S.S Polymers v. Kanodia Technoplast Ltd
Factual and Procedural Background
The Applicant, M/s SS Polymers, a sole proprietorship engaged in manufacturing and supplying plastic packaging materials since 2003, filed an application under Section 9 of the Insolvency and Bankruptcy Code, 2016 (IBC) read with Rule 6 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016, seeking initiation of the Corporate Insolvency Resolution Process against the Respondent, M/s Kanodia Technoplast Limited, a company incorporated in 1995.
The dispute arose from the supply of goods by the Applicant to the Respondent during July 2018, amounting to Rs. 54,20,802, evidenced by invoices and supported by 33 post-dated cheques. While the first six cheques were honored, six subsequent cheques were dishonoured, and the remaining cheques were not presented due to assurances from the Respondent to pay via RTGS with interest at 24% per annum for late payment.
The Respondent made partial RTGS payments totaling Rs. 25,00,000 by December 2018 and further payments including Rs. 7,71,800 by January 2019. Despite these payments, the Applicant pursued the claim for the balance amount and interest. The Applicant issued a Demand Notice under Section 8 of the IBC, which the Respondent replied to, admitting liability but contending that the liability was satisfied by issuance of post-dated cheques. The Applicant rejected this defense as dishonest and asserted no dispute over the debt.
The Respondent contested the application, asserting full payment of the principal amount and challenging the claim for interest, arguing no agreement existed on interest and alleging mala fide intent by the Applicant in filing the application.
Legal Issues Presented
- Whether the claim for interest on delayed payment, in absence of any agreement on interest, constitutes an operational debt under the Insolvency and Bankruptcy Code, 2016.
- Whether initiation of Corporate Insolvency Resolution Process is maintainable when the principal debt has been paid and only interest is claimed.
Arguments of the Parties
Applicant's Arguments
- The Applicant supplied goods worth Rs. 54,20,802 and issued invoices and post-dated cheques as payment security.
- Several cheques were dishonoured, and the Respondent assured payment via RTGS with interest at 24% per annum for late payment.
- The Respondent failed to issue new cheques or pay the outstanding dues despite requests and notices.
- The Respondent admitted outstanding liability of Rs. 31,71,800 but claimed it was satisfied by issuance of cheques, which the Applicant rejected as a dishonest defense.
- The Applicant claimed the Respondent owed Rs. 9,78,223.47 including principal and interest, with interest calculated up to 31.12.2018.
- The Applicant relied on multiple precedents to support the claim for interest and initiation of insolvency proceedings.
Respondent's Arguments
- The Respondent admitted payment of Rs. 25,00,000 by 31.12.2018 and the remaining Rs. 7,71,800 by 17.01.2019, thereby clearing the principal amount.
- The Respondent contended the Applicant was aware of payments and filed the application with mala fide intent after a delay.
- The Respondent pointed out that one cheque was not presented by the Applicant, leading to RTGS payment by the Respondent.
- No agreement existed between the parties regarding interest; thus, the claim for interest was arbitrary and excessive.
- The Respondent relied on the NCLAT judgment in Krishna Enterprises v. Gammon India Ltd., which held that claims for interest without an agreement are not maintainable under Section 9 of the IBC.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| M/S DF Deutsche Forfait AG And Anr. Vs. M/S Uttam Galva Steel Ltd. [CP No. 45/I&BP/NCLT/MAH/2017] | Support for claims under IBC Section 9 relating to operational debt and interest. | Considered as part of Applicant's reliance but no detailed application in reasoning. |
| Jatin Koticha v. VFC Industries Pvt. Ltd. | Operational debt and insolvency claims. | Referenced by Applicant; no specific application detailed. |
| Olive Tree Trading Pvt. Ltd. V. F lh De Filipro | Operational debt principles. | Referenced by Applicant; no detailed application. |
| Rajeev K Aggarwal v Panipat Texo Fabs Pvt. Ltd. | Operational debt and insolvency proceedings. | Referenced by Applicant; no specific analysis. |
| Mobilox Innovations Pvt. Ltd v Kirusa Software Pvt. Ltd. | Operational debt and insolvency claims. | Referenced by Applicant; no direct application in reasoning. |
| IDFC Bank Ltd v. Monnet Power Company Ltd. | Operational debt and insolvency initiation. | Referenced by Applicant; no detailed application. |
| DF Deutsche Forfait AG v Uttam Galva Steel Ltd. (Para 76, 77) | Operational debt and interest claims. | Referenced by Applicant; no detailed application. |
| Harsh Vinimay Pvt. Ltd v Mata Mahamaya Steels Pvt. Ltd. | Operational debt under IBC. | Referenced by Applicant; no detailed application. |
| Gulf Oil Lubricants India Ltd. V Eastern Coal Fields Limited | Operational debt principles. | Referenced by Applicant; no detailed application. |
| PK Vaduvammal v Jaydev Constructions (P) Ltd. | Operational debt and insolvency claims. | Referenced by Applicant; no detailed application. |
| Bank of India v. Tirupati Intraprojects Pvt. Ltd. | Respondent's reliance on precedents related to payments and insolvency. | Referenced by Respondent; no detailed application. |
| Dhar Textile Mills Ltd v Asset Reconstruction Company (India) Ltd. | Respondent's precedent on payment disputes. | Referenced by Respondent; no detailed application. |
| Wanbury Ltd. v. Panacea Biotech Ltd. (NCLT Chandigarh bench) | Respondent's reliance on insolvency jurisprudence. | Referenced by Respondent; no detailed application. |
| Wanbury Ltd v Panacea Biotech Ltd Company Appeal (AT) (Ins) no. 64/2017 | Respondent's reliance on appellate decisions. | Referenced by Respondent; no detailed application. |
| Krishna Enterprises v Gammon India Ltd. [Company Appeal (AT) (Insolvency) No. 144 of 2018] | Whether interest without agreement forms part of 'debt' under IBC. | Crucial precedent followed by the Court to dismiss claim for interest after principal payment. |
Court's Reasoning and Analysis
The Court examined the facts and submissions, noting that the Respondent had paid the entire principal amount of Rs. 32,71,800 by January 2019 through RTGS and NEFT transfers. The Applicant's claim was limited to interest on delayed payment amounting to Rs. 2,16,155.
The Court referred extensively to the Hon'ble NCLAT decision in Krishna Enterprises v. Gammon India Ltd., which held that interest claimed without an agreement does not constitute an operational debt under Section 9 of the IBC. The Court emphasized that initiation of the Corporate Insolvency Resolution Process on the basis of interest alone, without a contractual obligation to pay such interest, is not maintainable.
Applying this legal principle, the Court found that since there was no agreement on interest between the parties and the principal amount was fully paid, the Applicant's claim based solely on interest was not maintainable under the Code. The Court rejected the Applicant's contention that the interest claim could trigger insolvency proceedings.
Holding and Implications
The application under Section 9 of the Insolvency and Bankruptcy Code, 2016 is dismissed.
As the principal debt was fully discharged and no agreement existed for interest, the claim for interest alone does not qualify as an operational debt to initiate insolvency proceedings. The decision directly affects the parties by denying the Applicant's insolvency petition based on interest claims and clarifies that interest claims without contractual basis must be pursued through appropriate civil remedies rather than insolvency processes. No new precedent was established beyond adherence to the binding NCLAT ruling.
IN THE NATIONAL COMPANY LAW TRIBUNAL
NEW DELHI (COURT NO. IV)
Company Petition No. IB-121/ND/2019 (Under Section 9 of the Insolvency and Bankruptcy Code, 2016 Read with Rule 6 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules,
2016)
IN THE MATTER OF:
M/s SS POLYMERS …Applicant/Operational Creditor
VERSUS
M/s KANODIA TECHNOPLAST LIMITED …Respondent/Corporate Debtor Pronounced on: 20.09.2019
CORAM:
DR. DEEPTI MUKESH
HON'BLE MEMBER (Judicial)
SHRI HEMANT KUMAR SARANGI
HON'BLE MEMBER (Technical) For the Applicant : Mr. Ankit Singal, Mr. Achint Gupta, Adv Ms. Arushi Bhardwaj, Adv.
For the Respondent : Mr. Pawan Kumar, Adv. Mr Surender, Adv.
1
MEMO OF PARTIES
M/s SS POLYMERS Having its office at:
7E, Big Jos Tower, Plot No. A-8, Netaji Subhash Place,
Pitampura, New Delhi-110034 …Applicant/Operational Creditor
VERSUS
M/s KANODIA TECHNOPLAST LTD. Having its registered office at:
A-54 Wazirpur Industrial Area, New Delhi- 110052
…Respondent/ Corporate Debtor
ORDER
PER-SHRI HEMANT KUMAR SARANGI MEMBER (T)
1. The present application is filed under Section 9 of Insolvency and Bankruptcy Code, 2016 (for brevity 'IBC, 2016') read with Rule 6 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 (for brevity 'the Rules') by
2
M/s. SS Polymers (for brevity 'Applicant') through its proprietor Mr. Sunder Lal Gupta, with a prayer to initiate the Corporate Insolvency process against M/s Kanodia Technoplast Limited (for brevity 'Respondent').
2. The Applicant, the Operational Creditor is a sole proprietorship concern, which started its business in the year of 2003, with GST Registration No. 07AAOPG5646C1ZR, Importer Exporter Code no. 0508058554, PAN no. AAOPG5846C, having its office at C-92, Wazirpur Industrial Area, Delhi, New Delhi, 110052, inter alia, as a manufacturer and supplier of a wide range of Plastic Poly Bags for Textile Garments, Industrial Packaging, Poly Rolls Lamination, LD, PP, HM and HDPE Bags.
3. The Respondent, namely M/s Kanodia Technoplast Limited is a company incorporated on 20.04.1995 under the provisions of Companies Act, 1956 with CIN No.
U74899DL1995PLC067544, having its registered office at A- 54, Wazirpur Industrial Area, New Delhi-110052. The Authorised Share Capital of the respondent company is Rs.82,00,00,000/- (Rupees Eighty Two Crore Only) and Paid
3
Up Share Capital of the company is Rs.46,00,09,230/- (Rupees Forty Six Crore Nine Thousand Two Hundred Thirty Only), as per Master Data of the company.
4. It is the case of the applicant that, during the period from 05.07.2018 to 21.07.2018, the Operational Creditor supplied goods namely packaging material, to the Corporate Debtor aggregating to an amount of Rs.54,20,802 (Rupees Fifty Four Lakhs, twenty Thousand, Eight Hundred and Two only) and Invoices were raised on 05.07.2018 & 21,07.2018 bearing Nos. DL/18-19/0182, DL/18-19/0183, DL/18-19/0184, DL/18-19/0203, DL/18-19/0204, DL/18-19/0205.
5. Pursuant thereto, 18 (eighteen) post dated cheques bearing Nos. 501220 to 501229, 503822 to 503826, 503834 to 503835 were issued by the Corporate Debtor aggregating to a sum of Rs.54,20,802.00 (Rupees Fifty Four Lakhs, twenty Thousand, Eight Hundred and Two only). Although, the first 6 (six) cheques were honoured, the next 6 (six) cheques were dishonoured, copies of the return memos for the said cheques issued by the bank are annexed. It is pertinent to mention herein that the remaining 6 (six) posts dated cheques were
4
not deposited by the Operational Creditor relying on the assurances made by the Corporate Debtor that the all outstanding dues shall be paid through RTGS along with 24% (Twenty Four Percent) interest for late payment.
6. However, after the Corporate Debtor made the first payment amounting to Rs. 3,49,002/- (Rupees Three LakhForty Nine Thousand and Two only) vide RTGS on 25.09.2018, the Corporate Debtor expressed his inability to pay the outstanding dues through RTGS and assured that the old dishonoured and un presented cheques will be replaced by new current dated cheques.
7. Accordingly, the Corporate Debtor vide letter dated 13.10.2018 was called upon to collect the above mentioned 33 (thirty three) post dated cheques and to issue new current dated cheques for the outstanding dues along with interest at the rate of 24% (Twenty Four percent). Since, the Corporate Debtor neither issued new cheques nor did it reply to the letter dated 13.10.2018, a Notice of Demand dated 06.11.2018 under section 8 of Insolvency and Bankruptcy Code, 2016 (the "Code") read with Rule 5 of the Insolvency
5
and Bankruptcy (Application to Adjudicating authority) Rules, 2016 was issued by the Operational Creditor to the Corporate Debtor.
8. However, the Corporate Debtor sent an email dated 16.11.2018 stating that since the Operational Creditor did not present the Cheque bearing no. 506506 dated 15.11.2018 for Rs. 1,00,000/- (Rupees One Lakh Only), the amount for the same has been transferred vide RTGS to the Operational Creditor.
9. The Operational Creditor also states that, The Corporate Debtor issued a reply dated 22.11.2018 to the Demand Notice wherein the corporate debtor, on one hand admitted its outstanding liability of Rs. 31,71,800.00 (Rupees Thirty Two Lakhs, Seventy One Thousand and Eight Hundred only), however, on the other hand raised a contention that its liability stands satisfied merely by issuing post date cheques. As per the applicant, the stand taken by the Corporate Debtor in their reply dated 22.11.2018 is a half hearted moonshine defence which is nothing but a dishonest attempt to escape/evade its admitted liabilities. Therefore, there is no
6
dispute with respect to the outstanding debt owed by the Corporate Debtor.
10. Furthermore, the applicant has admitted that, the Corporate Debtor have unilaterally, without any instructions, as on 31.12.2018, made several RTGS payments amounting Rs.25,00,000/- (Rupees Twenty Five Lakhs) against first 25 (Twenty Five) of the aforementioned 33 (thirty three) post dated cheques.
11. The applicant has further stated that, the Corporate debtor is still liable to pay the Operational Creditor balance sum of INR 9,78,223.47 (Rupees Nine Lakhs, Seventy eight Thousand, Two Hundred Twenty Three and Paise Forty Seven only) comprising of a principal amount of Rs. 7,71,800.00 (Rupees Seven Lakhs, Seventy One thousand and Eight Hundred only) towards the outstanding invoices for goods supplied to the Corporate Debtor along with an interest @ 24% (Twenty Four percent) per annum amounting to Rs. 2,06,423.47/- (Rupees Two Lakh Six Thousand Four Hundred Twenty Three and paise forty seven only) calculated upto 31.12.2018.
7
12. The Applicant while putting his case forward relied on the following judgments:
(1) M/S DF Detuscheforfait AG And Anr. Vs. M/S Uttam Galva Steel Ltd. [CP No. 45/I&BP/NCLT/MAH/2017]
(2) Jatin Koticha v. VFC Industries Pvt. Ltd.
(3) Olive Tree Trading Pvt. Ltd. V. F lh De Filipro
(4) Rajeev K Aggarwal v Panipat Texo Fabs Pvt. Ltd.
(5) Mobilox Innovations Pvt. Ltd v Kirusa Software Pvt. Ltd.
(6) IDFC Bank Ltd v. Monnet Power Company Ltd.
(7) DF Deutsche Forfait AG v Uttam Galva Steel Ltd. (Para 76, 77)
(8) Harsh Vinimay Pvt. Ltd v Mata Mahamaya Steels Pvt. Ltd.
(9) Gulf Oil Lubricants India Ltd. V Eastern Coal fields Limited
(10) PK Vaduvammal v Jaydev Constructions (P) Ltd.
13. The respondent has relied on the following judgements:
(1) Bank of India v. Tirupati Intraprojects Pvt. Ltd.
(2) Dhar Textile Mills Ltd v Asset Reconstruction Company (India) Ltd.
(3) Wanbury Ltd. v. Panacea Biotech Ltd. (NCLT Chandigarh bench- CP no. 8/2016 & RT no 9/Chd/Pb/2017)
8
(4) WanburyLtd v Panacea Biotech Ltd Company Appeal (AT) (Ins) no. 64/2017
(5) Krishna Enterprises V Gammon India Ltd. NCLAT - Company Appeal (AT) (Ins) no. 144/2018
14. Respondent has filed its reply and raised objections that, as per applicant's own admission, the respondent had already made the payment of Rs. 25,00,000/- through RTGS out of Rs. 32,71,800/- by 31.12.2018. The remaining payment of Rs. 7,71,800/- was also made by the respondent to the applicant by 17.01.2019 through NEFT Fund Transfer. The copies of the payment receipts of Rs. 7,71,800/- made are also attached along with the affidavit. It shows and proves that the applicant was aware that the respondent is surely going to make the payment of the amount, however, with the ulterior and mala-fide motive, the applicant filed the above application after two months from the date of issuing the statutory notice under the IBC.
15. That it was informed by the respondent to the applicant vide email dated 16.11.2018 that the respondent had made RTGS against cheque no. 506506 dated 15.11.2018 for Rs.
9
1,00,000/- which has been issued from their Axis Bank Ltd. Since the cheque was not presented on due date by the applicant, thus, the applicant had made RTGS for the same amount. It was also informed to the applicant by the respondent that the respondent had already issued cheques for full and final amount to the applicant which the respondent expected would be presented on their due dates in the respondent's bank. In case, such cheques are not presented on due dates, the respondent would be making RTGS for the same to the applicant as done today.
16. It further states that, no agreement of any kind was entered into between the applicant and the respondent, hence, the interest asked to be paid by the applicant from the respondent is whimsical and arbitrary. The respondent submits, that the application is filed by the applicant to force the respondent to pay highly excessive interest rate which was never agreed by the respondent at any point of time by agreement or otherwise.
17. The respondent while putting his case forward has relied on the following judgement of Hon'ble NCLAT Krishna
10
Enterprises v. Gammon India Ltd. [Company Appeal (AT) (Insolvency) No. 144 of 2018]5; the issue was whether every interest due on the principal amount is included within the definition of 'debt'.
"5.In the present appeals, as we find that the principle amount has already been paid and as per agreement no interest was payable, the applications under Section 9 on the basis of claims for entitlement of interest, were not maintainable. If for delayed payment Appellant(s) claim any interest, it will be open to them to move before a court of competent jurisdiction, but initiation of Corporate Insolvency Resolution Process is not the answer.
6. We find no merit in these appeals. These are accordingly dismissed. No cost."
18. Admittedly, an amount of Rs. 25,00,000/- (Rupees Twenty Five Lakhs Only) out of Rs. 32,71,800/- (Rupees Thirty Two Lakhs Seventy One Thousand Only) was paid by 31.12.2018 through RTGS. The remaining payment of Rs. 7,71,800/- (Rupees Seven Lakhs Seventy One Thousand Eight Hundred Only) was also made by the respondent to the applicant by
11
17.01.2019 through NEFT Fund and now the applicant wants to pursue the application only for an amount of Rs.2,16,155/- (Rupees Two Lakhs Sixteen Thousand One Hundred Fifty Five Only) being interest, albeit after admitting payment of entire principal amount.
19. As per the orders of Hon'ble NCLAT in the case of Krishna Enterprises v. Gammon India Ltd. [Company Appeal (AT) (Insolvency) No. 144 of 2018]5, the issue was whether every interest due on the principal amount is included within the definition of 'debt'. The relevant para is reproduced as under:-
"5.In the present appeals, as we find that the principle amount has already been paid and as per agreement no interest was payable, the applications under Section 9 on the basis of claims for entitlement of interest, were not maintainable. If for delayed payment Appellant(s) claim any interest, it will be open to them to move before a court of competent jurisdiction, but initiation of Corporate Insolvency Resolution Process is not the answer.
6. We find no merit in these appeals. These are accordingly dismissed. No cost."
12
20. The Hon'ble NCLAT held that not every interest can be treated as a debt. If in terms of the agreement, interest is payable to the operational or financial creditor, then the debt will include interest; otherwise, the principal amount is to be treated as debt which is the liability in respect of the claim that can be made from the corporate debtor.
21. In view of above, we are satisfied that in the present case to the principal amount had already been paid, also, there is an absence of any agreement stating the interest to be charged. Hence, this bench, respectfully following the precedent set by Hon'ble NCLAT, is of the view that, the applications under Section 9 on the basis of claims for entitlement of interest, were not maintainable. If for delayed payment Appellant(s) claim any interest, it will be open to them to move before a court of competent jurisdiction, but initiation of Corporate Insolvency Resolution Process is not the answer.
22. As a consequence of above discussion, the applicant failed to establish that after payment of entire principal amount, the claim with respect to only interest on delayed payment in
13
absence of any specific contract will amount to operational debt under provisions of the code.
23. The application is dismissed.
24. Let the copy of order be served to the parties and to IBBI. Sd/- Sd/-