ARTI v. CENTRAL GROUND WATER AUTHORITY & ORS.

National Green Tribunal
Jan 17, 2023
Smart Summary (Beta)

Factual and Procedural Background

The application was filed by the Hotel and Restaurant Association, a Section 8 Company with 322 members from Uttar Pradesh, seeking recall of the Tribunal's order dated 17.10.2022 in Original Application No. 438/2018, titled Arti v. Central Ground Water Authority. The original order addressed compliance with the Supreme Court’s judgment in MC Mehta v. Union of India (1997) 11 SCC 312, which mandated regulation of groundwater withdrawal for sustainable management.

The Tribunal found widespread illegal extraction of groundwater by commercial establishments, particularly hotels, across nine major cities in Uttar Pradesh. The depletion of groundwater was noted to cause soil alkalinity and salinity, with remediation being costly. The Tribunal emphasized the precautionary principle, the public trust doctrine, and the criminality of unauthorized groundwater withdrawal. Following fact-finding reports, the Tribunal directed verification of violations and imposed interim compensation for illegal groundwater extraction, allowing affected parties to contest final compensation.

The present application challenges the scale and basis of the interim compensation fixed by the Tribunal, contending it lacks scientific foundation and treats dissimilar establishments equally, including small units exempted under a government notification.

Legal Issues Presented

  1. Whether the Tribunal’s order dated 17.10.2022, including the assessment and imposition of interim compensation for illegal groundwater extraction, should be recalled.
  2. Whether the scale of interim compensation fixed by the Tribunal is scientifically justified and equitable, particularly in relation to small hotels and those exempted under government notifications.
  3. Whether the methodology for estimating water consumption (350 KL per room per day) and the rate of Rs. 80 per KL for compensation are reasonable and not excessive.
  4. Whether the application by the Hotel and Restaurant Association complies with principles of natural justice and disclosure requirements.

Arguments of the Parties

Applicant (Hotel and Restaurant Association) Arguments

  • The scale of compensation fixed by the Tribunal is without any scientific basis.
  • All hotels have been treated equally despite differences in size and water consumption, disadvantaging small units exempted under Government Notification dated 24.09.2020.
  • The interim compensation is ad hoc and unrelated to actual water consumption.
  • The assumption of 350 KL water usage per room per day and full room occupancy is unrealistic.
  • The COVID-19 period has not been excluded from the compensation calculation.
  • The rate of Rs. 80 per KL is excessive.
  • Many members operate small hotels with low water consumption, some drawing as little as 4 KL per day.

Respondent Arguments

  • Learned Counsel for UP Jal Nigam suggested interim compensation as per guidelines dated 24.09.2020, covering five years prior to filing, calculated at Rs. 80 per KL and consumption of 350 KL per room per day.
  • The proposed compensation amounts to Rs. 50 lakhs for establishments with more than 100 rooms, Rs. 25 lakhs for 50-100 rooms, and Rs. 10 lakhs for up to 50 rooms.
  • No alternative basis for compensation was suggested by any party.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
MC Mehta v. Union of India, (1997) 11 SCC 312 Mandate for regulation of groundwater withdrawal for sustainable resource management. Foundation for Tribunal’s direction to regulate groundwater extraction and impose compensation for illegal drawal.
Indian Council for Enviro-Legal Action v. Union of India, (1996) 3 SCC 212 Principle of sustainable development requiring compensation to cover remediation costs. Tribunal found current reports non-compliant with this principle, reinforcing need for stringent regulation.
Vellore Citizen's Welfare Forum v. Union of India, (1996) 5 SCC 647 Further elaboration on sustainable development as a balancing concept. Supported the Tribunal’s emphasis on balancing development with environmental protection.
MC Mehta v. Kamal Nath, (1997) 1 SCC 388 Explanation of Public Trust Doctrine in environmental protection. Underpinned Tribunal’s view that groundwater is a public resource vested in the State.
A.P. Pollution Control Board II v. Prof. M.V. Nayudu (Retd), (2001) 2 SCC 62 No exemption to industries against sustainable development principles. Supported strict regulatory approach and compensation regime.
State of W.B. v. Kesoram Industries Ltd., (2004) 10 SCC 201 Deep underground water belongs to the State; Public Trust Doctrine applies. Reinforced criminality of unauthorized groundwater extraction and State’s duty to protect.
Intellectual Forum, Tirupathi v. State of A.P., (2006) 3 SCC 549 Reiteration of sustainable development and precautionary principles. Supported Tribunal’s insistence on impact assessment and stringent regulation.
Hanuman Laxman Aroskar v. Union of India, (2019) 15 SCC 401 Environmental rule of law as foundational for sustainable development and protection of constitutional rights. Emphasized legal basis for regulatory actions and public participation in environmental governance.

Court's Reasoning and Analysis

The Tribunal analyzed the extensive evidence of rampant illegal groundwater extraction, with verified non-compliance exceeding 70% among inspected establishments. It noted the failure of statutory authorities, including CGWA, District Magistrates, and Pollution Control Boards, to enforce regulatory mandates effectively despite Supreme Court directions.

The Tribunal emphasized the principles of sustainable development, precautionary principle, and public trust doctrine, underscoring the State’s ownership and custodial responsibility over groundwater resources. It highlighted the environmental consequences of depletion, including soil salinization and disruption of aquatic ecosystems.

Drawing on precedent, the Tribunal reaffirmed the necessity of a robust regulatory framework, including impact assessments, digital metering, periodic audits, and deterrent compensation. The existing regulatory mechanisms were found inadequate, with mechanical or absent permissions and lack of monitoring.

Regarding interim compensation, the Tribunal accepted the proposed calculation based on the Indian Standard Code for water consumption per room, noting the absence of installed meters precluded precise measurement. The rate of Rs. 80 per KL was deemed reasonable and not excessive, especially given the deliberate avoidance of metering by establishments.

The Tribunal rejected the applicant’s arguments, citing non-disclosure of membership details and lack of factual foundation for claims of low water usage. It found no violation of natural justice or arbitrariness in the compensation order, emphasizing the need for stringent remedial measures to address groundwater depletion.

Holding and Implications

The Tribunal DISMISSED the application filed by the Hotel and Restaurant Association seeking recall of the order dated 17.10.2022.

The direct effect of this decision is the continuation and enforcement of the Tribunal’s earlier order requiring interim compensation deposits by establishments found to be extracting groundwater without permission or consents under environmental laws. The order mandates strict regulatory compliance, monitoring, and recovery of compensation at rates deemed reasonable by the Tribunal.

No new legal precedent was set; rather, the decision reinforces existing principles of sustainable development, public trust doctrine, and environmental rule of law as applied to groundwater regulation in India. The ruling underscores the Tribunal’s commitment to stringent enforcement against illegal groundwater extraction to protect scarce natural resources for present and future generations.

Show all summary ...

1. The application has been filed by “Hotel and Restaurant Association”, claiming to be a ‘Section 8 Company’ with 322 Members from UP, for recall of the order of this Tribunal dated 17.10.2022 in OA No. 438/2018, Arti v. Central Ground Water Authority

2. By the said order, the Tribunal dealt with the issue of compliance of judgment of the Hon'ble Supreme Court in MC Mehta v. UOI, (1997) 11 SCC 312 requiring regulation of withdrawal of ground water for sustainable water resource management. The Tribunal noted that while a specialised regulatory agency - CGWA has been created with powers of Central Government under section 5 of Environment Protection Act, 1986, other statutory regulators, including the District Magistrates and the Pollution Control Boards have yet to perform their respective roles effectively. Regulation of groundwater extraction remained far cry and depletion of groundwater continues unabated which may result in irreversible situation, unless stringent regulation is enforced.

3. With regard to individual grievance in the application, the Tribunal observed that though the grievance was against unauthorized withdrawal of ground water by hotels in Ghaziabad, larger issue of the problem in major cities of the UP was required to be looked into. On enquiry by the fact finding regulators, it was found that there is large scale illegal extraction of groundwater in the entire State, including in areas scarce in terms of availability of groundwater. The Tribunal observed that depletion of ground water results in alkalinity and salinity of soil, remediation of may be difficult except at very huge cost. Precautionery principle requires prohibiting unregulated withdrawal and careful appraisal for permitting such withdrawal subject to ensuring replenishment. Further, groundwater being mineral vested in State, its withdrawal without permission was theft for which action under criminal law was called for. Statutory authorities have to perform their duty of protecting the scarce natural resource under public trust doctrine.

4. Considering the initial factual report from CGWA, State PCB and U.P Jal Nigam, it was directed that apart from named establishments, violations by similar other establishments in nine major cities of U.P-Lucknow, Kanpur, Agra, Meerut, Gautam Buddha Nagar, Bareilly, Varanasi, Jhansi, and Gorakhpur may be verified. Verification reports dated 24.09.2022, 26.09.2022 filed in pursuance of the said directions were considered vide order dated 17.10.2022 which were to the effect that almost 70 % of establishments were non compliant. In view of the said factual position, the Tribunal found it necessary to issue directions for remedial action of recovery of interim compensation at floor level for illegal drawl of ground water equal to the assessed approximate cost of water so drawn. It was further directed that final compensation be fixed after giving opportunity to the affected parties. Apart from opportunity to represent their grievance to the authorities, the Tribunal gave liberty to any aggrieved party to move this Tribunal with their grievance. Operative part of the order is reproduced below:—

“12. Summary of inspected hotels/guest house/marriage halls, etc. is as follows : -

“Table : Summary of inspected Hotels/Guest House/Marriage Halls etc.

Sl. No. District/City Total No. of Hotel/Banquet Hall/etc. (targets) No. of Hotels who have not obtained NOCs No. of Hotel who have obtained NOCs No. of Hotel could not be located No. of Hotels do not exist No. of Hotels who have not provided the data No. of Hotels repeated in the list No. of Hotels which do not require NOCs due to having supply through water supplying agencies. 1. Agra 424 386 10 0 18 0 0 10 2. Bareilly 117 44 27 27 0 0 4 15 3. G.B. Nagar 34 20 0 2 0 0 0 12 4. Gorakhpur 131 119 1 0 10 0 0 1 5. Jhansi 86 75 0 3 2 3 0 3 6. Kanpur 233 145 0 0 73 6 9 0 7. Lucknow 333 148 7 58 97 15 0 8 8. Meerut 132 106 0 0 3 3 0 20 9. Varanasi 413 364 10 3 0 17 4 15 Total 1903 1407 55 93 203 44 17 84

Analysis and finding by the Tribunal

13. From the above table compiled by the CGWA with the assistance of District Magistrates, it is patent that more than 70% of establishments have been found to be extracting ground water illegally. Verified compliance status is said to be only for 55 units out of 1903, which is less than 3%. Thus, situation is alarming as shown by rampant violations, defeating the directions of the Hon'ble Supreme Court in M.C. Mehta v. Union of India (1997) 11 SCC 312 requiring control and regulation of groundwater extractions. While a specialized body has been constituted in the form of CGWA, it is difficult to say that it is effective as expected. Observations of the Hon'ble Supreme Court that management of water resources is to achieve overall aspirational goal of sustainable development on principles of inter and intra generational equity, the precautionary principle, conservation of natural resources and environmental protection appear to have been completely ignored.

14. The Authority directed to be constituted by the Hon'ble Supreme Court was for the following mandate : -

“7. … The mandate of the authority needs to include the following:

* To deploy river basins as the basis for regional planning for sustainable water resource management (along with commensurate land use).

* To prepare medium and long-term national land use plans inter alia including agricultural practices, human settlement patterns and industrial typology in consultation with Ministries/Departments concerned based on the regional water supportive capacity.

* To assess the present irrigation practices and cropping patterns, with respect to high water consuming crops and lay down National Agricultural Water Use Policy to encourage judicious use of water resources.

* To keep under review groundwater levels and quality, and surface water quantity and quality to devise and implement pragmatic strategies at plan and programme levels.

* To ensure maintenance of minimum flows in the rivers so as to fulfil the riparian rights, to protect the flood plains, to as also to protect the vital ecological functions of the rivers.

* To ensure techno-economic feasibility and to implement programmes on reuse of appropriately treated sewage for agriculture, reuse of industrial wastewaters as industrial process water, use of treated sewage in social forestry and public parks in municipal areas and reuse of treated wastewater in new housing complexes for non-consumptive usages.

* To protect, conserve and augment traditional water retaining structures.

* To protect, conserve and augment natural and manmade wetlands in the country.

* To promote rain water harvesting in human settlement practices, particularly in cities with more than 10 lakh population in arid/semi-arid regions.

* To promote and implement modern and traditional water harvesting technologies to ensure minimal expenditure in groundwater harnessing.

* To design and implement programmes to arrest alarming rates of decline in snowline in the country.

* To ensure catchment area treatment, including construction of check dams, contour bunding, control of river bank erosion and plantation of endemic fast-growing tree species to arrest soil and water loss in all river basins.

* To ensure implementation of afforestation programmes for achieving a minimum of 33% forest cover as per the National Forest Policy, 1988.

* To prepare and implement guidelines on water rate structure for various water usages commensurate with the production and scarcity value of the resource.

* To ensure community participation with a view to harnessing traditional knowledge at all stages in the holo-logical approach to water resource management.”

15. With evidence of large-scale illegal extraction of ground water and data of depleting ground water levels, stringent measures are required for sustainable water management. We have no other option but to hold that there is all round failure of the statutory authorities in complying with the mandate of judgment of the Hon'ble Supreme Court.

16. This Tribunal has been dealing with the issue since 2012. Inspite of monitoring for ten years, the rampant non-compliance is continuing. There is unwillingness or neglect by the Authorities in performing their statutory functions which has also been recorded in earlier orders referred to above. There is consequential adverse effect on flow of river and streams which is obviously leading to disruption of aquatic ecosystems and food security. Salinization of soil is another well-known adverse consequences.

17. It remains patent that CGWA is ill-equipped to handle the problem. Statutory framework is required to be revamped to give effect to the directions of the Hon'ble Supreme Court. The appraisal process, essential component of regulatory powers, stands delegated to the District Magistrates or other authorities, without such authorities being equipped or mandated to conduct necessary appraisal. The result is that either groundwater extraction is taking place without any permission and with no adverse consequences or such approvals are being granted mechanically as a matter of course unconditionally or with conditions which are not monitored. Alternatives to ground water extraction in the form of re-use of treated water for secondary purposes are not being adequately considered. This is resulting in shortage of potable water for drinking purposes.

18. Vide order dated 20.07.2020 in Original Application No. 176/2015, Shailesh Singh v. Hotel Holiday Regency, Moradabad, the situation was reviewed exhaustively. The Tribunal expressed disappointment with the approach of the Authorities contrary to the mandate as per judgment of the Hon'ble Supreme Court. Some of the observations in the said order are : -

“27. In terms of the Tribunal's previous orders (dated 03.01.2019, Paras 29 and 311, and dated 11.09.2019, Para 242), the core issues that are required to be considered are:

a. Has a robust institutional monitoring mechanism been evolved

i. To define ‘assessment unit’ - wise carrying capacity and accordingly set (a) target replenishment levels and (b) plan for permissible levels of extraction, of ground water levels in OCS areas;

ii. to assign individual target replenishment levels as a condition for granting extraction permits, and to audit such replenishment by those who are extracting groundwater; as well as to audit and measure actual carrying capacity periodically;

iii. to monitor real-time implementation of conditions for permitting extraction of ground water;

iv. to withdraw permits for extraction of ground water failing target replenishment levels; as well as

v. to sustain the flow of rivers in terms of e-flows and sustain other water bodies?

b. Is there a provision for an impact study in light of projected data for the next 50 years (in phased manner with action plan decade-wise)?

c. Has an effective and measurable plan been prepared for preventing depletion and unauthorized extraction of ground water backed by requisite mechanism in the form of manning and effective functioning of CGWA so as to ensure sustainable ground water management in terms of the Hon'ble Supreme Court mandate by which CGWA was created?

d. Is the compensation regime against violators adequately deterrent?

28. The answer is ‘no’. If implemented, the current report would nullify the mandate of the Hon'ble Supreme Court by seeking to deregulate ground water extraction, ignoring its impact on the e-flow of rivers, water bodies and overall sustainable management of scarce natural resources with emphasis on industrial development, without balancing development and environment. Irreversible damage cannot be allowed by extracting water beyond safe levels, without impact assessment.

29. We, thus, hold that as per mandate of sustainable development under Section 20 of NGT Act, 2010, which has been held to be part of right to life under Article 21 of the Constitution, the regulatory authority must direct its policy towards preventing further depletion of and upgrading the groundwater levels based on impact assessment. Extraction can neither be unregulated or allowed across the board without individual consideration. For this purpose, there is need to compile data by mapping all the assessment units individually in terms of current and estimated water level, drawal and replenishment and preparing a management plan for all such units. The CGWA being a statutory regulator for the country has to exercise overriding power in the form of statutory regulatory orders. It may have its own network and, to the extent found viable, utilize the network of existing Authorities like District Magistrates, Environment Departments, Departments of Irrigation and Public Health etc. The ground water assessment has to be done annually and placed on the respective websites of the Districts or States. Any extraction of groundwater has to be permitted keeping in mind availability of groundwater ensuring that there is no further depletion and ground water level remains at safe level.

30. At this stage, we may notice that the regulatory mechanism of the CGWA has not been adequate, as the report also notes. CGWA does not appear to have requisite strength nor enforcement mechanism nor strategies. This may be one of the reasons for failure in effective monitoring, defeating the object of law. This has led to large number of petitions before this Tribunal pointing out that illegal groundwater extraction was rampant. The plans for rain water harvesting and many other steps to a great extent remain largely only on paper. Remedial measures need to be taken in view serious challenges in protection of groundwater level, to save rivers and water bodies and the entire chain of environment.”

Paras 31 to 35…xxx………………………….xxx…………………..…….xxx

Review of pertinent case law re. Sustainable Development

36. The principle of sustainable development is well established. We may refer to certain well-known decisions. In (1996) 3 SCC 212, Indian Council for Enviro-Legal Action v. Union of India, the Hon'ble Supreme Court considered and explained the principle and laid down that compensation has to cover cost of remediation.3 The report in the present case is not compliant with this principle as observed above. The principle of sustainable development, as a balancing concept, has been further discussed and explained in (1996) 5 SCC 647, Vellore Citizen's Welfare Forum v. Union of India The Public Trust Doctrine has been discussed and explained in (1997) 1 SCC 388, M.C. Mehta v. Kamal Nath There can be no exemption to industries against sustainable development principle as held in (2001) 2 SCC 62, A.P. Pollution Control Board II v. Prof. M.V. Nayudu (Retd.) In (2004) 10 SCC 201, State of W.B. v. Kesoram Industries Ltd., there are observations to the effect that deep underground water belongs to the State and is governed by the Public Trust Doctrine (Para 387). Use of water for irrigation purpose may be permissible but it cannot affect reuse of water by others. Reference was made to the judgment of the Kerala High Court in (2004) 1 KLT 731 restraining Hindustan Coca Cola Beverage from using groundwater for its plant. It was observed that the State was under duty to protect ground water against excessive exploitation (para 389). The issue involved therein was justifiability of levy of cess on minor minerals by the Central Govt which was upheld by majority. These observations are in the minority judgment but on this issue, there is no contra view in majority judgment. In (2006) 3 SCC 549, Intellectual Forum, Trupathi v. State of A.P., the said principles have been reiterated.7 We may refer to the need for impact assessment to give effect to sustainable development and precautionary principle. In recent judgment in (2019) 15 SCC 401, Hanuman Laxman Aroskar v. Union Of India ., the environmental rule of law has been discussed as follows:

“35. The Constitution (Forty-second Amendment) Act, 1976, which came into force with effect from 3-1-1977, inserted Article 48-A to the Constitution which mandates that the State shall endeavour to protect and improve the environment and safeguard the forests and wildlife of the country. Article 51-A(g) of the Constitution places a corresponding duty on every citizen to protect and improve the natural environment including forests, lakes, rivers and wildlife and to have compassion for living creatures. Following the decisions taken at the United Nations Conference on the Human Environment held at Stockholm (the Stockholm Conference) in June 1972 in which India participated, Parliament enacted the Environment (Protection) Act, 1986 to protect and improve the environment and prevent hazards to human beings, other living creatures, plants and property.

144. The environmental rule of law provides an essential platform underpinning the four pillars of sustainable development — economic, social, environmental and peace [ United Nations Environment Programme, First Environmental Rule of Law Report…. The environmental rule of law becomes a priority particularly when we acknowledge that the benefits of environmental rule of law extend far beyond the environmental sector. While the most direct effects are on protection of the environment, it also strengthens rule of law more broadly, supports sustainable economic and social development, protects public health, contributes to peace and security by avoiding and defusing conflict, and protects human and constitutional rights…. Similarly, the rule of law in environmental matters is indispensable “for equity in terms of the advancement of the Sustainable Development Goals (SDGs), the provision of fair access by assuring a rights-based approach, and the promotion and protection of environmental and other socioeconomic rights ….

149. In 2015, the International Community adopted the 2030 Agenda for Sustainable Development and its 17 SDGs. These 17 goals are:

(i) Eradication of poverty;

(ii) Eradication of hunger;

(iii) Good health and well-being;

(iv) Quality education;

(v) Gender equality;

(vi) Clean water and sanitation;

(vii) Affordable and clean energy;

(viii) Decent work and economic growth;

(ix) Industry, innovation and infrastructure;

(x) Reduced inequalities;

(xi) Sustainable cities and communities;

(xii) Sustainable consumption and production;

(xiii) Climate action;

(xiv) Protecting life below water;

(xv) Life on land;

(xvi) Peace, justice and strong institutions; and

(xvii) Partnerships to achieve the goals.

150. Each of these goals has a vital connection to the others. Together, they provide an agenda for human development : development in a manner which accords adequate protection to the environment. UNEP recognises that the natural environment—forests, soils and wetlands—contributes to the management and regulation of water availability and water quality, strengthening the resilience of watersheds and complements investments in physical infrastructure and institutional and regulatory arrangements for water access and disaster preparedness.”

37. In a recent judgment, Madras High Court9 considered the issue of regulation of the groundwater10. It was also observed that drawal of groundwater without authority will be criminal offence of theft and mischief under Section 379 and 425 IPC. Such extraction must be scientifically monitored District wise with punitive consequences against violations. Following order was passed:

“(1) The impugned order of regulation issued by the 1st respondent in G.O.Ms. No. 142, dated 23.07.2014 is confirmed.

(2) The respondents are directed not to grant licence, No Objection Certificate (NOC) or permission for the commercial establishments/person to extract ground water for commercial usage in the absence of fixation of water Flow Meter on the Board outlet, which is to be inspected.

(3) The respondents are directed to inspect the functional quality and other established standards of the Flow Meters fixed by the persons, who all are applying for permissions/No Objection Certificate (NOC) and at the time of granting permission/No objection Certificate (NOC), the Flow Meter should be sealed properly by the respondents/Public Works Department (PWD) officials.

(4) The Flow Meter must be sealed in such a way to prevent any tampering by any person. Quantum of Water to be extracted by individuals, are to be fixed periodically as per the assessment to be made by the P.W.D. Authorities as per the Regulations.

(5) The respondents are directed to measure the quantum of water extracted by the establishments/persons by taking meter reading every Month and accordingly, the same is to be regulated.

(6) The respondents are directed to follow all other terms and conditions fixed for grant of licence/permission for Extraction of Ground Water for commercial usage as per the guidelines issued in G.O. Ms. No. 142, Public Works Department dated 23.07.2014.

(7) The respondents are directed to register the Police complaint in the event of identifying any excess Extraction of Ground Water by tampering the Flow Meters sealed or by any other means by any person. The case must be registered Under Section 379 of Penal Code (IPC). In addition, if the water is wasted for causing wrongful loss, then Section 425 of the Penal Code, 1860 (IPC) will also attract.

(8) The respondents are directed to suspend the licenses by issuing show cause notices and by providing an opportunity to the persons, who have involved in the offence of theft or violation of all other conditions stipulated in the Government Regulations, or if a criminal case is registered. If any person is convicted, then he shall be permanently debarred from getting licence for Extraction of Ground Water.

(9) The District Collectors of all the Districts in the State of Tamil Nadu are directed to issue suitable directions/orders to the Revenue Divisional Officer, Tahsildars and all other officials concerned to inspect and monitor the Extraction of Ground Water by the persons for commercial usage.

(10) The District Collectors of all the Districts are directed to constitute monitoring committees to monitor the Extraction of Ground Water by the individuals for commercial purposes.

(11) Each Monitoring Committee appointed by the District Collector concerned, shall consists minimum of five persons and the Committee is empowered to monitor the Extraction of Ground Water for commercial purposes by the individual persons and commercial establishments.

(12) The Monitoring Committee shall consist of the following persons:

(i) The District Environmental Engineer from Pollution Control Board of the State of Tamil Nadu.

(ii) One qualified Public Works Department (PWD) Engineer from Water Resources Department.

(iii) The Assistant Director of Zoology and Mining of the State Government.

(iv) The Revenue Divisional Officer of the concerned locality.

(v) One nominee from the office of the Chief Engineer, Central Ground Water Board of the Government of India.

(13) The Monitoring Committee is entitled to collect proofs and documents in respect of the Extraction of Ground Water illegally and excessively by any person and submit a complaint/report to the District Collector concerned, who in turn, after verifying the same, shall register a complaint with the Jurisdictional Police for registering a criminal case under the provisions of Penal Code, 1860 (IPC).

(14) It is needless to State that, only in the event of compliance of the regulations and conditions imposed in this order, the persons/establishments shall be allowed to extract the Ground water for commercial usage or for commercial purposes.

(15) The 1st respondent/Secretary, Public Works Department is directed to issue consolidated instructions in this regard based on the order passed in the present writ petitions to all the District Collectors, enabling them to implement the Court orders promptly.”

19. Directions issued by the Tribunal in the said order are : -

39. In the light of the above discussion, we direct as follows:

a. MoJS may ensure requisite manning and effective functioning of CGWA so as to ensure sustainable ground water management in terms of the Hon'ble Supreme Court mandate by which CGWA was created.

b. Let CGWA and MoJS comply with the directions of this Tribunal in orders dated 3.1.2019, 7.5.2019 and 11.9.2019, to have a meaningful regulatory regime and institutional mechanisms for ensuring prevention of depletion and unauthorized extraction of ground water and sustainable management of groundwater in OCS areas. Regard must be had to water availability and safe levels to which its drawal can be allowed, especially for commercial purposes, based on available and assessed data in each “Assessment unit”. Procedures for assessment of individual applications and institutional mechanism may be clearly laid down.

c. As per orders dated 3.1.2019, undertaking an impact study in light of projected data for the next 50 years (in phased manner with action plan decade-wise).

d. There must be no general permission for withdrawal of ground water, particularly to any commercial entity, without environment impact assessment of such activity on individual Assessment units in cumulative terms covering carrying capacity aspects by an expert committee. Such permission should as per Water Management Plans to be prepared in terms of this order based on mapping of individual assessment units. Any permission should be for specified times and for specified quantity of water and not in perpetuity, and be necessarily subject to digital flow meters which cannot be accessed by proponents, with mandatory annual calibration by authorized agency at proponents' cost. An annual review by independent and expert evaluation must audit and record ground water levels as well as compliance with the conditions of the permission. Such audits must be published online for transparency and to track compliance and year-on-year change in ground water levels, and swift action taken against those who fail audit, including withdrawal of permission, blacklisting, initiation of prosecution and recovery of deterrent compensation as per CPCB regime. Records must be maintained online and for a sufficient and reasonable time.

e. As observed in para 0(a) and 29(a) above, all OCS assessment units must undergo water mapping. Water Management Plans need to be prepared for all OCS assessment units in the country based on the mapping data, starting with Over-exploited blocks. The Water Management Plans, data on water availability or scarcity and policy of CGWA must be uploaded on its website for transparency and public involvement. Such exercise may be done expeditiously, preferably within next three months.”

20. The Tribunal further considered the matter vide order dated 25.02.2022 as noted earlier. Earlier directions were reiterated and compensation levied in some matters but in the present matter, notice to the affected establishments was issued so that principles of natural justice are followed.

21. In the light of rampant violations as found above, further question is what further course of action is to be adopted. As already observed, extent of compliance is only to the extent of 3 % and established non-compliance is more than 70%. There is a grey area of about 25% for want of information being furnished or collected.

Conclusion and directions

22. Under the circumstances, case appears to be made out for directing sealing of all establishments operating without mandatory consents to operate as per Water Act, till compliance and registering criminal cases for theft of groundwater against owners of the establishments. We have already referred to, in para 18 above, the law on the point that ground water vests in the State and extraction is not permissible without consent of the State. Further, such extraction can only be on payment of laid down charges. There is also need to recover compensation for illegal drawal of groundwater equal to the cost of such water with deterrent element with reference to the turnover of such establishment and also equal to the cost of restoring the environment. We leave this course to be adopted as per law by concerned statutory authorities.

23. However, we find it necessary to direct deposit of interim compensation atleast at the floor level. We called upon learned Counsel to assist as about the quantum of interim compensation.

Quantum of interim compensation and basis thereof

24. Learned Counsel for UP Jal Nigam suggests that interim compensation may be as per guidelines dated 24.09.2020 (though found to be inadequate by the Tribunal in earlier judgment dated 25.2.2022 in OA2015). According to him, such interim compensation should be for atleast five years prior to filing of this application as per section 15 of the NGT Act but in any case from 1.10.2017 to 30.9.2022. It works out to Rs. 50 lakhs per establishment having more than 100 rooms, Rs. 25 lakhs per establishment having 50-100 rooms and Rs. 10 lakhs per establishment having upto 50 rooms. This is calculated at the rate of Rs. 80 per KL/cubic metre, taking consumption to be 350 KL per room per day, which comes to be Rs. 10,000 per room per year. For 100 rooms, it will be Rs. 10 lakhs per year and for five years Rs. 50 lakhs. Same basis applies to other calculations. No other basis is suggested by any learned Counsel. We find the suggestion to be acceptable.

25. After hearing learned Counsel for the appearing establishments, we direct interim compensation at above rate be deposited by all the establishments identified as extracting groundwater without permission as well those not having consents to operate under the Water Act. Any earlier deposit will be adjusted in the interim compensation, subject to verification by the District Magistrate. This will be without prejudice to further action by statutory regulators as per law. Deposit may be made within one month with the respective District Magistrates, failing which theft cases be registered against the concerned establishments and borewells sealed. The compensation deposited will be kept in separate accounts by the District Magistrates for utilisation in accordance with the respective District Environment Plans within six months for improving water quantity and quality, restoring water bodies and taking other relevant measures in their respective Districts. This task may be given specifically to an officer of level of ADM, who may report to the District Environment Committee already constituted as per directions of this Tribunal dated 26.09.2019 in OA No. 360/2018, Shree Nath Singh v. Union of India

26. We also direct the joint Committee constituted by CGWA, mentioned in para 11 above, to assess final compensation as per above guidelines, after giving opportunity to the concerned establishments, within three months. Any party aggrieved by such orders can take their statutory or other remedies as per law. This order may be served by the Committee by email on all the identified violators individually within one week.

27. We further direct the Committee constituted by CGWA as mentioned above in para 11 may verify the compliance status in respect of establishments for whom such status has not been so far verified either on account of such establishments being closed or having not furnished the information. This may be done within one month. On such verification, above course of action may be followed for them.

28. Action may also be taken for the establishments having not taken requisite consents under the Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981.

29. We further direct that while granting consents, requirement of installing digital water metres connected to central servers may be laid down. Concerned establishment may be required to furnish an ‘Appraisal report’ with regard to the quantity of ground water available for extraction in the area and replenishment measures proposed by the concerned establishment such as rain water harvesting, sewage treatment, use of treated sewage. Such Appraisal report may be duly verified by the State PCB by an appropriate mechanism. Such project proponents may also undertake measures to compensate environment, particularly augmenting water quantity and improve water quality by afforestation, education and other measures which may be mentioned in the consent conditions and NOCs for extraction of ground water. Further, in respect of establishments having water supply from the local bodies and also extracting ground water, there should be separate digital metres in respect of both sources.

30. We also direct the concerned statutory regulators to look into and regulate use of potable water for non-contact purposes for which non potable water can be used to augment availability of potable water for drinking. If consents/NOCs are not applied for within one month, the establishments may be closed by the State PCB. If filed, such applications may be examined within next one month. Consent mechanism may also cover conditions in terms of order of this Tribunal dated 23.07.2020 in O.A. No. 400/2017, Westend Green Farms Society v. Union of India applicable to such establishments.

31. The States other than Uttar Pradesh may also study above directions and take further action by issuing necessary SOP though their Water Resources Departments and State PCBs within one month from today.

32. Though opportunity of hearing was available to all the affected parties as they have been issued notices by PCB/DMs. about present proceedings and will also have opportunity to present their respective cases before the joint Committee, any party aggrieved by the above order, who claims that opportunity of being heard was not given by the Tribunal, is free to avail such opportunity by moving an application in the present matter, apart from statutory remedies against assessment/recovery of compensation.

33. Report of status of compliance as on 30.04.2023 may be filed by the UP State PCB, after compiling the relevant data from the concerned District Magistrates by 15.05.2023 by e-mail at judicial-ngt@gov.in preferably in the form of searchable PDF/OCR Support PDF and not in the form of Image PDF.”

5. In the application now filed, case of the Association is that scale of compensation laid down by this Tribunal is without any scientific basis and all hotels have been wrongly treated at par which amounts to treating unequals as equals, to the detriment of very small units, exempted as per Government Notification dated 24.09.2020. Interim compensation is adhoc, unrelated to actual consumption of water. There is no basis for assuming that water used is 350 KL per day per hotel room and that all rooms were occupied. COVID period has not been excluded. The rate for water assessed by the Tribunal @ Rs. 80 per KL (8 paise per litre) is excessive.

6. We have heard Shri Dhruv Mehta, Senior Advocate appearing in support of the application. Apart from averments in the application summed up above, Shri Mehta submitted that many of the members of the Association may be very small with hotels of 5 to 7 rooms, consuming less than 10 cubic mtr. water per day, falling in exempted category. According to data mentioned in the report submitted to this Tribunal, many hotels were drawing only 4 KL water per day.

7. On due consideration, we do not find any merit in the application. The Association has deliberately withheld details and particulars of the Members it represents though such information is readily available with it for which adverse inference has to be drawn. While withholding such information, case is sought to be built that its members are too small, not using much water and they be assumed to be of exempted category. For building such case, there is no factual foundation. Further, no meters have been installed by the hotels to ascertain the quantum of water drawn and in absence of it, there cannot be presumption in their favour, as sought to be drawn. Thus, there is no option but to make best judgment assessment of the quantum of water drawn. It is reasonable to take the figure of 350 KL per room (taking double occupancy per room) which is based on estimated assessment of water consumption of 180 KL per head in hotels as per “Indian Standard Code of Basic Requirements for Water Supply, Drainage and Sanitation”, Annexure A-4 to the application, which is part of Estimation of water requirement for drinking and domestic use (Source : NBC 2016, BIS) published by Central Ground Water Authority Jam Nagar House, New Delhi. Scale of compensation is reasonable being @ Rs. 80 per KLD, 8 paisa per litre. Further, compensation fixed is @ Rs. 10,000 per room per year (Rs. 800 per month and Rs. 30/- per day). This rate can by no stretch of imagination be held to be excessive particularly for those who have deliberately avoided having any meters and record which itself may call for more deterrent action for which liberty has been reserved after giving due opportunity.

8. There is thus neither any violation of natural justice nor any arbitrariness in direction for interim compensation by the Tribunal which may need to be recalled, as prayed for in the application. As noted earlier, the applicant has not come with clean hand with due disclosure of the information available with it. Its members are acknowledged violators in terms of not maintaining record and not installing meters and drawing groundwater without any regulation - statutory or even voluntary. Conduct of the applicant cannot, in any manner, be held to be consistent with the directions of the Hon'ble Supreme Court and Fundamental Duty under Article 51 (A) (g) of the Constitution. There is fast depletion of ground water in the area in which the hotels are located which calls for stringent remedial measures. No hardship is caused to the members of the applicant association by paying nominal charges for the water extracted illegally which is a resource vested in the people and required to be managed by the State under the doctrine of ‘Public Trust’. Compensation fixed is at bare minimum level though violations are immense. Even if covid period benefit is not extended to violators, the amount fixed being minimum, no hardship is caused. Violations have gone on and are continuing to the illegal benefit of violators at the cost of society and even next generation which cannot remain unchecked for ever.

9. The application is accordingly dismissed.