Raghbir Singh Complainant(S) v. Bptp Limited Opp.Party(S).

National Consumer Disputes Redressal Commission
Nov 11, 2021
Smart Summary (Beta)

Factual and Procedural Background

This Consumer Complaint was filed under Section 21 of the Consumer Protection Act, 1986 by Raghbir Singh (Complainant) against M/s BPTP Ltd. (Opposite Party or BPTP), seeking refund of amounts deposited because possession of a residential floor (Unit No. A-134-FF, Build-up area 1,999 sq.ft.) in the "Amstoria" project (Sector 102, Gurgaon) booked on 31.08.2011 and under a Floor Buyers Agreement executed on 14.03.2012, was not delivered as per the contractual timeline. The total sale consideration was stated as ₹85,31,992/- and the Complainant had paid ₹78,64,819/- (about 92%).

Clause 5.1 of the Agreement provided for delivery of possession within 24 months from execution with a grace period of 180 days, so possession was to be delivered by 13.09.2014. The Complainant alleged BPTP failed to hand over possession, used funds in other projects, refused to provide a firm date for possession, and did not refund amounts despite a legal notice dated 29.07.2020. The Complaint alleged deficiency of service and unfair trade practice, seeking refund with interest (claimed @18% p.a.), compensation and costs.

BPTP filed a written version admitting booking, allotment, receipt of the stated amount, and the Agreement (including Clause 5.1 subject to force majeure). BPTP raised preliminary objections that the Complainant was not a "consumer" but a speculative investor, and that an arbitration clause required reference to arbitration (citing the Arbitration and Conciliation Act amendments). On merits, BPTP relied on terms of the Agreement (including limited "delay charges" and force majeure), asserted construction was ongoing and contended delay resulted from reasons beyond their control and alleged payment defaults by the Complainant. The Complainant filed a rejoinder denying these defenses. The matter was heard and evidence/material on record was considered by the Commission.

Legal Issues Presented

  1. Whether the Complainant qualifies as a "consumer" under Section 2(1)(d) of the Consumer Protection Act, 1986, where booking may have been for investment/resale.
  2. Whether the existence of an arbitration clause in the Agreement bars the Consumer Forum from entertaining the Complaint.
  3. Whether the delay in delivering possession is excused by (a) the Complainant's alleged non-payment or (b) force majeure events pleaded by BPTP.
  4. If delay/deficiency is established, what relief is appropriate — specifically, entitlement to refund, interest rate and costs.

Arguments of the Parties

Complainant's Arguments

  • The Complainant booked and was allotted a residential floor and executed the Agreement on 14.03.2012 and paid ₹78,64,819/- (about 92% of the sale consideration).
  • BPTP failed to hand over possession by the contractual deadline (by 13.09.2014 including grace period) despite receiving substantial payments.
  • BPTP did not provide a definite date for possession and did not refund the amount despite a legal notice dated 29.07.2020.
  • Alleged deficiency in service and unfair trade practices; sought refund with interest, compensation and costs.

Opposite Party (BPTP)'s Arguments

  • The Complainant is not a "consumer" but a speculative investor (habitual reseller) and thus outside the protective scope of the Act.
  • The Agreement contains an arbitration clause and, in view of amendments to the Arbitration and Conciliation Act, 1996 (Section 8), the matter should be referred to arbitration.
  • The Complainant was aware of and agreed to the terms of the Agreement, including limited "delay charges" (₹10/₹20/₹30 per sq.ft. per month) and force majeure provisions; hence no broader compensation is payable.
  • Delay was due to factors beyond BPTP's control (service plan approvals, changes in community site, HUDA delays, redesigning, underground HT cables, environmental directions) and/or due to the Complainant's delayed payments; construction work was ongoing and BPTP was endeavouring to complete the project.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Kavita Ahuja vs. Shipra Estates, I (2016) CPJ 31 The onus of establishing that a complainant is dealing in real estate as a business (i.e., habitual investor) shifts to the opposite party; mere plea of investment is insufficient without documentary evidence. The Commission applied this principle to hold that BPTP failed to discharge the burden of proving that the Complainant was a speculative investor; hence the Complainant qualifies as a "consumer".
M/s Emaar MGF Land Limited vs. Aftab Singh, I (2019) CPJ 5 (SC) The existence of an arbitration clause in the agreement does not bar the jurisdiction of Consumer Fora to entertain complaints under the Consumer Protection Act. The Commission relied on this Supreme Court decision to reject BPTP's preliminary objection that the arbitration clause ousted the Forum's jurisdiction.
Emmar MGF Land Ltd. & Ors. vs. Amit Puri, II (2015) CPJ 568 NC After the promised date of delivery, the complainant has discretion to accept an offer of possession if made or to seek refund of amounts paid with reasonable interest. The Commission invoked this authority to hold that the Complainant could elect for refund rather than wait indefinitely for possession, since construction remained incomplete.
Pioneer Urban Land & Infrastructure Ltd. vs. Govindan Raghavan, II (2009) CPJ 34 (SC) Contractual terms imposed by builders that are one-sided and which leave buyers with no real option but to sign may be ex facie unfair and constitute an unfair trade practice under Section 2(r) of the Consumer Protection Act. The Commission relied on the Apex Court's observations to characterize the Agreement's one-sided clauses as unfair and to treat reliance on such clauses (while retaining monies) as deficiency of service and unfair trade practice.
Kolkata West International City Pvt. Ltd. vs. Devasis Rudra, II (2019) CPJ 29 (SC) A buyer should not be required to wait indefinitely for possession; long delays (e.g., seven years) are beyond what is reasonable and justify refund orders by consumer fora. The Commission applied this reasoning to conclude that the Complainant could not be made to wait indefinitely and was entitled to refund with interest.

Court's Reasoning and Analysis

The Commission undertook a stepwise analysis grounded in facts and cited authorities:

  1. Consumer status: Applying Kavita Ahuja, the Commission observed that BPTP bore the burden to show the Complainant was a habitual investor; BPTP did not produce documentary evidence. Therefore the Complainant was held to be a "consumer" under Section 2(1)(d).
  2. Jurisdiction despite arbitration clause: Relying on the Supreme Court decision in M/s Emaar MGF Land Ltd. vs. Aftab Singh, the Commission held that an arbitration clause in the Agreement did not bar the Consumer Forum from entertaining the Complaint; the arbitration point was rejected.
  3. Breach/delay: The Commission noted that the Agreement obligated BPTP to deliver possession by September 2014, but construction remained incomplete and possession was not delivered. The Complainant had paid about 92% of the price long back, yet exact dates for possession were not provided in response to the Complainant's queries; emails from BPTP during 2016–2019 were described as stereotyped and non-committal.
  4. Defenses of non-payment and force majeure: The Commission found BPTP's contention that delays were due to the Complainant's non-payment to be unsustainable because BPTP had contractual remedies (charge penal interest, cancel allotment and refund) but had not cancelled the allotment or refunded. As for force majeure, BPTP failed to substantiate any force majeure event by documentary evidence; the factors pleaded (service estimate approvals, redesign, road-level fixation, environmental directions) were held not to constitute force majeure in the absence of supporting material.
  5. Unfair contractual terms: The Commission viewed the clauses providing for high interest on buyers' delayed payments while offering token "delay charges" for possession delays (₹10/₹20/₹30 per sq.ft. per month) as one-sided and amounting to unfair trade practices under Section 2(r), relying on Pioneer and related authorities.
  6. Relief: In light of precedents (Emmar MGF, Kolkata West), the Commission held that the Complainant could elect a refund rather than await uncertain completion. Considering market interest trends and precedents awarding varying rates, the Commission fixed interest at 9% p.a. from respective dates of deposit until realization and awarded costs of ₹50,000/-. The Commission directed refund within eight weeks from the date of order.

Holding and Implications

HOLDING: The Complaint is partly allowed.

Direct orders and consequences for the parties (as directed by the Commission):

  • BPTP is directed to refund to the Complainant the deposited amount (₹78,64,819/- as per pleadings) along with interest at the rate of 9% per annum from the respective dates of deposit until payment/realization.
  • The refund is to be paid within eight weeks from the date of the order.
  • The Complainant is awarded costs of ₹50,000/-.

The decision was based on application of existing Supreme Court and Commission precedents (cited above). The order applies those precedents to the facts of this case; the opinion does not purport to lay down a new legal precedent beyond applying established authorities.

Show all summary ...

NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION

NEW DELHI

CONSUMER CASE NO. 835 OF 2020

1. RAGHBIR SINGH ...........Complainant(s) Versus

1. M/S. BPTP LIMITED ...........Opp.Party(s)

BEFORE:

HON'BLE MR. JUSTICE R.K. AGRAWAL,PRESIDENT HON'BLE DR. S.M. KANTIKAR,MEMBER HON'BLE MR. BINOY KUMAR,MEMBER

For the Complainant : For the Complainants : Mr. Sudhir Mahajan, Advocate and Complainant in Person

For the Opp.Party : For the Opposite Party : Ms. Nidhi Tewari, Advocate Mr. Pragyan Pradeep Sharma, Advocate

Dated : 11 Nov 2021

ORDER

R.K. AGRAWAL, J., PRESIDENT

The present Consumer Complaint has been filed under Section 21 of the Consumer Protection Act, 1986 (for short "the Act") by Raghbir Singh (hereinafter referred to as the Complainant) against Opposite Party, M/s. BPTP Ltd. (hereinafter referred to as the

"BPTP"), seeking refund of the amount deposited by him as the BPTP has failed to hand- over the possession of the residential floor booked by him in terms of the Flat Buyer Agreement.

1.

It has been averred in the Complaint that the BPTP has launched a Residential Group Housing Project in the name and style of "Amstoria" located at Sector 102, Gurgaon, Haryana. On 31.08.2011, the Complainant booked a Residential Floor in the said Project. Unit No. A-134-FF on First Floor admeasuring build up area of 1999 sq. ft. was allotted to the Complainant. The Floor Buyers Agreement (hereinafter referred to as the Agreement) was executed between the Parties on 14.03.2012. The total Sales Consideration of the Floor was ₹85,31,992/-. The Complainant had opted for Construction Linked Payment Plan and had deposited ₹78,64,819/- on different dates as per demand of the BPTP.

2.

As per Clause 5.1 of the Agreement, the possession of the Floor was to be delivered within a period of 24 months from the date of sanctioning of Building Plan or execution of the Agreement with a grace period of 180 days. In the instant case, the Agreement was executed on 14.03.2012 and allowing the grace period of 180 days, the BPTP was under an obligation to hand over the possession of the Floor latest by 13.09.2014.However, despite having received about 92% of the total Sale Consideration, the BPTP miserably failed to deliver the possession of the Floor within stipulated period. It is alleged by the

3.

1

Complainant that the BPTP had utilized his amount in other Projects; most of the clauses in the Agreement were one sided; Complainant was compelled to sign the Agreement which was totally in favour of the BPTP.Whenever the Complainant raised queries with the BPTP regarding the completion of the Project and exact date of handing over the possession, they neither provided any specific date for the delivery of the possession nor refunded the amount deposited by the Complainant. Consequently, the Complainant served a legal notice on BPTP on 29.07.2020 calling upon them to refund along with interest @ 18% and compensation and Costs of proceedings.However, the said notice was not responded to by the BPTP. Alleging deficiency in service and Unfair Trade Practice on the part of the BPTP, the Complainant has filed the present Consumer Complaint seeking a direction to the BPTP to refund the deposited amount with interest @ 18% p.a. and costs of complaint.

The BPTP filed its Written Version admitting to the booking, Allotment, Receipt of amount of ₹78,64,819/- execution of the Agreement dated 14.03.2012 and to Clause 5.1 of the Agreement, wherein they has agreed to deliver the possession of the allotted Apartment within 24 months from the date of execution of the Agreement with six months grace period and this Clause was subject to force majeure conditions.

4.

05. The BPTP has raised the preliminary objections that the Complainant is not a

"Consumer" as defined under Section 2 (1) (d) of the Act and is speculative investors as he has invested in the present Project only to gain profits by resale of the Apartment booked by him. It is further stated that the Agreement contains Arbitration Clause and especially after the amendment in Section 8 of the Arbitration and Conciliation Act, 1996, the matter has to be referred to the Arbitrator.

06. On merits, it is also contended that at the time of signing of the Agreement, the Complainant was well aware of the terms and conditions thereof and he has duly agreed to them. The Complainant is not entitled to a reciprocal compensation for the delay in handing over the possession as alleged. In terms of Clause 6 of the Agreement, the Complainant is only entitled to payment of "delay charges" @₹10 or ₹20 or ₹30 per sq. ft. per month in case of delay in handing over the possession beyond the stipulated period of 24 month plus the grace period of 6 months due to reasons attributable to the BPTP. Through various email, the Complainant was informed about the status of the Project, however, the same have not been brought on record by him. The construction work is going on in full swing at site and the BPTP is making every endeavour to hand over the possession to the Complainant at the earliest. The possession of the Floor was to be delivered to the Complainant within 24 months from the date of execution of the Agreement subject to the Force Majeure Conditions as enumerated in Clause 14 of the Agreement. The Complainant has failed to disburse timely payment towards the Unit in question and thus the Complainant cannot demand any compensation on account of delay in handing over the Apartment. In terms of Clause 5.6 of the Agreement, the BPTP is entitled for extension of time for completion of the Project is the delay is on account of the reasons beyond their control. The BPTP had carried the

2

entire detailing and designing of the proposed services to be laid in the licensed area and Service Plan Estimates were approved for most of the area about 86% of the gross area. Due to various factors such as non-fixation of levels of adjoining sector roads, NPR road and services to be laid in due course of time by HUDA, the plan for remaining Colony could not be finalized by the Department. Owing to the directions of the DTCP and State Environment Appraisal Committee, the community site was to be relocated which in turn required re- designing as well as re-planning of internal services etc. The Service Plan Estimates were also revised due to laying of underground HT Cables and covering of drain to keep the area smell free, pollution free and environmental friendly. The BPTP is diligently working upon the Project "Amstoria". It has already completed the developmental works like external plaster, internal plaster, plumbing, electrical works, HVAC work, access road from Dwarka Expressway and landscaping works including parks and plantation work.

07. All other averments made in the Complaint have been specifically denied by the BPTP and prayed dismissal of the Complaint with exemplary costs. The Complainants filed his Rejoinder denying all the rival contentions raised by the BPTP in its Reply and reiterating the averments made in the Complaint.

08. We have heard the Learned Counsel for the parties at some length and also perused the material available on record as well as the evidence adduced by the parties.

09. The plea taken by Learned Counsel for the BPTP that the Complainant is not a 'Consumer' as he had booked the floor for investment purpose or earning gain, is completely unsustainable in the light of the judgment of this Commission in Kavita Ahuja vs. Shipra Estates I (2016) CPJ 31, in which the principle laid down is that the onus of establishing that the Complainant was dealing in real estate i.e. in the purchase and sale of plots/flats in his normal course of business to earn profits, shifts to the Opposite Party, which in the instant case they had failed to discharge by filing any documentary evidence to establish their case. Therefore, we are of the considered view that the Complainant is a 'Consumer' as defined under Section 2 (1)(d) of the Act. 10. With regard to the preliminary objection taken by the BPTP that due to existence of Arbitration Clause in the Agreement, this Commission has no jurisdiction to entertain the Complaint, the Hon'ble Supreme Court in M/S Emaar MGF Land Limited vs Aftab Singh - I (2019) CPJ 5 (SC), has laid down the law that the Arbitration Clause in the Agreement does not bar the jurisdiction of the Consumer Fora to entertain the Complaint. As such, the said ground does not hold any merits.

11. The brief facts of the case are that the Complainant has booked a residential Floor in the Project, namely, "Amstoria" launched by the BPTP at Sector 102, Gurgaon, Haryana on 31.08.2021. The Complainant was allotted Unit No. A-134-FF First Floor and the Floor Buyer Agreement was also executed between the parties on 14.03.2012. As per Clause 5.1 of the Agreement, the possession of the booked Floor was to be delivered to the Complainant within a period of 24 months plus six months extended period from the date of execution of the Agreement i.e. by September, 2014. The total Sale Consideration of the booked Floor was ₹85,31,992/- out of which the Complainant had paid a sum of ₹78,64,819/- i.e. about 92% of the total Sale Consideration to the BPTP. However, despite having been received such a hefty amount long back, the BPTP has miserably failed to comply with its commitment/promise to deliver the possession of the allotted

3

Floor to the Complainant in terms of the Agreement.

12. It is vehemently argued on behalf of the BPTP that delay in completing the construction of the Project and handing over the possession of the booked Floor to the Complainant has occurred due to non-payment by the Complainant as per the demands raised and for force- majeure reasons which were not under their control.

13. So far as, the contention that the Complainant is a habitual defaulter in making payments and therefore there was delay in handing over possession of Unit, is concerned, we are of the considered view that the BPTP as per terms of the Agreement, was at liberty either to charge penal interest on delayed payment or cancel the allotment of the Complainant and refund the amount deposited by him. However, the BPTP has not cancelled the booking of the Complainant for default in making payment and refunded the deposited amount. Having not exercised the said option, the BPTP now cannot take excuse that there was delay in handing over possession due to non-payment by the Complainant. Moreover, the BPTP has charged higher rate of interest for delayed payments by the Complainant.

14. The defence taken by the learned Counsel appearing for the BPTP that the delay is attributable to force majeure events, and, therefore, no deficiency of service can be attributed to them, is totally unsustainable, as the BPTP could not substantiate by means of any documentary evidence that the Project was hit by force majeure events. Except for stating that there was delay in obtaining the Service Estimates approved from the Competent Authorities, sanctioning the plants due to incorporate changes from time to time, non-fixation of levels of adjoining sector roads, NPR Road by HUDA, revision of Service Estimate due to change in location of Community sites, which viewed from any angle, cannot be construed to be a "force majeure event", the BPTP has not filed any material on record to prove that there were any force majeure events beyond their control.

15. The BPTP, as per terms of the Agreement, was required to hand over the possession of the booked Floor to the Complainant latest by September 2014. However the construction was not completed within the stipulated time. In response to the queries of the Complainant regarding the exact date of delivery of possession, the BPTP through its emails dated 02.11.2016 to 17.05.2019, has given a stereo type reply that "it is essential for us to once again convey that the Organization is committed to meet customer expectations. We are striving to get the work completed on a high priority. It means that even after lapse of a period of five years from the committed date of possession, they were not sure when they will be able to deliver the possession to the Complainant. The Complainant had invested his hard earned money with the BPTP but till today the possession has not been handed over to the Complainant which has scattered his dream to have his own house. The Complainant has lost his trust in the BPTP as still today the BPTP is unable to give an exact date of delivery of possession. Moreover, no material has been produced by the BPTP to prove that the completion of construction and offer of possession has been delayed on account of reasons beyond its control; there is no justification for the said delay. Keeping in view the judgment of this Commission in Emmar MGF Land Ltd. & Ors. vs. Amit Puri [II (2015) CPJ 568 NC], wherein it was laid down that after the promised date of delivery, it is the discretion of the Complainant whether he wants to accept the offer of possession, if any, or seek refund of the amounts paid with reasonable interest, it is held that it is well within the Complainant's right to seek for refund of the principal amount with interest and compensation as construction is still

4

not complete. We are of the opinion that the Complainant cannot be made to wait indefinitely for the delivery of possession and the act of the BPTP in relying on force majeure clause while retaining the amounts deposited by the Complainant, is not only an act of deficiency of service but also amounts to Unfair Trade Practice, especially in light of the view of the fact that the BPTP charges interest @ 18% p.a. for any delay in the payments made by the flat purchasers, but at the same time, offers compensation of ₹10/- OR ₹20/- OR ₹30/-per sq. ft. per month for the delayed possession. In our view such terms in Clauses are extremely unfair and one sided and fall within the definition of 'Unfair Trade Practice' as defined under Section 2(r) of the Act.

16. At this juncture, we find it a fit case to place reliance on the recent judgment of the Hon'ble Apex Court in Pioneer Urban Land & Infrastructure Ltd. Vs. Govindan Raghavan, II (2009) CPJ 34 (SC), wherein the Apex Court has observed as follows:

"6.7. A terms of a contract will not be final and binding if it is shown that the flat purchasers had no option but to sign on the dotted line, on a contract framed by the builder. The contractual terms of the Agreement dated 08.05.2012 are ex-facie one sided, unfair and unreasonable. The incorporation of such one-sided clauses in an agreement constitutes an unfair trade practice as per Section 2(r) of the Consumer Protection Act, 1986 since it adopts unfair methods or practices for the purpose of selling the flats by the Builder.

7. In view of the above discussion, we have no hesitation in holding that the terms of the Apartment Buyer's Agreement dated 08.05.2012 were wholly one-sided and unfair to the Respondent-Flat Purchaser. The Appellant-Builder cannot seek to bind the Respondent with such one-sided contractual terms."

For all the aforenoted reasons, this judgments squarely applies to the facts and circumstances of this case.

17. We further place reliance on the judgment of the Hon'ble Supreme Court in Kolkata West International City Pvt. Ltd. Vs. Devasis Rudra, II (2019) CPJ 29 SC, in which the Hon'ble Apex Court has observed as hereunder:

".....It would be manifestly unreasonable to construe the contract between the parties as requiring the buyer to wait indefinitely for possession. By 2016, nearly seven years had elapsed from the date of the agreement. Even according to the developer, the completion certificate was received on 29 March 2016. This was nearly seven years after the extended date for the handing over of possession prescribed by the agreement. A buyer can be expected to wait for possession for a reasonable period. A period of seven years in beyond what is reasonable. Hence, it would have been manifestly unfair to non-suit the buyer merely on the basis of the first prayer in the reliefs sought before the SCDRC. There was in any event a prayer for refund.

5

In the circumstances, we are of the view that the orders passed by the SCDRC and by the NCDRC for refund of moneys were justified."

18. In the case in hand also the Complainant cannot be made to wait indefinitely for possession of the allotted Unit, as the construction is yet to be completed. Therefore, we are of the considered view that the Complainant is entitled for refund of the principal amount with reasonable interest.

19. Now, we address ourselves to the percentage of interest that has to be awarded to meet the ends of justice.

20. In the light of the observations of the Hon'ble Supreme Court in a catena of judgments awarding interest keeping in view the current market situation and that the Banks have lowered the interest rates and considering the recent downtrend in the rates of interest and the erosion in the values of real estate in the market, we are of the opinion that the Complainant is entitled to the refund of the amount deposited by him with interest @ 9% p.a. from the respective dates of deposits till the date of realization.

21. Hence, the Complaint is partly allowed with a direction to the BPTPto refund the deposited amount along with interest @ 9% p.a. from the respective date of deposits till payment, within a period of eight weeks from the date of passing of this order. The Complainant shall also be entitled for a costs of ₹50,000/-.

......................J

R.K. AGRAWAL

PRESIDENT

......................

DR. S.M. KANTIKAR

MEMBER

......................

BINOY KUMAR

MEMBER