Il&fs Tamil Nadu Power Company Limited v. T. Muruganandam And Others
Factual and Procedural Background
M/s IL&FS Tamil Nadu Power Co. Ltd. was incorporated in 2006 to set-up a 3600 MW imported-coal based thermal power project in Cuddalore District, Tamil Nadu. The Ministry of Environment, Forest and Climate Change (MoEF) granted an Environmental Clearance (EC) on 31-5-2010 after public hearing, an EIA study and recommendations of the Expert Appraisal Committee (EAC).
Fishermen groups challenged the EC before the National Environment Appellate Authority; the matter was transferred to the National Green Tribunal (NGT) as Appeals 16 & 17 of 2011.
• 23-5-2012 — NGT (Appeal 17 of 2011) upheld the EC but ordered MoEF to review it on the basis of a cumulative impact assessment; the EC was suspended in the interim.
• 14-8-2012 — MoEF issued a corrigendum adding further conditions (including compulsory installation of a flue-gas desulphurisation system).
• The same fishermen filed Appeal 50 of 2012 before NGT challenging the corrigendum. On 10-11-2014 NGT quashed the corrigendum.
• 10-2-2015 — The Supreme Court stayed the 2014 NGT order, enabling the appellant to commission two 600 MW units (operational since September 2015 and April 2016).
• The present Supreme Court appeals are against both NGT orders dated 23-5-2012 and 10-11-2014.
Legal Issues Presented
- Whether the appellant should be permitted to continue operating the two commissioned power units despite NGT’s suspension/quashing orders.
- Whether an appeal before the National Green Tribunal is maintainable against a MoEF “corrigendum” that merely adds conditions to an existing, otherwise unchallenged, Environmental Clearance.
- Whether a cumulative environmental impact assessment study is mandatorily required for projects of this nature (issue left open by the Court).
Arguments of the Parties
Appellant (M/s IL&FS Tamil Nadu Power Co. Ltd.)
- Closing the operating plant would severely harm power supply in energy-deficient Tamil Nadu; the two units presently serve about 4 million households.
- The plant complies with all EC and corrigendum conditions; six-monthly compliance reports are filed with MoEF.
- Imported Indonesian coal with low sulphur is used; an FGD system costing ₹ 775 crore has been installed, making the plant one of only 20 in India with such technology.
- The company, part of the IL&FS group under Government-controlled restructuring, has invested about ₹ 11,000 crore (including ₹ 6,080 crore in public-sector bank loans) and undertakes extensive CSR activities.
- Maintainability: the fishermen lacked locus to appeal against the corrigendum once the initial EC had been upheld and was not challenged.
- Requested that questions of law on cumulative impact studies and corrigendum appeals be kept open while allowing the plant to continue.
Ministry of Environment, Forest & Climate Change (MoEF)
- The appellant never challenged either the original EC conditions or the additional conditions in the corrigendum and is therefore bound to comply fully.
- Highlighted partial/non-compliance regarding green-belt, endowment funds, mangrove regeneration, fishermen welfare fund, social audit, and hydro-geological studies, and sought Court directions for strict compliance.
Original Petitioners (Fishermen)
- No objection to continued operation if all EC and corrigendum conditions are satisfied.
- Requested that the broader legal issue—necessity of a cumulative environmental impact assessment—remain open for future cases.
- Asserted that appeals to NGT are maintainable against corrigenda imposing additional EC conditions.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| T. Murugandam v. MoEF, 2012 SCC OnLine NGT 18 | Upheld EC validity; directed MoEF to conduct cumulative impact assessment; suspended EC pending review. | Formed the first part of the challenged orders; Supreme Court considered its directions but allowed plant to operate subject to compliance. |
| T. Muruganandam v. MoEF, 2014 SCC OnLine NGT 7161 | Quashed MoEF corrigendum dated 14-8-2012 adding additional conditions to EC. | Second impugned order; stayed by Supreme Court in 2015 and ultimately set aside by permitting plant operations. |
| Interim Order, 2015 SCC OnLine SC 1931 | Granted stay of the 2014 NGT order. | Enabled the appellant to commission and run two units; Court took note of ongoing operations while deciding final relief. |
| Application No. 25/2012, 2012 SCC OnLine NGT 44 | Referenced by appellant in opting for a Rapid Cumulative Impact Assessment (RCIA). | Cited as background for the type of impact study undertaken. |
| IL&FS Restructuring, 2021 SCC OnLine NCLAT 5466 | Recorded approval of the appellant’s restructuring plan. | Mentioned to demonstrate public-sector and financial stakes in the project. |
Court's Reasoning and Analysis
1. Public Interest and Power Deficit. The Court observed that Tamil Nadu is an energy-deficient State and the appellant’s two 600 MW units have been supplying power to roughly 40 lakh households since 2015. Shutting the plant would adversely affect the State’s power sector and thus would not serve the larger public interest.
2. Compliance Status. The Court scrutinised the MoEF’s latest compliance report (20-9-2022) and the appellant’s detailed responses. It found “substantial compliance” with both the original EC conditions and the additional conditions contained in the 14-8-2012 corrigendum, with only partial lapses remaining. The appellant undertook to rectify all outstanding issues within specified timelines.
3. Conditional Continuance. In light of significant compliance and public-interest considerations, the Court allowed operation of the plants to continue, but expressly made this conditional on full compliance with every EC and corrigendum requirement within the timelines proposed by the appellant.
4. Maintainability of Appeals Against Corrigenda. Addressing the jurisdictional question, the Court held that an “aggrieved person” may challenge a corrigendum before the NGT, but such an appeal would be confined to the additional conditions introduced by the corrigendum when the underlying EC itself is not under challenge.
5. Unresolved Question on Cumulative Impact Assessment. The Bench deliberately left open the broader legal issue of whether cumulative impact assessments are mandatory for large projects, noting that it may arise for determination in future cases.
Holding and Implications
DISPOSED OF: The Supreme Court disposed of the appeals by permitting the appellant to continue operating the two power units, subject to strict and time-bound compliance with all original and additional EC conditions. It affirmed that appeals to NGT against EC corrigenda are maintainable but limited to the corrigendum’s scope, and it expressly left unresolved the legal necessity of cumulative impact assessments.
Implications: The immediate effect is that power generation continues uninterrupted in Tamil Nadu while the appellant must meet outstanding environmental obligations. The decision sets no binding precedent on cumulative impact assessments and is not to be cited as precedent in other matters, thereby limiting its doctrinal reach.
The Judgment of the Court was delivered by
M.R. Shah, J.— Feeling aggrieved and dissatisfied with the impugned judgment and order dated 23-5-2012 in T. Murugandam v. Ministry of Environment & Forests 2012 SCC OnLine NGT 18 and judgment and order dated 10-11-2014 in T. Muruganandam v. Ministry of Environment & Forests 2014 SCC OnLine NGT 7161, passed by the National Green Tribunal (Principal Bench), New Delhi (hereinafter referred to as “NGT”), M/s IL&FS Tamil Nadu Power Co. Ltd. has preferred the present appeals.
2. The facts leading to the present appeals in a nutshell are as under : The appellant herein has been incorporated in the year 2006 to implement the Project for establishing a 2×600 MW and 3×800 MW (aggregating to 3600 MW) imported coal-based thermal power plant at Villages Kottatai, Ariyagoshti, Villianallur and Silambimangalam in Chidambram Taluk, District Cuddalore, Tamil Nadu. Now the appellant company is under the control of the Government of India. The appellant submitted Form I under the EIA Notification, 2006 to obtain terms of reference for the EIA study on 5-2-2008. The terms of reference approval Letter was issued by the Ministry of Environment, Forest and Climate Change (hereinafter referred to as “MoEF”) on 9-7-2008. Public hearing was carried out for the project on 5-2-2010.
3. The appellant completed the EIA study in accordance with the EIA Notification, 2006. That thereafter the Expert Appraisal Committee (for short “EAC”) considered the EIA study and directed the appellant to undertake certain additional submissions to address specific points and directed that an updated Form I be submitted. That thereafter the appellant submitted updated Form I reflecting recommendations of EAC meeting dated 19-3-2010 to MoEF. The EAC meeting considered the project and recommended the project for environment clearance (for short “EC”), subject to stipulation of specific conditions including project to keep space for providing flue gas de-sulfurisation (for short “FGD”) system with all the five units of the power plant to enable the system to be installed whenever required. The appellant herein was granted the EC in accordance with the recommendations of the EAC under the EIA Notification, 2006.
4. The original petitioners claiming to be fishermen and persons acting for welfare of fishermen filed appeals against the EC before National Environment Appellate Authority being NEAA Appeals Nos. 19 & 20 of 2010. On the constitution of NGT, Appeal No. 20 of 2010 filed before the National Environment Appellate Authority came to be transferred to NGT, which was renumbered as Appeals Nos. 16 of 2011 & 17 of 2011.
5. Vide order dated 23-5-2012 2012 SCC OnLine NGT 18 in Appeal No. 17 of 2011, NGT upheld the validity of the EC but directed the MoEF to review the EC based on the cumulative impact assessment study and stipulate any additional conditions, if required and directed that till then the EC shall remain suspended. Instead of the cumulative impact assessment study, the appellant completed the rapid cumulative impact assessment (for short “RCIA”) study and submitted a copy thereof to the MoEF. That thereafter the EAC, after extensive deliberations on the RCIA and after hearing the representative of the original petitioners and the appellant/project proponent, recommended certain additional conditions to be added to the EC including the requirement of installing a FGD system as part of the power plant.
6. At this stage, it is required to be noted that as such neither the original petitioners nor even the appellant challenged the first judgment and order dated 23-5-2012 2012 SCC OnLine NGT 18 passed in Appeal No. 17 of 2011 by which NGT upheld the validity of the EC but directed MoEF to review the EC based on the cumulative impact assessment study and stipulate any additional conditions, if required. That thereafter, on 14-8-2012, MoEF based on the recommendations of the EAC, issued a corrigendum to the EC imposing additional conditions to the EC. That thereafter the original petitioners who filed the earlier appeal against the grant of EC, filed Appeal No. 50 of 2012 against the corrigendum dated 14-8-2012 issued by the MoEF. By the impugned judgment and order dated 10-11-2014 2014 SCC OnLine NGT 7161, NGT has disposed of Appeal No. 50 of 2012, quashing the corrigendum dated 14-8-2012. The judgment and order dated 23-5-2012 2012 SCC OnLine NGT 18 in Appeal No. 17 of 2011 and subsequent judgment and order dated 10-11-2014 2014 SCC OnLine NGT 7161 in Appeal No. 50 of 2012 passed by NGT are the subject-matter of the present appeals.
7. By an interim order dated 10-2-2015 2015 SCC OnLine SC 1931, this Court stayed the impugned order dated 10-11-2014 2014 SCC OnLine NGT 7161 passed in Appeal No. 50 of 2012, which has been continued till date. Pursuant to the interim order 2015 SCC OnLine SC 1931 passed by this Court, the appellant Company had commenced two power plants in Phase I, which are in operation since 2015.
8. Dr Abhishek Manu Singhvi, learned Senior Advocate appearing on behalf of the appellant Company has submitted that to close the power plant now would not be in public interest. It is submitted that the appellant's power plant is running since September 2015 in power deficit State of Tamil Nadu. The appellant operates two units of 600 MW each since September 2015 and April 2016, which presently supply power to approximately 40 lakh households. The power plant is situated in an energy deficient State (Tamil Nadu) and therefore closing the power plant would adversely affect power sector of the State.
8.1. In support of his submission that to close the power plant now would not be in public interest, it is submitted as under:
8.1.1. That the appellant's power plant is running since September 2015 in power-deficit State of Tamil Nadu : The appellant operates two units of 600 MW each since September 2015 and April 2016, which presently supply power to approximately 40 lakh households. The power plant is situated in an energy deficient State (Tamil Nadu), and closing the plant would adversely affect power sector of the State.
8.1.2. Plant running in compliance with EC and Corrigendum : That the plant is in compliance with clearance conditions, and six-monthly reports being submitted to the Ministry of Environment, Forest & Climate Change, latest report of April-September.
8.1.3. Plant uses imported coal with low sulphur and uses FGD system : That the appellant uses imported coal from Indonesia for its thermal power plant, which already has low sulphur content. Pursuant to MoEF Corrigendum, has spent Rs 775 crores to install flue gas de-sulfurisation (FGD) system. Report of Centre for Science and Environment identifies the appellant's plant as compliant with SO2 standards. All over India only 20 power plants have FDGs, of which two units are the appellant's power plant.
8.1.4. The appellant part of IL&FS Group and value to be maximised : That Itpcl/appellant is a group company of IL&FS which is under control of Government of India and is undergoing restructuring. Larger public interest is to realise value and recover PSU debt. The appellant's restructuring plan has been approved by Hon'ble Nclat on 1-12-2021 2021 SCC OnLine NCLAT 5466. The appellant incurred expense of Rs 11,000 crores (approx.) to build 2 × 600 MW units, which are operational since September 2015 and April 2016. Of this, Rs 6080 crores was through loans from public sector banks (Punjab National Bank, Bank of Baroda, LIC, SBM Bank, SBI) and Rs 4560 crores in equity by IL&FS Energy Development (another IL&FS group entity).
8.1.5. The appellant's CSR initiatives : That till date approx. Rs 30 crores spent on CSR activities, including adopting several villages in the surrounding areas. As of February 2022, the appellant has 1466 employees of which 87% are from Tamil Nadu. Overall, 69% (1005 persons) are from Cuddalore District itself.
8.2. It is further submitted that instead of cumulative impact assessment study, the appellant bona fide and taking into consideration the order 2012 SCC OnLine NGT 44 passed by NGT in Application No. 25/2012 conducted/completed RCIA, a copy of which was submitted to MoEF and after undertaking extensive deliberations on the RCIA and after hearing the representative of the original petitioners and the appellant/project proponent, the EAC recommended certain additional conditions to be added to the EC including the requirement of installing FGD system and pursuant to which and based on the recommendations of the EAC, MoEF issued a corrigendum to the EC imposing additional conditions to the EC.
8.3. It is further submitted that taking into consideration the additional conditions imposed vide corrigendum dated 14-8-2012, the appellant Company had installed FGD system at a cost of Rs 775 crores, the only thermal power plant in the country to commence operations with FGD system.
8.4. Dr Abhishek Manu Singhvi, learned Senior Counsel appearing on behalf of the appellant has also made an elaborate submission on the maintainability of Appeal No. 50 of 2012 before NGT, filed by the original petitioners against the corrigendum dated 14-8-2012 issued by the MoEF. It is submitted that as such the first judgment dated 23-5-2012 2012 SCC OnLine NGT 18 passed in Appeal No. 17 of 2011, by which NGT specifically upheld the validity of the EC but directed MoEF to deal with the EC based on cumulative impact assessment study and stipulate any additional conditions, was not challenged by the original petitioners. It is submitted that the original petitioners had no locus and therefore the original petitioners could not have challenged the subsequent corrigendum dated 14-8-2012 by which certain additional conditions were imposed to the original EC by the MoEF.
8.5. Dr Abhishek Manu Singhvi, learned Senior Counsel has taken us to the additional affidavits dated 20-9-2022 and 28-11-2022. He has also taken us to the EC & CRZ Compliance Report dated 12-1-2022 as well as the subsequent Compliance Report dated 20-9-2022 and the copy of the response of the project proponent. He has stated at the Bar that by and large all the conditions of the original EC as well as corrigendum to the EC have been complied with by the appellant/project proponent and few conditions are under continuous compliance. He has stated that the conditions imposed while issuing the EC and the corrigendum have been substantially complied with and there are no fundamental breaches and/or non-compliance. He has stated at the Bar that whichever conditions are not complied with and not complied with fully and/or there is continuous compliance, the same shall be complied with within the time stipulated in the response of the project proponent.
8.6. Making the above submissions and praying for keeping the question of law, if any, namely, “Whether for the project like this, a cumulative impact assessment study is required or not” open and also the question, “whether an appeal before NGT against the corrigendum to the EC and the additional conditions imposed as per the corrigendum to the EC would be maintainable or not” and keeping the aforesaid question(s) of law open, it is prayed to dispose of the present appeals by permitting the appellant to continue the power plants which are in operation since 2015.
9. Shri Shiv Mangal Sharma, learned counsel appearing on behalf of the MoEF has submitted that as such the appellant had never challenged earlier conditions imposed while issuing the EC and the first judgment and order passed by NGT dated 23-5-2012 2012 SCC OnLine NGT 18 and even the corrigendum dated 14-8-2012 issued by the MoEF imposing additional conditions and therefore the appellant is bound by the conditions imposed while issuing the EC and corrigendum to the EC dated 14-8-2012 and the appellant has to comply with all the conditions imposed while issuing EC as well as additional conditions imposed vide corrigendum dated 14-8-2012. He has pointed out certain non-compliances/part compliances of certain conditions and the response by the appellant. Therefore, he has submitted that if this Court is inclined to permit the appellant to continue with the power plants in the public interest, in that case, the appellant may be directed to comply with all the conditions imposed while issuing EC as well as additional conditions imposed while issuing corrigendum dated 14-8-2012.
10. Ms Srishti Agnihotri, learned counsel appearing on behalf of the original petitioners has prayed that in case this Court is inclined to permit the appellant to continue with the power plants as per the EC and the corrigendum dated 14-8-2012 which are in operation since 2015, in that case, the question of law, namely, “whether for the project like this conducting a cumulative environment impact assessment study is must or not”, may be kept open as so many other such projects may come and that on conducting cumulative environment impact assessment study, the Tribunal may consider the said issue in detail.
11. Insofar as maintainability of appeal before NGT against the order of corrigendum is concerned, it is submitted that against the additional conditions imposed vide corrigendum dated 14-8-2012, an appeal would be maintainable before NGT against the corrigendum to the EC.
12. Having heard Dr Abhishek Manu Singhvi, learned Senior Counsel appearing on behalf of the appellant and the learned counsel appearing on behalf of the MoEF and original petitioners and the facts narrated hereinabove, it is to be noted that pursuant to the interim order passed by this Court, the appellant has commenced two power plants in Phase I, which are in operation since September 2015. The appellant is operating two units of 600 MW since September 2015 and April 2016, which presently supply power to approximately 40 lakh households. The power plants are situated in an energy deficit State (Tamil Nadu). Thus, closing the power plants/units would adversely affect power sector of the State and which shall not be in the larger public interest, more particularly the power deficient State of Tamil Nadu.
13. However, at the same time, the appellant has to comply with all the conditions imposed while issuing EC as well as the additional conditions imposed vide corrigendum to the EC dated 14-8-2012. From the compliance report dated 20-9-2022 (latest compliance report) and the response of the project proponent, it appears that by and large there is a substantial compliance of the conditions imposed while issuing EC as well as the additional conditions imposed vide corrigendum to the EC dated 14-8-2012. There do not appear to be any fundamental breaches or non-compliance of the conditions imposed while issuing EC as well as additional conditions imposed vide corrigendum to the EC dated 14-8-2012. However, some conditions are still partly complied with, which have been responded to by the appellant and it has agreed to comply with the same.
14. The particulars of the specific conditions, part compliances and the response to the same are as under:
Status of certain EC conditions referred by MoEF&CC vide email dated 16-11-2022
Sl. No. Specific conditions Compliance status reported by RO as on 13-9-2022 Information asked by MoEF&CC vide email dated 16-11-2022 Itpcl response—17-11-2022 EC No. J-1301213412008-IA.ll (T) dated on 31-5-2010 1. (xvii) To absorb the ground level pollutants, to act as buffer against strong winds arising out of tropical cyclones/storms, to reduce heat load and ameliorate environment, there is a need for shelterbelts/greenbelts/tree cover along the coastline, bunds around marshy areas, roadsides, around the project protected monuments, forts, waste places, school campuses and other vacant Partly complied. (As more plantation work to be carried out) The project proponent, as informed vide email dated 4-2-2022, has planted around 2,88,419 trees of native species in an area of 254.46 acres (which is more than 33% of land corresponding to Phase I). Trees such as pongamia, neem, Jamon, Gulmohar, Ashoka, Silver oak, etc. have been planted in Action plan with timelines be provided by which the compliance of this condition can be ensured. We would like to submit the following facts for your consideration. The specific conditions are mostly complied with except along the coastline since this region is vulnerable and frequently affected by natural calamities like cyclones, flood, low depressions and affected by tsunami at times. However, we have planted around 2,88,419 trees of native species in an area of 254.46 acres (which is more than 33% of land
plots. Coconut plantations can be developed along the coastline and near villages, school and forts. Stands of casuarina should also be developed on some dunes and along coasts. Bamboos, neem and other native trees should be planted in and around at the villages. and around the project site. However, no plantation has been taken up along the particular coastline as stated in the condition. Further, coconut plantations are not developed along the coastline and near villages, school and forts. Plantation on sand dunes was not carried out. Bamboo is not planted instead other native species including neem were planted. corresponding to Phase I). Trees such as pongamia, neem, Jamon, Gulmohar, Ashoka, Silver oak, etc. are planted in and around the project site, nearby villages and schools to take care of ground level pollutants. Due to hydrogeological as well as tropical conditions and heavy winds in the coastal region around the project site, coconut trees which were developed, could not be sustained along the shore as impacted by natural calamities. However, we have planted coconut, neem, and casuarina trees in the nearby villages, in and around the project area, and roadsides close to the coastal area to act as buffer against strong winds during cyclone/storms. Additionally, we propose to plant bamboo and casuarina trees 25,000 nos. in and around the project area, schools and nearby villages from January 2023 to October 2023. 2. (xxiii) Green belt shall consist of 3 tiers Partly complied. Action plan with timelines for three-tier As mentioned in report of IRO, Chennai, we have
of plantations as cited above and largely comprising of native species around the power plant and at least 100 m width shall be raised. Wherever 100 m width is not feasible a 50 m width shall be raised and adequate justification shall be submitted to the Regional office of the Ministry. Tree density shall not less than 2500 per ha with survival rate not less than 70%. (As more plantation work to be carried out) As stated in the condition, three-tier plantation is not carried out. However, they have taken up 100 m with plantation including native species at some places and 50 m width plantation at some places (Photos attached) Vide email dated 4-2-2022, the project proponent informed that so far about 2,88,419 trees of native species were planted in an area of 254.46 acres. During the visit, it was observed that many vacant lands are available within the site and the same can be used for plantation. The project proponent has agreed to plant more trees in those vacant lands inside their campus. The project proponent, vide email dated 16-9-2022, informed that an amount of Rs 9.25 crores (up to September 2022) was spent for the purpose of green belt plantation around the plant providing 100m-50m width as per EC condition be provided. Please submit the commitment in this regard. already made plantations for about 2,88,419 trees in the area of 254.56 acres and the details and photographs are already submitted. To comply with the conditions, three-tier plantations are carried out around the power plant in some of the locations like ash dyke, coal yard, and north side of the plant and sustained. However, three-tier plantation could not be sustained in some other areas due to land formations, soil conditions and plant setup. Three tier green belt is developed around the coal yard in addition to the wind barrier. Plantations are made to 100 m width wherever possible and minimum not less than 50 m width is maintained in other possible areas. Green belt development and tree plantation is a continuous activity as part of our sustainability initiatives and every year we plant 1000 of trees and till August 2022, around 2,88,419 saplings are planted in an area of 254.46 acres and tree density of (>2500 trees per ha) is
development including plantation and their maintenance. (Copy of expenditure statement as provided by the company is given in Appendix II) maintained in and around the project site. All dust generation areas have engineering controls like wind barriers around coal yard, dust suppression systems and dust extraction systems at the point source of emissions like coal unloading area, transfer towers, coal crushers, etc. Fly ash and bottom ash is handled in closed conveyors, pipeline transfers, etc. and hence dust generation is avoided. Since the requirement of green cover as well as dust control measures are fulfilling the requirement, we request the Ministry to consider our above submissions and note the condition as complied. 3. (xxiv) To meet the expenditure on plantations and their management, a Common Green Endowment Fund should be created by the project proponents out of EMP budgets the interest earned out of it should be Partly complied. (As Common Green Endowment Fund is not created) As specifically stated in the condition, a Common Green Endowment Fund is not created by the Please provide the method along with commitment to ensure the availability of fund to meet the expenditure on plantations and their management. Presently the company is undergoing debt restructuring. As per the current arrangement mandated by consortium of banks and RBI policy, we are allowed to open only one account for our company.
used for the development and management of green cover of the area. project proponent. In this regard, the project proponent vide email dated 4-2-2022 has indicated the following reasons: (1) Presently the company is undergoing debt restructuring. (2) As per the current arrangement, mandated by consortium of banks and RBI policy, it is allowed to open only one account for the company. (3) However, the lead bank will be requested to allow to open the desired account to comply with the requirements. The project proponent, vide email dated 16-9-2022, informed that an amount of Rs 9.25 crores (up to September 2022) was spent for the purpose of green belt development including plantation and their maintenance. No information was provided However, we requested the lead bank to allow us to open the desired account to comply with the requirements. Bankers have denied for opening of new account and the correspondence between the company and the bank is attached as Annexure 1. Though a separate account was not maintained as per the EC condition, a separate budget head has been created internally and the amount spent towards green belt development is being accounted under the budget head. So far, the company has spent a sum of Rs 9.27 crores (as on September 2022) towards green belt development and maintenance under this budget head. In comparison to the amount spent, the amount stipulated for Green Endowment Fund and the expected returns from the fund would be much lower. In fact company has already spent more than the amount planned.
about the Common Green Endowment Fund. However, as informed, the company has spent a sum of Rs 9.23 crores (as on September 2021) towards green belt development and maintenance from their budget provision. 4. (xxv) The project proponent shall submit a time-bound implementation plan for regeneration/preservation of Pichavaram Mangroves and others, if any, and the fund earmarked and committed for the same amounting to Rs 6.0 crores shall not be diverted for any other activity. Roadmap for implementation shall be submitted within six months to the Ministry. Implementing the condition. In this regard, during the recent site visit carried out on 13-9-2022, the project proponent produced a copy of the report, dated February 2013, regarding “Nursery Establishment for Mangrove Afforestation/Coastal bioshield Development” carried out through Annamalai University, Parangipettai (Tamil Nadu). (Copy of the report is attached in Appendix III) Around 30,000 mangrove saplings and propagules have been planted to conserve Pichavaram Mangrove area. Please submit the action plan for regeneration/preservation of Pichavaram Mangroves and others, if not prepared commitment by what period the said condition be submitted. The condition is already complied. Preservation and maintenance of Pichavaram Mangroves and others are part of our routine sustainability activities and recent photographs of mangroves are attached for your perusal in Annexure 2 which also covers the various stages of mangroves developed by the company.
The project proponent has earmarked Rs 6 crores for regeneration/preservation of Pichavaram Mangroves in a phased manner for entire capacity of the Plant and the same has not been diverted to any other activity. 5. (xxviii) An endowment of Fishermen Welfare Fund shall be created not only to enhance their quality of life through creation of facilities for fish landing platforms/fishing harbour/cold storage, but also to provide relief in case of emergency situations such as missing of fishermen on duty due to rough seas, tropical cyclones and storms, etc. Partly complied. (As endowment of Fishermen Welfare Fund is not created) The project proponent informed that an amount of Rs 13.12 crores (March 2022) was spent for the purpose of Fishermen Welfare activities (Appendix II). Further, the Company has provided relief activities to fishermen during emergency situations. However, as specifically stated in the condition, an endowment of Fishermen Welfare Fund is not created by the project proponent. In this regard, the project Please provide the method along with commitment to ensure the availability of fund. Presently the company is undergoing debt restructuring. As per the current arrangement mandated by consortium of banks and RBI policy, we are allowed to open only one account for our company. However, we requested the lead bank to allow us to open the desired account to comply with the requirements. Bankers have denied for opening of new account and the correspondence between the company and the bank is attached as Annexure 1. Though a separate account was not maintained, a separate budget head has been created and the amount spent towards Fishermen Welfare Fund is
proponent, vide email dated 4-2-2022, has indicated the following reasons: (1) Presently the company is undergoing debt restructuring. (2) As per the current arrangement, mandated by consortium of banks and RBI policy, it is allowed to open only one account for the company. (3) However, the lead bank will be requested to allow to open the desired account to comply with the requirements. being accounted under the budget head. So far, for enhancing quality of life of fisherman, the Company has incurred an expenditure of Rs 13.57 crores (as on September 2022) under this budget head. In addition to the above, Itpcl has been providing relief assistance to fishermen during emergency situations. 6. (xxxiv) It shall be ensured that in-built monitoring mechanism for the schemes identified is in place and annual social audit shall be got done from the nearest government institute of repute in the region. The project proponent shall also submit the status of implementation of the scheme from time to time. Partly complied. As specifically stated in the condition, annual audit through a government institute has not been carried out. However, project proponent informed that in-build monitoring mechanism is available as part of annual account auditing process with project proponent. The project proponent is informing the status of (i) What is the status of implementation of the scheme? (ii) Please submit the commitment by what period the said condition can be satisfied. All the schemes as required by the EC conditions are implemented and sustained. Status of implementations of schemes like green belt endowment, fishermen endowment and CSR are being submitted through six monthly compliance reports to MoEF&CC and hence complied to the conditions. Inbuilt monitoring mechanism is available as part of annual account auditing process. Expenditure
implementation of the scheme from time to time through their six-monthly compliance report to the Regional Office. incurred towards implementations of various social schemes are being audited and verified by 3rd party reputed financial auditors of the Company. As specified in the condition, a social audit will be conducted and status report will be submitted to the Ministry during the year 2023. 7. (xi) A copy of the clearance letter shall be sent by the proponent to Panchayat, Zila Parishad/Municipal Corporation, urban local Body and the Local NGO concerned, if any, from whom suggestions/representations, if any, received while processing the proposal. The clearance letter shall also be put on the website of the Company by the proponent. Partly complied. A physical copy of the EC letter was not sent to the Panchayat, Zila Parishad/Municipal Corporation, urban local Body and the Local NGO concerned. However, the environment clearance was published in local newspapers. Copy of clearance letter was uploaded in company's website. (i) Please submit the commitment by what period the said condition can be satisfied. No suggestions and representation received from the said authorities and hence a physical copy was not sent to them. Notwithstanding that, environment clearance was published in local newspapers. Copy of clearance letter was uploaded in Company's website. However, as required by IRO and MoEF&CC, copy of the environment clearance letter will be submitted to Local bodies and Zila Parishad concerned within 31-12-2022 and the compliance will be communicated to MoEF&CC. EC No. J-1301213412008-IA.II(T) dated on 14-8-2012 CORRIGENDUM 1. (xxxviii) Fish catch along the impacted zone of sea should be monitored periodically by Not complied. The project proponent informed that necessary (i) Latest action taken, if any, in this regard to ensure compliance of the condition. Complied. The Company has made a written request to Department of Fisheries, Tamil
the Department of Fishers, Government of Tamil Nadu. The project proponent shall accordingly take up the matter with the Fishery Dept., Government of Tamil Nadu from time to time. request was made by the Company vide letter dated 19-7-2013 to the Department of Fisheries, Government of Tamil Nadu and reply is awaited. (ii) Provide a timeline by which the compliance can be ensured. Nadu and details are awaited from the Fisheries Department. In addition to the above, the company has engaged M/s Annamalai University for conducting monthly marine monitoring and ensures there is no adverse impact in the fish catch along the impacted sea zone. The company will again follow up with the Department of Fisheries, Tamil Nadu to fulfil the obligation and submit the progress to the MoEF&CC within 31-3-2023. EC No. J-1301213412008-IA. II (T) dated on 4-2-2014 1. (xlix) Hydrogeological study of the area shall be reviewed annually and report submitted to the Ministry. No water bodies including natural drainage system in the area shall be disturbed due to activities associated with the setting up/operation of the power plant. Not complied. As stipulated in the condition, the hydro- geological study of the area has not been taken up by the project proponent. The project proponent, vide email dated 16-9-2022, has agreed to conduct Hydrogeological study of the area by 31-12-2022 (Appendix V). (i) What is the current status regarding the compliance of this condition? (ii) Since you have agreed to conduct Hydrogeological study of the area by 31-12-2022 as per the email dated 16-9-2022. In this regard please give your commitment with timelines for the same to the MoEF&CC. Current status : Preliminary area walk through survey conducted by the consultant for estimating the quantum of work and techno-commercial offers are under evaluation for vendor engagement and the Hydrogeological study will be completed by January 2023 due to rain predictions and monsoon in the month of December' 22. After completion of the hydrogeological study, the report will be submitted to
MoEF&CC within 31-3-2023. 2. (li) Three tier green belt shall be developed all around ash pond over and above the green belt around the plant boundary. Partly complied. The project proponent has taken up plantation around ash pond area by planting different species including local species of 1,96,313 numbers wherever possible. However, as stipulated in the condition, three tier green belt development is not carried out on all sides. The plantation work and survival are good. (i) The green belt development is insufficient. In this regard please ensure that the three tier green belt development is carried on all sides completely. (ii) In this regard please give your commitment with timelines for the same to the MoEF&CC. The condition is mostly complied. There is a difficulty in sustaining three tier formation due to natural calamities (cyclones and wind storms) in this coastal region. However, the Company has developed three tier green belt in many places around ash pond. However, due to natural land formation, soil condition and proximity to railway track, three tier green belt could not be sustained in some locations. Further, we state that here is no possibility of dust generation from ash dyke as there is no fly ash discharge into our ash pond for the last 5 years and our fly ash generation is 100% utilised in the cement plants. However, we have planned for additional green belt development for about 5 acres around the ash pond by October 2023. 3. (lii) A Common Green Endowment Fund shall be created and the interest earned out of it shall be used for the development and Partly complied. (As Common Green Endowment Fund is not created) As specifically stated in the condition, a (i) List out the ways by which it is being ensured that sufficient amount is being spent for the purpose of green belt development including Presently the company is undergoing debt restructuring. As per the current arrangement mandated by consortium of banks
management of green cover of the area. Common Green Endowment Fund is not created by the project proponent. In this regard, the project proponent vide email dated 4-2-2022 has indicated the following reasons: 1. Presently the company is undergoing debt restructuring. 2. As per the current arrangement, mandated by consortium of banks and RBI policy, it is allowed to open only one account for the company. 3. However, the lead bank will be requested to allow to open the desired account to comply with the requirements. The project proponent, vide email dated 16-9-2022, informed that an amount of Rs 9.25 crores (up to September 2022) was spent for the purpose of green belt development including plantation and their maintenance. plantation and their maintenance. (ii) The amount that will be spent in another six months for ensuring the compliance. (iii) Has the request been sent to the lead bank to open the desired account to comply with the requirements? If yes, what is the current status? and RBI policy, we are allowed to open only one account for our company. However, we requested the lead bank to allow us to open the desired account to comply with the requirements. Bankers have denied for opening of new account and the correspondence between the company and the bank is attached as Annexure 1. Though a separate account was not maintained, a separate budget head was created and the amount spent towards Green Endowment is being accounted under the budget head. So far, the company has spent a sum of Rs 9.27 crores (as on September 2022) towards green belt development and maintenance under this budget head. In comparison to the amount spent, the amount stipulated for Green Endowment Fund and the expected returns from the fund would be much lower. In fact company has already spent more than the amount planned.
15. Considering the aforesaid facts and circumstances and subject to compliance of the conditions imposed while issuing EC and the additional conditions imposed vide corrigendum to the EC dated 14-8-2012 and subject to the conditions/additional conditions which are partly complied with, to be complied with within the time suggested in the response of the appellant/project proponent, reproduced hereinabove and keeping the larger question of law, namely, “whether for the project like this, a cumulative impact assessment study is required or not”, open and to be decided in an appropriate case, we dispose of the present appeals by permitting/allowing the appellant/project proponent to continue with the power plants which are in operation since September 2015 and April 2016 on the conditions as above i.e. subject to compliance of all the conditions mentioned in the EC as well as additional conditions imposed vide corrigendum to the EC dated 14-8-2012 and to fully comply with the conditions which are partly complied with within the stipulated time as suggested and prayed by the appellant company, prayed in response to the compliance report dated 20-9-2022, reproduced hereinabove.
16. Now so far as the issue, “whether against the corrigendum to the EC along with additional conditions, an appeal before NGT would be maintainable or not” is concerned, having heard the learned counsel appearing on behalf of the respective parties, we are of the opinion that an aggrieved person may always challenge the corrigendum to the EC, however, the appeal will be restricted to the corrigendum to the EC on additional conditions only, if the original EC is not under challenge and/or the original EC has been confirmed by NGT earlier on certain conditions which have not been challenged.
17. The present appeals stand disposed of in the aforesaid terms. We make it clear that the present order shall not be cited as a precedent in any other matter.