Mala Sharma v. Shipra Estate Limited & Jai Krishna Estate Developers Private Limited .

RERA
Mar 11, 2022
Smart Summary (Beta)

Factual and Procedural Background

The appeals arise from a common judgment and order dated 21.10.2020 passed by the U.P. Real Estate Regulatory Authority (RERA), Lucknow, which dismissed complaints filed by appellants concerning a project known as “Shipra Integrated Township” located at village Maste Mau, district Lucknow. The Regulatory Authority dismissed the complaints on the ground that the project was not registered with RERA, and thus it lacked jurisdiction to entertain complaints relating to unregistered projects, advising the complainants to file complaints post-registration.

The appellant had entered into an agreement dated 11.11.2012 with the respondent for the allotment of a 250 square yard residential plot at a cost of Rs. 8,50,000, which was fully paid. The agreement stipulated possession within 24 months or an agreed extended period, failing which the appellant was entitled to a refund at Rs. 9,000 per square yard. The respondent failed to deliver possession or refund the amount.

The respondent was licensed by the Lucknow Development Authority (LDA) for developing the integrated township, with the licence revalidated in 2015. Despite repeated requests by the appellant, possession was not delivered, leading to the complaint before the Regulatory Authority, which was dismissed due to lack of project registration.

The appellant challenged this dismissal before the Tribunal, raising multiple grounds contesting the Regulatory Authority's jurisdiction and the merits of the complaint.

Legal Issues Presented

  1. Whether the appellant qualifies as an 'allottee' under the agreement dated 11.11.2012 and the Real Estate (Regulation and Development) Act, 2016 (Act 2016)?
  2. Whether a complaint under the Act 2016 is maintainable in the absence of registration of the project?

Arguments of the Parties

Appellant's Arguments

  • The appellant is an allottee entitled to relief under the Act 2016, not merely an investor.
  • The Integrated Township project should be registered under RERA as an ongoing project per Section 3(1) of the Act 2016.
  • RERA has jurisdiction despite the absence of registration and despite arbitration clauses or civil court options.
  • The Regulatory Authority failed to consider issues, evidence, and legal provisions raised by the appellant, including Sections 2(d), 2(zk), 2(zj), 2(zn), 3, 11, 18, 31, 59, and 79 of the Act 2016.
  • The Regulatory Authority's order is non-speaking, vague, and violates principles of natural justice, estoppel, jurisdiction, equity, and justice.
  • The appellant seeks allotment of the plot with interest for delay, refund of the amount with interest, compensation for breach of contract, and reimbursement of legal expenses.

Respondent's Arguments

  • The appellant is not an allottee but an investor who contributed funds for acquisition of undeveloped land to enable future development.
  • The agreement is not an agreement for sale of a developed plot but an agreement for investment in land assembly for a future project launch.
  • The project has not been launched nor registered with RERA, and registration is premature until requisite land acquisition and approvals (e.g., DPR, Layout Plan) are obtained.
  • The complaint is not maintainable before RERA due to absence of project registration and is barred by the arbitration clause in the agreement.
  • The dispute is civil in nature and lies within the jurisdiction of civil courts or arbitral tribunals, not RERA.
  • The Regulatory Authority's order is reasoned and free from infirmity.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Newtech Promoters and Developers Pvt. Ltd. v. State of U.P., Civil Appeal No(s). 6745-6749 of 2021, decided on 11.11.2021 Clarification on the retrospective/retroactive operation of the Act 2016; projects completed or with completion certificates are excluded, while ongoing and future projects require registration under Section 3. The court relied on this precedent to hold that in absence of registration, complaints under the Act 2016 are not maintainable, affirming the Regulatory Authority's dismissal of the complaint.

Court's Reasoning and Analysis

The court examined the agreement dated 11.11.2012 and the definition of 'allottee' under Section 2(d) of the Act 2016. It found that the appellant had invested funds for the purchase of undeveloped raw land to enable the respondent to develop an integrated township in future, contingent upon obtaining necessary approvals and licenses. The allotment of the plot was to occur only after such permissions were secured. The appellant was thus not an allottee as defined by the Act since no actual allotment had taken place.

The court further noted that the respondent had not yet acquired the requisite 50% land or obtained development approvals, making the project unlaunched and unregistered. Registration under the Act 2016 is mandatory only for launched or ongoing projects.

The court cited the Supreme Court's decision in Newtech Promoters, confirming that the Act applies prospectively to ongoing and future projects and does not affect vested rights in completed projects. Consequently, the complaint was premature and not maintainable before the Regulatory Authority in absence of project registration.

The court found no illegality or perversity in the Regulatory Authority's order and upheld its reasoning that the appellant may approach the Regulatory Authority after the project is registered.

Holding and Implications

The appeals (Nos. 55/2021, 56/2021, and 57/2021) are dismissed.

The dismissal confirms that in absence of registration of a real estate project under the Act 2016, the Regulatory Authority lacks jurisdiction to entertain complaints related to that project. The appellant does not qualify as an allottee under the Act since no allotment has occurred. The decision leaves open the option for the appellant to file complaints post-registration of the project. No new precedent was established beyond affirming the existing legal position on jurisdiction and maintainability under RERA.

Show all summary ...

1. All these appeals have been preferred against the common judgment and order of the U.P. Real Estate Regulatory Authority, Lucknow (hereinafter referred to as ‘the Regulatory Authority’), dated 21.10.2020, therefore, they were heard together and are being disposed of by a common judgment. For the sake of convenience we take Appeal No. 55/2021 as leading case.

2. The Regulatory Authority, vide impugned order dated 21.10.2020 dismissed the complaints of the appellants on the ground that the project in question was not registered with RERA and the Regulatory Authority has no power to pass order with respect to unregistered project. The complainants/appellants may file their complaint again after registration of the project.

3. The facts of the case, in brief, as culled out from the memo of Appeal No. 55 of 2021, are that the appellant with the desire to purchase a residential plot in the respondent's project known as “Shipra Integrated Township” situated at village Maste Mau, district Lucknow, approached the respondent.

4. The appellant and the respondent entered into an agreement dated 11.11.2012 through which the appellant was allotted a plot admeasuring 250 square yards. The cost of the plot as per agreement was Rs. 8,50,000/- and the appellant paid the full amount of the cost of the plot.

5. In clause 9 of the agreement it was clearly stated that the first party (respondent herein) contemplates that it shall allot the plot to the second party (appellant herein) within a period of 24 months from the date of the agreement or such extended period as may be mutually agreed upon by the parties, however, if for any reason beyond the control of the first party there is any delay, the first party shall be entitled to a grace period as may be mutually agreed upon by both the parties beyond the said period of 24 months.

6. As per the above mentioned clause of the agreement the respondent should have handed over the possession of the plot to the appellant on or before 24 months i.e. 10.11.2014, but the respondent has failed to do so.

7. As per clause 13(i) of the agreement the respondent agreed that in the event of failure to allot the plot in the said colony after 24 months, then in that case the appellant would be entitled to get a refund of amount at the rate of Rs. 9000/- per square yard for the plot of 250 square yard. The respondent has also failed to refund the same.

8. Under the Integrated Township Policy of the Government of Uttar Pradesh the respondent was permitted by Lucknow Development Authority vide Licence No. 112/VC/EE/HTIG/2013 dated 09.07.2013 for development of above mentioned residential township on 372 acres of land. Later, on 18 September, 2015, the licence was revalidated by Vice Chairman, Lucknow Development Authority vide letter No. 116/VC/EE/HTIG/2015 dated 18.09.2015 for an indefinite period.

9. The requests made by the appellant to the respondent for delivery of possession of the plot went in deaf ears. Feeling aggrieved the appellant filed a complaint before the Regulatory Authority which was registered as Complaint No. LKO162/09/1161/2019.

10. Before the Regulatory Authority the appellant raised the issue of immediate possession with delay interest as per the provisions of the Real Estate (Regulation and Development) Act, 2016 (hereinafter referred to as ‘the Act 2016’) whereas the respondent made the contention that the complaint of the appellant was not maintainable since the project of the respondent does not come within the jurisdiction of the Regulatory Authority.

11. The Regulatory Authority vide order dated 21.10.2020 dismissed the complaint of the appellant on the ground that the project in question was not registered with RERA and the Regulatory Authority has no power to pass order with respect to unregistered project, and the complainant/appellant may file her complaint again after registration of the project.

12. The appellant has challenged the impugned order of the Regulatory Authority dated 21.10.2020 on the following grounds:—

(I) The appellant is an allottee and not a promoter/shareholder/creditor of M/S Shipra Estate Limited, the respondent.

(II) The Integrated Township Project licensed by LDA is liable to be registered in RERA as an ongoing project under the proviso of Section 3(1) of the Act 2016.

(III) The RERA should not come into action if the promoter and LDA both are in dereliction of their duties towards the allottees.

(IV) The jurisdiction of the Real Estate Regulatory Authority is not only co-extensive with the registration of the project.

(V) RERA has jurisdiction over such dispute, despite an arbitral clause in the agreement or the existing option of filing a suit in civil court.

(VI) A company cannot be represented in the authority by a person who is not authorized by its board to do so.

(VII) The issues, evidence, authorities and facts raised in the complaint have not been taken into cognizance by the Regulatory Authority while passing the impugned order.

(VIII) The impugned order is against the objects and specific provisions such as Sections 2(d), 2 (zk), 2 (zj), 2(zn), 3, 11, 18, 31, 59 and 79 of the Act 2016.

(IX) The evidence has not been properly evaluated by the Regulatory Authority.

(X) The pleas raised and precedents cited in the case have not been considered by the Regulatory Authority.

(XI) The order passed by the Regulatory Authority is devoid of reasons and non-speaking on the issues raised by the complainant/appellant.

(XII) Ignoring the facts and pleas raised by the complainant the Regulatory Authority has not followed the principles of natural justice and the statutes.

(XIII) The principle of estoppel, jurisdiction, equity and justice have been ignored by the Regulatory Authority.

(XIV) All the issues raised in the complaint have not been answered in the judgment passed by the Regulatory Authority.

(XV) The operative portion of the judgment is vague and has no legal effect at all.

(XVI) The judgment suffers from the lack of transparency and sense of justice.

13. The appellant has prayed for the following relief:—

(1) Pass an order to the opposite party to honour the terms and conditions of the agreement and allot the plot with payment of interest for every month of delay from the due date i.e. 12.08.2014 till the handing over of the possession of the plot at the rate of 18% annually compoundable. Or, in compliance of para 13 of the agreement, regarding the refund of amount after lapse of 24 months from the date of agreement i.e. 11.11.2012 under which the opposite party is liable to refund the advance amount at the rate of rupees 9,000/- per sq. yard along with interest.

(2) Pass an order to pay to appellant Rs. 62,20,771/- which is worked out as above @ Rs. 9000/- per sq. yards × 250= Rs. 49,50,000/- due on 10 November, 2014 with interest @ 18% compounding annually.

(3) Award compensation against the damage caused due to breach of contract for the sale of a plot by the opposite party, thus causing mental agony to the complainant by their intended fraud and inordinate delay.

(4) Pass an order directing the respondent to pay all the legal and other ancillary expenses incurred by the complainant in the present matter.

14. The respondent filed objection to the memo of appeal stating that the appellant has not approached the Tribunal with clean hand and the instant appeal is not maintainable.

15. The appellant is relying on the agreement dated 11.11.2012 entered into between the parties. Clause 19 of the said agreement specifically provides a mechanism for resolution of disputes between the parties through arbitration. On this ground alone the present appeal is not maintainable and is liable to be dismissed.

16. The purported project in question is not registered with UP RERA and also not required to be registered under the provisions of the Act 2016, therefore, this Tribunal has no jurisdiction to adjudicate the present appeal.

17. The agreement dated 11.11.2012 is basically an agreement between the parties for purchase/acquisition of undeveloped/raw land to enable the respondent to launch an Integrated Township in future as per the then applicable relevant provisions of bye laws and policies, governing launch and development of an Integrated Township. The appellant has contributed Rs. 8,50,000/- with the respondent for assembly of land to enable the respondent to launch an Integrated Township in future and in this regard the agreement dated 11.11.2012 was executed between the parties clearly mentioning all these terms therein and in lieu of the aforesaid contribution of the appellant towards purchase of land, the appellant is entitled to get the benefit as mentioned in the agreement.

18. It is denied that the project was launched by the respondent and as per the agreement the date of completion of project is 11.11.2014. Launch of project is agreed to be a future development/promise dependent upon the assembly of required land, approvals, sanctions in shape of DPR, Layout Plan etc. to launch an integrated township.

19. Without any cause of action the appellant filed the complaint before the Regulatory Authority instead of invoking arbitration clause 19 as mentioned in the agreement dated 11.11.2012.

20. The Regulatory Authority passed the reasoned order having no infirmity.

21. The appellant preferred the present appeal without any valid grounds.

22. Issues were neither raised nor framed by the Regulatory Authority while adjudicating the complaint. The appellant is not an allottee of plot. The appellant contributed Rs. 8,50,000/- in the form of investment. The hearing was conducted by the Regulatory Authority through online mode. The authorized representative of the respondent participated in the hearing through virtual mode.

23. Section 3(1) of the Act 2016 provides that no promoter shall advertise, market, book, sell or offer for sale or invite persons to purchase in any manner any plot, apartment or building, as the case may be, in any Real Estate Project or part of it, in any planning area, without registering the Real Estate Project with the Real Estate Regulatory Authority established under the Act. To attract the provisions of Section 3(1) of the Act, existence of a Real Estate Project is mandatory pre-requisite condition. Section 2(zn) of the Act 2016 defines ‘Real Estate Project’. This definition suggests existence of a development work in respect of apartment or plot, which is missing in the instant matter.

24. The appellant is making an allegation against the Lucknow Development Authority without impleading LDA as a party. These allegations were never raised before the Regulatory Authority.

25. Section 79 of the Act 2016 bars the jurisdiction of Civil Court. This section does not bar the jurisdiction of Arbitral Tribunal to resolve the dispute as per the terms of the agreement.

26. The dispute raised by the appellant is of civil nature and only Civil Court has jurisdiction to adjudicate the dispute, if any.

27. A dispute of similar nature based on similar agreement for same relief and relating to the same project was raised by Smt. Deepti Rastogi and Sri Rajat Rastogi against the respondent before the Regulatory Authority in Complaint No. LKO162/03/1046/2019 claiming that the proposed Integrated Township is mandatorily required to be registered with UP RERA. The Regulatory Authority held that the complainants are not allottees, rather they are partner or creditor in the project, the project is not liable for registration with RERA and RERA does not have any role for refund of amount invested and dismissed the complaint vide order dated 04.06.2019.

28. The purported project in question is not registered with UP RERA and also not required to be registered as such under the provisions of the Act 2016. The transaction alleged by the complainant cannot be treated as launch of any real estate project.

29. The facts narrated below emerging from the agreement dated 11.11.20112 entered into between the parties and relevant provisions of Integrated Township Policy, 2014, establish beyond any iota of doubt that the respondent has not launched any real estate project as yet, which requires to be registered as project or ongoing project under the provisions of the Act 2016:—

A. It has been categorically mentioned in the recital A of the agreement dated 11.11.2012 that as per integrated township policy, 2005, assembly of the land is permitted in law. Further as per recital B it has also been declared that the respondent is only contemplating development of integrated township. It is nowhere mentioned or agreed that the respondent is launching or is about to launch any real estate project.

B. The agreement dated 11.11.2012 is basically an agreement between the parties for purchase of land to enable the respondent to launch an Integrated Township in future as per the then applicable relevant provisions of bye laws and policies governing launch and development of an Integrated Township.

C. As per clause 1 and recital C of the agreement dated 11.11.2012 the complainant was in agreement to provide funds for purchase/acquisition of undeveloped land by the respondent for purpose of development of Integrated Township.

D. Clause 15 of the agreement dated 11.11.2012 does not treat the transaction as agreed and even a pre-launch of the project. As such launch or existence of project cannot be assumed. Launch of project is agreed to be a future development/promise dependent upon the assembly of required land, approvals, sanctions in shape of DPR, Layout Plan etc. to launch an integrated township.

E. Clause 3 and other terms and conditions of the agreement dated 11.11.2012 provide that after issuance of a licence, requisite approvals and sanctions from the competent authorities the respondent will be required to develop colony and to launch the project i.e. integrated township in future. Thereafter the launch of the project can only be assumed. Presently parties to the agreement have not assembled required quantum of land to get said approvals and sanctions from the competent authorities, therefore, no question of launching of a project arises. The launch of the project and requirement of its registration under the Act 2016 is a farfetched argument at this stage.

30. The Lucknow Development Authority had already issued a licence dated 09.07.2013 duly validated on 18.09.2015 in favour of the respondent for development of integrated township having area of 372 acres of land and the respondent is in process to obtain other legal approvals, sanctions to launch the project/integrated township. Respondent is just short of acquiring 50% land of proposed project/integrated township and as soon as the respondent acquires land for approval of DPR, development agreement will be executed with Lucknow Development Authority and it will get the DPR approved and layout plan sanctioned. Thereafter only the question of launch of the project will arise. After completing the above formalities and approvals, the registration of the project with UP RERA will be required.

31. As per clause 9 of integrated township policy, 2014, for approvals of DPR and to start the development of the project, 50% area of licensed land is required. The said policy of 2014 also provides for extension of time for assembly of land. At this stage registration of the project under the provisions of the Act 2016 is not required and is premature.

32. The complainant/appellant is under obligation to establish that under the aforesaid circumstances the respondent is liable to launch and to register the project with U.P. RERA.

33. The complaint is premature and is beyond the scope of the Act 2016. The complainant has chosen wrong forum to adjudicate the alleged dispute.

34. It is vehemently denied that total value of flat/apartment/plot is Rs. 8,50,000/-. In this regard the respondent neither executed any agreement nor any allotment was made in favour of the complainant.

35. No agreement for sale indicating the date of completion i.e. 11.11.2014 was executed by the respondent.

36. The appellant has contributed Rs. 8,50,000/- with the respondent for assembly of land to enable the respondent to launch an integrated township in future as per the then applicable relevant provisions of bye laws and policies regarding launch and development of an integrated township and in this regard the agreement dated 11.11.2012 was also executed between the parties clearly mentioning all the terms therein.

37. The complainant issued a legal notice dated 23.06.2019 through her counsel making vague allegation therein upon the respondent. In the said notice the complainant admitted that she has contributed Rs. 8,50,000/- in the form of investment with the respondent and no allotment was made in favour of the complainant. The present complaint filed by the complainant is after thought and the contents are contrary to the facts stated in the notice dated 23.06.2019.

38. This Tribunal has no jurisdiction to adjudicate the present dispute and pass any order for enforcement of the terms mentioned in the agreement dated 11.11.2012.

39. The appellant is neither customer nor allottee of the respondent. The appellant is rather investor as is evident from clause C, 1, 2 & 5 of the aforesaid agreement.

40. As per the appellant she was entitled to claim the alleged relief in the instant case after expiry of 24 months i.e. 11.11.2012, but filed the complaint in the year 2019.

41. If, by any stretch of imagination, the appellant is deemed to be eligible for any respite from this Tribunal, the respondent shall be obliged and endeavor to refund Rs. 8,50,000/- principal amount with interest @ MCLR+1% within 6 months as per the norms of the Act 2016.

42. The appellant submitted her reply to the objection of the respondent and submitted that the agreement dated 11.11.2012 was an agreement for sale of a plot in the upcoming township being developed by the respondent under the licence issued by LDA. In the agreement dated 11.11.2012 the main contents are that (a) respondent has got permission from LDA under Integrated Township Policy of Government of U.P.; (b) the respondent, under the above policy is contemplating development of Integrated Township after purchase of raw land; (c) in consideration of fund received from the appellant the respondent shall obtain all sanctions, approvals, licences for developing residential colony at their own cost; and (d) respondent will allot 250 sq. yards freehold plot to appellant subject to paying stamp duty and freehold conversion charges as demanded by LDA and external development charges. The agreement contains all necessary clauses which normally remain in allotment of plot.

43. The issue whether the township in question developed by the respondent falls under the jurisdiction of the Act 2016 has been positively dealt with by the Regulatory Authority and the Regulatory Authority has suggested the respondent to get the project registered with RERA.

44. As per para 9 of the agreement the respondent contemplates that it shall allot a plot to the appellant within a period of 24 months from the date of agreement or such extended period as mutually agreed. If the respondent fails to allot plot within 24 months or extended period for any reason whatsoever, the appellant shall be entitled for refund @ Rs. 9000/- per sq. yard. This provision of the agreement is restricted to a time frame and not for indefinite period.

45. The respondent is misleading the facts and it has not even replied the legal notice served upon the respondent.

46. The project of the respondent comes under the purview of Section 2(h) of the Act 2016 as ‘ongoing project’.

47. The respondent itself has stated that the project in question is already licensed by the LDA then the respondent cannot deny that the project should not be registered with RERA.

48. Integrated Township is a self-contained private township having an area of 121.47 acres of land that constitutes a major fraction of the project's development cost. It is not covered under the exemption provisions of Section 3(2) of the Act 2016. The project is being established under the licence issued by LDA since 9 July, 2012. The project is not adhering the milestones of development set up by the revised Integrated Township Policy, 2014. There is a flagrant violation of the provisions of paras 9, 12, 15 and 16 of the Integrated Township Policy, 2014 promulgated by the Government of Uttar Pradesh. Most of the plots in the ongoing project have been allotted/sold after accepting BSP as consideration in advance by the promoter through agreement for sale with a promise that the plot shall be handed over to the allottee/buyer within 24 months from the date of agreement for sale. Investigation report on RERA's portal shows that 70% of the plots have been allotted/sold. Investigation Officer is of the opinion that the project needs to be registered with RERA.

49. After three years' lapse from the date of agreement, vide letter dated 28.09.2015 the respondent has asked the appellant to fill up a form requiring personal information and specific preference as to the plot for final allotment.

50. In statutory terms the respondent is developer and the appellant is the allottee. Section 31 of the Act 2016 provides that any person aggrieved can file a complaint before the Regulatory Authority against the promoter who has committed a breach of any of the provisions of the Act 2016 or the Rules made thereunder.

51. The respondent cannot say that let the project be registered and only thereafter the Regulatory Authority will entertain the complaint.

52. Despite all the defaults and irregularities having been proved against the respondent the Regulatory Authority did not pass order under Sections 18 and 59 of the Act 2016. The appellant had proved that the jurisdiction of the Act 2016 is not co-extensive to the registration of the project. The Regulatory Authority, in its order, did not even make mention of the issues raised and the pleas specifically quoted by the appellant. The Regulatory Authority has completely failed in protecting the interest of the consumer/appellant in the ongoing Integrated Township Project being promoted by the respondent. In its decision the Regulatory Authority has postponed the delivery of justice to an uncertain date depending upon the option of the defaulting promoter.

53. Heard Sri Hari Ram Gupta, learned counsel for the appellant and Sri Amitabh Banerjee, learned counsel for the respondent.

54. In order to examine the issue involved in the instant appeals we deem it proper to cull out the relevant clauses of the agreement dated 11.11.2012 entered into between the appellants and the respondent, which are as under:—

A. The Government of Uttar Pradesh has in May 2005 initiated a proposal to allow developers in development of land under the Integrated Township Policy of the State. Under this policy, developers have been permitted by Lucknow Development Authority to aggregate land for the purpose of development of Residential Townships.

B. The First Party, which is a registered “A-Class Developer” as per the Integrated Township Policy is contemplating development of an Integrated Township in accordance with the said Integrated Township Policy (hereinafter referred to as the ‘said colony’) after purchase of raw undeveloped land in its own name.

C. The Second Party has approached the First Party and has expressed its desire to invest funds for the purchase of such raw undeveloped land, which is being purchased by the First Party for development of the said Colony to be developed by the First Party after obtaining all permissions and approvals from the concerned regulatory and statutory authorities.

D. The Second Party has also requested the First Party that in lieu of the aforesaid contribution by the Second Party for the purchase of raw land as aforesaid, developed plot of land in the proposed colony shall be reserved for allotment to the Second Party after the licenses/LOI/requisite permissions for the said Colony are granted by the concerned authorities.

E. The First Party has accepted the request of the Second Party and has agreed to accept the contribution of funds by the Second Party for the aforesaid purpose.

NOW, THEREFORE, THIS AGREEMENT WITNESSETH AS UNDER:

1. The second party has agreed to provide funds to the First Party for the purchase/acquisition of undeveloped/raw land for the purpose of development of the said Colony. The First Party shall be entitled to purchase land for the said Colony in its own name, as may be necessary in order to procure permissions and approvals.

3. The First Party shall obtain all sanctions, approval, licenses for developing the said Colony at their own costs and expenses. However, The First Party will allot freehold plots to Second Party, subject to the Second party paying stamp duty for procuring the freehold rights and thereof the Second Party shall pay freehold conversion charges at such rates as applicable for such properties as per rules prescribed by the Lucknow Development Authority.

5. The First Party, in lieu of the aforesaid contribution of the Second Party towards purchase of the said land, has agreed to allot a plot having an approximate area of 250 Sq. yds in favour of the Second Party in the said Colony developed by the First Party (‘hereinafter referred to as Plot/s”). The Plots shall be allotted after grant of license/LOI/other requisite permissions for the said Colony are granted by the concerned authorities and determination of the category of sizes, preferential location and the plotted component of the Said Colony by the Second Party.

7. It is agreed by and between the Parties that the amount paid by the Second Party shall only comprise the basic cost of the Plot and all other charges such as Club Membership, IFMS, ECC and FFC, EDC, PLC, Club Membership fees etc. shall be paid by the Second Party as may be applicable to other buyers of the plot in the Said Colony. The additional cost shall be paid by the Second Party in two installments. The first installment of 50% of the additional costs/charges shall be paid on allotment of the Plot and the second installment of the balance 50% of the additional costs/charges shall be paid at the time of offer of registration/possession to the Second party.

9. The Second Party shall be entitled to get the Plot allotted in its own name or its nominees in lieu of its contribution towards purchase of raw land for the Said Colony in the Integrated Township. The First Party contemplates that it shall allot the Plot to the Second Party within a period of 24 months from the date of this Agreement or such extended period as may be mutually agreed upon by the Parties. However, if for any reason beyond the control of the First Party, there is any delay, the First Party shall be entitled to a grace period as may be mutually agreed upon by both the parties beyond the said period of 24 months.

10. The terms of conditions of the allotment of the Plot by the First Party to the Second Party except as specifically provided in this agreement will be identical as applicable to other buyers of the plot of land. The Second party undertakes to execute the Standard Plot Buyer's Agreement as shall be executed by other allottees in the Colony and such terms as contained in the agreement which shall contain detailed terms and conditions pertaining to the allotment as well as rights and obligations of the allottees. This shall be a condition precedent for allotment of the Plot in favour of Second Party. It is specifically agreed that the contribution made by the Second Party is equivalent to Basic Sale Price (BSP) of the Plot having approximately an area of 250 sq. Yds. and all other charges applicable as per the Plot Buyer's agreement shall be in addition to the amounts remitted by the Second Party in terms of this Agreement.

13. It is further agreed between the Parties as under:

(i) In the event the First Party fails to allot the Plot in the Said Colony as contemplated above within a period of 24 (twenty four) months or such extended period as may be mutually agreed upon : or is unable to allot the Plot in terms of this Agreement for any reason whatsoever, then the Second Party shall be entitled to the refund of an amount of Rs. 9000/- per sq. yd. agreed to be allotted to the Second Party, which the Parties agree shall be the approximate value of the said Land to be allotted to the Second Party. Further, the Second Party hereby agrees that upon receipt of such refund, it shall have no further claims against the First Party in any manner and under any circumstances whatsoever.

(ii) In the event the First Party allots the Plot to the Second Party within the time period as aforesaid or mutually extended period as per clause 9 above, the Second Party shall have the option either to accept the allotment or sell the Plot back to the First Party at the rate of Rs. 9000/- per sq. yd.

The aforesaid amount mentioned in (i) and (ii) above, shall be treated as mutually agreed amount and fair market value of the Plot and shall not be negotiable or challenged. The aforesaid amount shall be paid by the First Party to the Second Party within 30 days of exercise of such option by the Second Party.

This option is available to the Second Party only on expiry of the period of 24 months from the date of this agreement or mutually extended period as per clause 9 above. In such an event, a suitable agreement will be executed between the First Party and the Second Party or any person nominated by him for substitution on his place as Second Party.

(iii) In the event the Second Party accepts the allotment, then such allotment shall be treated as complete and regular and shall not be called in question on any other ground by the Second Party and the Second Party shall pay such other charges as mentioned hereinabove in this Agreement as are payable by other allottees of the plot in the said Colony whether covered in this Agreement or not.

(iv) In the event the allotment is made at a date later than agreed herein and is accepted by the Second Party, the Second Party shall not be entitled for any interest on the amount paid by him or for any additional amount as payment and upon acceptance of the allotment by the Second Party, the First Party shall not be obliged to buy back the Plot as well.

15. The Second Party acknowledges that this agreement is not a pre-launch offer and understands fully well that the allotment at this stage is tentative and based on approvals accorded for the same.

16. The obligations of the First Party under this agreement shall be subject to Force Majeure and the First Party shall be entitled to transfer its obligations, rights and responsibilities so that the implementation of development of the said Colony is not affected.

55. On examination of the pleadings, record and submissions of the legal representatives the admitted facts are that the respondent in pursuance to the policy of the State Government regarding Integrated Township and permitted by the Lucknow Development Authority to aggregate land for the purpose of Residential Township was contemplating development of an Integrated Township after purchase of raw undeveloped land in its own name.

56. The appellant and many others approached the respondent expressing their desire to invest funds for purchase of raw undeveloped land for development of a colony to be developed by the respondent after obtaining all permissions and approvals from the concerned regulatory and statutory authorities. The appellants requested the respondent to reserve developed plot of land in the proposed colony for allotment to the appellants after the licenses/LOI/requisite permission for the said colony are granted by the concerned authorities.

57. The respondent accepted the request of the appellants and had agreed to accept the contribution of funds from them for procurement of raw undeveloped land in its own name and accordingly an agreement was executed between the appellants and the respondent on 11.11.2012 (annexure-2 to the memo of appeal).

58. The respondent was required to obtain sanctions/approvals/licenses for development of the said colony at its cost and expenses and allot free hold plots having approximate area of 250 square yards, to the appellants. After grant of requisite permissions the appellants were required to pay stamp duty for procurement of free hold rights as per rules prescribed by the Lucknow Development Authority.

59. Clause 9 of the agreement provides that the respondent/first party contemplates that it shall allot the plot to the appellants/second party within a period of 24 months from the date of the agreement or such extended period as may be mutually agreed upon by the parties. However, if for any reason beyond the control of the respondent/first party, there is any delay, the respondent/first party shall be entitled to a grace period as may be mutually agreed upon between both the parties beyond the said period of 24 months.

60. Clause 10 of the agreement provides that the appellants/second party undertook to execute the identical Plot Buyer's Agreement as shall be executed by other allottees in the colony and such terms as contained in the agreement which shall contain detailed terms and conditions pertaining to the allotment as well as rights and obligations of the allottees.

61. Clause 13 of the agreement provides that in case the respondent/first party fails to allot the plot in the said colony as contemplated within a period of 24 months or such extended period as may be mutually agreed upon or is unable to allot the plot in terms of the agreement for any reason whatsoever, then the appellants/second party shall be entitled to the refund of an amount of Rs. 9,000/- per sq. yard agreed to be allotted to the appellants/second party. In the event the respondent/first party allots the plot to the appellants/second party within the time period prescribed or mutually extended period as per clause 9, the appellants/second party shall have the option either to accept the allotment or sell the plot back to the respondent/first party at the rate of Rs. 9,000/- per sq. yard. The said option was available to the appellants/second party only on expiry of 24 months from the date of agreement or mutually extended period as per clause 9 and in such an event a suitable agreement will be executed between the respondent/first party and the appellants/second party.

62. Sub-clause (iv) of Clause 13 further provides that in the event the allotment is made at a date later than agreed herein and is accepted by the appellants/second party, the appellants/second party shall not be entitled for any interest on the amount paid by him or for any additional amount as payment and upon acceptance of the allotment by the appellants/second party, the respondent/first party shall not be obliged to buy back the plot as well.

63. Vide clause 15 of the agreement the appellants/second party acknowledged to the effect that the said agreement was not a pre-launch offer and understood fully that the allotment at that stage was tentative and based on approvals accorded for the same.

64. The appellant approached RERA vide Complaint No.LKO162/09/1161/2019 on 10.09.2019 raising issue of delay seeking possession of 250 sq. yards developed plot in the proposed township or in any other similar project in Gomti Nagar and also sought refund of Rs. 22,50,000/- as per agreement payable on 10.11.2014 along with interest @ 18% and tax liability, total amount being Rs. 59,95,244/- as per notice served to the company.

65. Three similar complaints were clubbed and by means of composite order dated 21.10.2020 the complaints were rejected by the Bench of RERA on the ground that the project of the respondent is not registered with the RERA and the RERA has no jurisdiction on the unregistered projects and also gave liberty to the appellants to approach the RERA after registration of the project. Feeling aggrieved against the order of RERA dated 21.10.2020 the present appeals have been filed.

66. The issues required to be examined for determination in these appeals are:—

(1) Whether in pursuance to the agreement dated 11.11.2012 the appellant falls in the category of ‘allottee’?

(2) Whether in absence of registration of the project the complaint is maintainable for violation of the provisions of the Act 2016?

67. Issue no. (1) : In pursuance to issue no. (1) we are required to examine as to whether in pursuance to the agreement dated 11.11.2012 the appellant falls in the category of ‘allottee’. Before we proceed to examine further, it will be appropriate to cull out the definition of ‘allottee’ provided in the Act 2016. Section 2(d) of the Act 2016 provides that ‘allottee’ in relation to a real estate project, means the person to whom a plot, apartment or building, as the case may be, has been allotted, sold (whether as freehold or leasehold) or otherwise transferred by the promoter, and includes the person who subsequently acquires the said allotment through sale, transfer or otherwise, but does not include a person to whom such plot, apartment or building, as the case may be, is given on rent.

68. The whole reliance of the appellant is on the agreement dated 11.11.2012. The relevant clauses of the agreement have already been reproduced in para 9 of this judgment and from the perusal of the same it is evident that the appellant approached the respondent who was contemplating development of Integrated Township after purchase of raw undeveloped land in its own name in pursuance to the policy of the State Government regarding Integrated Township 2005 and permitted by the Lucknow Development Authority to aggregate land for the said purpose, expressing desire to invest funds for purchase of raw undeveloped land for development of a colony to be developed by the respondent after obtaining all permissions and approvals from the concerned regulatory and statutory authorities and requested the respondent to reserve developed plot of land in the proposed colony for allotment to the appellant after the licenses/LOI/requisite permission for the said colony are granted by the concerned authorities.

69. The respondent accepted the request of the appellants and their contribution for procurement of raw undeveloped land and it was agreed between the parties vide agreement dated 11.11.2012 that the respondent in lieu of the contribution of the appellants towards purchase of land will allot a freehold plot having approximate area of 250 sq. yards to the appellants in the colony developed by the respondent after receipt of requisite permissions, licenses etc. It was also agreed between the parties that the respondent shall allot the plot to the appellant within a period of 24 months from the date of execution of the agreement or such extended period as may be mutually agreed upon by the parties. However, if for any reason beyond the control of the respondent there is any delay, the respondent shall be entitled to a grace period as may be mutually agreed upon between both the parties beyond the said period of 24 months and in case the respondent fails to allot the plot in the said colony as contemplated within a period of 24 months or such extended period, as may be mutually agreed upon or is unable to allot the plot in terms of the agreement for any reason whatsoever, then the appellant shall be entitled to the refund of an amount of Rs. 9,000/- per sq. yard. In clause 15 of the agreement it has been specifically mentioned that the second party/appellant acknowledges that this agreement is not a pre-launch offer and understands fully well that the allotment at this stage is tentative and based on approvals accorded for the same.

70. The respondent in its reply stated that the agreement dated 11.11.2012 is basically an agreement between the parties for purchase/acquisition of undeveloped raw land to enable the respondent to launch an Integrated Township in future as per the then applicable relevant provisions of bye laws and policies, governing launch and development of an Integrated Township. The respondent has not launched any real estate project as yet which requires to be registered as a project under Section 3 of the Act 2016. Since the respondent could not assemble the required quantum of land to get approvals/sanctions from the competent authorities and is just short of acquiring 50% land of proposed project/integrated township and as soon as the respondent acquires land for approval of DPR, development agreement will be executed with Lucknow Development Authority and it will get the DPR approved and layout plan sanctioned. Thereafter only the question of launch of the project will arise. Therefore, at this stage the registration of the project under the provisions of the Act 2016 is not required and is premature.

71. It is further submitted that the appellant approached the respondent for investment of funds for purchase of raw undeveloped land for development of Integrated Township and the appellant was to be allotted a developed plot in the proposed colony after obtaining all the approvals and necessary permissions from the concerned competent authorities and the said stage has not yet arrived. Therefore, till the necessary approvals and permissions are not granted and the DPR is not approved, the appellant cannot be allotted any plot and till such allotment is made the appellant does not fall within the definition of ‘allottee’.

72. On examination of the provisions of the agreement dated 11.11.2012 read with definition of ‘allottee’ provided in Section 2(d) of the Act 2016 we are of the considered view that the appellant does not fall in the category of ‘allottee’. Issue no. (1) is decided accordingly.

73. Vide issue no. (2) we are required to examine as to whether in absence of registration of the project the complaint is maintainable for violation of the provisions of the Act 2016.

74. The Hon'ble Supreme Court in Civil Appeal No (s). 6745-6749 of 2021 Newtech Promoters and Developers Pvt. Ltd. v. State of U.P., decided on 11.11.2021, while examining the question as to whether the Act 2016 is retrospective or retroactive in its operation and what will be its legal consequence if tested on the anvil of the Constitution of India, answered the said question vide paragraph no. 54 as under:—

“54. From the scheme of the Act 2016, its application is retroactive in character and it can safely be observed that the projects already completed or to which the completion certificate has been granted are not under its fold and therefore, vested or accrued rights, if any, in no manner are affected. At the same time, it will apply after getting the ongoing projects and future projects registered under Section 3 to prospectively follow the mandate of the Act 2016.”

75. Therefore, the issue is no more res-integra. We are of the considered view that in absence of registration of the project the complaint is not maintainable for violation of the provisions of the Act 2016.

76. On examination of the impugned order we do not find any illegality or perversity in the same. The Regulatory Authority has already observed that the appellant can approach the Regulatory Authority again after registration of the project.

77. Accordingly Appeal Nos. 55/2021, 56/2021 and 57/2021 are dismissed.

78. No order as to costs.