Dilip Venishankar Vasoo And Others Applicants v. State Of Maharashtra

Bombay High Court
Nov 4, 2020
Smart Summary (Beta)

Factual and Procedural Background

The plaintiffs filed a suit seeking to injunct the defendant-Corporation from enforcing a notice dated 18.09.2019 or otherwise disturbing the plaintiffs' possession of their tenements in the “Radha Raman Kunj” premises (buildings A, C, and D) at Santacruz, Mumbai. The trial court, by order dated 21.01.2020, declined to restrain the Corporation from evicting the plaintiffs, concluding the premises were in a ruinous condition as per the Technical Advisory Committee (TAC) report. The plaintiffs appealed this order under Order 43 Rule 1(r) of the Civil Procedure Code. During the pendency of the appeal, this Court granted ad-interim relief restraining eviction. The buildings in question are approximately 64 years old, with several tenants having surrendered possession and accepted Permanent Alternate Accommodation (PAA). The first floor slab of building C had collapsed on 30.07.2019, leading to rescue operations. Structural audit reports submitted by different consultants classified the buildings variably, leading to referral to the TAC. The TAC inspected the premises and submitted a report categorizing the buildings, which was relied upon by the Corporation to issue notices and take action. The plaintiffs challenged the notice inviting objections to the Area Statement and alleged procedural irregularities by the Corporation and TAC in classifying the buildings as ‘C-1’ category.

Legal Issues Presented

  1. Whether the procedural irregularities alleged by the plaintiffs in the classification of buildings “C” and “D” as ‘C-1’ category by the Corporation and TAC render the classification and consequent eviction illegal and invalid?
  2. Whether the trial court erred in refusing to grant injunction restraining eviction of the plaintiffs from their tenements pending the suit?
  3. Whether the Corporation complied substantially with the procedural guidelines before declaring the buildings as ‘C-1’ category?

Arguments of the Parties

Appellants' Arguments

  • The Corporation and TAC did not conduct the “essential test” before declaring buildings “C” and “D” as ‘C-1’ category, making the report invalid.
  • The notice dated 08.01.2019 under Section 354 of the M.M.C. Act was premature as it should have been issued only after the TAC report was approved by the Deputy Chief Engineer as per the guidelines.
  • The Corporation failed to issue a notice after the TAC report, and there is no record showing the TAC report was approved by the Deputy Chief Engineer.
  • In the alternative, the appellants sought expedited trial and interim relief restraining eviction until the trial concluded.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Mahendra Bhalchandra Shah v. MCGM, (2019) 5 Bom CR 451 Court’s limited role in assessing demolition notices: it cannot determine if a building is structurally ruinous but can assess the legality and process of demolition notices and TAC recommendations. The court relied on this precedent to emphasize that intervention requires proof of malafides, arbitrariness, or perversity in the process followed by the Corporation and TAC, which was not shown in this case.

Court's Reasoning and Analysis

The court observed that the plaintiffs did not challenge the notice under Section 354 of the M.M.C. Act or the TAC report directly. The plaintiffs’ main contention was procedural irregularities in classification of the buildings as ‘C-1’ category. The court noted settled law requires substantial compliance with procedural requirements and mere procedural irregularities do not vitiate the action unless they cause miscarriage of justice.

The trial court’s refusal to grant injunction was discretionary, and appellate interference is limited to cases of arbitrariness, perversity, or disregard of legal principles. The trial court found no prima facie case for injunction, holding that the Corporation substantially complied with guidelines, and the plaintiffs’ interests were protected by offering Permanent Alternate Accommodation.

The court found that the Corporation issued notices under Section 353-B, called for structural audit reports, and referred conflicting reports to the TAC as per guidelines. The TAC conducted inspection, held hearings, and submitted its report which was communicated to stakeholders. The court rejected the argument that TAC was required to conduct “essential tests,” clarifying that tests are to be conducted by structural auditors, not TAC.

The court found no evidence of malafides, arbitrariness, or perversity in the Corporation’s process. Most tenants had vacated and accepted alternate accommodation, and statutory provisions protected tenancy rights post-demolition. Thus, refusal of injunction did not cause irreparable harm or tilt balance of convenience in plaintiffs’ favor. The court relied on the precedent in Mahendra Bhalchandra Shah v. MCGM to underscore the limited scope of judicial review over such administrative decisions.

Accordingly, the court concluded that the impugned order did not suffer from jurisdictional error and declined to interfere with the trial court’s exercise of discretion.

Holding and Implications

The appeal is dismissed.

All interim orders stand vacated. The direct effect of this decision is that the trial court’s order refusing injunction and permitting eviction based on the classification of buildings as ‘C-1’ category remains upheld. No new legal precedent was established, and the decision confirms the principle that procedural irregularities alone, absent proof of malafides or miscarriage of justice, do not invalidate administrative acts concerning building safety and eviction under the Mumbai Municipal Corporation Act.

Show all summary ...

Sandeep K. Shinde, J.:— Heard.

2. Aggrieved by the order dated 21 January, 2020 passed by the learned Judge, City Civil Court, Mumbai in Notice of Motion No. 3944/2019 in Short Cause Suit No. 2909/2019, plaintiffs have preferred this Appeal from Order under Order 43 Rule 1(r) of the Civil Procedure Code.

3. Briefly stated, the plaintiffs filed suit to injunct the defendant-Corporation from enforcing notice dated 18.09.2019 or otherwise disturbing plaintiff's possession in their respective tenements in the premises “Radha Raman Kunj” (building-A, C & D) at Santacruz, Mumbai.

4. Pending suit, the learned trial Court vide order dated 21.01.2020 declined to restrain the Corporation from evicting the plaintiffs from their respective tenements upon reaching a conclusion that, suit premises is in ruinous condition as reported by the Technical Advisory Committee (“TAC” for short) of the Corporation. Hence, this Appeal.

5. On 4.3.2020, this Court (Hon'ble Justice Shri. A.S. Gadkari) granted ad-interim relief and restrained the Corporation from evicting the appellants from their respective tenements.

6. Admitted facts are as under:

(i) “Radha Raman Kunj” premises consist of “A”, “B”, “C” “d” “E” and “F” buildings.

(ii) These buildings are about 64 year old.

(iii) Tenants in buildings “A”, “B”, “E” and “F” have surrendered possession of their respective tenements and accepted, Permanent Alternate Accommodation (PAA), offered by the landlord.

(iv) Pending this Appeal, out of six, appellants no. 2, 3 and 6 surrendered possession of their respective tenements and accepted, Permanent Alternate Accommodation.

(v) First floor slab of building “C” had collapsed on 30.07.2019 and appellant no. 5 was rescued by the rescue team. Thus, though the appellant no. 5 is not, in possession, she is contesting the Appeal with appellants no. 1 and 4.

(vi) On 1/3.7.2019 Corporation had issued notice under Section 353-B, of the Mumbai Municipal Corporation Act to occupants/owners of the “Radha Raman Kunj” premises, vide which they were directed to submit structural audit report since building premises were, more than 30 years old. On 31.7.2019, landlord submitted structural report of M/s. Regal Consultants, Consulting Engineers, who classified premises in ‘C-V category and concluded evacuation of tenants and demolition of the buildings.

(vii) Since part of the building “C” had collapsed on 30.7.2019 on the very next day i.e. on 1.08.2019 Corporation had issued notice under Section 354 of the M.M.C. Act to the landlord and all tenants.

(viii) Since tenants could not submit structural reports within 30 days, they filed Suit No. 1936/2019 (previous suit) and sought extension of time to submit structural audit report. Vide orders dated 9 and 16.8.2019, time was extended and Corporation was also restrained from acting upon notice issued under Section 354 of the M.M.C. Act.

(ix) On 27.8.2019, Sardar Patil College of Engineering submitted structural audit report in respect of building “B” declaring the structure in ‘C-2’ category.

(x). On 28.9.2019, M/s. Sumendra Jain submitted structural audit report in respect of building “C” and “D” declaring the structure in “C-2B' category and suggested “no eviction; only structural repairs”.

7. In view of conflicting structural reports on the status of the buildings, the Corporation in terms of Clause-1.05 of the guidelines for declaring “private and municipal buildings” as ‘C-V category (dangerous, unsafe) (‘guidelines’ for short), referred the matter to the concerned T.A.C. on 4.10.2019.

8. On 31.10.2019, T.A.C. visited the site at 10: 00 a.m. and held hearing on the same day in the Chamber of Executive Engineer which was attended by the officers/consultants of Stakeholders, Deputy Chief Engineer, Executive Engineer, Ward Engineer (H/W Ward) and Assistant Engineer (H/W Ward).

9. In the meanwhile, authorised officer of the Corporation, had issued notice to the tenants and informed them about “Area Statement” submitted by the landlord and invited their objections, if any, to it. This exercise was done interms of Clause-1.09 of the guidelines.

10. On 30.9.2019, plaintiffs instituted Suit No. 2909/2019 (subject suit) in the Court of City Civil Court, Mumbai and challenged the notice dated 18.09.2019 whereby objections of tenants to the Area Statement were invited. Prayer (a) in the suit reads as under:

“a) That this Hon'ble Court be pleased to declare that the impugned Notices dated 18 September 2019 issued by Executive Engineer, H/West Ward (Defendant No. 2) and threatened action of the demolition of the suit premises being “Radha Raman Kunj (Building ‘A’, ‘C’ and ‘D’) constructed on the property being C.T.S. No. H-280 to 285, 293, H-529 and H-549 of Village Danda, Station Road, Santacruz (West), Mumbai-400 054 is perverse and nullity and as such is bad in law, illegal, void, ultra virus the Guidelines issued by the Municipal Commissioner and directives issued by the Hon'ble High Court and that the said high handed action of the Defendants is unreasonable, improper, invalid, in violation of principles of natural justice, arbitrary, without application of mind, unfair, unjust, bad in law, unenforceable and null and void ab-initio, not binding upon the Plaintiffs and are therefore liable to be set aside forthwith.”

11. On 10.12.2019, T.A.C. submitted report to the Structural Engineers of the tenants, owners and occupants of building-“A”, “B”, “C” and “D”. T.A.C. in its report has observed as under:

“During site visit by TAC members and H/West ward staff, it is observed that all the buildings having completed approximately more than 62 years of age. TAC members inspected the structure from externally and internally. The structural members in individual units in the building at each floor along with terrace/roof are inspected by TAC members. The observations of the site visit and actual site condition of Buildings were discussed in the meeting in detail. All the TAC members have carefully gone through the structural audit reports, Test results submitted by both consultants and had discussion on the recommendations and conclusions as seen in the table given above.;

and reached the conclusion which is reproduced herein below;

CONCLUSION

“Considering the statements & records of the Structural Engineers, opinion given by the Committee Members and having gone through the details, the Committee is of the opinion that the

1) Report submitted by M/s. Sumendra Jain, Project Management & Structural Stability Consultants Building “A” declaring the structure in “C-2B” category shall be accepted.

2) Report submitted by M/s. REGAL CONSULTANTS, Consulting Engineers Building “C” and Building “D”, declaring the structure in ‘C-1’ category shall be accepted.

3) Report submitted by M/s. Sardar Patel College of Engineering Building ‘B’ declaring the structure in “C-2B' category shall be accepted.

12. Admittedly, in the subject suit, plaintiffs have neither challenged the notice under Section 354 of the M.M.C. Act dated 01.08.2019 nor challenged the report of T.A.C. The thrust of plaintiff's argument before the trial Court and before me is; that the gross procedural irregularities committed by the Corporation and TAC, while declaring and classifying building premises in “C-1” category, intentionally or unintentionally, has seriously affected the substantive rights of the plaintiffs.

13. Thus, in support of appeal, Learned Counsel for the appellants, contended that;

(i). Corporation and T.A.C., before declaring buildings - “C” and “D' in category ‘C-1’ did not conduct “essential test” and in its absence, report of T.A.C, ought not to be have been acted upon.

(ii). That Notice dated 8.01.2019 issued under Section 354 of the M.M.C. Act was premature, inasmuch as, it could be issued only after the T.A.C. report is approved by the Deputy Chief Engineer (B & P) in terms of Clause-1.07 and Clause-1.08 of the guidelines.

(iii) That the Corporation, did not issue notice after report of the T.A.C. and there is nothing on record to suggest that, report of the T.A.C. was approved by the Deputy Chief Engineer (B & P).

In the alternative, Counsel would argue that, let the trial be expedited and till then, the Corporation be restrained from evicting the appellants from their respective tenements.

14. The arguments of the appellants, therefore suggest, procedural irregularities committed by the Corporation were gross, which has rendered the entire exercise for declaring the buildings in ‘C-1’ category, illegal.

15. Now on merits, It is settled law that, substantial compliance is the requirement of law and thus mere procedural irregularity would not vitiate the trial, unless, the same results in miscarriage of justice. In other words, procedural irregularities cannot vitiate the action itself. So also, order refusing temporary injunction is of discretionary character. Ordinarily, court of appeal will not interfere with the exercise of discretion by the trial Court and substitute its own discretion. The interference with the discretionary order, however, may be justified if lower Court acts ‘arbitrarily or perversely, capriciously or in disregard of ‘sound legal principles’ or without considering all relevant records. However, herein the learned trial Court, in his well-reasoned order, concluded that the plaintiffs could not make out a prima-facie case nor the balance of convenience tilts in their favour, nor irreparable loss would be caused to them, if injunction is refused. The learned trial Judge, found substantial compliance of guidelines by the Corporation before declaring buildings-“C” and “D” in ‘C-1’ category and further held that, plaintiff's interest in their respective tenements has been adequately taken care of by the landlord by offering them permanent alternation accommodation. Besides, the learned Judge has also observed in para-11, that plaintiff's right in tenements in terms of Section 354(5) of the M.M.C. Act read with the guidelines of the Corporation, has been adequately protected, though the building is demolished.

16. Herein, the Corporation had issued notice under Section 353-B of the M.M.C. Act and called upon all the stakeholders to submit the structural audit reports. Since owners and occupants submitted conflicting structural audit reports, the matter was referred to concerned T.A.C. in terms of Clause-1.05 of the guidelines. On receipt of TAC report, findings were communicated to all the stakeholders; building site was inspected and meeting was held in the chamber of Executive Engineer alongwith the consultants of the respective stakeholders. Thus, respondents Corporation substantially complied with the guidelines, before categorising suit buildings in category “C-1”.

17. Herein, all tenants, except, appellants no. 1, 4 and 5 have vacated their respective tenaments and accepted the Permanent Alternate Accommodation offered by the landlord on ownership basis as is evident from Index-II annexed to the affidavit-in-reply filed by the landlord. Besides provisions of Section 354(5) of the M.M.C. Act, protect the tenancy of the appellants-plaintiffs, even after the demolition of the buildings. Thus, no irreparable loss would be caused to the plaintiff, if injunction is refused nor balance of convenience tilts in their favour.

That so far as contention, that T.A.C. did not conduct “essential test” is concerned, it may be stated that in terms of Clause - 1.01 of the guidelines, the tests are required to be conducted by the structural auditor and report is to be presented in Proforma-B. The guidelines do not suggest, that T.A.C. is required to conduct the test.

18. Thus, the evidence on record, does not even suggest that the report is malafide or arbitrary. Infact, the Corporation has followed the entire procedure in terms of its guidelines before declaring buildings - “C” and “D” in ‘C-1’ category. Thus, in absence of proof of malafides, arbitrariness and perversity, no interference is called for.

19. The Division Bench of this Court in the case of Mahendra Bhalchandra Shah v. MCGM, (2019) 5 Bom CR 451 has held in para-33 as under:

“33 It is now clear that a Court is not permitted or even capable of determining whether a building is truly so ruinous as to warrant its demolition. We do not assess the structural condition of the building (and the chawl in question is very much a ‘building’), or its structural vulnerability. We only assess the vulnerability in law of demolition notices or the TAC recommendation or order. In other words, we address ourselves not to the decision itself, but to the process by which it was reached. We do not suggest that the mere age of a structure invariably and unquestionably means that it is ‘ruinous’ or dilapidated. By that reasoning, the High Court building, which is 150 years old, or other heritage structures such as CST railway station or the Mumbai University's Fort campus would all be deemed to be in imminent danger of collapse. They are not. But even these buildings, like all built structures, require periodic and timely intervention for their preservation and upkeep. There are several buildings in the Island city that have been well-maintained for decades, or have been restored and do not pose a danger. Should any of these buildings, in demonstrably good condition, be subjected to such a demolition notice, a Court will have no hesitation in concluding that the decision is perverse. But that perversity has to be shown. It is not to be assumed. Therefore, when there is material available to show deterioration, and the lack of timely and periodic maintenance and repairs over time, the writ Court will be slow to interfere without clear demonstration and proof of malafides, arbitrariness and perversity.”

20. Thus, in view of the facts and material on record, the impugned order does not suffer jurisdictional error. Ordinarily, a Court of Appeal is not expected to interfere with the exercise of discretion by the trial Court and substitute for it, its own discretion, unless it is shown that, order has been passed in disregard to some legal principles or without considering the relevant records, which is not the case before me.

21. Appeal therefore fails. It is dismissed. All interim orders stand vacated.