Factual and Procedural Background

This case arises from a suit for copyright infringement. The plaintiff alleged that defendant no. 2, an employee of the plaintiff company from 2011 until around 2022, unauthorizedly took copies of drawings and documents related to the manufacturing process of shock tubes in 2016 and divulged and sold them to third parties, including defendant no. 1. After discovering these acts, the plaintiff filed a complaint with the police in Bokaro, Jharkhand, in 2022. The defendant no. 1 filed an application seeking revocation of dispensation granted under section 12A of the Commercial Courts Act, 2015, which relates to pre-institution mediation requirements.

Legal Issues Presented

  1. Whether the requirement of compliance with section 12A of the Commercial Courts Act, 2015, relating to pre-institution mediation, ought to have been dispensed with in this case.

Arguments of the Parties

Defendant No. 2's Arguments

  • The plaint does not justify urgent interim reliefs since the plaintiff remained silent for a considerable period after defendant no. 2 left the company.
  • The alleged unauthorized sharing of impugned drawings occurred as far back as 2016, with urgency only arising after the criminal complaint was filed in 2022.
  • The plaintiff remained silent for more than one year after filing the criminal complaint, undermining the claim of urgency.
  • Relied on precedents including Patil Automation Private Limited v. Rakheja Engineers Private Limited, Odisha Slurry Pipeline Infrastructure Ltd. v. IDBI Bank Ltd., and an unreported judgment in Sanjay Kumar Mishra v. Godavari Commodities Ltd.

Plaintiff's Arguments

  • The suit concerns protection of intellectual property rights and explicitly contemplates urgent interim reliefs, thus no scope for mediation or compliance with section 12A.
  • The averments in the plaint should be accepted as true for the purposes of the application.
  • Relied on precedents including Bolt Technology Ou v. Ujoy Technology (P) Ltd., Chandra Kishore Chaurasia v. R A Perfumery Works Private Limited, Odisha Slurry Pipeline Infrastructure v. IDBI Bank Ltd., and SLP (Civil) No. 8481/2023.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Patil Automation Private Limited v. Rakheja Engineers Private Limited, (2022) 10 SCC 1 Section 12A of the Commercial Courts Act, 2015 is mandatory; mediation is a new mechanism of access to justice; plaintiff must exhaust mediation before instituting suit unless urgent relief is sought. The Court relied on this precedent to emphasize the mandatory nature of section 12A and the necessity of judicial scrutiny in granting dispensation from mediation.
Laxmi Polyfab Pvt. Ltd. v. Eden Realty Ventures Pvt. Ltd., 2021 SCC OnLine Cal 1457 Section 12A serves a public purpose to expedite commercial dispute resolution via pre-institution mediation, thus conserving court time and resources. The Court cited this case to underline the legislative intent behind mandatory pre-institution mediation and its benefits.
Chandra Kishore Chaurasia v. R A Perfumery Works Private Limited, 2022 SCC OnLine Del 3529 Consideration of urgent interim reliefs and maintainability of suit in intellectual property infringement cases. The Court found this precedent distinguishable and inapposite, noting that dispensation from mediation cannot be granted solely based on plaintiff’s averments.
Bolt Technology Ou v. Ujoy Technology (P) Ltd., 2022 SCC OnLine Del 2639 Supports the proposition that suits for intellectual property rights protection may contemplate urgent interim reliefs. The plaintiff relied on this case to argue no requirement for mediation; the Court considered it but emphasized judicial discretion in dispensation.
Odisha Slurry Pipeline Infrastructure Ltd. v. IDBI Bank Ltd., 2022 SCC OnLine Cal 3951 Application of section 12A and exceptions for urgent interim reliefs. Both parties cited this case; the Court considered it in evaluating the urgency and the applicability of mediation requirements.
Sanjay Kumar Mishra v. Godavari Commodities Ltd., Unreported Judgment dated 16 February 2023 Illustrates application of section 12A in commercial disputes. Defendant relied on this judgment to support the contention against urgent relief and dispensation.

Court's Reasoning and Analysis

The Court began by interpreting section 12A of the Commercial Courts Act, 2015, which mandates pre-institution mediation for suits that do not contemplate urgent interim relief, emphasizing its procedural and public purpose to expedite dispute resolution and reduce court congestion. The Court noted that while suits seeking urgent interim reliefs are exempt from mediation, such exemption requires judicial scrutiny based on pleadings in the plaint.

Applying this to the facts, the Court observed that the alleged misappropriation occurred in 2016, with the defendant leaving the plaintiff's service in 2022, and the criminal complaint filed in 2022. The suit was filed in March 2023, after a significant delay of over five years from the alleged act and more than one year after the criminal complaint. The plaintiff’s pleadings did not establish a genuine need for urgent interim relief, as rival plants had been operational since 2019.

The Court rejected the plaintiff-centric approach of automatically dispensing with mediation based on the plaintiff's averments alone, emphasizing that judicial discretion must prevent misuse of the urgent relief exception. The Court distinguished the plaintiff’s cited precedents and reaffirmed the mandatory nature of section 12A, concluding that the plaintiff must comply with the mediation requirement before instituting the suit.

Holding and Implications

The Court rejected the plaint filed in CS 48 of 2023 on the ground that the plaintiff failed to comply with the mandatory pre-institution mediation requirement under section 12A of the Commercial Courts Act, 2015. Consequently, the application by defendant no. 1 seeking revocation of dispensation was allowed to the extent that the dispensation was revoked.

There was no order as to costs. This decision directly affects the parties by requiring adherence to mediation procedures before filing such suits but does not establish any new precedent beyond reinforcing the mandatory nature of section 12A and the necessity of judicial scrutiny in dispensation requests.

Show all summary ...

Ravi Krishan Kapur, J.:— This is an application by the defendant no. 1 inter alia seeking revocation of dispensation granted under section 12A of the Commercial Courts Act, 2015 (the Act).

2. At the outset, it is clarified that though pleaded, the prayer for revocation of leave under Clause 12 of the Letters Patent Act, 1865 was not pressed at the time of hearing of the application. The only question which arises for consideration is whether the requirement with the compliance of section 12A of the Act ought to have been dispensed with or not.

3. Briefly, the suit is for infringement of copyright. It is alleged that the defendant no. 2, was an employee of the plaintiff company since 2011 and had ultimately left the services of the plaintiff company in or around 2022. It is also alleged that in or about 2016, the defendant no. 2 had unauthorizedly taken copies of the drawings and documents relating to the manufacturing process of shock tubes and had divulged and sold the same to third parties including the defendant no. 1. It is further alleged that after having discovered the unlawful and illegal acts of the defendant no. 2, the plaintiff had in 2022 filed a complaint with the concerned Police Authorities at Bokaro, Jharkhand.

4. On behalf of the defendant no. 2, it is contended that on a plain reading of the plaint, there is no scope for urgent interim reliefs in view of the fact that the plaintiff has been silent for a considerable period of time since the defendant no. 2 had left the services of the plaintiff company. It is also alleged that the defendant no. 2 had shared unauthorised copies of the impugned drawings as far back as on 2016. The alleged urgency has arisen only after the filing of the criminal case in 2022. This also demonstrates that the plaintiff has remained silent for more than one year after the filing of the criminal complaint. In support of their contentions, reliance is placed on the decisions in Patil Automation Private Limited v. Rakheja Engineers Private Limited, (2022) 10 SCC 1, Odisha Slurry Pipeline Infrastructure Ltd. v. IDBI Bank Ltd., 2022 SCC OnLine Cal 3951 and an unreported judgment of this Court dated 16 February, 2023 in Sanjay Kumar Mishra v. Godavari Commodities Ltd., G.A. No. 2 of 2023 in C.S. No. 267 of 2022.

5. On behalf of the plaintiff it is contended that, the suit is for protection of intellectual property rights and the plaintiff has categorically averred that the suit contemplates urgent interim reliefs. Thus, there is no scope for mediation and hence no requirement to comply with section 12 A of the Act. In any event, in an application of this nature the averments in the plaint are taken to be true and correct. In support of their contentions, the plaintiff relies on the decisions in Bolt Technology Ou v. Ujoy Technology (P) Ltd., (2022) 5 HCC (Del) 347 : 2022 SCC OnLine Del 2639, Chandra Kishore Chaurasia v. R A Perfumery Works Private Limited, 2022 SCC OnLine Del 3529, Odisha Slurry Pipeline Infrastructure v. IDBI Bank Ltd., 2022 SCC OnLine Cal 3951 and SLP (Civil) No. 8481/2023.

6. Section 12A of the Act reads as follows:

“12A. Pre-Institution Mediation and Settlement-

(1) A suit, which does not contemplate any urgent interim relief under this Act, shall not be instituted unless the plaintiff exhausts the remedy of pre-institution mediation in accordance with such manner and procedure as may be prescribed by rules made by the Central Government.

(2) The Central Government may, by notification, authorise the Authorities constituted under the Legal Services Authorities Act, 1987 (39 of 1987), for the purposes of pre-institution mediation.

(3) Notwithstanding anything contained in the Legal Services Authorities Act, 1987, the Authority authorised by the Central Government under sub-section (2) shall complete the process of mediation within a period of three months from the date of application made by the plaintiff under sub-section (1) : Provided that the period of mediation may be extended for a further period of two months with the consent of the parties : Provided further that, the period during which the parties remained occupied with the pre-institution mediation, such period shall not be computed for the purpose of limitation under the Limitation Act, 1963 (36 of 1963).

(4) If the parties to the commercial dispute arrive at a settlement, the same shall be reduced into writing and shall be signed by the parties to the dispute and the mediator.

(5) The settlement arrived at under this section shall have the same status and effect as if it is an arbitral award on agreed terms under sub-section (4) of section 30 of the Arbitration and Conciliation Act, 1996 (26 of 1996).]”

7. In Laxmi Polyfab Pvt. Ltd. v. Eden Realty Ventures Pvt. Ltd., 2021 SCC OnLine Cal 1457 it has been held as follows:

“51. Section 12A of the Act of 2015 although being procedural in nature has a public purpose. The public purpose is to have commercial disputes within the meaning of the Act of 2015 disposed of expeditiously through mediation at the pre-institution stage. A mandatory pre-institution mediation will not only expedite the resolution of a commercial dispute within the meaning of the Act of 2015 on an amicable platform but will also facilitate and face up the time of a congested Commercial Division or a Commercial Court to devote time and energy to the disposal of the pending suits. Section 12A of the Act of 2015 if construed as mandatory achieves twin objects of expeditious disposal and freeing up time and space for the Court.”

8. In Patil Automation Private Limited v. Rakheja Engineers Private Limited, (2022) 10 SCC 1 it has been held that:

“99.3. The language used in Section 12-A of the 2015 Act, which includes the word “shall”, certainly, goes a long way to assist the Court to hold that the provision is mandatory.

99.4. Mediation must be perceived as a new mechanism of access to justice. Any reluctance on the part of the Court to give Section 12-A of the 2015 Act, a mandatory interpretation, would result in defeating the object and intention of Parliament. The fact that the mediation can become a non-starter, cannot be a reason to hold the provision not mandatory. Apparently, the value judgment of the lawgiver is to give the provision, a modicum of voluntariness for the defendant, whereas, the plaintiff, who approaches the court, must, necessarily, resort to it. Section 12-A of the 2015 Act elevates the settlement under the Act and the Rules to an award within the meaning of section 30(4) of the Arbitration Act, 1996 giving it meaningful enforceability. The period spent in mediation is excluded for the purpose of limitation. The Act confers power to order costs based on conduct of the parties.

9. Section 9 of the Civil Procedure Code, 1908 gives the Courts an inherent right to try all suits of a civil nature subject to jurisdiction with the exception of suits which are expressly or impliedly barred. The Act had been introduced for speedy disposal of high value commercial disputes. By introducing section 12A of the Act, the Act has carved out two different categories of suits i.e. where no urgent relief is contemplated and those where urgent relief is contemplated.

10. Mediation is now perceived as a new mechanism of access to justice and a potent alternate dispute resolution device in the justice delivery system. This is the clear legislative intent of the Act. However, an exception is to be found in section 12 A of the Act where a class of suits i.e. suits which contemplate urgent interim reliefs have been exempted from the requirement of mediation. The section quite obviously saves immediate access to justice as contemplated ordinarily through Courts in cases of urgent interim reliefs.

11. There may be urgency in any of the specified transactions enumerated in section 2(c) of the Act which defines “commercial dispute”. Urgency would vary from case to case. There can be no strait jacket formulae in such cases. Each case must be decided on its own facts. There must be pleadings to support the case of urgent interim reliefs. The Court at the time of presentation of the plaint has to be satisfied that there are averments which justify a case for urgent interim reliefs and for dispensation with the requirement of section 12A of the Act in the overall facts and circumstances. Ordinarily, at the stage of admission of the plaint, the defendant is not represented. However, a defendant has a right to question whether dispensation has been appropriately granted or not. This exercise may require the Court to re-examine the grant of dispensation. The entire exercise of seeking dispensation under section 12A of the Act must be subject to judicial scrutiny.

12. The decision in Chandra Kishore Chaurasia v. R A Perfumery Works Private Limited, 2022 SCC OnLine Del 3529 cited on behalf of the plaintiff is distinguishable and inapposite. In the said decision, the Court in a suit inter alia for infringement and passing off found the same to be maintainable in the light of averments in the plaint. It is true that the plaintiff is dominus litis. However, the exercise of seeking dispensation cannot be made solely plaintiff-centric. This exercise must withstand judicial discretion. Otherwise, it would lead to every plaintiff having the formal averments in the plaint that the suit contemplates urgent interim reliefs simply to overcome the mediation process. This would render nugatory the entire purpose of mediation. The ultimate grant or refusal of the interim relief on merits is not the determining factor. The only question is whether on the basis of the averments made out in the plaint and the cause of action pleaded, there is a case for urgent interim reliefs.

13. In the facts of this case, on a combined reading of paragraphs 9, 10, 11, 21 and 32 of the plaint, it appears that the defendant no. 2 had purportedly misappropriated the infringing materials in 2016 and ultimately left the services of the plaintiff as far back as in 2022. Thereafter, a criminal complaint was filed in 2022, whereupon the plaintiff came to allegedly learn of the existence of plants which had been constructed based on the infringing materials and also the incorporation of a new company in February, 2022. The suit was filed on 17 March, 2023. The plaintiff has waited for a period of more than five years since the alleged act of misappropriation of the infringing materials as well as a year since the filing of the criminal complaint. In the meantime, even on the averments in the plaint, rival plants have been set up in April 2019 on the basis of the alleged infringing materials. In such a situation, it cannot by any stretch of imagination be contended that there is any need to seek immediate urgent reliefs and the plaintiff cannot await the process of mediation.

14. For the foregoing reasons, there are no grounds seeking dispensation with the requirement of section 12A of the Act. The averments made in the plaint do not warrant dispensation under section 12A of the Act. The provision of Pre-Institution Mediation must be complied with.

15. In view of the above, the plaint filed in CS 48 of 2023 stands rejected. However, there shall be no order as to costs. To this extent, GA 2 of 2022 stands allowed.