India Glycols Limited v. National Load Despatch Centre (Nldc) .
Summary of the Commission's Order in Petition No. 151/MP/2019
Factual and Procedural Background
The Petitioner, M/s India Glycols Limited, operates a bio-mass based renewable energy co-generation facility (installed capacity 12 MW; 4 MW availing REC mechanism) at Gorakhpur, Uttar Pradesh, registered under the REC mechanism. The Petitioner sought condonation of delay in applying for issuance of Renewable Energy Certificates (RECs) for energy injected in February 2018. The Petitioner reported that the verified Energy Injection Report (EIR) issued by the State Load Despatch Centre (UPSLDC) was received only on 30.08.2018. Because the Petitioner required time to collate and authenticate the physical application, and because 01.09.2018–03.09.2018 were non-working days (Saturday, Sunday and a public holiday), the complete physical application was submitted to the Central Agency (NLDC) on 04.09.2018. NLDC refused to entertain the application by email dated 13.09.2018 and again rejected a re-presentation dated 20.09.2018 by reply dated 24.09.2018, relying on strict compliance with Regulation 7.1 of the REC Regulations, 2010. The Petitioner therefore filed this petition under Section 79(1)(k) of the Electricity Act, 2003 read with Regulation 15 of the REC Regulations, 2010 praying for condonation of the three-day delay and directions to issue the RECs.
Procedural history: The petition was admitted on 09.07.2019, heard on 25.08.2020, and reserved for orders on that date. The Commission reserved its decision and subsequently issued the order disposing the petition.
Legal Issues Presented
- Whether the procedural delay of three days in filing the physical application (EIR) with NLDC for issuance of RECs for February 2018 can be condoned.
- Whether the Respondent (NLDC) can be directed to issue the equivalent RECs for the energy injected, following condonation of the delay.
Arguments of the Parties
Petitioner's Arguments
- The Petitioner owns a biomass-based generating facility accredited and registered under the REC mechanism (4 MW accredited on 17.05.2016 and registered on 08.06.2016).
- The online application specifying the quantum for RECs was submitted on NLDC portal on 20.08.2018 based on an EIR from the REC Registry.
- The verified EIR from UPSLDC was received only on 30.08.2018; the Petitioner required one day to collate internal reports and obtain management verification and attestation before filing the physical application.
- Due to internal processes and the intervening non-working days (01–03 Sept 2018), the physical application was filed on 04.09.2018.
- NLDC refused the physical application citing procedural timelines under Regulation 7(1); the Petitioner sought reconsideration which was rejected.
- The delay was caused by late issuance of the verified EIR by UPSLDC and by non-working days, matters outside the Petitioner’s control; thus the delay is procedural and should be condoned.
- The viability of the Petitioner’s generating facility is affected by fuel price and revenue realisation; RECs (valid for 1,095 days) help recover generation costs—denial of RECs for procedural delay would adversely affect sustainability and recovery of costs.
- The Petitioner invoked the Commission’s power to relax norms under Regulation 15 of the REC Regulations, 2010 and sought issuance of the RECs for the relevant month after condonation.
Respondent's (NLDC) Arguments
- NLDC, as the Central Agency under the REC Regulations, is required to follow the timelines and procedures set out in Regulation 7 and the REC Issuance Procedures.
- In terms of Regulation 7, the eligible entity is required to apply to the Central Agency within six months from the corresponding generation month; NLDC submitted there is an admitted delay in this case.
- Under the extant Regulations and established procedure, NLDC asserted it did not have power to condone the delay and must comply with the timelines strictly.
Table of Precedents Cited
No precedents were cited in the provided opinion.
Court's Reasoning and Analysis
The Commission examined the statutory and procedural framework and the facts before it:
-
Regulatory framework relied upon:
- The REC Regulations, 2010 require an eligible entity (other than distribution licensees) to apply to the Central Agency for certificates within six months from the corresponding generation month, and provide procedural details for issuance (Regulation 7 as reproduced in the order).
- The REC Issuance Procedures require both an online application and submission of physical documents (including the duly certified EIR) to the Central Agency; the Central Agency must undertake preliminary scrutiny and may issue or reject the application following verification (steps 3.1–3.5 as set out in the order).
- Time-bound obligations on the Central Agency are noted in the order (preliminary scrutiny timeline, verification steps, and that Certificates shall be issued within fifteen days from application where conditions are met).
-
Factual application of the framework:
- The Petitioner submitted an online application on 20.08.2018 but received the verified EIR from UPSLDC only on 30.08.2018, leaving inadequate time to complete internal sign-offs before 31.08.2018 (the procedural deadline under the prescribed formats).
- Non-working days (01–03 Sept 2018) intervened, and the Petitioner filed the physical application on 04.09.2018; NLDC rejected the submission on strict timeline grounds.
-
Assessment of responsibility and discretionary relief:
- The Commission found the three-day delay to be attributable to the late approval of the EIR by UPSLDC, an event beyond the Petitioner’s control.
- The Commission treated the delay as procedural rather than substantive and observed the potential prejudice to the Petitioner (loss of REC issuance for energy actually injected) if strict procedural non-compliance were enforced without consideration of the circumstances.
- The petition sought condonation under the statutory/ regulatory framework (Section 79(1)(k) read with Regulation 15 was invoked by the Petitioner in its prayers and submissions), and the Commission considered the equities and the nature of the delay in exercising its supervisory power.
-
Conclusion of analysis:
- On the basis that the delay was caused by an external delay in UPSLDC's EIR approval and by intervening non-working days, the Commission concluded the delay "merits condonation."
- Accordingly, the Commission directed NLDC to process the Petitioner’s case for issuance of RECs for February 2018 after due verification in accordance with the REC Regulations and REC Issuance Procedures.
Holding and Implications
Holding: The Commission condoned the three-day delay in filing the physical Energy Injection Report with NLDC and directed NLDC to process the Petitioner’s application for issuance of Renewable Energy Certificates for February 2018 after due verification.
Implications:
- Direct effect: The Petitioner’s procedural delay has been excused; NLDC is required to verify the Petitioner’s application and proceed with issuance of RECs for the relevant month if the verification is satisfactory.
- No broader precedent was articulated in the order beyond this factual context. The Commission's decision is expressly grounded on the specific circumstances (late EIR from UPSLDC and intervening non-working days) and on the Commission's supervisory authority to provide relief in appropriate cases; the order does not purport to lay down a general rule altering the statutory timelines in other, dissimilar circumstances.
- The petition was disposed of in consequence of the above direction.
Disposition
Petition No. 151/MP/2019 is disposed of in terms of the order: the three-day delay is condoned and NLDC is directed to process the Petitioner’s application for issuance of RECs for February 2018 after due verification.
The Petitioner, M/s India Glycols Limited is engaged in the business of generation of electricity from its bio-mass based renewable energy co-generation facility having an installed capacity of 12 MW (availing 4 MW under REC mechanism) located at Gorakhpur, Uttar Pradesh registered under REC mechanism. The Petitioner has filed the Petition under Section 79(1)(k) of the Electricity Act, 2003 read with Regulation 15 of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 (hereinafter referred to as the REC Regulations, 2010) seeking condonation of delay in submitting the application for issuance of Renewable Energy Certificates (REC) and other appropriate directions.
2. The Respondent, National Load Despatch Centre (NLDC) has been designated as the Central Agency for the REC mechanism, in accordance with the REC Regulations, 2010. NLDC is entrusted with registration of eligible renewable energy generators, issuance of RECs, maintenance and settlement of REC accounts, repository of transactions in REC, and such other functions incidental to implementation of REC mechanism as may be assigned by CERC from time to time.
3. The Petitioner has made the following prayers: (a) To condone the delay in applying for issuance of Renewable Energy Certificates due to it for energy injected in the month of February 2018 and consequently direct the Order in Petition No. 151/MP/2019 Page 3 of 8 Respondent to issue the same; (b) pass such other order(s) as deemed fit, necessary and appropriate in favor of the Petitioner. Submissions of the Petitioner
4. The Petitioner has submitted that it owns bio-mass based renewable energy co-generation facility having an installed capacity of 12 MW (availing 4 MW under REC mechanism) at Sahjanwa, District Gorakhpur, Uttar Pradesh registered under the REC mechanism. The verified energy injection report (EIR) for the month of February 2018 was issued by UPSLDC on 30.08.2018, after which it submitted the physical application to NLDC on 04.09.2018.
5. The Petitioner has submitted that since the verified EIR was received by the Petitioner only on 30.08.2018, it required one days time to collate the reports and prepare its application, duly verified and attested by the management, so as to enable itself to apply for the issuance of certificate without any lapse. On account of the above, it failed to submit the duly completed and verified report before the last day of the month i.e. 31.08.2018 (in adherence to the procedural requirement under Regulation 7(1) of the REC Regulations, 2010). On account of this delay, issuance of RECs has been declined by NLDC.
6. The Petitioner has submitted that while it was required to complete all the internal procedural requirements and formalities by the last day of the month i.e. 31.08.2018, the subsequent days i.e. 01.09.2018, 02.09.2018 and 03.09.2018 were Saturday, Sunday and Public Holiday, respectively. Therefore, without any further delay, complete application along with the verified EIR was submitted to NLDC on 04.09.2018.
7. The Petitioner has submitted that NLDC vide its email dated 13.09.2018 refused to entertain the application dated 04.09.2018. Therefore, the petitioner made another representation vide email dated 20.09.2018 before NLDC for reconsideration of its earlier decision dated 13.09.2018. However, NLDC vide its reply dated 24.09.2018 again rejected the request of the Petitioner based on strict compliance with the timelines prescribed under Regulation 7.1 of the REC Regulations, 2010. Order in Petition No. 151/MP/2019 Page 4 of 8
8. The Petitioner has submitted that its application specifying the quantum for which REC was requested to be issued was submitted on the online portal of the Respondent as early as 20.08.2018, based on the EIR from REC Registry. However, on account of delay in obtaining the verified EIR from UPSLDC (which was obtained only on 30.08.2018), it was unable to submit the physical copy of its application seeking request for issuance of RECs for the month of February 2018, by the last day of the month i.e. 31.08.2018.
9. The Petitioner has submitted that it being a biomass-based generating entity, the viability of its generating facility depends to a large extent on the fuel price. In order to enable recovery of the cost of generation and to realize revenue, and seeking to promote renewable facilities, this Commission has provided for a floor price and forbearance price of a RE Certificate. REC once issued, remains valid for a period of 1095 days from the date of issuance. The intent behind the promulgation of the REC Regulations, 2010 was to promote generation and cogeneration based on RE sources. While the legislative intent to promote RE based generating facilities is writ large, the procedural lapse of not being able to submit the application by the last day of the month, which if not adequately and appropriately considered by this Commission, by virtue of its power to relax the norms under Regulation 15 of the REC Regulations, 2010, it would not only affect sustainability of the Petitioner, but would also affect its ability to recover the cost of power which has been utilised upon injection into the grid but not accounted for, and for which, no concession/ incentives have been availed by the Petitioner. Analysis and Decision
10. The Petition was admitted on 09.07.2019 and came up for hearing on 25.08.2020 and thereafter, it was reserved for Orders on 25.08.2020. During the hearing held on 25.08.2020, the representative of NLDC submitted that in terms of Regulation 7 of REC Regulations, 2010, the renewable energy generator is required to apply for REC to NLDC within 6 months from the month in which renewable energy was generated and injected into the grid. Representative of NLDC further submitted that admittedly, there is a delay in the present case and under the extant Regulations/ Procedure, NLDC does not have power to condone any such delay.
11. We have heard the learned counsels for the Petitioner and the Respondent and have carefully Order in Petition No. 151/MP/2019 Page 5 of 8 perused the records.
12. The brief facts of the case are that M/s India Glycols Limited (the Petitioner) is engaged in the business of generation of electricity from its bio-mass based renewable energy co- generation facility having an installed capacity of 12 MW located at Gorakhpur, Uttar Pradesh out of which 4 MW was accredited on 17.05.2016 and registered under REC mechanism on 08.06.2016. Based on the EIR received from REC Registry, the Petitioner submitted online application on the portal on 20.08.2018 specifying the quantum for which REC needs to be issued. However, the Petitioner obtained the verified EIR report from UPSLDC only on 30.08.2018, and owing to internal processes of the Petitioner and the subsequent days i.e. 01.09.2018, 02.09.2018 and 03.09.2018 being non-working days, the Petitioner physically filed the application with NLDC on 04.09.2018. However, NLDC vide its email dated 13.09.2018 refused to accept the request of the Petitioner. The Petitioner made another representation vide email dated 20.09.2018 which was again rejected by NLDC on 24.09.2018 based on the timelines prescribed under Regulation 7.1 of the REC Regulations, 2010. The Petitioner has filed the present petition seeking condonation of three days delay in submitting the application for issuance of RECs for the month of February 2018.
13. The only issue involved is whether the procedural delay of 3 days in filing the application for issuance of RECs for the month of February 2018 can be condoned and whether the Respondent can be directed to issue equivalent RECs for the energy injected accordingly?
14. The relevant provisions of Procedure for Issuance of Renewable Energy Certificates to the Eligible Entity by Central Agency (hereinafter referred to as REC Issuance Procedures) stipulates as under:-
3. STEP-WISE DESCRIPTION OF THE PROCEDURE 3.1. Step - 1: An application for issuance of Renewable Energy Certificate shall be made by the Eligible Entity to the Central Agency. The eligible entity shall apply for Issuance of REC on the Web Based Application as per the details given in the Energy Injection Report (EIR issued by the SLDC / Recommendation of SERC for issuance of RECs) and shall also submit the same information in physical form with the Central Agency. The online application shall be acceptable by the Central Agency only if complete in all respect. The physical application for issuance of certificate shall include (i) Energy Injection Report (EIR) for RE projects /Recommendation of SERC for issuance of RECs Order in Petition No. 151/MP/2019 Page 6 of 8 for distribution licensee, and shall be made in the specified format (FORMAT-3.1: Application for Issuance of Renewable Energy Certificates to the Eligible Entities/FORMAT-3.1.1 for distribution licensee) (ii) Print out of online application duly signed and stamped by Authorized Signatory (iii) Commissioning Certificate for RE Generator, only for issuance for the first month after registration. The application shall be accompanied with the details of payment of the applicable fee & charges towards issuance of certificates as determined by CERC from time to time. While making application for issuance of RECs, the Applicant (Eligible Entity) shall quote the unique Registration Number assigned to it by Central Agency at the time of registration. 3.2. Step - 2: After receipt of physical application for issuance of renewable energy certificates from the Eligible Entity, the Central Agency shall undertake a preliminary scrutiny within 6 working days to ensure that the Application Form is complete in all respect along with necessary documents and applicable fees and charges. As part of preliminary scrutiny, the Central Agency shall satisfy that the following conditions are fulfilled by the RE generators or distribution licensee, as the case may be:
a) The application is made in the format specified by the Central Agency from time to time.
b) The status of Accreditation of the Eligible Entity with the State Agency has not expired. The status of Registration of the Eligible Entity with the Central Agency has not expired.
c) The duly certified EIR/ Recommendation of SERC for issuance of RECs is attached for the same period for which application is made towards issuance of Renewable Energy Certificate by the Eligible Entity.
d) The application is accompanied with fees & charges. 3.3. Step - 3: After conducting the preliminary scrutiny, the Central Agency shall intimate in writing to the Applicant for submission of any further information or clarification, if necessary, to further consider the application for issuance of Renewable Energy Certificates or reject the application. 3.4. Step - 4: While considering any application for issuance of Renewable Energy Certificate, the Central Agency shall verify and ascertain availability of following information:
a) Verification of the time period for which the Central Agency may have already issued Renewable Energy Certificates to the concerned Eligible Entity.
b) Verification of Renewable Energy Certificates claimed by the Eligible Entity from the duly certified Energy Injection Reports by the concerned State Load Despatch Centre in respect of concerned Eligible Entity.
c) Details of fee & charges made for issuance of certificates.
d) Confirmation of Compliance Auditor report, if any. 3.5. Step - 5: The Central Agency shall issue Renewable Energy Certificates to the Eligible Entity only after confirming, the claims made by the Eligible Entity, with the duly certified EIR forwarded by the SLDC/ Recommendation of SERC for issuance of RECs . In case of any discrepancy, in the EIR enclosed by the Eligible Entity along with Application and regular EIR received by Central Agency from concerned State Load Order in Petition No. 151/MP/2019 Page 7 of 8 Despatch Centre, the information contained in regular EIR furnished by concerned State Load Despatch Centre shall be considered as final and binding for the purpose of issuance of Renewable Energy Certificates.
15. Further, Regulation 7(2) of the REC Regulations, 2010 provides as under:-
7. Denomination and issuance of Certificates (1) The eligible entity other than distribution licensee shall apply to the Central Agency for certificates within six months from the corresponding generation from eligible renewable energy projects: Provided that the application for issuance of certificates may be made on 10th, 20th and last day of the month (1A) The eligible distribution licensees shall apply to the Central Agency for Certificates within three months from the date of obtaining the certification, as provided in clause (1
A) of the Regulation 5, from the concerned Appropriate Commission (2) The Certificates shall be issued to the eligible entity after the Central Agency duly satisfies itself that all the conditions for issuance of Certificate, as may be stipulated in the detailed procedure, are complied with by the eligible entity: (3) The Certificates shall be issued by the Central Agency within fifteen days from the date of application by the eligible entities. (4) The Certificates shall be issued to the eligible entity on the basis of the units of electricity generated from renewable energy sources and injected into the Grid [or deemed to be injected in case of self consumption by eligible captive generating plant and duly accounted in the Energy Accounting System as per the Indian Electricity Grid Code or the State Grid Code as the case may be, and the directions of the authorities constituted under the Act to oversee scheduling and dispatch and energy accounting, or based on written communication of distribution licensee to the concerned State Load Dispatch Centre with regard to the energy input by renewable energy generators which are not covered under the existing scheduling and dispatch procedures.
16. From the above, the Commission observes that as per mandate of the REC Regulations, 2010 and the REC Issuance Procedures, the eligible entity has to apply for issuance of REC on the Web Based Application as per the details given in the Energy Injection Report (EIR issued by the SLDC/ on Recommendation of SERC for issuance of RECs) and shall also submit the same information in physical form with the Central Agency (NLDC) within six months. The Central Agency has to verify the application in terms of the Energy Injection Reports issued by the concerned State Load Despatch Centre in respect of the Eligible Entity, fee & charges for issuance of certificates and compliance auditors report, if any. Order in Petition No. 151/MP/2019 Page 8 of 8
17. The Commission observes that the Petitioner has accepted the delay of three days in filing of the application for issuance of RECs for the month of February 2018 and that the delay was due to delay in approving EIR by UPSLDC and has prayed for condoning the delay and issuance of equivalent RECs. NLDC has submitted that it does not have the powers to condone the delay in the present case and under the extant Regulations/ Procedure.
18. In our view, the delay in filing physical EIR with NLDC for issuance of RECs for the month of February 2018 was because of late receipt of approval of UPSLDC which was beyond the control of the Petitioner. The same is procedural in nature and merits condonation. Accordingly, the delay in filing EIR by the Petitioner is condoned and the NLDC is directed to process the case of the Petitioner for issuance of RECs for the month of February 2018 after due verification.
19. Accordingly, the Petition No. 151/MP/2019 is disposed of. Sd/- Sd/- Sd/- ( ) (..) (. .)