Power Grid Corporation of India Ltd.

Central Electricity Regulatory Commission
Feb 8, 2021
Smart Summary (Beta)

Structured Summary: Order in Petition No. 80/TT/2020 (Central Electricity Regulatory Commission)

Factual and Procedural Background

Power Grid Corporation of India Limited (the Petitioner), a deemed transmission licensee, filed Petition No. 80/TT/2020 seeking:

  • truing-up of tariff for the period 1.4.2014 to 31.3.2019 under Regulation 8 of the 2014 Tariff Regulations; and
  • determination of tariff for the period 1.4.2019 to 31.3.2024 under Regulation 8 of the 2019 Tariff Regulations

The petition concerns transmission assets associated with RAPP 5 & 6 in the Northern Region, described as Combined Element‑I and Combined Element‑II (detailed asset list in the opinion). The Petitioner made multiple specific prayers (approval of Additional Capitalisation (ACE) for 2014‑19; approval of trued up AFC for 2014‑19 and AFC for 2019‑24; permission to recover changes due to income tax rate changes; reimbursement of filing/publication expenses; billing of licensee and RLDC fees; adjustment for floating rate interest; separate petition for security expenses; claim for capital spares; and recovery of GST if applicable in future).

Key procedural events recorded in the opinion:

  • The Commission had earlier fixed notional COD and allowed tariff for various periods by prior orders for these assets (notably orders dated 29.2.2012 and 23.2.2016).
  • The petition was filed on 24.12.2019; notices were published as required under Section 64 of the Electricity Act, 2003; public comments were not received.
  • Replies were filed by some beneficiaries: BSES Rajdhani Power Limited (BRPL) and Uttar Pradesh Power Corporation Ltd. (UPPCL) raised issues; the Petitioner filed rejoinders.
  • Hearing took place on 9.6.2020 by video conference and the order was reserved; this order disposes of Petition No.80/TT/2020.

Legal Issues Presented

  1. Whether the Commission should approve the actual Additional Capitalisation (ACE) expenditure incurred during the 2014‑19 tariff block as claimed by the Petitioner.
  2. Whether the Commission should approve the trued-up Annual Fixed Charges (AFC) for the 2014‑19 block and determine the tariff for the 2019‑24 block for the assets covered.
  3. Whether the Petitioner may recover/refund the impact on Return on Equity (RoE) on account of changes in applicable Minimum Alternate Tax/Corporate Income Tax rates directly from beneficiaries without separate application.
  4. Whether the Petitioner is entitled to reimbursement of petition filing fee and publication expenses under Regulation 70(1) of the 2019 Tariff Regulations.
  5. Whether the Petitioner may bill and recover Licensee fee and RLDC fees/charges separately from beneficiaries under Regulation 70(3) & (4) of the 2019 Tariff Regulations.
  6. How to treat decapitalisation and recapitalisation (shifting) of assets (specifically a 50 MVAR bus reactor shifted from Kankroli to Kanpur) for tariff computation and the applicable dates for decapitalisation/recapitalisation.
  7. Whether apportionment of previously admitted capital cost to IT equipment at the truing-up stage (and consequent higher depreciation @15% for IT equipment) is permissible.
  8. Whether PLCC (Power Line Carrier Communication) should receive separate O&M allowance (@2% under the communications head) or be treated as part of sub‑station O&M norms.
  9. Whether security expenses and capital spares should be considered in this petition or in separate proceedings.

Arguments of the Parties

Petitioner (Power Grid Corporation of India Limited)

  • Sought approval of actual ACE incurred during 2014‑19 and determination of tariff for 2019‑24 for the listed assets.
  • Claimed trued-up AFC for 2014‑19 with specific figures for Combined Element‑I and Combined Element‑II (tables in the opinion provide year‑wise numbers).
  • Submitted auditor certificates for capital costs and ACE; provided contract-wise details and flow of liability statements in support of ACE (notably balance/retention payments to Crompton Greaves Ltd for Combined Element‑II).
  • Explained that OPGW was not envisaged but was laid under certain ULDC schemes and any scrap value was adjusted in capital cost when realised.
  • Claimed decapitalisation of 50 MVAR bus reactor at Kankroli (de‑capitalised on 6.12.2016) and recapitalisation at Kanpur (28.9.2017), and supplied supporting minutes of meetings (NRPC/SCM) and contended that discontinuation/recapitalisation dates are consistent with prior Commission observations.
  • Argued that RoE should be grossed up based on notified MAT rates applicable to the company and referenced prior Commission determinations of effective tax/MAT rates.
  • Claimed O&M expenses (including a separate claim for PLCC @2% under Regulation 35(4) of 2019 Tariff Regulations) and computed IWC and other components per applicable regulations.
  • Sought reimbursement of petition filing fee and publication expenses, and sought ability to bill licence fee and RLDC charges separately.
  • Stated it will file a separate petition for security expenses and for capital spares to be claimed at end of tariff block.

Respondents (selected — BRPL and UPPCL)

  • BRPL (BSES Rajdhani Power Limited): raised issues including grossing up of RoE, ACE, deferred tax liability, decapitalisation (questioned whether decapitalisation and recapitalisation could be on same date and sought date of commencement of removal work), and representation of consumer interests at hearings (suggested an agency or forum represent consumers under Regulation 18 of Conduct of Business Regulations and Section 94(3) of the Electricity Act, 2003).
  • UPPCL (Uttar Pradesh Power Corporation Ltd.): challenged the Petitioner's calculations for depreciation, Interest on Loan, Return on Equity and O&M expenses; specifically contended that the Petitioner used incorrect figures for cumulative depreciation and questioned grossed up RoE calculations based on presumptive MAT values.
  • Both respondents sought supporting documentary proof where the Petitioner claimed ACE or other adjustments; BRPL specifically asked for documentary proof that work (for which ACE claimed) was executed before cut‑off date.

Petitioner's Rejoinders (summarised)

  • Provided auditor certificates, flow of liability statements and contract‑wise details supporting ACE and retention payments for Combined Element‑II.
  • Explained that decapitalisation date for the 50 MVAR bus reactor was 6.12.2016 and that re‑installation at Kanpur was delayed due to force majeure events (condoned in a separate petition).
  • Explained that effective tax/grossing up should be based on MAT as notified for respective years and that consolidated financials are not the correct basis for computing taxable income when returns are filed on standalone basis.
  • Provided reasons for methodology used to compute weighted average interest rates and IWC components, referring to the applicable Tariff Regulations.

Table of Precedents Cited

Below are prior Commission orders and petitions expressly cited in the opinion and how the Commission relied on them.

Precedent Rule or Principle Cited For Application by the Court
Order dated 23.2.2016 in Petition No. 557/TT/2014 Previously allowed/trued-up transmission tariff and admitted capital costs for the assets for 2014‑19 period; basis for opening capital cost as on 1.4.2014 The Commission used the admitted capital cost and AFC components from this order as the baseline for the present truing‑up and compared the Petitioner's claims against amounts allowed in that order.
Order dated 29.2.2012 in Petition No. 340/2010 Fixed notional COD of transmission assets as 1.4.2009 for computation of tariff The Commission continued to treat 1.4.2009 as the notional COD for tariff computations in the instant petition.
Order dated 27.4.2020 in Petition No. 274/TT/2019 Determination that for entities under MAT regime, the notified MAT rate for the financial year shall be the effective tax rate for grossing up RoE The Commission adopted the MAT‑based effective tax rates (as used in that order) to gross up RoE for the 2014‑19 truing‑up and applied the same principle for RoE under 2019 Regulations (for 2019‑24, with truing‑up).
Order dated 20.7.2018 in Petition No. 116/TT/2017 Treatment of shifting of transmission assets: discontinuation of tariff in original project not later than COD of shifted asset in new project The Court referenced this order to accept that decapitalisation date may precede recapitalisation date and that tariff for shifted asset cannot continue for period when asset was not in use; used in assessing the 50 MVAR bus reactor shifting.
Order dated 9.5.2020 in Petition No. 19/TT/2020 Principle that truing‑up cannot be used to reapportion capital cost (apportion or reapportion capital cost towards IT equipment at truing‑up not permitted) The Commission relied on this principle to reject the Petitioner's apportionment of a portion of capital cost to IT equipment at the truing‑up stage and to keep the depreciation treatment for IT equipment as in the earlier order.
Order dated 24.1.2021 in Petition No. 126/TT/2020 PLCC is treated as part of sub‑station for O&M norms; separate O&M @2% for PLCC under communication head not applicable where PLCC has been included in sub‑station norms The Commission applied this reasoning to deny the Petitioner's separate claim for PLCC O&M @2% and directed the same principle to be applied in other petitions (31 petitions listed in that order).
Order dated 30.8.2012 in Petition No. 343/2010 and order dated 9.5.2013 in Petition No. 147/TT/2011 Earlier tariff determinations and commercial operation period (referred to in context of 2009‑14 period) The Commission noted these earlier orders as part of the tariff history for the assets and as background to the truing‑up exercise.
Order dated 25.2.2016 in Petition No. 10/TT/2015 Truing up and tariff determination for related assets during earlier periods (referenced in discussion on historic claims) Used as part of the factual background that the Petitioner had not claimed IT equipment earlier and could not re‑apportion capital cost at truing‑up.
Petition Nos. 189/TT/2015 and 240/TT/2013 (as referenced) Projects under which OPGW was laid (ULDC schemes) The Commission noted the Petitioner's explanation about OPGW being laid under these ULDC schemes and that scrap proceeds of earth wire, if any, were adjusted in capital cost.
Petition No. 125/TT/2018 (condonation) and Petition No. 128/TT/2020 (recapitalisation entries referenced) Relevant to delays/force majeure and commissioning dates for shifted asset The Commission acknowledged that erection at Kanpur was delayed due to force majeure which had been condoned in the referenced petition, supporting the Petitioner's chronology for recapitalisation.
Petition No. 260/MP/2020 Consolidated petition filed by the Petitioner claiming security expenses for 2019‑24 based on 2018‑19 actuals The Commission directed that security expenses will be dealt with in Petition No.260/MP/2020 and not in the instant petition.

Court's Reasoning and Analysis

The Commission's analysis proceeds by applying the relevant provisions of the 2014 Tariff Regulations for truing‑up of 2014‑19 and the 2019 Tariff Regulations for the 2019‑24 period, and by checking Petitioner submissions against documentary evidence and prior Commission orders. The key legal and factual points in the Court's step‑by‑step reasoning are:

  1. Public Notice and Representation: The Petitioner complied with publication requirements under Regulation 3(6) and (8) of the 2004 Application Regulations and Section 64 of the Electricity Act; no suggestions/objections were received. Consequently the Commission concluded it was unnecessary to engage a separate consumer representation agency as suggested by BRPL.
  2. Baseline Capital Cost and ACE: The Commission treated the admitted capital cost as on 1.4.2014 as per its earlier order dated 23.2.2016 (Petition No.557/TT/2014). The Petitioner supported ACE claims with auditors' certificates and contract flow statements. The Commission examined ACE claims (including retention payments) and approved the ACE for Combined Element‑II (Rs. 75.80 lakh in 2015‑16) and treated a decapitalisation (-Rs.483.07 lakh) for Combined Element‑I reflecting the shifted 50 MVAR bus reactor.
  3. Decapitalisation and Non‑use Period for Shifted Reactor: Applying Regulation 9(6) of the 2014 Tariff Regulations (assets not in use to be excluded from capital cost), the Commission accepted the Petitioner's evidence that the bus reactor was decapitalised on 6.12.2016 and recapitalised on 28.9.2017. Accordingly, transmission charges were not allowed for the period 6.12.2016 to 27.9.2017 because the asset was not in use during that interval.
  4. Debt‑Equity and Funding: The Petitioner's claimed normative debt‑equity ratio of 70:30 as on 31.3.2014 and for ACE was accepted in accordance with Regulation 19 of the 2014 Tariff Regulations and Regulation 18 of the 2019 Tariff Regulations for the 2019‑24 period.
  5. Interest on Loan (IoL): IoL was computed based on actual loan portfolios and weighted average rate of interest in accordance with Regulation 26 of the 2014 Tariff Regulations for truing‑up and Regulation 32 of the 2019 Regulations for the 2019‑24 computations. Repayments were taken equal to depreciation allowed for the period.
  6. Return on Equity (RoE) Grossing‑up: The Commission adopted the approach in its prior order dated 27.4.2020 (Petition No.274/TT/2019) to treat the notified MAT rate for each financial year as the effective tax rate for grossing up RoE. Consequently, RoE for the 2014‑19 truing‑up and RoE for 2019‑24 were computed using MAT‑based effective tax rates applicable in each year (tables in the order set the year‑wise RoE values).
  7. Depreciation and Apportionment to IT Equipment: The Petitioner attempted to segregate IT equipment cost and claim higher depreciation (@15%) at truing‑up. Relying on the principle in Regulation 8(1) of the 2014 Tariff Regulations and the reasoning in earlier orders (including the 9.5.2020 order in Petition No.19/TT/2020), the Commission held that truing‑up cannot be used to reapportion previously admitted capital cost; therefore the earlier depreciation treatment (IT equipment as part of sub‑station at 5.28%) was retained for 2014‑19. For the 2019‑24 period IT equipment was considered separately and depreciated as per 2019 Regulations going forward.
  8. Operation & Maintenance (O&M) and PLCC: The Petitioner claimed separate O&M @2% for PLCC under Regulation 35(4) of 2019 Regulations. The Commission referred to its order dated 24.1.2021 in Petition No.126/TT/2020 and concluded that PLCC has been treated as part of sub‑station for O&M norms; consequently separate PLCC O&M @2% was not allowed and this decision applies to other petitions where similar claims were made (31 petitions listed in that order).
  9. Interest on Working Capital (IWC): IWC was computed per Regulation 28 of the 2014 Regulations for truing‑up and Regulation 34 of the 2019 Regulations for 2019‑24, with components maintenance spares (15% of O&M), one month O&M, and receivables (2 months for 2014‑19; 45 days for 2019‑24 as per Regulation 34). The normative rate on working capital was applied (SBI MCLR + 350 bps / bank rate as specified).
  10. Filing Fee, Publication Expenses, Licence & RLDC Fees: The Commission found the Petitioner’s claim for reimbursement of filing fee and publication expenses to be in accordance with Regulation 70(1) of the 2019 Tariff Regulations and allowed recovery directly from beneficiaries on pro‑rata basis. The Petitioner was also entitled to recover licence fee and RLDC fees/charges as per Regulation 70(3) & (4).
  11. Security Expenses and Capital Spares: The Petitioner had not included security expenses in this petition and proposed to file separate petitions. The Commission directed the Petitioner to claim security expenses for all transmission assets in one petition; it noted Petition No.260/MP/2020 already filed by the Petitioner to address consolidated security expenses for 2019‑24 and indicated security expenses will be considered in that petition. Capital spares claims to be dealt with under 2019 Regulations at appropriate time (end of tariff period / true‑up).
  12. Final AFC Computations and Application of 2019 Regulations for WAL and Depreciation: For the 2019‑24 period the Commission combined Combined Element‑I and II into Combined Asset‑A (per proviso (i) of Regulation 8(1) of 2019 Regulations) and determined an Effective COD of 1.4.2009 (weighted by admitted capital cost). Weighted Average Life (WAL) was computed per Regulation 33 of the 2019 Regulations using element‑wise lives prescribed in the 2019 Regulations, resulting in WAL ≈ 30 years and remaining life as on 31.3.2019 of 20 years (10 years lapsed).

Holding and Implications

Holding (core ruling):

DISPOSED OF — The Commission disposed of Petition No. 80/TT/2020 by truing‑up the Annual Fixed Charges for 2014‑19 and determining the Annual Fixed Charges for 2019‑24 for the transmission assets covered in the petition, with specific approvals and adjustments as set out in the order.

Direct outcomes and effects on the parties

  • The Commission approved the trued‑up Annual Fixed Charges for 2014‑19 as shown (selected summaries from the order):
    • Combined Element‑I (AFC after truing‑up): 2014‑15 = Rs. 6,993.53 lakh; 2015‑16 = Rs. 6,810.36 lakh; 2016‑17 = Rs. 6,593.88 lakh; 2017‑18 = Rs. 6,355.12 lakh; 2018‑19 = Rs. 6,170.21 lakh.
    • Combined Element‑II (AFC after truing‑up): 2014‑15 = Rs. 3,715.86 lakh; 2015‑16 = Rs. 3,673.47 lakh; 2016‑17 = Rs. 3,626.52 lakh; 2017‑18 = Rs. 3,573.46 lakh; 2018‑19 = Rs. 3,524.52 lakh.
  • The Commission allowed the Annual Fixed Charges for the 2019‑24 tariff period for the Combined Asset‑A (Combined Elements I & II aggregated) as follows (annual totals): 2019‑20 = Rs. 9,083.83 lakh; 2020‑21 = Rs. 8,825.36 lakh; 2021‑22 = Rs. 6,430.58 lakh; 2022‑23 = Rs. 6,395.84 lakh; 2023‑24 = Rs. 6,358.41 lakh.
  • The Commission accepted specific ACE items (notably Rs. 75.80 lakh for Combined Element‑II) and recognized a decapitalisation (‑Rs. 483.07 lakh) reflecting the shifting of the 50 MVAR bus reactor and excluded tariff for the period the asset was not in use (6.12.2016 to 27.9.2017).
  • The Commission applied MAT‑based effective tax rates for grossing up RoE for the truing‑up and for 2019‑24, consistent with its prior order referenced.
  • Petitioner is entitled to recover filing and publication expenses and to bill licence fee and RLDC fees/charges as per the 2019 Tariff Regulations.
  • Separate claims for security expenses will be adjudicated in Petition No.260/MP/2020; capital spares will be dealt with per 2019 Regulations at appropriate stage.

Broader implications highlighted by the order

  • The Commission reaffirmed that truing‑up is limited to truing up admitted capital expenditure and does not permit re‑apportionment of capital cost items (e.g., apportioning IT equipment retrospectively at truing‑up); this principle was applied consistently with prior orders and directed to be followed across related petitions.
  • The Commission confirmed that PLCC will be treated as part of sub‑station for O&M norms (and separate PLCC O&M @2% will not be allowed), and directed that this principle apply to other petitions where Petitioner had made similar claims (31 petitions referenced in the order dated 24.1.2021 in Petition No.126/TT/2020).
  • The Commission treated decapitalisation (shifting) in accordance with Regulation 9(6) (2014 Regulations) and related provisions in 2019 Regulations: assets not in use must be excluded from capital cost for tariff computation and no tariff is payable in the period of non‑use.

Note: The summary above is strictly confined to the matters, findings and figures expressly stated in the provided opinion text. No information beyond the opinion has been inferred or added.

End of summary.

Show all summary ...

The instant petition has been filed by Power Grid Corporation of India Limited (hereinafter referred to as the Petitioner), a deemed transmission licensee, for truing up of tariff for the period from 1.4.2014 to 31.3.2019 under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 (hereinafter referred to as the 2014 Tariff Regulations) and for determination of tariff for the period from 1.4.2019 to 31.3.2024 under Regulation 8 of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (hereinafter referred to as the 2019 Tariff Regulations) in respect of the following assets under the Transmission System associated with RAPP 5&6 in Northern Region (hereinafter referred to as the transmission project): Combined Element-I: (i) 400kV D/C RAPP-KankroliTransmission Line along with associated bays, (ii) 50MVAR Bus Reactor along with associated bays at Order in Petition No.80/TT/2020 Page 4 of 59 Kankroli Sub-station, and (iii) 400 kV S/C RAPP- Kota Transmission Line along with 80 MVAR Bus Reactor Combined Element-II: (i) 400/220 kV 315 MVA ICT-II along with associated bays & two no. 220kV line bays at Kankroli Sub-station, (ii) 400/220 kV 315 MVA ICT-I along with associated bays & 2 no 220 kV line bays at Kankroli Sub- station, and (iii) 400/220 kV 315 MVA ICT-I and ICT-II at Kota Sub-station and 400/220 kV 315 MVA ICT-III at Kankroli Sub-station along with associated bays at Kota and Kankroli Sub-stations respectively.

2. The Petitioner has made the following prayers in this petition:

1) Approve the actual Additional Capitalisation expenditure incurred during 2014-19 tariff block, as claimed at para 9.5 above.

2) Approve the trued up Transmission Tariff for 2014-19 block and transmission tariff for 2019-24 block for the assets covered under this petition as per para 10.1 & 11.4 respectively.

3) Allow the Petitioner to recover the shortfall or refund the excess Annual Fixed Charges, on account of Return on Equity due to change in applicable Minimum Alternate/Corporate Income Tax rate as per the Income Tax Act, 1961 (as amended from time to time) of the respective financial year directly without making any application before Honble Commission as provided in Tariff Regulations, 2014 and Tariff Regulations, 2019.

4) Approve the reimbursement of expenditure by the beneficiaries towards petition filing fee, and expenditure on publishing of notices in newspapers in terms of Regulation 70 (1) Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019, and other expenditure ( if any) in relation to the filing of petition.

5) Allow the Petitioner to bill and recover Licensee fee and RLDC fees and charges, separately from the beneficiaries in terms of Regulation 70 (3) and (4) Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019.

6) Allow the Petitioner to bill and adjust impact on Interest on Loan due to change in Interest rate on account of floating rate of interest applicable during 2019-24 period, if any, from the beneficiaries.

7) Allow the Petitioner to file a separate petition before Honble Commission for claiming the overall security expenses and consequential IOWC on that security expenses.

8) Allow the Petitioner to claim the capital spares at the end of tariff block as per actual. Order in Petition No.80/TT/2020 Page 5 of 59

9) Allow the Petitioner to bill and recover GST on Transmission Charges separately from the beneficiaries, if GST on transmission is withdrawn from negative list at any time in future. Further, any taxes including GST and duties including cess etc. imposed by any statutory/Govt./municipal authorities shall be allowed to be recovered from the beneficiaries.and pass such other relief as Honble Commission deems fit and appropriate under the circumstances of the case and in the interest of justice. and pass such other relief as Honble Commission deems fit and appropriate under the circumstances of the case and in the interest of justice. Background

3. The brief facts of the case are as under:

a) The Administrative Approval and expenditure sanction for the transmission system was accorded by Government of India vide Ministry of Power letter No. 12/22/2033-PG dated 3.6.2005 at an estimated cost of 49945 lakh, which included IDC of 2238 lakh based on 4th quarter, 2004 price level. Subsequently, Revised Cost Estimate (RCE) for the transmission system was approved by the Board of Directors of the Petitioner vide letter No. C/CP/RCE RAPP-5&6 dated 29.12.2008 at an estimated cost of 62665 lakh including IDC of 4088 lakh based on 1st quarter, 2008 price level.

b) The scope of the transmission system is as under: a. Transmission Lines:

i. 400 kV S/C RAPP-Kota Transmission Line

ii. 400 kV D/C RAPP-Kankroli TransmissionLine b. Sub-stations:

i. 400/220 kV Kota (POWERGRID) Sub-station (New) with 2 x 315 MVA transformation capacity

ii. 400/220 kV Kankroli (POWERGRID) Sub-station (New) with 3 x 315 MVA transformation capacity

c) The entire scope of work under thetransmission system is covered under the instant petition. Order in Petition No.80/TT/2020 Page 6 of 59

d) The details of commercial operation of the transmission assets covered in the instant petition are as under: Asset Description COD Combined Element-I

(i) 400kV D/C RAPP-KankroliTransmission Linealong with associated bays 1.4.2009

(ii) 50MVAR Bus Reactor along with associated bays at Kankroli Sub-station and

(iii) 400 kV S/C RAPP- Kota Transmission Line along with 80 MVAR Bus Reactor Combined Element-II

(i) 400/220 kV 315 MVA ICT-II along with associated bays & two no. 220kV line bays at Kankroli Sub-station 1.4.2009

(ii) 400/220 kV 315 MVA ICT-I along with associated bays & 2 no 220 kV line bays at Kankroli Sub-station and

(iii) 400/220 kV 315 MVA ICT-I and ICT-II at Kota Sub-station and 400/220 kV 315 MVA ICT-III at Kankroli Sub-station along with associated bays at Kota and Kankroli Sub-stations respectively

e) The transmission tariff of Combined Elements-I and II from their respective COD to 31.3.2014 was allowed vide order dated 29.2.2012 in Petition No. 340/2010 as per the 2009 Tariff Regulations. The transmission tariff of Combined Elements-I and II was trued-up for the 2009-14 period and tariff was determined for the 2014-19 tariff period as per the 2014 Tariff Regulations vide order dated 23.2.2016in Petition No. 557/TT/2014. The tariffallowed in case of Combined Elements-I and II for the 2014-19 tariff period vide order dated 23.2.2016 is being trued up in the instant petition.

f) AFC approved by the Commission vide order dated 23.2.2016 in Petition No. 557/TT/2014 and the trued up tariff claimed by the Petitioner in respect of thetransmission assets for the 2014-19 tariff period are as under: ( in lakh) Project 2014-15 2015-16 2016-17 2017-18 2018-19 Combined Element -I AFCapproved 6993.41 6797.60 6602.27 6407.59 6213.41 Revised AFC claimed based on truing up 7014.49 6828.82 6630.44 6401.88 6179.20 Combined Element -II AFCapproved 3723.05 3675.44 3621.50 3568.42 3516.43 Order in Petition No.80/TT/2020 Page 7 of 59 Revised AFC claimed based on truing up 3763.44 3716.21 3664.13 3606.53 3546.32

4. The Respondents are transmission licensees, distribution licensees, and power departments, who are procuring transmission services from the Petitioner, mainly beneficiaries of the Northern Region.

5. The Petitioner has served the petition on the Respondents and Public Notice regarding filing of this petition has also been published in newspapers in accordance with Section 64 of the Electricity Act, 2003. No comments or suggestions have been received from the general public in response to the aforesaid notices published in the newspapers by the Petitioner. General Notice dated 12.3.2020 directing the beneficiaries/ Respondents to file reply in the matter was also posted on the Commissions website. BSES Rajdhani Power Limited (BRPL) i.e. Respondent No.12 has filed its reply vide affidavit dated 12.3.2020 and comprehensive reply dated 8.6.2020 and has raised issues like grossing up of RoE, Additional Capital Expenditure (ACE), deferred tax liability and decapitalization. BRPL filed hard copy of its comprehensive reply dated 8.6.2020 vide affidavit dated 24.9.2020 after lifting of the lockdown due to Covid-19 pandemic. The Petitioner vide affidavits dated 19.3.2020 and 25.6.2020 has filed its rejoinder in response to the reply filed by BSES Rajdhani Power Limited (BRPL). Uttar Pradesh Power Corporation Ltd. (UPPCL) i.e. Respondent No.9 has filed its reply vide affidavit dated 1.6.2020 and has raised issues regarding the Petitioners calculation of depreciation, Interest on Loan, Return on Equity and O&M Expenses, against which the Petitioner has filed its rejoinder vide affidavit dated 25.6.2020. Order in Petition No.80/TT/2020 Page 8 of 59

6. This order is issued considering the submissions made by the Petitioner in the petition dated 24.12.2019, the Petitioners affidavits dated 12.3.2020 and 25.6.2020, the replies of BRPL and UPPCL and the Petitioners rejoinders thereto.

7. The hearing in this matter was held on 9.6.2020 through video conference and the order was reserved.

8. Having heard the representatives of the Petitioner and having perused the material on record, we proceed to dispose of the petition.

9. BRPL has submitted that representation of consumers interest and their participation in the tariff determination proceedings is an integral part of the hearing. Referring to Regulation 18 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, BRPL has submitted that some Association, Forum or body Corporate recognized by the Commission may be asked to represent the interest of consumers during hearings of the instant petition. BRPL has further submitted that one of the said agencies may be instructed to represent the consumers interest in the instant case and the same is also provided for in Section 94(3) of the Electricity Act, 2003.

10. We have considered the submissions of the BRPL. In terms of Regulation 3(6) and (8) of the Central Electricity Regulatory Commission (Procedure for Making of Application for Determination of Tariff, Publication of Application and Other Related Matters) Regulations, 2004 (hereinafter referred to as the 2004 Application Regulations), the Petitioner has published notice in newspapers and vide affidavit dated 5.3.2020 has submitted that it has carried out the publication of the present tariff application in the newspapers dated 24.1.2020 in various languages. Further, Order in Petition No.80/TT/2020 Page 9 of 59 the instant petition has been uploaded on the Petitioners website. Notice published in newspaper contained a statement that the application made for determination of tariff is posted on the website of the applicant and the address of the website has also been given. The said notice contained a statement that suggestions or objections, if any, on the tariff proposals for determination of tariff may be filed by any person including the beneficiary in the Office of the Secretary, Central Electricity Regulatory Commission with a copy to the applicant at its Corporate Office within 30 days of publication of the notice. No suggestions/objections with regard to the present tariff petition were received by the Commission before listing of the present petition for hearing. In view of the above, we are of the view that there is no need to engage any agency to represent the consumers. TRUING-UP OF ANNUAL FIXED CHARGES FOR THE 2014-19 TARIFF PERIOD

11. The details of the trued-up transmission charges claimed by the Petitioner in respect of the transmission assets are as under: ( in lakh) Combined Element-I Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Depreciation 2250.76 2250.76 2250.76 2238.00 2222.46 Interest on Loan 1620.28 1411.31 1202.35 989.09 777.09 Return on Equity 2508.72 2520.23 2518.95 2504.67 2497.09 Interest on working capital 172.39 168.70 164.74 160.11 155.63 O & M Expenses 462.34 477.82 493.64 510.01 526.93 Total 7014.49 6828.82 6630.44 6401.88 6179.20 ( in lakh) Combined Element-II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Depreciation 938.89 940.89 942.89 942.89 936.01 Interest on Loan 766.29 681.77 597.06 509.73 422.66 Return on Equity 1096.57 1103.84 1105.52 1105.52 1108.49 Interest on working capital 111.46 111.28 111.03 110.69 110.31 O & M Expenses 850.23 878.43 907.63 937.70 968.85 Total 3763.44 3716.21 3664.13 3606.53 3546.32 Order in Petition No.80/TT/2020 Page 10 of 59

12. The details of the trued-up Interest on Working Capital (IWC) claimed by the Petitioner for the transmission assets are as under: ( in lakh) ( in lakh) Capital Cost

13. The Commission vide order dated 23.2.2016in Petition No.557/TT/2014 allowed the capital cost of 42611.01 lakh and 18625.42 lakh for Combined Elements-I and II respectively as opening capital cost as on 1.4.2014 for determination of tariff for the 2014-19 period.

14. BRPL in its reply dated 8.6.2020 has submitted that the Petitioner should inform whether it is using Optical Ground Wire (OPGW) as earth wire for the instant transmission assets. In response, the Petitioner vide its rejoinder dated 25.6.2020 has submitted that OPGW was not envisaged for the transmission system. However, OPGW was laid on both the lines under following ULDC schemes:

i. 400 kV D/C RAPP C-Kankroli line under "Establishment of Fibre Optic Communication System in Northern Region" covered in Petition No. 189/TT/2015. Combined ElementI Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Maintenance Spares 38.53 39.82 41.14 42.50 43.91 O&M expenses 69.35 71.67 74.05 76.50 79.04 Receivables 1169.08 1138.14 1105.07 1066.98 1029.87 Total 1276.96 1249.63 1220.26 1185.98 1152.82 Rate of Interest (%) 13.50 13.50 13.50 13.50 13.50 Interest on Working Capital 172.39 168.70 164.74 160.11 155.63 Combined ElementII Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Maintenance Spares 70.85 73.20 75.64 78.14 80.74 O&M expenses 127.53 131.76 136.14 140.66 145.33 Receivables 627.24 619.37 610.69 601.09 591.05 Total 825.62 824.33 822.47 819.89 817.12 Rate of Interest (%) 13.50 13.50 13.50 13.50 13.50 Interest on Working Capital 111.46 111.28 111.03 110.69 110.31 Order in Petition No.80/TT/2020 Page 11 of 59

ii. 400 kV D/C RAPP C-Kota line under Fibre Optic Communication System in Lieu of Existing Unified Load Despatch & Communication (ULDC) Microwave Links In Northern Region covered in Petition No. 240/TT/2013.

15. The Petitioner has also submitted that in both the above-mentioned projects, scrap value of earth wire, if any received, has been adjusted in capital cost of the assets during the respective years in which earth wire was sold.

16. The details of approved apportioned capital cost, capital cost as on COD, Additional Capital Expenditure (ACE) incurred upto 31.3.2019 and projected ACE incurred upto 31.3.2019 approved by the Commission vide order dated 23.2.2016 in Petition No. 557/TT/2014 for the transmission assets are as under: ( in lakh) Asset Capital Cost as on COD/ 31.3.2014 ACE Total completion cost as on 31.3.2019 2014-15 Combined Element-I 42611.01 0.00 42611.01 Combined Element-II 18625.42 80.65 18706.07 Total 61236.43 80.65 61317.08

17. The Petitioner vide Auditors Certificates dated 8.11.2019 has submitted the capital cost incurred upto 31.3.2014, ACE upto 31.3.2019 and estimated ACE during the period from 1.4.2019 to 31.3.2020. The details of approved apportioned capital cost, capital cost as on COD, ACE upto 31.3.2019 and projected ACEupto 31.3.2019 claimed by the Petitioner for the transmission assets are as follows: ( in lakh) Assets approved appor- tioned capital Capital cost as on COD/ 31.3.2014 Additional Capital Expenditure Total completion cost as on 31.3.2019 2014-15 2015-16 2016-17 2017-18 Order in Petition No.80/TT/2020 Page 12 of 59 cost Combined Element-I 43003.72 42611.01 0.00 0.00 0.00 -483.07 42127.94 Combined Element-II 19661.14 18625.42 0.00 75.80 0.00 0.00 18701.22 Total 62664.86 61236.43 0.00 75.80 0.00 -483.07 60829.16

18. The estimated completion cost of the transmission assets as on 31.3.2019 including ACE is within the apportioned approved capital cost.

19. The Commission vide orderdated 29.2.2012 in Petition No. 340/2010 fixed the notional COD of the transmission assets as 1.4.2009 for the purpose of computation of tariff. The same is being considered in this order. Initial Spares

20. The Petitioner had claimed Initial Spares of 74.89 lakh and 133.19 lakh for Combined Element-I and Combined Element-II respectively in Petition No. 557/TT/2014, which were allowed by Commission vide order dated 23.2.2016 in Petition No. 557/TT/2014. The Petitioner has not claimed any Initial Spares in the instant petition. Capital Cost as on the COD

21. The capital cost allowed as on 1.4.2014 is summarized as under: ( in lakh) Assets Capital Cost claimed as on 1.4.2014 Capital Cost allowed as on COD Combined Element-I 42611.01 42611.01 Combined Element-II 18625.42 18625.42 Total 61236.43 61236.43 Order in Petition No.80/TT/2020 Page 13 of 59 Additional Capital Expenditure (ACE)

22. The Petitioner has claimed the following ACE for the transmission assets and submitted the Auditors Certificates in support of the same: ( in lakh) Assets 2014-15 2015-16 2016-17 2017-18 Combined Element-I 0.00 0.00 0.00 - 483.07 Combined Element-II 0.00 75.80 0.00 0.00

23. The Petitioner has submitted that ACE incurred for Combined Element-II is on account of balance and retention payment due to work already executed before cut- off date. The Petitioner has claimed the same under Regulation 14(3)(v) of the 2014 Tariff Regulations. BRPL vide its reply dated 8.6.2020 has submitted that the Petitioner should file documentary proof to show that the work was executed before the cut-off date. In response to reply filed by BRPL, the Petitioner vide its rejoinder dated 25.6.2020 has submitted that it has already filed the flow of liability statement and other documentary evidences along with the petition.The contract-wise details for balance and retention payments are as detailed below: ( in lakh) Asset Party Package Outstanding Payment 2014-15 2015-16 2016-17 2017-18 Combined Element -II Crompton Greaves Ltd. Sub-station Work 0.00 75.80 0.00 0.00 Total 0.00 75.80 0.00 0.00

24. The Petitioner vide affidavit dated 25.2.2020 has also submitted that ACE upto 31.3.2019 has been considered in the Auditors certificate as per actuals whereas the ACE claimed for the period from 1.4.2019 to 31.3.2020 is on estimated basis and may vary due to final claim/reconciliation at the time of contract closing. Order in Petition No.80/TT/2020 Page 14 of 59

25. The Petitioner vide affidavit dated 24.12.2019 has claimed decapitalization of 483.07 from Combined Element-1. The Petitioner has submitted that 50 MVAR Bus Reactor installed at Kankroli Sub-station has been shifted and put into commercial operation as Line Reactor at Kanpur end of 400 kV D/C Allahabad-Kanpur Line w.e.f. 28.9.2017 under NRSS-XXX Project. The Petitioner vide affidavit dated 25.6.2020 has also filed the Minutes of the 28th Meeting of Northern Regional Power Committee held on 26.4.2016 wherein the stated conversion was consented.

26. BRPL has submitted that the Petitioner has claimed the decapitalization of 50 MVAR bus reactor at Kankroli and erection of the same as line reactor at Kanpur end of 400 kV D/C Allahabad-Kanpur Line on the same day, i.e. 28.9.2017. BRPL has submitted that the date of decapitalisation from Kankroli and recapitalization at Kanput cannot be on the same day, as it takes time for removal of bus reactor at Kankroliand transporation to Kanpur. Accordingly, the reactor is required to be de- capitalized with effect from the date of commencement of work at Kankroli. Hence, the Petitioner should furnish the date of commencement of work at Kankroli along with complete details of the procedure. In response, the Petitioner has submitted that actual date of de-capitalsiation of the 50 MVAR bus reactors at Kankroli was 6.12.2016. The Petitioner has further submitted that the Commission in order dated 20.7.2018 in Petition No. 116/TT/2017 has observed that discontinuation of tariff of shifted transmission asset in original project shall not be later than COD of the shifted transmission asset in another project in case of shifting of transmission assets from one project to another project. Further, the reactor could not be erected due to the force majeure events encountered during the implementation of associated line i.e. Order in Petition No.80/TT/2020 Page 15 of 59

400 kV D/C AllahabadKanpur Line, which was condoned by the Commission in Petition No. 125/TT/2018.

27. We have considered the submissions of the Petitioner and BRPL. It is observed that the Petitioner initially charged 50 MVAR bus reactor at Kankroli on 1.4.2009. It was decapitalsied on 6.12.2016 from Kankroli and capitalized in Kanpur on 28.9.2017. The shifting of the bus reactor was discussed and agreed in 34th SCM of Northern Region and 28th NRPC meeting.

28. Regulation 9(6) of the 2014 Tariff Regulations provides as under: (6) The following shall be excluded or removed from the capital cost of the existing and new project: (a) The assets forming part of the project, but not in use; (b) Decapitalisation of Asset; (c) In case of hydro generating station any expenditure incurred or committed to be incurred by a project developer for getting the project site allotted by the State government by following a two stage transparent process of bidding; and (d) the proportionate cost of land which is being used for generating power from generating station based on renewable energy: Provided that any grant received from the Central or State Government or any statutory body or authority for the execution of the project which does not carry any liability of repayment shall be excluded from the Capital Cost for the purpose of computation of interest on loan, return on equity and depreciation;

29. Accordingly, as per Regulation 9(6) of the 2014 Tariff Regulations, the transmission assets not in use shall be excluded from the capital cost of the exisiting project. In the instant case, the 50 MVAR bus reactorwas not in use from 6.12.2016 to 27.9.2017. Accordingly, as provided in Regulation 9(6) of the 2014 Tariff Regulations, transmission charges are not allowed for the period from 6.12.2016 to 27.9.2017 as it was not in use. The details of de-capitalisation considered in respect of 50 MVARbusreactor from Kankroli to Kanpursub-station in the instant petition are as under: Order in Petition No.80/TT/2020 Page 16 of 59 ( in lakh) Date of de- capitalisation considered in the instant petition Date of re- capitalisation considered in the Petition No. 128/TT/2020 Original book value of the asset being re-capitalised Cumulative depreciation corresponding to the date of decapitali- sation Cumulative repayment of loan corresponding to the date of to de- capitalisation 1.4.2009 6.12.2016 28.9.2017 483.07 212.36 212.36

30. Accordingly, capital cost considered for the tariff period 2014-19 is as follows: ( in lakh) Combined Element -I Capital cost as on COD/ 31.3.2014 Additional Capital Expenditure Total capital cost including ACE as on 31.3.2019 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 42611.01 0.00 0.00 0.00 0.00 0.00 42611.01 As claimed 42611.01 0.00 0.00 0.00 -483.07 0.00 42127.94 Approved in this order 42611.01 0.00 0.00 -483.07 0.00 0.00 42127.94 ( in lakh) Combined Element -II Capital cost as on COD/ 31.3.2014 Additional Capital Expenditure Total capital cost including ACE as on 31.3.2019 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 18625.42 80.65 0.00 0.00 0.00 0.00 18706.07 As claimed 18625.42 0.00 75.80 0.00 0.00 0.00 18701.22 Approved in this order 18625.40 0.00 75.80 0.00 0.00 0.00 18701.20 Capital Cost for the 2014-19Tariff Period

31. Accordingly, the capital cost considered as on 31.3.2019 for the 2014-19 tariff period is as under: ( in lakh) Order in Petition No.80/TT/2020 Page 17 of 59 Assets Admitted Capital Cost as on COD Additional Capital Expenditure Total Capital Cost as 31.3.2019 2014-15 2015-16 2016-17 2017-18 Combined Element-I 42611.01 0.00 0.00 (-)483.07 0.00 42127.94 Combined Element-II 18625.40 0.00 75.80 0.00 0.00 18701.20 Total 61236.41 0.00 75.80 (-)483.07 0.00 60829.14 Debt-Equity Ratio

32. The Petitioner has claimed debt-equity ratio of 70:30 as on 31.3.2014 and for ACEafter 31.3.2014. The debt-equity ratio of 70:30 has been considered for capital cost as on 31.3.2014 and ACE during 2014-19 tariff period as provided under Regulation 19 of the 2014 Tariff Regulations. The same is summarised as under:- Funding Combined Element-I As on 31.3.2014 As on 31.3.2019 Amount ( in lakh) Amount ( in lakh) Debt 29827.72 70.00 29489.57 70.00 Equity 12783.29 30.00 12638.37 30.00 Total 42611.01 100.00 42127.94 100.00 Funding Combined Element-II As on 31.3.2014 As on 31.3.2019 Amount ( in lakh) Amount ( in lakh) Debt 13037.80 70.00 13090.86 70.00 Equity 5587.60 30.00 5610.34 30.00 Total 18625.40 100.00 18701.20 100.00 Interest on Loan (IoL)

33. The Petitioner has prayed for change in interest rates prevailing as on 1.4.2019 for respective loans. The change in interest rate is due to floating rate of interest applicable for the project to be claimed/adjusted over the period of 5 years directly from the beneficiaries. We have considered the submissions of the Petitioner and accordingly calculated IoL based on actual interest rate, in accordance with Regulation 26 of the 2014 Tariff Regulations.IoL has been worked out as follows: Order in Petition No.80/TT/2020 Page 18 of 59

(i) Gross amount of loan, repayment of instalments and weighted average rate of interest on actual average loan have been considered as per the petition.

(ii) The repayment for the tariff period 2014-19 has been considered to be equal to the depreciation allowed for that period.

34. The details of IoL are as follows: ( in lakh) ( in lakh) Combined Element I Particular 2014-15 2015-16 1.4.2016 5.12.2016 6.12.2016 31.3.2017 2017-18 2018-19 Gross Normative Loan 29827.72 29827.72 29827.72 29489.57 29489.57 29489.57 Cumulative Repayments upto Previous Year 11276.20 13507.48 15738.76 17048.56 17749.58 19955.35 Net Loan-Opening 18551.52 16320.24 14088.96 12441.00 11739.99 9534.22 Addition due to 0.00 0.00 0.00 0.00 0.00 0.00 Repayment during the year 2231.28 2231.28 1522.16 701.01 2205.77 2205.77 Net Loan-Closing 16320.24 14088.96 12566.79 11739.99 9534.22 7328.44 Average Loan 17435.88 15204.60 13327.87 12090.50 10637.10 8431.33 Weighted Average Rate of Interest on Loan (%) 9.298 9.300 9.303 9.303 9.306 9.310 Interest on Loan 1621.18 1414.03 845.83 357.46 989.89 784.99 Combined Element II Particular 2014-15 2015-16 2016-17 2017-18 2018-19 Gross Normative Loan 13037.80 13037.80 13090.86 13090.86 13090.86 Cumulative Repayments upto Previous Year 4306.41 5197.42 6090.43 6985.44 7880.45 Net Loan-Opening 8731.39 7840.38 7000.43 6105.42 5210.41 Addition due to ACE 0.00 53.06 0.00 0.00 0.00 Repayment during the year 891.01 893.01 895.01 895.01 895.01 Net Loan-Closing 7840.38 7000.43 6105.42 5210.41 4315.39 Average Loan 8285.89 7420.41 6552.92 5657.91 4762.90 Weighted Average Rate of Interest on Loan (%) 9.275 9.278 9.281 9.284 9.287 Interest on Loan 768.51 688.43 608.17 525.29 442.35 Order in Petition No.80/TT/2020 Page 19 of 59

35. Accordingly, IoL approved vide order dated 23.2.2016 in Petition No. 557/TT/2014, claimed by the Petitioner in the instant petition and trued up in this order is shown in the tablesas under: ( in lakh) Combined Element I Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.02.2016 in Petition No. 557/TT/2014 1621.07 1413.70 1206.45 999.26 791.99 As claimed by the Petitioner 1620.28 1411.31 1202.35 989.09 777.09 Allowed after truing-up 1621.18 1414.03 1203.28 989.89 784.99 ( in lakh) Combined Element II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.02.2016 in Petition No. 557/TT/2014 771.03 690.89 608.05 525.15 442.20 As claimed by the Petitioner 766.29 681.77 597.06 509.73 422.66 Allowed after truing-up 768.51 688.43 608.17 525.29 442.35 Return on Equity (RoE)

36. The Petitionerhas claimed Return on Equity for thetransmission assets in terms of Regulations 24 and 25 of the 2014 Tariff Regulations. The Petitioner has submitted that it is liable to pay income tax at MAT rates and has claimed following effective tax rates for the 2014-19 tariff period: Year Claimed effective tax (in %) Grossed up ROE (Base Rate/1-t) (in %) 2014-15 21.018 19.624 2015-16 21.382 19.715 2016-17 21.338 19.704 2017-18 21.337 19.704 2018-19 21.549 19.757 Order in Petition No.80/TT/2020 Page 20 of 59

37. BRPL vide its reply dated 8.6.2020 has submitted that claims of deferred tax is required to be adjusted for the 2004-09 tariff period. During the 2004-09 tariff period, there was no grossing up of the equity and the beneficiaries were paying the income tax on actuals as per the 2004 Tariff Regulations. As the Respondents were paying the income tax on the transmission business without getting the benefits allowed under the Income Tax Act, 1961 and accordingly Respondents were made to pay huge amount in income tax. The Petitioner is required to pay back the extra amount of Income tax after accounting for the benefits allowed under the Income Tax Act, 1961. In response, the Petitioner vide its rejoinder dated 25.6.2020 has submitted that ithas claimed deferred tax liability materialized during the 2009-14 period only for the deferred tax liability accrued upto 31.3.2009 and all the required documents along with the Auditors Certificate have been submitted with deferred tax liability bills.

38. BRPL has contended that the Petitioner has not deducted income tax for non- transmission business while calculating the actual income tax. Further, in the 2009-14 tariff period, here was grossing up of the equity with the income tax on the transmission business and not grossing up with effective tax rate and accordingly huge amount was collected by the Petitioner which is required to be trued up as per the 2014 Tariff Regulations. Accordingly, the beneficiaries were paying the taxes on actual income tax without the benefit available under the Income Tax Act, 1961 which was not permitted under Regulation 25(2) of the 2014 Tariff Regulations, but allowed during the annual true up to be undertaken by the Petitioner on Regulation 8(8) read with Regulation 25(3) of the 2014 Tariff Regulations. In response, the Petitioner has submitted that the Respondent has used the Profit Before Tax as reported in the Statement of Profit and Loss while companys taxable income is derived as per the Order in Petition No.80/TT/2020 Page 21 of 59 MAT provisions from the Profit Before Tax. The effective tax rate computed by the Respondent is based on the consolidated financial statements of the Company whereas income tax return is filed for the company on the basis of standalone financial statements. The Petitioner has further submitted that the tariff for each year of the 2014-19 tariff period is being determined by the Commission considering the Effective Tax percentage to arrive at the Grossed up return of equity (RoE).The Grossed upRoE (in %) and effective tax rate for the 2014-19 tariff period have already been determined by the Commission.

39. UPPCL vide its reply dated 1.6.2020 has submitted that the Petitioner has claimed grossed up Return on Equity for the period from 2016-17 to 2018-19 based on presumptive value of MAT rates. In response, the Petitioner vide its rejoinder dated 25.6.2020 has submitted that the Respondent has used the Profit Before Tax as reported in the Statement of Profit and Loss (of consolidated financial statements), whereas Companys taxable income is derived as per the MAT provisions from the Profit Before Tax as reported in the standalone financial statements. Further,for the purpose of grossing-up of rate of ROE, it has considered the effective tax rate based (for the 2014-19 tariff period) on notified MAT rates that were approved vide tariff orders dated 18.4.2020 in Petition No. 247/TT/2019, 27.4.2020 in Petition No. 274/TT/2019, 23.4.2020 in Petition No. 245/TT/2019 and 16.4.2020 in Petition No. 307/TT/2019 for transmission assets under the respective petitions.

40. We have considered the contentions raised by BRPL and UPPCL and the rejoinders submitted by the Petitioner. The Commission vide order dated 27.4.2020 in Petition No. 274/TT/2019 has arrived at the effective tax rate for the Petitioner based Order in Petition No.80/TT/2020 Page 22 of 59 on the notified MAT rates. The relevant extract of the order dated 27.4.2020 is as under:

26. We are conscious that the entities covered under MAT regime are paying Income Tax as per MAT rate notified for respective financial year under IT Act, 1961, which is levied on the book profit of the entity computed as per the Section115JB of the IT Act, 1961. The Section 115JB(2) defines book profit as net profit in the statement of Profit & Loss prepared in accordance with Schedule-III of the Companies Act, 2013, subject to some additions and deductions as mentioned in the IT Act, 1961. Since the Petitioner has been paying income tax on income computed under Section 115JB of the IT Act, 1961 as per the MAT rates of the respective financial year, the notified MAT rate for respective financial year shall be considered as effective tax rate for the purpose of grossing up of RoE for truing up of the tariff of the 2014-19 tariff period in terms of the provisions of the 2014 Tariff Regulations. Interest imposed on any additional income tax demand as per the Assessment Order of the Income Tax authorities shall be considered on actual payment. However, penalty (for default on the part of the Assessee) if any imposed shall not be taken into account for the purpose of grossing up of rate of return on equity. Any under-recovery or over-recovery of grossed up rate on return on equity after truing up, shall be recovered or refunded to beneficiaries or the long term transmission customers/ DICs as the case may be on year to year basis.

27. Accordingly, following effective tax rates based on notified MAT rates are considered for the purpose of grossing up of rate of return on equity: Year Notified MAT rates (inclusive of surcharge & cess) Effective tax (in %) 2014-15 20.961 20.961 2015-16 21.342 21.342 2016-17 21.342 21.342 2017-18 21.342 21.342 2018-19 21.549 21.549

41. The MAT rates as considered in order dated 27.4.2020 in Petition No. 274/TT/2019 are considered for the purpose of grossing up of the rate of RoE for truing up of the tariff of the 2014-19 tariff period in terms of the provisions of the 2014 Tariff Regulations, which is as follows: Year MAT Rate(t) (in %) Base Rate (in %) Grossed up ROE [Base Rate/(1-t)] (in %) 2014-15 20.9605 15.50 19.610 2015-16 21.3416 15.50 19.705 2016-17 21.3416 15.50 19.705 2017-18 21.3416 15.50 19.705 2018-19 21.5488 15.50 19.758 Order in Petition No.80/TT/2020 Page 23 of 59

42. Accordingly, RoE is trued up on the basis of MAT rates applicable in respective years and is allowed for the transmission assets as under: ( in lakh) Combined Element I Particulars 2014-15 2015-16 1.4.2016 5.12.2016 6.12.2016 31.3.2017 2017-18 2018-19 Opening Equity 12783.29 12783.29 12783.29 12638.37 12638.37 12638.37 Addition due to 0.00 0.00 0.00 0.00 0.00 0.00 Closing Equity 12783.29 12783.29 12783.29 12638.37 12638.37 12638.37 Average Equity 12783.29 12783.29 12783.29 12638.37 12638.37 12638.37 Return on Equity (Base Rate) (%) 15.50 15.50 15.50 15.50 15.50 15.50 Tax Rate applicable (%) 20.961 21.342 21.342 21.342 21.342 21.549 Rate of Return on Equity (Pre-tax) 19.610 19.705 19.705 19.705 19.705 19.758 Return on Equity (Pre-tax) 2506.80 2518.95 1718.41 791.47 2490.39 2497.09 ( in lakh) Combined Element II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Opening Equity 5587.60 5587.60 5610.34 5610.34 5610.34 Addition due to ACE 0.00 22.74 0.00 0.00 0.00 Closing Equity 5587.60 5610.34 5610.34 5610.34 5610.34 Average Equity 5587.60 5598.97 5610.34 5610.34 5610.34 Return on Equity (Base Rate) (%) 15.50 15.50 15.50 15.50 15.50 Tax Rate applicable (%) 20.961 21.342 21.342 21.342 21.549 Rate of Return on Equity (Pre-tax) 19.610 19.705 19.705 19.705 19.758 Return on Equity (Pre-tax) 1095.73 1103.28 1105.52 1105.52 1108.49

43. Accordingly, RoE allowed in order dated 23.2.2016 in Petition No. 557/TT/2014, claimed by the Petitioner in the instant petition and trued up in the instant order is shown in the table as under: ( in lakh) Combined Element-I Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 2506.80 2506.80 2506.80 2506.80 2506.80 As claimed by the Petitioner 2508.72 2520.23 2518.95 2504.67 2497.09 Order in Petition No.80/TT/2020 Page 24 of 59 Allowed after truing-up 2506.80 2518.95 2509.87 2490.39 2497.09 ( in lakh) Combined Element-II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 1098.10 1100.48 1100.48 1100.48 1100.48 As claimed by the Petitioner 1096.57 1103.84 1105.52 1105.52 1108.49 Allowed after truing-up 1095.73 1103.28 1105.52 1105.52 1108.49 Depreciation

44. The Petitioners claim towards depreciation in this petition was found to be higher than the depreciation allowed in order dated 23.2.2016 in Petition No. 557/TT/2014. The Petitioner has neither given any justification for claiming higher depreciation than that allowed earlier in order dated 23.2.2016 nor made any specific prayer for allowing higher depreciation in this petition. It is observed that in Petition No. 557/TT/2014, the depreciation for IT equipment was allowed @5.28% vide order dated 28.3.2016. The Petitioner now at the time of truing up of the tariff of the 2014-

19 period has segregated the IT equipment cost from the sub-station cost and has considered depreciation rate for IT Equipment @15% and the salvage value for IT Equipment is NIL as per the 2014 Tariff Regulations. Similar issue had come up in some earlier petitions filed by the Petitioner. In this regard, the Commission in order dated 9.5.2020 in Petition No. 19/TT/2020 held as under:

31. We have considered the submissions of the Petitioner. The instant assets were put into commercial operation during the 2009-14 period and the tariff from the respective CODs to 31.3.2014 was allowed vide orders dated 30.8.2012and 9.5.2013in Petition No.343/2010 and Petition No. 147/TT/2011 respectively. Further, the tariff of the 2009-

14 period was trued up and tariff for the 2014-19 period was allowed vide order dated 25.2.2016 in Petition No.10/TT/2015. The Petitioner did not claim any capital expenditure towards IT Equipment in the above said three petitions where tariff for the instant assets for the 2009-14 period was allowed, tariff of the 2009-14 period was trued up and tariff for 2014- 19 period was allowed even though there was a clear provision in the 2009 Tariff Regulations and 2014 Tariff Regulations providing Order in Petition No.80/TT/2020 Page 25 of 59 depreciation @15% for IT Equipment. Having failed to make a claim as per the 2009 Tariff Regulations(the period during which COD of assets was achieved), the Petitioner has now, at the time of truing up of the tariff allowed for the 2014-19 period has apportioned apart of the capital expenditure to IT Equipment.The Petitioner has adopted similar methodology not only in this but in some of the other petitions listed along with the instant petition on 26.2.2020. It is observed that the Petitioner has for the first time apportioned a part of the capital expenditure towards IT Equipment and has claimed depreciation under the head IT Equipment @15% at the time of truing up of the tariff of 2014-19 period. Regulation 8(1) of the 2014 Tariff Regulations provides for truing up of the capital expenditure including the additional capital expenditure, incurred upto 31.3.2019, admitted by the Commission after prudence check. We are of the view that scope of truing up exercise is restricted to truing up of the capital expenditure already admitted and apportionment or reapportionment of the capital expenditure cannot be allowed at the time of truing up. Therefore, we are not inclined to consider the Petitioners prayer for apportionment of capital expenditure towards IT Equipment and allowing depreciation @ 15% from 1.4.2014 onwards. Accordingly, the depreciation @ 5.28% has been considered for IT Equipment as part of the substation upto 31.3.2019while truing up the capital expenditure for the 2014-19 period. During the 2019-24 tariff period, the IT Equipment has been considered separately and depreciation has been allowed @ 15% for the balance depreciable value of IT Equipment in accordance with Regulation 33 read with Sr. No. (p) of the Appendix-I (Depreciation Schedule) of the 2019 Tariff Regulations.

45. UPPCL vide its reply dated 1.6.2020 has raised the issue that Petitioner has considered wrong figure of cumulative depreciation upto previous year for 2014-15 for both the transmission assets. The Petitioner vide its rejoinder dated 25.6.2020, in response to reply filed by UPPCL, has submitted that in order to calculate cumulative depreciation (Rs. 11276.20 lakh), it has taken difference of depreciable value at the beginning of 2014-15 (Rs. 38027.39 lakh) and remaining depreciable value at the beginning of 2014-15 (Rs. 26751.20 lakh). The Petitioner has further submitted that the values are same as were allowed by the Commission vide order dated 23.2.2016 in Petition No. 557/TT/2014.

46. We have considered the submissions of the Respondent and the Petitioner. The instant transmission assets were put into commercial operation during the 2009-

14 period and the tariff from 1.4.2014 to 31.3.2019 was allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014. The Petitioner did not claim any capital expenditure towards IT Equipment in the above said petition where tariff for the Order in Petition No.80/TT/2020 Page 26 of 59 instant transmission assets for 2014-19 period was allowed whereas there was a clear provision in the 2014 Tariff Regulations providing depreciation @15% for IT Equipment. Having failed to make a claim as per the 2014 Tariff Regulations, the Petitioner has now, at the time of truing-up, apportioned a part of the capital expenditure as IT Equipment. The Petitioner has adopted a similar methodology not only in this petition but also in some other Petitions listed along with the instant petition on 23.2.2020. Regulation 8(1) of the 2014 Tariff Regulations provides for truing-up of the capital expenditure including the ACE, incurred upto 31.3.2019, admitted by the Commission after prudence check. We are of the view that the scope of truing-up exercise is restricted to truing-up of the capital expenditure already admitted and apportionment or reapportionment of the capital expenditure cannot be allowed at the time of truing-up. Therefore, we are not inclined to consider the Petitioners approach for apportionment of capital expenditure towards IT Equipment and allowing depreciation @15% from 1.4.2014 onwards. Accordingly, depreciation @5.28% has been considered for IT Equipment as part of the Sub-station upto 31.3.2019 while truing-up the capital expenditure for the 2014-19 period.

47. The Gross Block during the tariff period 2014-19 has been depreciated at weighted average rate of depreciation (WAROD) and working of WAROD is at Annexure-I. The weighted average rate of depreciation (WAROD) has been worked out after taking into account the depreciation rates of transmission assets as prescribed in the 2014 Tariff Regulations and depreciation allowed during the 2014-

19 tariff period is as follows: ( in lakh) Combined Element-I Particulars 2014-15 2015-16 1.4.2016 to 5.12.2016 6.12.2016 to 31.3.2017 2017-18 2018-19 Order in Petition No.80/TT/2020 Page 27 of 59 Opening Gross Block 42611.01 42611.01 42611.01 42127.94 42127.94 42127.94 Addition during 2014-

19 due ACE 0.00 0.00 0.00 0.00 0.00 0.00 Closing Gross Block 42611.01 42611.01 42611.01 42127.94 42127.94 42127.94 Average Gross Block 42611.01 42611.01 42611.01 42127.94 42127.94 42127.94 Weighted average Rate of Depreciation (%) (WAROD) 5.24 5.24 5.24 5.24 5.24 5.24 Balance useful life of the asset at the beginning of the year

28 27 26 26 25 24 Total Depreciable Value 38027.39 38027.39 38027.39 37592.63 37592.63 37592.63 Depreciation for the year 2231.28 2231.28 1522.16 701.01 2205.77 2205.77 Remaining Depreciable Value 25212.39 22981.11 21458.95 20535.53 18329.75 16123.98 ( in lakh) Combined Element-II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Opening Gross Block 18625.40 18625.40 18701.20 18701.20 18701.20 Addition during 2014-19 due ACE 0.00 75.80 0.00 0.00 0.00 Closing Gross Block 18625.40 18701.20 18701.20 18701.20 18701.20 Average Gross Block 18625.40 18663.30 18701.20 18701.20 18701.20 Weighted average Rate of Depreciation (%) (WAROD) 4.78 4.78 4.79 4.79 4.79 Balance useful life of the asset at the beginning of the year

18 17 16 15 14 Total Depreciable Value 15690.31 15724.42 15758.53 15758.53 15758.53 Depreciation for the year 891.01 893.01 895.01 895.01 895.01 Remaining Depreciable Value 10644.92 9786.02 8925.12 8030.11 7135.10

48. The details of the depreciation allowed for the transmission assets vide order dated 23.2.2016 in Petition No. 557/TT/2014, claimed by the Petitioner in the instant petition and trued up in the instant order is shown in the table as follows: ( in lakh) Combined Element-I Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.02.2016 in Petition No. 557/TT/2014 2231.28 2231.28 2231.28 2231.28 2231.28 As claimed by the Petitioner 2250.76 2250.76 2250.76 2238.00 2222.46 Allowed after Truing-up 2231.28 2231.28 2223.17 2205.77 2205.77 ( in lakh) Combined Element-II Order in Petition No.80/TT/2020 Page 28 of 59 Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Allowed vide order dated 23.02.2016 in Petition No. 557/TT/2014 893.14 895.27 895.27 895.27 895.27 As claimed by the Petitioner 938.89 940.89 942.89 942.89 936.01 Allowed after Truing-up 891.01 893.01 895.01 895.01 895.01 Operation & Maintenance Expenses (O&M Expenses)

49. The details of the O&M Expenses claimed by the Petitioner for the transmission assets and allowed under Regulation 29(4)(a) of the 2014 Tariff Regulations for the purpose of tariff are as under: ( in lakh) Combined Element- I Particulars 2014- 2015- 1.4.2016 to 5.12.2016 6.12.2016 to 31.3.2017 2017- 2018- Sub-station Bays

400 kV Bay (AIS) at Kankroli: RAPP-I Bay Sub-station

1 1 1 1 1 1

400 kV Bay (AIS) at Kankroli: RAPP-II Bay Sub-station

1 1 1 1 1 1

400 kV Bay (AIS) at Kankroli: 50 MVAR BUS REACTOR Sub-station

1 1 1 1 1 1

400 kV Bay (AIS) at Kota: RAPP Bay Sub-station

1 1 1 1 1 1

400 kV Bay (AIS) at Kota:

80 MVAR BUS REACTOR Sub-station

1 1 1 1 1 1 Norm ( lakh/bay) 60.30 62.30 64.37 64.37 66.51 68.71 Total Sub-station O&M Expenses 301.50 311.50 321.85 321.85 332.55 343.55 Transmission Line

400 kV D/C RAPP Kankroli Line (km) 198.64 198.64 198.64 198.64 198.64 198.64 Norm ( lakh/km) 0.707 0.731 0.755 0.755 0.780 0.806

400 kV S/C RAPP Kota Line (km) 50.50 50.50 50.50 50.50 50.50 50.50 Norm ( lakh/km) 0.40 0.42 0.43 0.43 0.45 0.46 Total transmission Line O&M Expenses 160.84 166.31 171.79 171.79 177.46 183.38 Total O&M Expenses 462.34 477.81 336.76 156.88 510.01 526.93 ( in lakh) Order in Petition No.80/TT/2020 Page 29 of 59 Combined Element- II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Sub-station Bays

400 kV Bay (AIS) at Kankroli: ICT-I Bay Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli: ICT-II Bay Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli: ICT-III Bay Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kota: ICT- I Bay Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kota: ICT- II Bay Sub-station

1 1 1 1 1 Norm ( lakh/bay)- 400kV 60.30 62.30 64.37 66.51 68.71

220 kV Bay (AIS) at Kota: ICT- I Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kota: ICT- II Bay Sub-station

2 2 2 2 2

220 kV Bay (AIS) at Kankroli: KSTPS-I Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: KSTPS-II Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: ICT-III Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: KANKROLI-I Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: KANKROLI-II Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: LINE 3 Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: LINE 6 Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: BHILWARA Bay Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kota: BEBARI Bay Sub-station

1 1 1 1 1

200 kV Bay (AIS) at Kota: ICT- I Bay Sub-station

1 1 1 1 1 Norm ( lakh/bay)- 220 kV 42.21 43.61 45.06 46.55 48.10 Total Sub-station O&MEXpenses 850.23 878.43 907.63 937.70 968.85 Total O&M Expenses 850.23 878.43 907.63 937.70 968.85

50. The details of the O&M Expenses approved vide order dated 23.2.2016 in Petition No. 557/TT/2014, O&M Expenses claimed by the Petitioner in the instant petition and trued up O&M Expenses allowed in the instant order are shown in the table below: Order in Petition No.80/TT/2020 Page 30 of 59 ( in lakh) Asset Particulars 2014- 2015- 2016- 2017- 2018- Combined Element-I Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 462.34 477.81 493.64 510.01 526.93 As claimed by the Petitioner 462.34 477.82 493.64 510.01 526.93 Allowed after Truing-up 462.34 477.81 493.64 510.01 526.93 Combined Element-II Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 850.23 878.43 907.63 937.70 968.85 As claimed by the Petitioner 850.23 878.43 907.63 937.70 968.85 Allowed after Truing-up 850.23 878.43 907.63 937.70 968.85 Interest on Working Capital (IWC)

51. The Petitioner has claimed IWC as per Regulation 28(1)(c) of the 2014 Tariff Regulations as under:

i. Maintenance spares: Maintenance spares have been worked out based on 15% of Operation and Maintenance Expenses.

ii. O & M Expenses: O&M Expenses have been considered for one month of the allowed O&M Expenses.

iii. Receivables: The receivables have been worked out on the basis of 2 months of annual transmission charges as worked out above.

iv. Rate of interest on working capital: Rate of interest on working capital is considered on normative basis in accordance with Clause (3) of Regulation 28 of the 2014 Tariff Regulations.

52. IWC allowed for thetransmission assets is as under: ( in lakh) Combined Element I Particulars 2014- 2015- 1.4.2016 to 5.12.2016 6.12.2016 to 31.3.2017 2017-18 2018-19 O & M Expenses 38.53 39.82 41.14 41.14 42.50 43.91 Order in Petition No.80/TT/2020 Page 31 of 59 Maintenance Spares 69.35 71.67 74.05 74.05 76.50 79.04 Receivables 1165.59 1135.06 1108.15 1079.30 1059.19 1028.37 Total 1273.47 1246.55 1223.33 1194.49 1178.19 1151.32 Rate of Interest on working capital(%) 13.50 13.50 13.50 13.50 13.50 13.50 Interest of working Capital 171.92 168.28 112.66 51.25 159.06 155.43 ( in lakh) Combined Element II Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 O & M Expenses 70.85 73.20 75.64 78.14 80.74 Maintenance Spares 127.53 131.76 136.14 140.66 145.33 Receivables 619.31 612.25 604.42 595.58 587.42 Total 817.70 817.21 816.20 814.37 813.49 Rate of Interest (%) 13.50 13.50 13.50 13.50 13.50 Interest of Working Capital 110.39 110.32 110.19 109.94 109.82

53. The details of IWC approved vide order dated 23.2.2016 in Petition No. 557/TT/2014, claimed by the Petitioner in the instant petition and trued up IWC allowed in the instant order is shown in the table below: ( in lakh) Asset Particulars 2014- 2015- 2016- 2017- 2018- Combined Element-I Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 171.92 168.00 164.10 160.24 156.40 As claimed by the Petitioner 172.39 168.70 164.74 160.11 155.63 Allowed after Truing-up 171.92 168.28 163.91 159.06 155.43 Combined Element-II Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 110.55 110.37 110.07 109.83 109.64 As claimed by the Petitioner 111.46 111.28 111.03 110.69 110.31 Allowed after Truing-up 110.39 110.32 110.19 109.94 109.82 Annual Transmission Charges for the 2014-19 period

54. Acordingly, the annual transmission charges allowed after truing-up for the 2014-19 tariff period are as under: Order in Petition No.80/TT/2020 Page 32 of 59 ( in lakh) Combined Element I Particulars 2014- 2015- 1.4.2016 to 5.12.2016 6.12.2016 to 31.3.2017 2017- 2018- Depreciation 2231.28 2231.28 1522.16 701.01 2205.77 2205.77 Interest on Loan 1621.18 1414.03 845.83 357.46 989.89 784.99 Return on Equity 2506.80 2518.95 1718.41 791.47 2490.39 2497.09 Int. on Working Capital 171.92 168.28 112.66 51.25 159.06 155.43 Op. and Maintenance 462.34 477.81 336.76 156.88 510.01 526.93 Total 6993.53 6810.36 4535.81 2058.07 6355.12 6170.21 ( in lakh) Combined Element II Particulars 2014- 2015-16 2016-17 2017-18 2018- Depreciation 891.01 893.01 895.01 895.01 895.01 Interest on Loan 768.51 688.43 608.17 525.29 442.35 Return on Equity 1095.73 1103.28 1105.52 1105.52 1108.49 Int. on Working Capital 110.39 110.32 110.19 109.94 109.82 Op. and Maintenance 850.23 878.43 907.63 937.70 968.85 Total 3715.86 3673.47 3626.52 3573.46 3524.52

55. Accordingly, the Annual Transmission Charges approved vide order dated 23.2.2016 in Petition No. 557/TT/2014, AFC claimed by the Petitioner in the instant petition and trued up AFC allowed in the instant order are shown in the table below: ( in lakh) Asset Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Combined Element-I Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 6993.41 6797.6 6602.27 6407.59 6213.41 As claimed by the Petitioner 7014.49 6828.82 6630.44 6401.88 6179.20 Allowed after Truing-up 6993.53 6810.36 6593.88 6355.12 6170.21 Combined Element-II Allowed vide order dated 23.2.2016 in Petition No. 557/TT/2014 3723.05 3675.44 3621.50 3568.43 3516.44 As claimed by the Petitioner 3763.44 3716.21 3664.13 3606.53 3546.32 Allowed after Truing-up 3715.86 3673.47 3626.52 3573.46 3524.52 Order in Petition No.80/TT/2020 Page 33 of 59 DETERMINATION OF ANNUAL FIXED CHARGES FOR THE 2019-24 TARIFF PERIOD

56. The Petitioner has submitted the tariff forms combining the Combined Elements-I and II, wherein the COD has been achieved prior to 1.4.2019, as a CombinedAsset-A. Accordingly, as per proviso (i) of Regulation 8(1) of the 2019 Tariff Regulations, single tariff for the Combined Asset-A has been worked out for the 2019-

24 tariff period.

57. The Petitioner has claimed the following transmission charges for the 2019-24 tariff period: ( in lakh) Particulars 2019-20 2020-21 201-22 2022-23 2023-24 Depreciation 3064.19 3064.19 843.69 843.69 843.67 Interest on Loan 911.02 626.56 445.80 367.10 286.32 Return on Equity 3427.48 3427.48 3427.48 3427.48 3427.48 Interest on Working Capital 171.69 169.91 135.89 136.99 137.79 Operation and Maintenance 1385.22 1434.34 1484.44 1537.02 1589.21 Total 8959.60 8722.48 6337.30 6312.28 6284.47

58. The Petitioner has claimed the following Interest on Working Capital (IWC) for the 2019-24 tariff period: ( in lakh) Particulars 2019-20 2020-21 2021-22 2022-23 2023-24 O&M expenses 115.44 119.53 123.70 128.09 132.43 Maintenance Spares 207.78 215.15 222.67 230.55 238.38 Receivables 1101.59 1075.37 781.31 778.23 772.68 Total 1424.81 1410.05 1127.68 1136.87 1143.49 Rate of Interest (%) 12.05 12.05 12.05 12.05 12.05 Interest on Working Capital 171.69 169.91 135.89 136.99 137.79 Order in Petition No.80/TT/2020 Page 34 of 59 Effective Date of Commercial Operation (E-COD)

59. The Petitioner has claimed E-COD of the Combined Asset-A as 1.4.2009. Based on the trued-up admitted capital cost and actual COD of both the transmission assets, the E-COD has been worked out as follows: ( in lakh) Computation of Effective COD Asset Actual Admitted Capital Cost as 31.3.2019 Weight of the cost (%) No. of Days from last Weighted Days Effective COD (Latest COD Total weighted Days) Combined Element- I 01.4.2009 42127.94 69.26 0.00 0.00 1.4.2009 Combined Element- II 01.4.2009 18701.20 30.74 0.00 0.00 Total 60829.14 100

60. E-COD is used to determine the lapsed life of the project as a whole, which works out as ten years as on 1.4.2019 (i.e. the number of completed years as on 1.4.2019 from E-COD). Weighted Average Life (WAL)

61. The life as defined in Regulation 33 of the 2019 Tariff Regulations has been considered for determination of Weighted Average Life.

62. The Combined Asset-A may have multiple elements such as land, building, transmission line, sub-station and PLCC and each element may have different span of life. Therefore, the concept of Weighted Average Life (WAL) has been used as the useful life of the project as a whole.

63. WAL has been determined based on the admitted capital cost of individual elements as on 31.3.2019 and their respective life as stipulated in the 2019 Tariff Order in Petition No.80/TT/2020 Page 35 of 59 Regulations. The element-wise life as defined in the 2009 Tariff Regulations or the 2014 Tariff Regulations prevailing at the time of actual COD of individual transmission assets has been ignored for this purpose. The life as defined in 2019 Tariff Regulations has been considered for determination of WAL. Accordingly, WAL of the Combined Asset-A has been worked out as 30 years as shown below: Admitted Capital Cost as on 31.3.2019 Particulars Combined Cost ( in lakh) Life as per 2019 Regulation (Years) Weight C=(a) x (b) Weighted Avg. Life of Asset (in years) D=c/a Freehold Land 1550.07 - - Leasehold Land 0.00 25 0.00 Building & Other Civil Works 1687.73 25 42193.25 Transmission Line 35266.65 35 1234332.75 Sub-Station Equipment 21289.43 25 532235.75 PLCC 342.23 15 5133.45 IT Equipment amd Software 693.03 7 4620.20 Total 60829.14 1818515.40 29.90 years, rounded off to 30 years

64. WAL as on 1.4.2019 as determined above is applicable prospectively (i.e. for the 2019-24 tariff period onwards) and no retrospective adjustment of depreciation in previous tariff period is required to be done. As discussed above, the Effective COD of the transmission assets is 1.4.2009 and the lapsed life of the project as a whole, works out as ten years as on 1.4.2019 (i.e. the number of completed years as on 1.4.2019 from Effective COD). Accordingly, WAL has been used to determine the remaining useful life as on 31.3.2019 to be 20 years. Capital Cost

65. Regulation 19 of the 2019 Tariff Regulations provides as under:

19 Capital Cost: (1) The Capital cost of the generating station or the transmission system, as the case may be, as determined by the Commission after prudence check Order in Petition No.80/TT/2020 Page 36 of 59 in accordance with these regulations shall form the basis for determination of tariff for existing and new projects. (2) The Capital Cost of a new project shall include the following: (a) The expenditure incurred or projected to be incurred up to the date of commercial operation of the project; (b) Interest during construction and financing charges, on the loans (i) being equal to 70% of the funds deployed, in the event of the actual equity in excess of 30% of the funds deployed, by treating the excess equity as normative loan, or (ii) being equal to the actual amount of loan in the event of the actual equity less than 30% of the funds deployed; (c) Any gain or loss on account of foreign exchange risk variation pertaining to the loan amount availed during the construction period; (d) Interest during construction and incidental expenditure during construction as computed in accordance with these regulations; (e) Capitalised Initial Spares subject to the ceiling rates in accordance with these regulations; (f) Expenditure on account of additional capitalization and de-capitalisation determined in accordance with these regulations; (g) Adjustment of revenue due to sale of infirm power in excess of fuel cost prior to the date of commercial operation as specified under Regulation 7 of these regulations; (h) Adjustment of revenue earned by the transmission licensee by using the assets before the date of commercial operation;

(i) Capital expenditure on account of ash disposal and utilization including handling and transportation facility; (j) Capital expenditure incurred towards railway infrastructure and its augmentation for transportation of coal upto the receiving end of the generating station but does not include the transportation cost and any other appurtenant cost paid to the railway; (k) Capital expenditure on account of biomass handling equipment and facilities, for co-firing;

(l) Capital expenditure on account of emission control system necessary to meet the revised emission standards and sewage treatment plant; (m) Expenditure on account of fulfilment of any conditions for obtaining environment clearance for the project; (n) Expenditure on account of change in law and force majeure events; and (o) Capital cost incurred or projected to be incurred by a thermal generating station, on account of implementation of the norms under Perform, Achieve and Trade (PAT) scheme of Government of India shall be considered by the Commission subject to sharing of benefits accrued under the PAT scheme with the beneficiaries. (3) The Capital cost of an existing project shall include the following: (a) Capital cost admitted by the Commission prior to 1.4.2019 duly trued up by excluding liability, if any, as on 1.4.2019; (b) Additional capitalization and de-capitalization for the respective year of tariff as determined in accordance with these regulations; (c) Capital expenditure on account of ash disposal and utilization including handling and transportation facility; (d) Capital expenditure on account of ash disposal and utilization including handling and transportation facility; (e) Capital expenditure incurred towards railway infrastructure and its augmentation for transportation of coal up to the receiving end of generating Order in Petition No.80/TT/2020 Page 37 of 59 station but does not include the transportation cost and any other appurtenant cost paid to the railway; and (f) Capital cost incurred or projected to be incurred by a thermal generating station, on account of implementation of the norms under Perform, Achieve and Trade (PAT) scheme of Government of India shall be considered by the Commission subject to sharing of benefits accrued under the PAT scheme with the beneficiaries. (4) The capital cost in case of existing or new hydro generating station shall also include: (a) cost of approved rehabilitation and resettlement (R&R) plan of the project in conformity with National R&R Policy and R&R package as approved; and (b) cost of the developers 10% contribution towards Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) and Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY) project in the affected area. (5) The following shall be excluded from the capital cost of the existing and new projects: (a) The assets forming part of the project, but not in use, as declared in the tariff petition; (b) De-capitalised Assets after the date of commercial operation on account of replacement or removal on account of obsolescence or shifting from one project to another project: Provided that in case replacement of transmission asset is recommended by Regional Power Committee, such asset shall be decapitalised only after its redeployment; Provided further that unless shifting of an asset from one project to another is of permanent nature, there shall be no de-capitalization of the concerned assets. (c) In case of hydro generating stations, any expenditure incurred or committed to be incurred by a project developer for getting the project site allotted by the State Government by following a transparent process; (d) Proportiaonate cost of land of the existing project which is being used for generating power from generating station based on renewable energy; and (e) Any grant received from the Central or State Government or any statutory body or authority for the execution of the project which does not carry any liability of repayment.

66. The Petitioner has claimed a capital cost of 42127.94 lakh and 18701.20 lakh for Combined Elements-I and II respectively. Against the overall apportioned approved capital cost (as per FR) of 62664.86 lakh, the estimated completion cost including ACE is 60829.14 lakh. The individual cost of each transmission asset is also within the respective FR apportioned cost. Order in Petition No.80/TT/2020 Page 38 of 59

67. The capital cost has been dealt in line with Regulation 19(3) of the 2019 Tariff Regulations. The element-wise capital cost (i.e. land, building, transmission line, sub- station and PLCC) admitted by the Commission as on 31.3.2019 for the instant transmission assets are clubbed together and the combined capital cost has been considered as capital cost for Combined Asset-A as on 1.4.2019, as per the following details: ( in lakh) Particulars Combined Element I Combined Element II Capital Cost for Combined Asset-A as on 1.4.2019 (1+2) Free hold Land 358.35 1191.72 1550.07 Leasehold Land 0.00 0.00 0.00 Building & Other Civil Works 167.69 1520.04 1687.73 Transmission Line 35266.65 0.00 35266.65 Sub-Station Equipment 5792.61 15496.82 21289.43 PLCC 342.23 0.00 342.23 IT Equipment and Software 200.41 492.62 693.03 Total 42127.94 18701.20 60829.14

68. The trued-up capital cost of 60829.14 lakh for Combined Asset-A is considered as admitted capital cost as on 1.4.2019 for working out tariff for 2019-24 tariff period.

69. The Petitioner has not claimed any ACE for the 2019-24 period. Capital cost for the 2019-24 tariff period

70. Accordingly, the capital cost of the Combined Asset-A, considered for the 2019-24 tariff period, subject to truing-up, is as follows: Order in Petition No.80/TT/2020 Page 39 of 59 ( in lakh) Capital Cost allowed as on 1.4.2019 ACE allowed for the year 2019-20 Total Estimated Completion Cost up to 31.3.2024 60829.14 0.00 60829.14 Debt-Equity Ratio

71. Regulation 18 of the 2019 Tariff Regulations provides as under:

18. Debt-Equity Ratio: (1) For new projects, the debt-equity ratio of 70:30 as on date of commercial operation shall be considered. If the equity actually deployed is more than 30% of the capital cost, equity in excess of 30% shall be treated as normative loan: Provided that:

i. where equity actually deployed is less than 30% of the capital cost, actual equity shall be considered for determination of tariff:

ii. the equity invested in foreign currency shall be designated in Indian rupees on the date of each investment:

iii. any grant obtained for the execution of the project shall not be considered as a part of capital structure for the purpose of debt: equity ratio. Explanation.-The premium, if any, raised by the generating company or the transmission licensee, as the case may be, while issuing share capital and investment of internal resources created out of its free reserve, for the funding of the project, shall be reckoned as paid up capital for the purpose of computing return on equity, only if such premium amount and internal resources are actually utilised for meeting the capital expenditure of the generating station or the transmission system. (2) The generating company or the transmission licensee, as the case may be, shall submit the resolution of the Board of the company or approval of the competent authority in other cases regarding infusion of funds from internal resources in support of the utilization made or proposed to be made to meet the capital expenditure of the generating station or the transmission system including communication system, as the case may be. (3) In case of the generating station and the transmission system including communication system declared under commercial operation prior to 1.4.2019, debt: equity ratio allowed by the Commission for determination of tariff for the period ending 31.3.2019 shall be considered: Provided that in case of a generating station or a transmission system including communication system which has completed its useful life as on or after 1.4.2019, if the equity actually deployed as on 1.4.2019 is more than 30% of the capital cost, equity in excess of 30%shall not be taken into account for tariff computation; Order in Petition No.80/TT/2020 Page 40 of 59 Provided further that in case of projects owned by Damodar Valley Corporation, the debt: equity ratio shall be governed as per sub-clause (ii) of clause (2) of Regulation 72 of these regulations. (4) In case of the generating station and the transmission system including communication system declared under commercial operation prior to 1.4.2019, but where debt: equity ratio has not been determined by the Commission for determination of tariff for the period ending 31.3.2019, the Commission shall approve the debt: equity ratio in accordance with clause (1) of this Regulation. (5) Any expenditure incurred or projected to be incurred on or after 1.4.2019 as may be admitted by the Commission as additional capital expenditure for determination of tariff, and renovation and modernisation expenditure for life extension shall be serviced in the manner specified in clause (1) of this Regulation..

72. The details of the debt-equity considered for the purpose of tariff for the 2019-

24 tariff period is as follows: Funding Capital Cost as on 1.4.2019 ( in lakh) Total Capital Cost as on 31.3.2024 ( in lakh) Debt 42580.43 70.00 42580.43 70.00 Equity 18248.71 30.00 18248.71 30.00 Total 60829.14 100.00 60829.14 100.00 Return on Equity

73. Regulations 30 and 31 of the 2019 Tariff Regulations provide as under:

30. Return on Equity: (1) Return on equity shall be computed in rupee terms, on the equity base determined in accordance with Regulation 18 of these regulations. (2) Return on equity shall be computed at the base rate of 15.50% for thermal generating station, transmission system including communication system and run-of- river hydro generating station, and at the base rate of 16.50% for the storage type hydro generating stations including pumped storage hydro generating stations and run-of-river generating station with pondage: Provided that return on equity in respect of Additional Capitalization after cut- off date beyond the original scope excluding Additional Capitalization due to Change in Law, shall be computed at the weighted average rate of interest on actual loan portfolio of the generating station or the transmission system; Provided further that:

i. In case of a new project, the rate of return on equity shall be reduced by 1.00% for such period as may be decided by the Commission, if the generating station or transmission system is found to be declared under commercial operation without commissioning of any of the Restricted Governor Mode Operation (RGMO) or Free Governor Mode Operation Order in Petition No.80/TT/2020 Page 41 of 59 (FGMO), data telemetry, communication system up to load dispatch centre or protection system based on the report submitted by the respective RLDC;

ii.in case of existing generating station, as and when any of the requirements under (i) above of this Regulation are found lacking based on the report submitted by the concerned RLDC, rate of return on equity shall be reduced by 1.00% for the period for which the deficiency continues;

iii. in case of a thermal generating station, with effect from 1.4.2020:

a) rate of return on equity shall be reduced by 0.25% in case of failure to achieve the ramp rate of 1% per minute;

b) an additional rate of return on equity of 0.25% shall be allowed for every incremental ramp rate of 1% per minute achieved over and above the ramp rate of 1% per minute, subject to ceiling of additional rate of return on equity of 1.00%: Provided that the detailed guidelines in this regard shall be issued by National Load Dispatch Centre by 30.6.2019.

31. Tax on Return on Equity:(1) The base rate of return on equity as allowed by the Commission under Regulation 30 of these regulations shall be grossed up with the effective tax rate of the respective financial year. For this purpose, the effective tax rate shall be considered on the basis of actual tax paid in respect of the financial year in line with the provisions of the relevant Finance Acts by the concerned generating company or the transmission licensee, as the case may be. The actual tax paid on income from other businesses including deferred tax liability (i.e. income from business other than business of generation or transmission, as the case may be) shall be excluded for the calculation of effective tax rate. (2) Rate of return on equity shall be rounded off to three decimal places and shall be computed as per the formula given below: Rate of pre-tax return on equity = Base rate / (1-t) Where t is the effective tax rate in accordance with clause (1) of this Regulation and shall be calculated at the beginning of every financial year based on the estimated profit and tax to be paid estimated in line with the provisions of the relevant Finance Act applicable for that financial year to the company on pro-rata basis by excluding the income of non-generation or non-transmission business, as the case may be, and the corresponding tax thereon. In case of generating company or transmission licensee paying Minimum Alternate Tax (MAT), t shall be considered as MAT rate including surcharge and cess. Illustration-

(i) In case of a generating company or a transmission licensee paying Minimum Alternate Tax (MAT) @ 21.55% including surcharge and cess: Rate of return on equity = 15.50/(1-0.2155) = 19.758%

(ii) In case of a generating company or a transmission licensee paying normal corporate tax including surcharge and cess: Order in Petition No.80/TT/2020 Page 42 of 59 (a) Estimated Gross Income from generation or transmission business for FY 2019-20 is Rs 1,000 crore; (b) Estimated Advance Tax for the year on above is Rs 240 crore; (c) Effective Tax Rate for the year 2019-20 = Rs 240 Crore/Rs 1000 Crore = 24%; (d) Rate of return on equity = 15.50/ (1-0.24) = 20.395%. (3) The generating company or the transmission licensee, as the case may be, shall true up the grossed up rate of return on equity at the end of every financial year based on actual tax paid together with any additional tax demand including interest thereon, duly adjusted for any refund of tax including interest received from the income tax authorities pertaining to the tariff period 2019-24 on actual gross income of any financial year. However, penalty, if any, arising on account of delay in deposit or short deposit of tax amount shall not be claimed by the generating company or the transmission licensee, as the case may be. Any under-recovery or over-recovery of grossed up rate on return on equity after truing up, shall be recovered or refunded to beneficiaries or the long term customers, as the case may be, on year to year basis.

74. The Petitioner has submitted that MAT rate is applicable to the Petitioner's Company. Accordingly, the MAT rate applicable during the year 2019-20 has been considered for the purpose of RoE, which shall be trued-up with actual tax rate in accordance with Clause (3) of Regulation 31 of the 2019 Tariff Regulations. RoE allowed for the transmission assets under Regulation 30 of the 2019 Tariff Regulations is as under: ( in lakh) Combined Asset-A Particulars 2019-20 2020-21 201-22 2022-23 2023-24 Opening Equity 18248.71 18248.71 18248.71 18248.71 18248.71 Addition due to Additional Capitalization 0.00 0.00 0.00 0.00 0.00 Closing Equity 18248.71 18248.71 18248.71 18248.71 18248.71 Average Equity 18248.71 18248.71 18248.71 18248.71 18248.71 Return on Equity (Base Rate) (%) 15.50 15.50 15.50 15.50 15.50 Tax Rate applicable (%) 17.472 17.472 17.472 17.472 17.472 Rate of Return on Equity (Pre- tax) 18.782 18.782 18.782 18.782 18.782 Return on Equity (Pre-tax) 3427.47 3427.47 3427.47 3427.47 3427.47 Interest on Loan (IoL)

75. Regulation 32 of the 2019 Tariff Regulations provides as under: Order in Petition No.80/TT/2020 Page 43 of 59

32. Interest on loan capital: (1) The loans arrived at in the manner indicated in Regulation 18 of these regulations shall be considered as gross normative loan for calculation of interest on loan. (2) The normative loan outstanding as on 1.4.2019 shall be worked out by deducting the cumulative repayment as admitted by the Commission up to 31.3.2019 from the gross normative loan. (3) The repayment for each of the year of the tariff period 2019-24 shall be deemed to be equal to the depreciation allowed for the corresponding year/period. In case ofde- capitalization of assets, the repayment shall be adjusted by taking into account cumulative repayment on a pro rata basis and the adjustment should not exceed cumulative depreciation recovered upto the date of de-capitalisation of such asset. (4) Notwithstanding any moratorium period availed by the generating company or the transmission licensee, as the case may be, the repayment of loan shall be considered from the first year of commercial operation of the project and shall be equal to the depreciation allowed for the year or part of the year. (5) The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual loan portfolio after providing appropriate accounting adjustment for interest capitalized: Provided that if there is no actual loan for a particular year but normative loan is still outstanding, the last available weighted average rate of interest shall be considered; Provided further that if the generating station or the transmission system, as the case may be, does not have actual loan, then the weighted average rate of interest of the generating company or the transmission licensee as a whole shall be considered. (6) The interest on loan shall be calculated on the normative average loan of the year by applying the weighted average rate of interest. (7) The changes to the terms and conditions of the loans shall be reflected from the date of such re-financing.

76. The weighted average rate of IoL has been considered on the basis of rate prevailing as on 1.4.2019. The Petitioner has prayed that the change in interest rate due to floating rate of interest applicable, if any, during the 2019-24 tariff period will be adjusted. Accordingly, the floating rate of interest, if any, shall be considered at the time of true-up. In view of above, IoL has been worked out in accordance with Regulation 32 of the 2019 Tariff Regulations. IoL allowed is as follows: Order in Petition No.80/TT/2020 Page 44 of 59 ( in lakh) Combined Asset-A Particular 2019-20 2020-21 2021-22 2022-23 2023-24 Gross Normative Loan 42580.43 42580.43 42580.43 42580.43 42580.43 Cumulative Repayments upto Previous Year 30936.59 34104.74 37272.89 38218.39 39163.88 Net Loan-Opening 11643.84 8475.69 5307.54 4362.04 3416.54 Addition due to Additional Capitalization 0.00 0.00 0.00 0.00 0.00 Repayment during the year 3168.15 3168.15 945.50 945.50 945.50 Net Loan-Closing 8475.69 5307.54 4362.04 3416.54 2471.05 Average Loan 10059.76 6891.61 4834.79 3889.29 2943.80 Weighted Average Rate of Interest on Loan (%) 9.309 9.321 9.350 9.354 9.294 Interest on Loan 936.49 642.37 452.04 363.81 273.59 Depreciation

77. Regulations 33(1), (2) and (5) of the 2019 Tariff Regulations provide as under:-

33. Depreciation: (1) Depreciation shall be computed from the date of commercial operation of a generating station or unit thereof or a transmission project or element thereof including communication project. In case of the tariff of all the units of a generating station or all elements of a transmission project including communication project for which a single tariff needs to be determined, the depreciation shall be computed from the effective date of commercial operation of the generating station or the transmission project taking into consideration the depreciation of individual units: Provided that effective date of commercial operation shall be worked out by considering the actual date of commercial operation and installed capacity of all the units of the generating station or capital cost of all elements of the transmission project, for which single tariff needs to be determined. (2) The value base for the purpose of depreciation shall be the capital cost of the asset admitted by the Commission. In case of multiple units of a generating station or multiple elements of a transmission project, weighted average life for the generating station of the transmission project shall be applied. Depreciation shall be chargeable from the first year of commercial operation. In case of commercial operation of the asset for part of the year, depreciation shall be charged on pro rata basis. (5) Depreciation shall be calculated annually based on Straight Line Method and at rates specified in Appendix-I to these regulations for the assets of the generating station and transmission project: Provided that the remaining depreciable value as on 31st March of the year closing after a period of 12 years from the effective date of commercial operation of the station shall be spread over the balance useful life of the assets.

78. The IT equipment has been considered as a part of the Gross Block and depreciated using weighted average rate of depreciation (WAROD). The weighted Order in Petition No.80/TT/2020 Page 45 of 59 average of depreciation (WAROD) has been worked out (Annexure-2) after taking into account the depreciation rates of IT and non-IT assets as prescribed in the 2019 Tariff Regulations. The salvage value of IT equipment has been considered as NIL,

i.e., IT asset has been considered as 100% (hundred percent) depreciable. The depreciation has been worked out considering the admitted capital expenditure as on 31.3.2019 and accumulated depreciation up to 31.3.2019. The depreciation allowed for the transmission asset is as follows: ( in lakh) Combined Asset-A Particulars 2019-20 2020-21 2021-22 2022-23 2023-24 Opening Gross Block 60829.14 60829.14 60829.14 60829.14 60829.14 Addition during 2019-24 due to Projected Additional Capitalisation 0.00 0.00 0.00 0.00 0.00 Closing Gross Block 60829.14 60829.14 60829.14 60829.14 60829.14 Average Gross Block 60829.14 60829.14 60829.14 60829.14 60829.14 Weighted average Rate of Depreciation (WAROD) 5.21 5.21 Spread Spread Spread Balance Useful life of the transmission asset 20.00 19.00 18.00 17.00 16.00 Aggregate Depreciable Value 53420.47 53420.47 53420.47 53420.47 53420.47 Depreciation during the year 3168.15 3168.15 945.50 945.50 945.50 Aggregate Cumulative Depreciation 33233.36 36401.51 37347.01 38292.51 39238.00 Remaining Depreciable Value 20187.10 17018.95 16073.46 15127.96 14182.46 Operation & Maintenance Expenses (O&M Expenses)

79. Regulations 35(3) and (4) of the 2019 Tariff Regulations provide as under:

35 (3) Transmission system: (a) The following normative operation and maintenance expenses shall be admissible for the transmission system: Particulars 2019- 2020- 2021- 2022- 2023- Norms for sub-station Bays ( Lakh per bay)

765 kV 45.01 46.60 48.23 49.93 51.68

400 kV 32.15 33.28 34.45 35.66 36.91

220 kV 22.51 23.30 24.12 24.96 25.84

132 kV and below 16.08 16.64 17.23 17.83 18.46 Norms for Transformers ( Lakh per MVA)

765 kV 0.491 0.508 0.526 0.545 0.564

400 kV 0.358 0.371 0.384 0.398 0.411

220 kV 0.245 0.254 0.263 0.272 0.282 Order in Petition No.80/TT/2020 Page 46 of 59 Particulars 2019- 2020- 2021- 2022- 2023-

132 kV and below 0.245 0.254 0.263 0.272 0.282 Norms for AC and HVDC lines ( Lakh per km) Single Circuit (Bundled Conductor with six or more sub-conductors) 0.881 0.912 0.944 0.977 1.011 Single Circuit (Bundled conductor with four sub-conductors) 0.755 0.781 0.809 0.837 0.867 Single Circuit (Twin & Triple Conductor) 0.503 0.521 0.539 0.558 0.578 Single Circuit (Single Conductor) 0.252 0.260 0.270 0.279 0.289 Double Circuit (Bundled conductor with four or more sub-conductors) 1.322 1.368 1.416 1.466 1.517 Double Circuit (Twin & Triple Conductor) 0.881 0.912 0.944 0.977 1.011 Double Circuit (Single Conductor) 0.377 0.391 0.404 0.419 0.433 Multi Circuit (Bundled Conductor with four or more sub-conductor) 2.319 2.401 2.485 2.572 2.662 Multi Circuit (Twin & Triple Conductor) 1.544 1.598 1.654 1.713 1.773 Norms for HVDC stations HVDC Back-to-Back stations (Rs Lakh per 500 MW) (Except Gazuwaka BTB)

834 864 894 925 958 Gazuwaka HVDC Back-to-Back station ( Lakh per 500 MW) 1,666 1,725 1,785 1,848 1,913

500 kV Rihand-Dadri HVDC bipole scheme (Rs Lakh) (1500 MW) 2,252 2,331 2,413 2,498 2,586

500 kV Talcher- Kolar HVDC bipole scheme (Rs Lakh) (2000 MW) 2,468 2,555 2,645 2,738 2,834

500 kV Bhiwadi-Balia HVDC bipole scheme (Rs Lakh) (2500 MW) 1,696 1,756 1,817 1,881 1,947

800 kV, Bishwanath-Agra HVDC bipole scheme (Rs Lakh) (3000 MW) 2,563 2,653 2,746 2,842 2,942 Provided that the O&M expenses for the GIS bays shall be allowed as worked out by multiplying 0.70 of the O&M expenses of the normative O&M expenses for bays; Provided further that:

i. the operation and maintenance expenses for new HVDC bi-pole schemes commissioned after 1.4.2019 for a particular year shall be allowed pro-rata on the basis of normative rate of operation and maintenance expenses of similar HVDC bi-pole scheme for the corresponding year of the tariff period;

ii. the O&M expenses norms for HVDC bi-pole line shall be considered as Double Circuit quad AC line;

iii. the O&M expenses of 500 kV Mundra-Mohindergarh HVDC bipole scheme (2000 MW)shall be allowed as worked out by multiplying 0.80 of the normative O&M expenses for 500 kV Talchar-Kolar HVDC bi-pole scheme (2000 MW);

iv. the O&M expenses of 800 kV Champa-Kurukshetra HVDC bi-pole scheme Order in Petition No.80/TT/2020 Page 47 of 59 (3000 MW) shall be on the basis of the normative O&M expenses for 800 kV, Bishwanath-Agra HVDC bi-pole scheme;

v. the O&M expenses of 800 kV, Alipurduar-Agra HVDC bi-pole scheme (3000 MW)shall be allowed as worked out by multiplying 0.80 of the normative O&M expenses for 800 kV, Bishwanath-Agra HVDC bi-pole scheme; and

vi. the O&M expenses of Static Synchronous Compensator and Static Var Compensator shall be worked at 1.5% of original project cost as on commercial operation which shall be escalated at the rate of 3.51% to work out the O&M expenses during the tariff period. The O&M expenses of Static Synchronous Compensator and Static Var Compensator, if required, may be reviewed after three years. (b) The total allowable operation and maintenance expenses for the transmission system shall be calculated by multiplying the number of sub-station bays, transformer capacity of the transformer (in MVA) and km of line length with the applicable norms for the operation and maintenance expenses per bay, per MVA and per km respectively. (c) The Security Expenses and Capital Spares for transmission system shall be allowed separately after prudence check: Provided that the transmission licensee shall submit the assessment of the security requirement and estimated security expenses, the details of year-wise actual capital spares consumed at the time of truing up with appropriate justification. (4) Communication system: The operation and maintenance expenses for the communication system shall be worked out at 2.0% of the original project cost related to such communication system. The transmission licensee shall submit the actual operation and maintenance expenses for truing up.

80. The O&M Expenses claimed by the Petitioner for the Combined Asset-A is as under: ( in lakh) Particulars 2019-20 2020-21 2021-22 2022-23 2023-24 Actual line length (km) Double Circuit (Twin Conductor) 198.64 198.64 198.64 198.64 198.64 Single Circuit (Twin Conductor) 50.50 50.50 50.50 50.50 50.50 Actual (No. of Bays)

400 kV Bays 10 10 10 10 10

220 kV Bays 13 13 13 13 13 Transformer 400 kV MVA input 1575 1575 1575 1575 1575 Communication system/PLCC Original Capital Cost ( in lakh) 342.23 342.23 342.23 342.23 342.23 Norms as per Regulation Double Circuit (Twin Conductor) 0.88 0.91 0.94 0.98 1.01 Single Circuit 0.50 0.52 0.54 0.56 0.58 Order in Petition No.80/TT/2020 Page 48 of 59 (Twin Conductor)

400 kV Bays 32.15 33.28 34.45 35.66 36.91

220 kV Bays 22.51 23.30 24.12 24.96 25.84 lakh per MVA 0.36 0.37 0.38 0.40 0.41 PLCC 2% of Original Capital Cost Total O&M Expense (Claimed) 1385.22 1434.34 1484.44 1537.02 1589.21

81. The Petitioner has claimed O&M Expenses separately for the PLCC under Regulation 35(4) of the 2019 Tariff Regulations @2% of its original project cost in the instant petition.The Petitioner has made similar claims in other petitions as well. Though PLCC is a communication system, it has been considered as part of the sub- station in the 2014 Tariff Regulations and the 2019 Tariff Regulations and the norms for sub-station have been specified accordingly. Accordingly, the Commission vide order dated 24.1.2021 in Petition No.126/TT/2020 has already concluded that no separate O&M Expenses can be allowed for PLCC under Regulation 35(4) of the 2019 Tariff Regulations even though PLCC is a communication system. Therefore, the Petitioners claim for separate O&M Expenses for PLCC @2% is not allowed. The relevant portions of the order dated 24.1.2021 in Petition No.126/TT/2020 are extracted hereunder:

103. Thus, although PLCC equipment is a communication system, it has been considered as a part of sub-station, as it is used both for protection and communication. Therefore, we are of the considered view that rightly, it was not considered for separate O&M Expenses while framing norms of O&M for 2019-24 tariff period. While specifying norms for bays and transformers, O&M Expenses for PLCC have been included within norms for O&M Expenses for sub-station. Norms of O&M Expenses @2% of the capital cost in terms of Regulation 35(4) of the 2019 Tariff Regulations have been specified for communication system such as PMU, RMU, OPGW etc. and not for PLCC equipment.

------

105. In our view, granting of O&M Expenses for PLCC equipment @2% of its capital cost under Regulation 35(4) of the 2014 Tariff Regulations under the communication system head would tantamount to granting O&M Expenses twice for PLCC equipment as PLCC equipment has already been considered as part of the sub-station. Therefore, the Petitioners prayer for grant of O&M Expenses for the PLCC equipment @2% of its capital cost under Regulation 35(4) of the 2014 Tariff Regulations is rejected.

106. The principle adopted in this petition that PLCC is part of sub-station and accordingly no separate O&M Expenses is admissible for PLCC equipment in the Order in Petition No.80/TT/2020 Page 49 of 59 2019-24 tariff period under Regulation 35(4) of the 2019 Tariff Regulations shall be applicable in case of all petitions where similar claim is made by the Petitioner. As already mentioned, the Commission, however, on the basis of the claim made by the Petitioner has inadvertently allowed O&M Expenses for PLCC equipment @2% of its original project cost, which is applicable for other communication system, for 2019-

24 period in 31 petitions given in Annexure-3 of this order. Therefore, the decision in this order shall also be applicable to all the petitions given in Annexure-3. Therefore, PGCIL is directed to bring this decision to the notice of all the stakeholders in the 31 petitions given in Annexure-3 and also make revised claim of O&M Expenses for PLCC as part of the sub-station at the time of truing up of the tariff allowed for 2019-

24 period in respective petitions. Therefore, the Petitioners claim for separate O&M Expenses for PLCC @2% is not allowed.

82. The total O&M Expenses admitted under the instant petition for the Combined Asset-A are as follows: ( in lakh) Particulars 2019-20 2020-21 2021-22 2022-23 2023-24 Sub-station Bays

400 kV Bay (AIS) at Kankroli: ICT-I Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli: ICT-II Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli: ICT-III Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kota: ICT- I Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kota: ICT- II Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli: RAPP-I Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli: RAPP-II Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kankroli:

50 MVAR BUS REACTOR Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kota: RAPP Sub-station

1 1 1 1 1

400 kV Bay (AIS) at Kota: 80 MVAR BUS REACTOR Sub- station

1 1 1 1 1 Norm ( lakh/bay)- 400kV 32.15 33.28 34.45 35.66 36.91

220 kV Bay (AIS) at Kota: ICT- I Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kota: ICT- II Sub-station

2 2 2 2 2

220 kV Bay (AIS) at Kankroli: KSTPS-I Sub-station

1 1 1 1 1 Order in Petition No.80/TT/2020 Page 50 of 59

220 kV Bay (AIS) at Kankroli: KSTPS-II Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: ICT-III Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: KANKROLI-I Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: KANKROLI-II Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: LINE 3 Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: LINE 6 Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kankroli: BHILWARA Sub-station

1 1 1 1 1

220 kV Bay (AIS) at Kota: BEBARI Sub-station

1 1 1 1 1

200 kV Bay (AIS) at Kota: ICT- I Sub-station

1 1 1 1 1 Norm ( lakh/bay)- 220kV 22.51 23.30 24.12 24.96 25.84 Total Sub-station O&M 614.13 635.70 658.06 681.08 705.02 Transmission Line

400 kV D/C RAPP Kankroli Line (km) 198.64 198.64 198.64 198.64 198.64 Norm ( lakh/km) 0.88 0.91 0.94 0.98 1.01

400 kV S/C RAPP Kota Line (km) 50.50 50.50 50.50 50.50 50.50 Norm ( lakh/km) 0.50 0.52 0.54 0.56 0.58 Total transmission Line O&M 200.40 207.47 214.74 222.25 230.01 Transformer

400 kV transformer at Kota: ICT-I & II at Kota Sub-station 630.00 630.00 630.00 630.00 630.00

400 kV transformer at Kankroli: ICT-I,II & 3 at Kankroli Sub- station 945.00 945.00 945.00 945.00 945.00 Norm ( lakh/MVA) 0.36 0.37 0.38 0.40 0.41 Total transformer O&M Expenses 563.85 584.33 604.80 626.85 647.33 Total O&M Expenses 1378.38 1427.50 1477.60 1530.18 1582.36 Interest on Working Capital (IWC)

83. Regulations 34(1)(c), (3) and (4) and Regulation 3(7) of the 2019 Tariff Regulations specify as follows:

34. Interest on Working Capital: (1) The working capital shall cover: (c) For Hydro Generating Station (including Pumped Storage Hydro Generating Station) and Transmission System: Order in Petition No.80/TT/2020 Page 51 of 59

(i) Receivables equivalent to 45 days of annual fixed cost;

(ii) Maintenance spares @ 15% of operation and maintenance expenses including security expenses; and

(iii) Operation and maintenance expenses, including security expenses for one month. (3) Rate of interest on working capital shall be on normative basis and shall be considered as the bank rate as on 1.4.2019 or as on 1st April of the year during the tariff period 2019-24 in which the generating station or a unit thereof or the transmission system including communication system or element thereof, as the case may be, is declared under commercial operation, whichever is later: Provided that in case of truing-up, the rate of interest on working capital shall be considered at bank rate as on 1st April of each of the financial year during the tariff period 2019-24. (4) Interest on working capital shall be payable on normative basis notwithstanding that the generating company or the transmission licensee has not taken loan for working capital from any outside agency.

3. Definition - In these regulations, unless the context otherwise requires:- (7) Bank Rate means the one year marginal cost of lending rate (MCLR) of the State Bank of India issued from time to time plus 350 basis points;

84. The Petitioner has submitted that it has computed IWC for the 2019-24 period considering the SBI Base Rate plus 350 basis points as on 1.4.2019. The Petitioner has considered the rate of IWC as 12.05%.IWC is worked out in accordance with Regulation 34 of the 2019 Tariff Regulations. The Rate of Interest (RoI) on working capital considered is 12.05% (SBI 1-year MCLR applicable as on 1.4.2019 of 8.55% plus 350 basis points) for 2019-20, whereas, ROI for 2020-21 onwards has been considered as 11.25% (SBI 1-year MCLR applicable as on 1.4.2020 of 7.75% plus

350 basis points). The components of the working capital and interest thereon allowed for the Combined Asset-Aare as under: ( in lakh) Particulars 2019-20 2020-21 201-22 2022-23 2023-24 O & M Expenses 114.87 118.96 123.13 127.52 131.86 Maintenance Spares 206.76 214.12 221.64 229.53 237.35 Order in Petition No.80/TT/2020 Page 52 of 59 Receivables 1116.86 1088.06 792.81 788.53 781.77 Total 1438.49 1421.14 1137.58 1145.57 1150.99 Rate of Interest (%) 12.05% 11.25% 11.25% 11.25% 11.25% Interest of working capital 173.34 159.88 127.98 128.88 129.49 Annual Fixed Charges for the 2019-24 Tariff Period

85. The annual transmission charges allowed for the instant Combined Asset-A for the 2019-24 tariff period are summarised as under: ( in lakh) Particulars 2019-20 2020-21 201-22 2022-23 2023-24 Depreciation 3168.15 3168.15 945.50 945.50 945.50 Interest on Loan 936.49 642.37 452.04 363.81 273.59 Return on Equity 3427.47 3427.47 3427.47 3427.47 3427.47 Interest on Working Capital 173.34 159.88 127.98 128.88 129.49 Operation and Maintenance 1378.38 1427.50 1477.60 1530.18 1582.36 Total 9083.83 8825.36 6430.58 6395.84 6358.41 Filing Fee and Publication Expenses

86. The Petitioner has sought reimbursement of fee paid by it for filing the petition and publication expenses, in terms of Clause (1) of Regulation 70 of the 2019 Tariff Regulations. BRPL in its reply dated 8.6.2020 has raised the issue that the exercise of such discretion is a judicial discretion in the adjudication of the tariff and to exercise this discretion no justification has been filed by the Petitioner. The Petitioner vide its rejoinder dated 25.6.2020 in response to reply filed by BRPL has submitted that ithas requested for reimbursement of expenditure by the beneficiaries towards petition filing fee and publication expense, in terms of Regulation 70(1) of the 2019 Tariff Regulations and the same has been allowed by the Commission from time to time.

87. We have considered the contention of BRPL.The Petitionersclaimis as per the 2019 Tariff Regulations. Accordingly, the Petitioner shall be entitled toreimbursement of the filing fees and publication expenses in connection with the present petition, Order in Petition No.80/TT/2020 Page 53 of 59 directly from the beneficiaries on pro-rata basis in accordance with Clause (1) of Regulation 70 of the 2019 Tariff Regulations. Licence Fee and RLDC Fees and Charges

88. The Petitioner has requested to allow the Petitioner to bill and recover License fee and RLDC fees and charges, separately from the Respondents. The Petitioner shall be entitled for reimbursement of licence fee and RLDC fees and charges in accordance with Clauses (4) and (3) of Regulation 70of the 2019 Tariff Regulations. Goods and Services Tax

89. The Petitioner has sought to recover GST on transmission charges separately from the Respondents, if at any time GST on transmission is withdrawn from negative list in future.

90. We have considered the submission of the Petitioner. GST is not levied on transmission service at present and we are of the view that Petitioners prayer is premature. Security Expenses

91. The Petitioner has submitted that security expenses for the instant transmission assets are not claimed in the instant petition and it would file a separate petition for claiming the overall security expenses and the consequential Interest on Working Capital. The Petitioner has requested to consider the actual security expenses incurred during 2018-19 for claiming estimated security expenses for 2019-

20 which shall be subject to true up at the end of the year based on the actuals. The Petitioner has submitted that similar petition for security expenses for 2020-21, 2021- 22, 2022-23 and 2023-24 shall be filed on yearly basis on the basis of the actual Order in Petition No.80/TT/2020 Page 54 of 59 expenses of previous year subject to true up at the end of the year on actual expenses. The Petitioner has submitted that the difference, if any, between the estimated security expenses and actual security expenses as per the audited accounts may be allowed to be recovered from the beneficiaries on yearly basis. BRPL in its reply dated 8.6.2020 has sought justification for claiming IWC in advance since the Petitioner has submitted that Security Expenses shall be filed on year to year basis with annual true-up. BRPL has also asked the Petitioner to clarify the relevant provision of the 2019 Tariff Regulations under whichit is seeking such relief from the Commission. The Petitioner vide its rejoinder dated 25.6.2020 in response to reply filed by BRPL has submitted that as per regulation 35(3)(c) of CERC Tariff Regulation 2019, the Security Expenses and Capital Spares for transmission system will be allowed separately after prudence check. Thus, petition for Security Expenses will be filed on year to year basis with annual true up. Similarly petition for security expenses for 2020-21, 2021-22, 2022-23 and 2023-24 will be filed on the basis of actual expenses of previous year subject to true up at the end of the year on actual expenses. Further, the capital spares will be claimed by the Petitioner at the end of tariff period as per actual. Accordingly, IWC claimed in the instant petition is exclusive of these expenses and will be claimed separately in a separate petition along with all other transmission assets in accordance of the 2019 Tariff Regulations.

92. We have considered the submissions of the Petitioner and the contentions of BRPL. We are of the view that the Petitioner should claim security expenses for all the transmission assets in one petition. It is observed that the Petitioner has already filed the Petition No.260/MP/2020 claiming consolidated security expenses on projected basis for the 2019-24 tariff period on the basis of actual security expenses Order in Petition No.80/TT/2020 Page 55 of 59 incurred in 2018-19. Therefore, security expenses will be dealt with in Petition No. 260/MP/2020 in accordance with the applicable provisions of the 2019 Tariff Regulations. Capital Spares

93. The Petitioner has sought reimbursement of capital spares at the end of tariff period. The Petitioners claim, if any, shallbe dealt with in accordance with the provisions of the 2019 Tariff Regulations. Sharing of Transmission Charges

94. The billing, collection and disbursement of the transmission charges approved shall be governed by the provisions of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010 or the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, as applicable, as provided in Regulation 43 of the 2014 Tariff Regulations for the 2014-19 tariff period and Regulation 57 of the 2019 Tariff Regulations for the 2019-24 tariff period.

95. To summarise, the trued-up Annual Fixed Charges allowed for thetransmission assets for the 2014-19 tariff period are as under: ( in lakh) Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 Combined Element I 6993.53 6810.36 6593.88 6355.12 6170.21 Combined Element II 3715.86 3673.47 3626.52 3573.46 3524.52

96. The Annual Fixed Charges allowed for the transmission asset for the 2019-24 tariff period in the instant order are as under: Order in Petition No.80/TT/2020 Page 56 of 59 ( in lakh) Combined Asset-A 2019-20 2020-21 2021-22 2022-23 2023-24 Annual Fixed Charges 9083.83 8825.36 6430.58 6395.84 6358.41

97. This order disposes of Petition No. 80/TT/2020. (Arun Goyal) (I.S. Jha) (P. K. Pujari) Member Member Chairperson Order in Petition No.80/TT/2020 Page 57 of 59 Petition No.: 80/TT/2020 Annexure -1 Period: 2014-19 True Up Asset 2014-19 Combined Admitted Capital Cost as on 1.4.2014 ( in lakh) Additional Capital Expenditure ( in lakh) Admitted Capital Cost as on 31.3.2019 ( in lakh) Rate of Depreciation as per Regulations Annual Depreciation as per Regulations ( in lakh) Combined Element - I Capital Expenditure 2014-15 2015-16 2016-17 2017-18 2018-19 2014-15 2015-16 2016-17 2017-18 2018-19 Land- Freehold 358.35 0.00 0.00 0.00 0.00 0.00 358.35 - 0.00 0.00 0.00 0.00 0.00 Building, Civil Works & Colony 167.69 0.00 0.00 0.00 0.00 0.00 167.69 3.34% 5.60 5.60 5.60 5.60 5.60 Transmission Line 35266.65 0.00 0.00 0.00 0.00 0.00 35266.65 5.28% 1862.08 1862.08 1862.08 1862.08 1862.08 Substation 6476.09 0.00 0.00 -483.07 0.00 0.00 5993.02 5.28% 341.94 341.94 323.25 318.60 305.85 PLCC 342.23 0.00 0.00 0.00 0.00 0.00 342.23 6.33% 21.66 21.66 21.66 21.66 21.66 IT Equipment and Software 200.41 0.00 0.00 0.00 0.00 0.00 200.41 5.28% 10.58 10.58 10.58 10.58 10.58 Total 42611.01 0.00 0.00 -483.07 0.00 0.00 42127.94 Total 2231.28 2231.28 2223.17 2205.77 2205.77 Average Gross Block ( in lakh) 42611.01 42611.01 42611.01/ 42127.94 42127.94 42127.94 Weighted Average Rate of Depreciation 5.24% 5.24% 5.24% 5.24% 5.24% Order in Petition No.80/TT/2020 Page 58 of 59 Asset 2014-19 Combined Admitted Capital Cost as on 1.4.2014 ( in lakh) Additional Capital Expenditure ( in lakh) Admitted Capital Cost as on 31.3.2019 ( in lakh) Rate of Depreciation as per Regulations Annual Depreciation as per Regulations ( in lakh) Combined Element - II Capital Expenditure 2014-15 2015-16 2016-17 2017-18 2018-19 2014-15 2015-16 2016-17 2017-18 2018-19 Land- Freehold 1191.72 0.00 0.00 0.00 0.00 0.00 1191.72 - 0.00 0.00 0.00 0.00 0.00 Building, Civil Works & Colony 1520.04 0.00 0.00 0.00 0.00 0.00 1520.04 3.34% 50.77 50.77 50.77 50.77 50.77 Substation 15421.02 0.00 75.80 0.00 0.00 0.00 15989.44 5.28% 814.23 816.23 818.23 818.23 818.23 IT Equipment and Software 492.62 0.00 0.00 0.00 0.00 0.00 492.62 5.28% 26.01 26.01 26.01 26.01 26.01 Total 18625.40 0.00 75.80 0.00 0.00 0.00 18701.2 Total 891.01 893.01 895.01 895.01 895.01 Average Gross Block ( in lakh) 18625.40 18663.30 18701.20 18701.20 18701.20 Weighted Average Rate of Depreciation 4.78% 4.78% 4.79% 4.79% 4.79% Order in Petition No.80/TT/2020 Page 59 of 59 Petition No.: 80/TT/2020 Annexure -2 Period: 2019-24 Tariff 2019-24 Combined Admitted Capital Cost as on 1.4.2019 ( in lakh) Projected Additional Capital Expenditure ( in lakh) Admitted Capital Cost as on 31.3.2024 ( in lakh) Rate of Depreciation as per Regulations Annual Depreciation as per Regulations ( in lakh) Capital Expenditure 2019-20 2020-21 2021-22 2022-23 2023-24 2019-20 2020-21 2021-22 2022-23 2023-24 Land- Freehold 1550.07 0.00 0.00 0.00 0.00 0.00 1550.07 - 0.00 0.00 Land- Leasehold 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.34% 0.00 0.00 Building Civil Works & Colony 1687.73 0.00 0.00 0.00 0.00 0.00 1687.73 3.34% 56.37 56.37 Transmission Line 35266.65 0.00 0.00 0.00 0.00 0.00 35266.65 5.28% 1862.08 1862.08 Substation 21289.43 0.00 0.00 0.00 0.00 0.00 21289.43 5.28% 1124.08 1124.08 PLCC 342.23 0.00 0.00 0.00 0.00 0.00 342.23 6.33% 21.66 21.66 IT Equipment (Incl. Software) 693.03 0.00 0.00 0.00 0.00 0.00 693.03 15% 103.95 103.95 Total 60829.14 0.00 0.00 0.00 0.00 0.00 60829.14 Total 3168.15 3168.15 945.50 945.50 945.50 Average Gross Block ( in lakh) 60829.14 60829.14 60829.14 60829.14 60829.14 Weighted Average Rate of Depreciation 5.21% 5.21% Spread Spread Spread