Het Infraprojects Llp v. State Of Gujarat

Gujarat High Court
Jul 13, 2018

Bela M. Trivedi, J.:— This is the classic case in which the petitioner Het Infraprojects LLP, through its partner Riyazhusain Noormohmed Ghanchi and its successors have not only tried to defeat the efforts made and the actions taken by the respondent Corporation under the Gujarat Provincial Municipal Corporations Act (hereinafter referred to as “the said Act”), but have in brazen violation of building Rules and Regulations played smart with the Corporation and also with the Court. The petitioner, in utter disregard and disrespect to the process of law has also tried to mislead the Court by suppressing material facts from the Court.

2. The chequered history of the case as emerging from the record may be stated as under:—

2.1 As per the case of the petitioner, one Electric Gear (India) Limited owned a parcel of land admeasuring 21276 sq. mtrs., in Rakhial area within the city of Ahmedabad. The petition is silent about the description and survey number of the said land. The said land was purchased by one Elcon-Clipsal India Limited and thereafter the same was divided into three sub-plots - one plot admeasuring 12845.61 sq. mtrs., another admeasuring 3620.31 sq. mtrs., and the third admeasuring 4810 sq. mtrs. Then the name of Elcon-Clipsal India Limited was changed to Elcon-Clipsal India Private Limited and then to Gerard Electric India Private Limited, and then to Pierlite India Private Limited. The said company had proposed to make construction over the said land and accordingly had applied for development permission from the Corporation. The said permission was granted to put up construction in the nature of industrial sheds over the area admeasuring 9432.95 sq. mtrs.

2.2 The petitioner is conveniently silent as to how the said Pierlite India Private Limited became the owner and occupier of the lands bearing Final Plot Nos. 60 and 61 and as to how the said land was allotted Final Plot Nos. 60 and 61 under the Town Planning Scheme. Anyhow, as stated in the petition, in the year 2015, Pierlite India Private Limited sold the land bearing Final Plot No. 60 admeasuring 14881 sq. mtrs. and Final Plot No. 61 admeasuring 6395 sq. mtrs., along with the construction over an area admeasuring 9432.95 sq. mtrs. to the petitioner Het Infraprojects LLP by executing the sale deed on 11.6.2015.

2.3 The petitioner Het Infraprojects Limited applied to the Corporation for consolidation of both the plots and also for their sub-division thereafter. The Corporation granted the said permission (Raja Chitthi) on 27.6.2016, permitting amalgamation and subdivision of the said lands into two sub-plots i.e. Sub-plot No. 60+61/1, admeasuring 12512 sq. mtrs., and the other Sub-plot No. 60+61/2, admeasuring 8763.09 sq. mtrs., subject to number of conditions mentioned therein. One of the conditions mentioned in the permission was to remove the illegal constructions shown in the plans annexed thereto, before commencing any construction on the said subplots. However, the said permissions dated 27.6.2016 along with the plans, have not been produced by the petitioner along with the petition. The same has been produced by the respondent Corporation along with the affidavit-in-reply at Annexure-R-II.

2.4 The petitioner immediately after obtaining the said permission, sold the sub-plot No. 60+61/2 together with the construction over the said sub-plot to one Global Reality Consultancy by an Indenture of Sale registered on 1.8.2016 with the office of Sub-Registrar, Ahmedabad. Thereafter, a correction document also came to be registered on 21.9.2016.

2.5 According to the petitioner, the petitioner continued to retain the ownership and possession of the Sub-plot No. 60+61/1 on which the petitioner had proposed to make construction. Accordingly, the petitioner applied for the grant of development permission under the provisions contained in the said Act. The petitioner had applied for construction of four building blocks of various size over the said land and the Corporation granted Development permission as per the four separate orders of even date 17.4.2017, subject to the terms and conditions mentioned therein and also subject to the conditions mentioned in the earlier approved plan dated 27.6.2016 submitted by the petitioner. Pertinently the petitioner though has ostensibly produced the said Development Permissions dated 17.4.2017 as Annexure-P-3 (colly), the said documents are incomplete inasmuch as the conditions mentioned overleaf the said permissions have not been produced. The complete set of permissions dated 17.4.2017 and other documents have been produced by the respondent Corporation along with the affidavit-in-reply as Annexure-R-I (colly).

2.6 According to the petitioner, the petitioner had started construction as per the development permissions granted to it, however, the Corporation issued the notice dated 14.2.2018 mentioning therein that earlier a notice was issued to the petitioner calling upon the petitioner to show cause as to why the consolidation plan submitted by it in the past be not filed or closed, and why the development permissions granted earlier be not cancelled. According to the petitioner there was no notice served upon the petitioner or upon any of its partners by the Corporation prior to 14.2.2018. The petitioner, therefore, wrote a letter dated 19.2.2018 to the Corporation seeking time. However, the petitioner had not received any communication from the Corporation thereafter and no opportunity of hearing was granted to the petitioner by the Corporation.

2.7 The Deputy Estate Officer (East Zone) sent a communication/letter dated 7.3.2018 (Annexure-P/1) to the petitioner directing the petitioner to stop the construction work going on the site at Final Plot No. 60+61/1, in view of the decision taken on 6.3.2018 to cancel the sanctioned plans and the development permissions granted earlier for the said plots. According to the petitioner, thereafter, on 13.3.2018 the officials of the Corporation had come to the site and had asked the petitioner to stop the construction work. Hence, the petitioner has filed the present petition, challenging the decision taken by the competent authority on 6.3.2018 as contained in the communication dated 7.3.2018 sent by the Deputy Estate Officer (East Zone).

3. The petition has been resisted by the respondent Corporation by filing the reply contending inter alia as under -

3.1 The petition suffered from material suppression of facts inasmuch as on the similar subject matter the petitioner had already filed the Civil Suit No. 406 of 2018 on 9.3.2018 i.e. prior to filing of the present petition, annexing all the documents, which have been annexed to the present petition. In the said suit, the petitioner has challenged the action of the respondent in cancelling the development permissions granted in respect of the plots in question and seeking direction to permit the petitioner - plaintiff to put up construction as per the permissions granted on 17.4.2017. The copy of the plaint along with the documents produced in the said suit have been produced as Annexure-R-1(colly).

3.2 It has also been contended by the respondent that the petitioner had not come with clean hands and had sought to invoke extraordinary jurisdiction by abusing the process of law. The respondent has further contended that before passing of the impugned order, the petitioner was issued the notice on 9.2.2018 calling upon it to show cause as to why their plans sanctioned for amalgamation and sub-division dated 27.6.2016 should not be cancelled, as the petitioner had committed breach of conditions. Thereafter, again vide communication dated 14.2.2018 another opportunity was granted to the petitioner.

3.3 According to the respondent, the owner and occupier of plots bearing Final Plot Nos. 60 and 61 admeasuring 14881 sq. mtrs. and 6351 sq. mtrs., respectively had filed an application for amalgamation and sub-division of the plots through their authorized engineer. Since there were illegal constructions in existence on the Final Plot Nos. 60 and 61, the petitioner was required to remove the same before amalgamation and sub-division of plots, as per the provisions contained in the said Act read with GDCR. Hence, the plans for amalgamation and sub-division were approved subject to the conditions mentioned therein on 27.6.2016, whereby the original Final Plot Nos. 60 and 61 were sub-divided and new No. 60+61/1 admeasuring 12512.91 sq. mtrs., and No. 60+61/2 admeasuring 8763.09 sq. mtrs., were approved. It has been further stated that in the approved plans dated 27.6.2016, certain constructions shown in Sub-plot No. 60+61/2 out of the area admeasuring 8763.09 sq. mtrs., were shown as “existing work to be removed”, meaning thereby the said plans for amalgamation and sub-division were approved subject to the condition that the petitioner would remove the existing constructions shown as “existing work to be removed” in the said plans. However, without removing the said constructions, an application was filed seeking permission to put up construction on the Sub-plot No. 60+61/1 within the area of 12512.91 sq. mtrs. The said application was considered by the competent authority and the commencement letters (Raja chitthi) were granted on 17.4.2017 for putting up construction of four blocks i.e. Block Nos. A, B, C, and D, subject to the conditions mentioned therein. The Condition No. (9) thereof was that the said permission was subject to the conditions mentioned in the commencement letter dated 27.6.2016.

3.4 The respondent Corporation has further contended that since the petitioner had not complied with the conditions contained in the commencement letters dated 27.6.2016 by not removing the constructions shown in the said plans, the respondent Corporation had issued various notices under Section 260 and 267 of the said Act, prohibiting the petitioner from carrying on illegal construction and calling upon the petitioner to demolish the illegal constructions. The respondent Corporation had also applied seals on such illegal constructions carried out by the petitioner in breach of the conditions of the commencement letter, however, the said seals were removed by the petitioner/occupiers taking law in their hands. On 9.2.2018, the respondent Corporation had issued notices to the engineer as well as to the owner of the land in question to show cause as to why the commencement certificate and the approval of plans dated 27.6.2016 for the amalgamation and sub-division should not be cancelled, on the ground that the illegal constructions shown in the plans under the caption “existing constructions to be removed”, were not removed and on the ground that the petitioner had got the plans approved by submitting false information. On 14.2.2018 again another opportunity was given to the engineer as well as the petitioner, however, there was no legal and justifiable reply given by the petitioner, and therefore, the Corporation at the highest level had considered the matter. Accordingly, final decision was taken on 6.3.2018 to suspend the licence of the concerned engineer and to cancel the plan/commencement letters of amalgamation and sub-division dated 27.6.2016 in respect of which communication was issued on 7.3.2018. According to this respondent the petitioner had misrepresented before the authorities by submitting false plans and had flouted the conditions on which the Development Permissions were granted for the plots in question.

4. Before adverting to the contentions raised by the learned Advocates for the parties, it is required to be stated that the successors of the petitioner i.e. the Global Reality Consultancy and other petitioners claiming to be the owners/occupiers of the various Industrial sheds constructed on Plot No. 60+61/2 had filed the Special Civil Application Nos. 4558 of 2017, 11800 of 2017 and 11811 of 2017, challenging the impugned notices of respondent Corporation for demolishing the offending constructions. The said petitions were heard together with this petition. The petitioners in the said petitions having volunteered to remove the illegal constructions, the same have been disposed of by giving necessary directions in the separate order.

5. So far as this petition is concerned, it may be stated at the outset that the present petition was filed by the petitioner on 15.3.2018, challenging the action of the respondent Corporation in issuing notice dated 14.2.2018 and the communication dated 7.3.2018 containing the decision of the Corporation dated 6.3.2018 cancelling the sanctioned plans and the commencement permissions granted in respect of sub-plot No. 60+61/1 and 60+61/2 and calling upon the petitioner to stop construction activities thereon forthwith. The present petitioner Riyazhusain Noormohmed Ghanchi had also filed Civil Suit No. 406/2018 in the Court of City Civil, Ahmedabad on 9.3.2018, prior to filing of the present petition, seeking declaration to the effect that the order cancelling the sanctioned plans dated 27.6.2016 submitted by the petitioner and the permissions thereon granted by the Corporation in respect of the land bearing Final Plot No. 60+61/1 and 60+61/2 was illegal, and for restraining the Corporation and its officers from demolishing any construction or causing any obstruction to the plaintiff-petitioner in carrying on the construction work on the said lands. It is pertinent to note that though the petitioner had already approached the Civil Court by filing he said Civil Suit, seeking almost identical relief as prayed for in the present petition in respect of the same lands in question and in respect of the same cancellation of the commencement permissions and development permissions in question, the petitioner had suppressed the said material facts in the present petition filed invoking extraordinary jurisdiction under Article 226 of the Constitution of India. Hence, the petitioner having misused the process of law by suppressing material facts from the Court, the petition deserves to be dismissed on that ground alone, without any further consideration. It is needless to say that the petitioner, who does not come with clean hands and suppresses the material facts from the Court is not entitled to any relief, much less equitable relief under Article 226 of the Constitution of India. Beneficial reference to the decisions of the Supreme Court in case of Udyani Evam Khadi Gramodyog Welfare Sanstha v. State of U.P., reported in AIR 2007 SC (suppl.) 1223 and in case of Kishore Samrite v. State of Uttar Pradesh, reported in (2013) 2 SCC 398, be made in this regard.

6. It is further required to be noted that the petitioner and its successors have not only taken the Corporation and its officers for a ride by misrepresenting the facts and giving false undertakings for obtaining development permissions in respect of the plots in question, the petitioner, its successor Global Reality Consultancy and other occupiers have also taken the Court for a ride and tried to mislead the Court by filing various petitions in the High Court, not disclosing the correct facts and producing the relevant documents. In the instant petition also, the petitioner has not produced the commencement letter dated 27.6.2016 along with the plans in which the conditions to remove illegal constructions and the undertakings given by the partner of the petitioner firm were mentioned. The development permissions dated 17.4.2017 were granted subject to the conditions mentioned in the commencement letters dated 27.6.2016 and the other conditions mentioned therein. However, the said documents of development permissions dated 17.4.2017 produced in the petition are also incomplete, inasmuch as the petitioner has not produced the backside of the said permissions wherein the other conditions have been mentioned. Such conduct of the petitioner smacks of its mala fide intentions. The said commencement letters with plans have been produced on record by the Corporation as Annexure-R/2 and the development permissions dated 17.4.2017 in respect of the Final Plot No. 60+61/1 along with the other documents produced in the Civil Suit as Annexure-R/1.

7. From the said documents, it clearly transpires that the petitioner through its partners Rajesh K. Patel and Anilkumar Nathani had applied for the said permissions for amalgamation and division of the plots in question and they were granted on 27.6.2016 subject to the conditions mentioned therein. The petitioner through its partner Rajesh Patel had also submitted undertakings before the Corporation that they shall carry out construction only as per the sanctioned plans and shall remove the existing illegal constructions as shown in the said plans sanctioned along with the said permissions. However, the petitioner without removing the said illegal constructions which it had undertaken to remove from the plot No. 60+61/2 for obtaining building permission for the plot No. 60+61/1, had started construction on the plots in question in utter violation of the said conditions and undertaking given by them. The notices issued by the respondent Corporation to the petitioner, its successor and to the occupiers of the illegal constructions in question were also not responded or respected by them, and the seals applied by the respondent Corporation on the said constructions were also sought to be removed taking law into their hands. Ultimately, the respondent Corporation appears to have taken the decision to cancel the development permissions after giving opportunity to explain by issuing notices dated 9.2.2018 and 14.2.2018. Under the circumstances, it could not be said that the respondent Corporation had not afforded opportunity of hearing to the petitioner before cancelling development permissions. Since the petitioner was carrying out illegal constructions in utter violation of the conditions mentioned in the commencement permissions and the sanctioned plans, the petitioner was called upon to stop the said construction as per the communication dated 7.3.2018, which could not be said to be arbitrary or illegal as sought to be contended by the learned Advocate for the petitioner.

8. Though it was sought to be submitted by the learned Sr. Advocate Mr. Nanavati for the petitioner that the petitioner has already carried out the construction and the occupiers, who are innocent purchasers would suffer if the stringent action is permitted to be taken at the instance of the respondent Corporation, such submission has no force in view of the observations made by the Supreme Court in case of In Royal Paradise Hotel (P) Ltd. v. State of Haryana, reported in (2006) 7 SCC 597. The relevant paragraph 7 is reproduced as under:—

“7..…. Whatever it be, the fact remains that the construction was made in the teeth of the notices and the directions to stop the unauthorized construction. Thus, the predecessor of the appellant put up the offending construction in a controlled area in defiance of the provisions of law preventing such a construction and in spite of notices and orders to stop the construction activity. The constructions put up are thus illegal and unauthorized and put up in defiance of law. The appellant is only an assignee from the person who put up such a construction and his present attempt is to defeat the statute and the statutory scheme of protecting the sides of highways in the interest of general public and moving traffic on such highways. Therefore, this is a fit case for refusal of interference by this Court against the decision declining the regularization sought for by the appellant. Such violations cannot be compounded and the prayer of the appellant was rightly rejected by the authorities and the High Court was correct in dismissing the Writ Petition filed by the appellant. It is time that the message goes aboard that those who defy the law would not be permitted to reap the benefit of their defiance of law and it is the duty of High Courts to ensure that such defiers of law are not rewarded. The High Court was therefore fully justified in refusing to interfere in the matter. The High Court was rightly conscious of its duty to ensure that violators of law do not get away with it.”

9. The Supreme Court, expressing serious concern about the rampant illegal construction activities going on in the urban areas in violation of the Building Regulations, in case of Esha Ekta Apartments Cooperative Society. Housing Society Limited v. Municipal Corporation of Mumbai, reported in (2013) 5 SCC 357, after discussing various observations made in earlier cases, has strongly deprecated such activities. The relevant observations of which are produced as under:—

“1. In last five decades, the provisions contained in various municipal laws for planned development of the areas to which such laws are applicable have been violated with impunity in all the cities, big or small, and those entrusted with the task of ensuring implementation of the master plan, etc., have miserably failed to perform their duties. It is highly regrettable that this is so despite the fact that this Court has, keeping in view the imperatives of preserving the ecology and environment of the area and protecting the rights of the citizens, repeatedly cautioned the concerned authorities against arbitrary regularization of illegal constructions by way of compounding and otherwise.

2. In Friends Colony Development Committee v. State of Orissa, this Court examined the correctness of an order passed by the Orissa High Court negating the appellant's right to be heard in a petition filed by the builder who had raised the building in violation of the sanctioned plan. While upholding the appellant's plea, the two-Judge Bench observed:

“20….………Builders violate with impunity the sanctioned building plans and indulge in deviations much to the prejudice of the planned development of the city and at the peril of the occupants of the premises constructed or of the inhabitants of the city at large. Serious threat is posed to ecology and environment and, at the same time, the infrastructure consisting of water supply, sewerage and traffic movement facilities suffers unbearable burden and is often thrown out of gear. Unwary purchasers in search of roof over their heads and purchasing flats/apartments from builders, find themselves having fallen prey and become victims to the designs of unscrupulous builders. The builder conveniently walks away having pocketed the money leaving behind the unfortunate occupants to face the music in the event of unauthorised constructions being detected or exposed and threatened with demolition. Though the local authorities have the staff consisting of engineers and inspectors whose duty is to keep a watch on building activities and to promptly stop the illegal constructions or deviations coming up, they often fail in discharging their duty. Either they don't act or do not act promptly or do connive at such activities apparently for illegitimate considerations. If such activities are to stop some stringent actions are required to be taken by ruthlessly demolishing the illegal constructions and non-compoundable deviations. The unwary purchasers who shall be the sufferers must be adequately compensated by the builder. The arms of the law must stretch to catch hold of such unscrupulous builders………….

21. The conduct of the builder in the present case deserves to be noticed. He knew it fully well what was the permissible construction as per the sanctioned building plans and yet he not only constructed additional built-up area on each floor but also added an additional fifth floor on the building, and such a floor was totally unauthorised. In spite of the disputes and litigation pending he parted with his interest in the property and inducted occupants on all the floors, including the additional one. Probably he was under the impression that he would be able to either escape the clutches of the law or twist the arm of the law by some manipulation. This impression must prove to be wrong.

22. In all developed and developing countries there is emphasis on planned development of cities which is sought to be achieved by zoning, planning and regulating building construction activity. Such planning, though highly complex, is a matter based on scientific research, study and experience leading to rationalisation of laws by way of legislative enactments and rules and regulations framed thereunder. Zoning and planning do result in hardship to individual property owners as their freedom to use their property in the way they like, is subjected to regulation and control. The private owners are to some extent prevented from making the most profitable use of their property. But for this reason alone the controlling regulations cannot be termed as arbitrary or unreasonable. The private interest stands subordinated to the public good. It can be stated in a way that power to plan development of city and to regulate the building activity therein flows from the police power of the State. The exercise of such governmental power is justified on account of it being reasonably necessary for the public health, safety, morals or general welfare and ecological considerations; though an unnecessary or unreasonable intermeddling with the private ownership of the property may not be justified.

23. The municipal laws regulating the building construction activity may provide for regulations as to floor area, the number of floors, the extent of height rise and the nature of use to which a built-up property may be subjected in any particular area. The individuals as property owners have to pay some price for securing peace, good order, dignity, protection and comfort and safety of the community. Not only filth, stench and unhealthy places have to be eliminated, but the layout helps in achieving family values, youth values, seclusion and clean air to make the locality a better place to live. Building regulations also help in reduction or elimination of fire hazards, the avoidance of traffic dangers and the lessening of prevention of traffic congestion in the streets and roads. Zoning and building regulations are also legitimised from the point of view of the control of community development, the prevention of overcrowding of land, the furnishing of recreational facilities like parks and playgrounds and the availability of adequate water, sewerage and other governmental or utility services.

24. Structural and lot area regulations authorise the municipal authorities to regulate and restrict the height, number of storeys and other structures; the percentage of a plot that may be occupied; the size of yards, courts and open spaces; the density of population; and the location and use of buildings and structures. All these have in our view and do achieve the larger purpose of the public health, safety or general welfare. So are front setback provisions, average alignments and structural alterations. Any violation of zoning and regulation laws takes the toll in terms of public welfare and convenience being sacrificed apart from the risk, inconvenience and hardship which is posed to the occupants of the building.

25. Though the municipal laws permit deviations from sanctioned constructions being regularised by compounding but that is by way of exception. Unfortunately, the exception, with the lapse of time and frequent exercise of the discretionary power conferred by such exception, has become the rule. Only such deviations deserve to be condoned as are bona fide or are attributable to some misunderstanding or are such deviations as where the benefit gained by demolition would be far less than the disadvantage suffered. Other than these, deliberate deviations do not deserve to be condoned and compounded. Compounding of deviations ought to be kept at a bare minimum. The cases of professional builders stand on a different footing from an individual constructing his own building. A professional builder is supposed to understand the laws better and deviations by such builders can safely be assumed to be deliberate and done with the intention of earning profits and hence deserve to be dealt with sternly so as to act as a deterrent for future. It is common knowledge that the builders enter into underhand dealings. Be that as it may, the State Governments should think of levying heavy penalties on such builders and therefrom develop a welfare fund which can be utilised for compensating and rehabilitating such innocent or unwary buyers who are displaced on account of demolition of illegal constructions.”

(emphasis supplied)

3. to 55 xxx

56. In view of the above discussion, we hold that the petitioners in the transferred case have failed to make out a case for directing the respondents to regularize the construction made in violation of the sanctioned plan. Rather, the ratio of the above-noted judgments and, in particular, Royal Paradise Hotel (P) Ltd. v. State of Hryana is clearly attracted in the present case. We would like to reiterate that no authority administering municipal laws and other similar laws can encourage violation of the sanctioned plan. The Courts are also expected to refrain from exercising equitable jurisdiction for regularization of illegal and unauthorized constructions else it would encourage violators of the planning laws and destroy the very idea and concept of planned development of urban as well as rural areas.”

10. In view of the above, and the petitioner having suppressed material facts from the Court and having misused the process of law as also misled the officers of the Corporation, the petitioner does not deserve any sympathy. On the contrary, from the conduct of the petitioner and its predecessor in title the present petition deserves to be dismissed with cost of Rs. 1,00,000/-.

11. In that view of the matter, the petition is dismissed with cost of Rs. 1,00,000/- to be deposited by the petitioner with the Corporation within one week from today.