acquisition process commenced. The enhanced compensation amounts granted by the Reference Court was further enhanced, upon appeal, by the District Court.

d) The dissatisfied landowners further approached the High Court for a higher compensation, which was subsequently granted vide the impugned judgments. The original rates of compensation awarded by the SLAO, the enhanced compensation amounts granted by the Reference Court, the compensation amounts as further enhanced by the District Court and impugned compensation amounts granted by the High Court, vide the impugned judgments, can be understood as follows-

Amount granted by SLAO (Rupees/acre) Amount granted by Reference Court (Rupees/acre) Amount granted by District Court (Rupees/acre) Amount granted by the High Court (Rupees/acre) 8,000 for dry lands & 10,000 for wet lands 70,000 - 1,15,086 10,000 for dry lands & 15,000 for wet lands 50,000 for dry lands 75,000 for wet lands - 1,24,992 for dry lands 1,86,440 for wet lands 8,000 33,000 74,750/75,543 1,33,500

7. It may thus be seen that the enhancement in the compensation granted by the High Court varies from project to project and while the minimum amount is Rs. 83,500/- per acre, the maximum amount is seen to have gone up to Rs. 1,78,429/- per acre for dry lands and Rs. 2,46,334/- for wet lands.

8. Having regard to the big chunk of land acquired for different projects referred to above, at different points in time, the enhancement made by the High Court in a few cases, where the compensation of Rs. 1,20,814/- per acre for dry lands and Rs. 1,81,221/- per acre for wet lands was awarded, came to be challenged before this Court in a batch of appeals, including C.A. No. 2591/2022 (The Executive Engineer, KNNL v. Annarao @ Anveerappa), in which this Court, vide Judgment dated 10.05.2022, having found that the High Court has not analyzed each case independently, much less notification wise, concerning particular village or area and that the parameters delineated in various decisions of this Court were not adverted to, held as follows:

“In the impugned judgment(s) and order (s), the High court has made no effort to analyze the concerned case(s) either notification-wise or for that matter, village-wise, including the other parameters required to be observed for arriving at a just compensation amount.

Further, in most of the appeals, the appellant (Karnataka Neeravari Nigam Limited) was not made party in the appeal proceeding before the High Court.

It is also the grievance of the appellant that most of the cases, entertained at the instance of land owners, were grossly delayed and yet they have been granted enhancement, and in some cases along with interest.

The fact remains that the High Court in the impugned judgment(s) and order(s) has not analyzed each case independently much less notification-wise concerning particular village or area and keeping in mind the parameters delineated in the reported decision, adverted to earlier.

In our opinion, it is appropriate that the parties are relegated before the High Court for reconsideration of the entire matter afresh and in accordance with law.

Learned counsel appearing for the land owners were at pains to point out that some matters pertaining to some of the notifications, referred to in the present appeal proceedings, have reached upto this Court and decided in favour of the land owners, including in some cases the appellants have acted upon the decision by paying compensation amount. Even the effect of such orders passed by this Court can be examined by the High Court on its own merits and in accordance with law.

Accordingly, we keep all contentions available to both sides open, to be considered by the High Court on its own merits and in accordance with law.

The impugned judgment(s) and order(s) are set aside and the concerned appeals/petitions are remanded to the High Court for reconsideration in the above terms.

The parties to appear before the High Court on 11.07.2022, when the High Court may assign suitable date for hearing of the concerned batch of cases which, as aforesaid, must proceed notification-wise pertaining to concerned village as a separate group.

Needless to observe that some of the notifications pertain to the year 1983, therefore, it would be appropriate that the High Court disposes of the appeal(s) expeditiously. The appeals are disposed of in the above terms.”

9. The High Court judgments, which were set aside and the cases remanded back for fresh consideration, also included the judgments rendered by the High Court in MSA No. 200020/2018 (LAC) titled Rajshekhar s/o Sangappa deceased by Lrs. v. The Special Land Acquisition Officer, MSA No. 200014/2018 (LAC) titled Kalappa S/o Paudapppa v. The Special Land Acquisition Officer and MSA No. 200147/2017 (LAC) titled Motibee W/o Mashak Patel v. The Spl. Land Acquisition Officer decided on 19.02.2018, 21.02.2018 and 09.01.2018 respectively, awarding compensation of Rs. 1,64,223/acre, Rs. 1,64,223/acre and Rs. 1,52,059/acre respectively for the dry lands. Consequently, Rajshekhar's case (supra) has also been remanded to the High Court for fresh adjudication. The abovementioned judgments of the High Court had in turn placed reliance on MSA No. 200055/2016 (LAC) titled Malkajappa @ Mallikarjun v. The Special Land Acquisition Officer, decided by the High Court on 13.03.2017, which has also been remanded to the High Court vide this Court's order dated 10.05.2022 in Annarao @ Anveerappa case (supra).

10. We find that in the present batch of appeals, the brief impugned order passed by the High Court in CA No. 4053/2024, has solely relied upon its own decision in Rajshekhar's case (supra). In some of the other appeals, namely CA Nos. 4954, 4055, 4056, 4064, 4065, 4066, 4067, 4068, 4079, 4080, 4081, 4082, 4083, 4087 and 4088 of 2024, the High Court has relied upon its decision in Malkajappa @ Mallikarjun (supra), Kalappa (supra) (which placed reliance on Malkajappa @ Mallikarjun (supra)) and Motibee (supra) (which placed reliance on Malkajappa @ Mallikarjun (supra)). These judgments did not find favour with this Court in Annarao @ Anveerappa case (supra), whereby the matters have been remanded to the High Court for reconsideration.

11. Learned senior counsel for the appellant-Corporation, submits that after the remand, the matter has been heard in part by the High Court.

12. On the other hand, learned senior counsel for the respondents-land owners submits that there are numerous cases in which similarly placed land owners have already been paid compensation at enhanced rate granted by the High Court. Those judgments of the High Court have attained finality and are not subject matter of these appeals.

13. Learned senior counsel for the appellant(s), however, counters this submission, as according to him, those matters pertain to different villages and the respondents cannot claim parity with those cases.

14. We have considered the rival submissions made by learned senior counsel for the parties. It is not in dispute that a batch of cases has been remanded by this Court for reconsideration by the High Court, as seen above. It is also an admitted fact that those matters pertain to the same broader acquisition, though they possibly pertain to different projects. In a peculiar situation where some of the judgments of the High Court attained finality as the compensation amount, as enhanced, stands paid whereas the others are still subject matter of adjudication, we deem it appropriate to remand these cases also to the High Court so that a holistic view pertaining to the subject acquisition, at least project wise, can be taken by the High Court. The High Court will make an endeavour to infuse uniformity in the matter of award of compensation, to the extent it is possible, in accordance with law.

15. It goes without saying that the High Court, while undertaking this exercise, will not reduce the compensation to a rate which has already been paid to some of the land owners and which has attained finality. The rest of the contentions from both sides are kept open to be gone into by the High Court.

16. It is clarified that we have not expressed any opinion on the merits of the case.

17. The parties are directed to appear before the High Court of Karnataka at Kalaburagi Bench on 18.03.2024. We request the High Court to take up these matters also, along with the Rajshekhar's case (supra) and other cases, which are already part heard before the High Court. Since the acquisition is more than three decades old, we request the High Court to decide the matters expeditiously and preferably within three months from the date of this judgment.

18. The instant civil appeals are disposed of in the above terms.