Prem Fabricators v. Commissioner Of C. Ex., Ahmedabad-Ii

CESTAT
Sep 3, 2009
Smart Summary (Beta)

Tribunal Order Summary — M/s. Prem Fabricators (Order per: B.S.V. Murthy, Member (T))

Factual and Procedural Background

M/s. Prem Fabricators (the appellant) manufactured and cleared iron-and-steel structures (beams, channels, pillars, columns, canopy, portals, trusses etc.) from their factory between December 2006 and February 2007. The appellant cleared goods valued at Rs. 5,50,28,186/- to Central Warehousing Corporation (CWC), Mundra, claiming exemption under Notification No. 58/03-C.E., dated 22-7-03 (which exempts excisable goods supplied to SEZ units subject to specified conditions).

The Revenue issued a show-cause notice questioning fulfillment of notification conditions, proposed duty recovery with interest and penalty under Section 11AC of the Central Excise Act, 1944. The adjudicating Commissioner confirmed a duty demand of Rs. 89,80,600/- with interest and imposed a penalty equal to the duty amount under Section 11AC. The Commissioner also held that the goods were manufacture and excisable (classifiable under CETH 7308) and therefore duty was payable if the Notification exemption was not available.

The appellant appealed to the Tribunal challenging those conclusions and sought reliefs including denial of excisability, relief from penalty and entitlement to Cenvat credit and cum-duty-price treatment.

Legal Issues Presented

  1. Whether the goods cleared by the appellant to CWC were excisable and classifiable under CETH 7308 (i.e., whether the activities constituted "manufacture").
  2. Whether the appellant was entitled to exemption under Notification No. 58/03-C.E. (i.e., whether the conditions for SEZ supply — in particular conditions (ii) and (iii) — were fulfilled).
  3. Whether penalty under Section 11AC of the Central Excise Act, 1944 was justifiably imposable on the appellant.
  4. Whether the appellant was entitled to Cenvat credit and to treat the price charged as cum-duty-price.

Arguments of the Parties

Appellant's Arguments

  • The appellant had a bona fide belief that goods supplied to CWC were exempt under Notification No. 58/03 and therefore cleared them under ARE-1 without payment of duty.
  • After being informed by the department, they surrendered original ARE-1 forms for Dec. 2006–Feb. 2007 and informed the department they had not manufactured excisable goods and did not utilize ARE-1 benefit.
  • The appellant contended that structural items classifiable under CETH 7308 were not manufactured in their factory; they had purchased steel sheets, performed cutting/drilling/grounding, and completed fabrication (columns, rafters, etc.) at the CWC site, invoking Notification No. 3/05 (exemption for structural items manufactured at site).
  • The ARE-1 description was given only as “structure”; the appellant argued this did not indicate finished excisable goods and was used for ease of description relevant to site activity.
  • They argued electricity consumption at the construction site (higher than factory consumption) would have demonstrated that fabrication occurred at the site.
  • Sought Cenvat credit of duty paid on inputs and treatment of price as cum-duty-price; cited several Tribunal decisions in support.

Revenue's (Respondent's) Arguments

  • The Commissioner relied on ARE-1 forms and commercial invoices issued by the appellant; the description in those documents repeatedly described the goods as "structure/structure consists of columns, portal, canopy, truss".
  • The department found no evidence to support the appellant's later claim that goods were not excisable; appellant failed to produce ARE-1s or invoices in the appeal memorandum.
  • Enquiries with the Development Commissioner, Kandla SEZ revealed that no SEZ unit by the name “CWC Kandla” existed and even if CWC operated in SEZ it had not acquired SEZ unit status for tax concession—so conditions (ii) and (iii) of Notification No. 58/03 were not met.
  • Work orders and contracts showed the appellant was contracted to "supply" fabricated pre-engineered steel structures (including columns, rafters, bracings, purlins, nuts and bolts, etc.) and the terms required “supplying at site”; the orders did not speak of fabrication at site.
  • The CWC certificate relied upon by the appellant covered only limited items and was inconsistent with the broader contract and documentation showing supply of fabricated structures.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
CCE, Hyderabad v. M/s. Deepak Galvanising Engg. Indus. P. Ltd. (Tri.-Bang.) Held that cutting/drilling of duty-paid angles, rods, channels, plates as per specification and drilling holes to facilitate fastening does not amount to manufacture (the item remains the same). The Tribunal stated this decision was not applicable on the facts because the appellant did not contend they had purchased such finished duty-paid angles/plates and merely drilled holes; factual matrix differed.
CCE, Pune v. M/s. TELCO Ltd. (Tri.-Mumbai) Decision that cutting of aluminium sheets for roofing and shaping/sizing for drainage did not constitute manufacture (thus not excisable) where items remained essentially the same. The Court noted this decision was not relevant to present facts; the factual situation in TELCO involved cutting sheets only and differed materially from the present case.
CCE, Jaipur v. M/s. Man Structurals Ltd. (Supreme Court) Relied upon by the Revenue/SDR in support of excisability and the proposition that fabrication can lead to distinct manufactured articles. The opinion records that SDR relied upon this Supreme Court decision; the Court treated it as supportive of the revenue's position (no detailed excerpt beyond reliance is given in the text).
M/s. Aarti Steels Ltd. v. Collector of C.E., Chandigarh (Tri.-Del.) Relied upon by the Revenue (SDR) in support of excisability / revenue's position. The decision was cited by SDR; the opinion records the citation but does not elaborate detailed principles beyond noting reliance.
Mahindra & Mahindra Ltd. v. CCEs (Tri.-LB) (Larger Bench) Held that fabrication of iron-and-steel parts (frames, trusses, etc.), whether at site or in factory, produces distinct articles (e.g., roofing framework, trusses, pillars) which are goods manufactured and classifiable under relevant headings (discussion on Heading 7308). The Tribunal found this Larger Bench decision highly relevant and applicable to the present facts and relied upon its reasoning to uphold the Commissioner’s finding that the appellant’s products were manufactured and excisable under CETH 7308.

Court's Reasoning and Analysis

The Tribunal proceeded through a document-centric and textual analysis, applying statutory notification conditions and comparing contractual documents with the appellant's subsequent statements:

  1. Statutory requirements: The Tribunal set out the three conditions under Notification No. 58/03 (removal procedure per Rule 11 CER 2002; supply against bill of export or domestic procurement certificate issued to the SEZ unit; proof of export certified by Deputy/Assistant Commissioner of Customs in SEZ submitted within one month).
  2. Failure to meet notification conditions: Revenue found that conditions (ii) and (iii) were not fulfilled. Enquiry with the Development Commissioner, Kandla SEZ produced a reply that no SEZ unit named "CWC Kandla" existed and CWC had not acquired SEZ unit status to be eligible for concession—therefore appellant was not eligible for the claimed exemption.
  3. Documentary consistency: The Tribunal reviewed ARE-1 forms, commercial invoices, and the work orders/contracts. The Commissioner had examined ARE-1s and invoices which described the goods repeatedly as containing columns, portals, canopy, truss. The work orders described "supplying of fabricated pre-engineered steel structures" and listed items (columns, rafters, bracing, purlins, nuts and bolts, washers etc.) and required supply at site inclusive of applicable taxes.
  4. Evaluation of appellant's contrary claims: The appellant's later contention that fabrication occurred at site (and that goods were non-excisable) was not supported by the contractual documentation or invoices. The appellant did not produce copies of ARE-1s/invoices in the appeal memorandum and offered explanations (e.g., ARE-1 description used for ease) that the Tribunal found unconvincing in light of the invoices and work orders.
  5. Assessment of the CWC certificate: The CWC certificate attested that fabrication of certain items was carried out at site, but the Tribunal observed that the certificate covered only limited items and was carefully worded; it did not override the broader evidence of contractual terms and the consistency between orders, ARE-1 and invoices which indicated supply of fabricated structures.
  6. Reliance on precedent: The Tribunal considered precedent authorities. It distinguished decisions relied upon by the appellant (Deepak Galvanising; TELCO) as factually inapplicable. The Tribunal found the Larger Bench decision in Mahindra & Mahindra (and other decisions relied upon by SDR including the Supreme Court in Man Structurals and Tribunal precedents) supportive of the proposition that fabrication of distinct iron-and-steel structural parts yields goods manufactured (classifiable under Heading 7308).
  7. Conclusion on excisability: On the combined documentary record and precedential reasoning, the Tribunal found no reason to set aside the Commissioner’s findings that the goods were manufactured and excisable and upheld the duty demand.
  8. Penalty and equitable considerations: The Tribunal accepted that the appellant acted under a bona fide belief of entitlement to exemption and that the dispute centrally involved interpretation of law and applicability of the exemption notification. On that basis, the Tribunal found no justification for the imposition of penalty under Section 11AC.
  9. Reliefs granted: The Tribunal directed that the appellant be given the benefit of Cenvat credit admissible (subject to production of necessary documents) and allowed the appellant’s claim for treatment of the price charged as cum-duty-price.

Holding and Implications

Core Ruling: Appeal partially allowed.

The Tribunal upheld the Commissioner’s classification and duty demand that the goods supplied by the appellant were manufactured and excisable (classifiable under CETH 7308) and therefore the exemption under Notification No. 58/03 was not available because the notification conditions were not fulfilled. The confirmed duty demand was for Rs. 89,80,600/- (with applicable interest) as per the impugned order.

However, because the appellant had a bona fide belief in their entitlement to the exemption and the dispute involved lawful interpretation, the Tribunal held that imposition of penalty under Section 11AC was not justified and directed that no penalty be imposed on that ground.

The Tribunal also directed that the appellant be allowed the benefit of Cenvat credit admissible (subject to production of necessary documents) and allowed the treatment of the price charged by the appellant as cum-duty-price.

Direct consequences: the duty demand as adjudicated remains payable; penalty under Section 11AC is set aside; appellant may claim Cenvat credit and cum-duty-price treatment upon producing required documentation. The opinion applies existing precedent (notably the Mahindra & Mahindra Larger Bench decision) but does not purport to lay down a new precedent beyond applying established authorities.

Disposition: Appeal is partially allowed in the terms described above.

Pronounced in Court on: 3-9-2009

Show all summary ...

[Order per : B.S.V. Murthy, Member (T)]. - M/s. Prem Fabricators, the appellant is engaged in manufacture and clearances of structures of iron and steel viz. beams, channels, pillars, columns, canopy, portals, trusses etc. During the period between December, 2006 to February, 2007, the appellants manufactured and cleared the structures of iron and steel valued at Rs. 5,50,28,186/- from their factory premises to Central Warehousing Corporation, Mundra (CWC for short) without payment of Central Excise duty claiming benefit of Notification No. 58/03-C.E., dated 22-7-03 as amended. The notification provides for exemption from duty to all excisable goods manufactured by a unit when supplied to unit located in SEZ.

2. A show cause notice was issued by the Revenue to the appellant requiring to show cause as to why exemption should not be denied to them since the conditions in the Notification No. 58/03-C.E, have not been fulfilled. Besides demand of duty with interest, penalty was also proposed under Section 11AC of CEA, 1944. After adjudication process, the impugned order has been passed whereby the duty demand for Rs. 89,80,600/- with interest as applicable has been confirmed and a penalty equal to duty amount has been imposed under Section 11AC of CEA, 1944. The Commissioner in the impugned order also negated the claim of the appellant that there was no manufacture of the goods in the factory and the goods manufactured by them were not at all excisable and held that if the exemption under Notification No. 58/03 was not available, they were liable to pay the Excise duty on the goods.

3. Learned advocate on behalf of the appellant submitted that the appellant had a bona fide belief that the goods sent to CWC were exempted under Notification No. 58/03 and accordingly they had supplied the same. As soon as they were advised by the department that they were not eligible for exemption, they had surrendered all the original ARE-1 forms used for clearance during the period from Dec. 06 to Feb. 07 and also intimated the department that they had not manufactured any excisable goods and therefore they did not need/utilise the benefit of ARE-1. He also submitted that contrary to the observations of the Commissioner in the impugned order, they had not manufactured the structural items classifiable under CETH 7308 at all. They had simply purchased steel sheets, cut them to size, drilled holes and ground them and the same were taken to CWC warehouse where they were converted into columns, rafters. The structural items manufactured at site are exempted from payment of Excise duty under Notification No. 3/05. He also submitted that the description of the goods in ARE-1 was ‘structure’. He also submitted that the columns and other parts required for building CWC shed came into being at the site only. The Commissioner has relied upon the ARE-1 form and the commercial invoices for his conclusion. He submits that their claim that if the electricity consumption at site was considered, the Commissioner could have easily come to the conclusion and could have easily noticed the electricity consumption at site was much higher than the electricity consumption in the factory. The very fact that there was high electricity consumption, compared to that in the factory, shows that the manufacturing activity actually took place in the warehouse under construction and not in the factory. He also submits that the appellants are entitled to the benefit of Cenvat credit of duty paid on the raw materials etc. and also the treatment of price as cum-duty-price both of which have been denied by the Commissioner in the event of their claim that the goods are not excisable, is not acceptable. He also cited several decisions of the Tribunal in support of his contention.

4. Learned SDR, on the other hand, submits that the Commissioner has relied upon the ARE-1 forms and the commercial invoices issued by the appellant. It was the appellant who described the goods in the ‘description’ column of ARE-1 form as “structure/structure consists of columns, portal, canopy, truss”. In the Central Excise invoices issued by the appellant, the same description has been repeated. He submits that the Commissioner has gone through all the ARE-1 as well as invoices issued by the assessee and has found that in all the invoices/ARE-1 forms, the same description has been shown and nowhere it has been mentioned that the goods were parts of columns, portals, canopy, or truss. He submits that the department took up the issue in May, 07 when appellant failed to submit evidence to show that they have fulfilled the conditions of Notification No. 58/03. The clearance of the goods was completed by that time and all of them had reached CWC premises. Therefore, there was no way to department could have verified the actual position and further there is no basis or support in the form of document or evidence submitted by the appellant to show that the goods were different compared to invoices prepared by them.

5. We have considered the submissions made by both sides. Admittedly, the appellant cleared the goods under ARE-1 claiming benefit of exemption Notification No. 58/03 during the period from Dec., 06 to Feb., 07. The notification No. 58/03 exempts all excisable goods produced/manufactured by a unit from whole of the duty of Excise leviable, when cleared to unit in SEZ subject to the following conditions :

(i)      that such goods are removed from the factory or warehouse, as the case may be, in accordance with the procedure specified in Rule 11 of CER, 2002;
(ii)    that the said goods are supplied against bill of export duly assessed by the customs authorities of SEZ or against a domestic procurement certificate issued to the SEZ unit by the customs authorities in the SEZ;
(iii)   that the proof of export, duly certified by the Deputy Commissioner of Customs or the Assistant Commissioner of Customs in the SEZ, is submitted to the officer-in-charge of the Central Excise range concerned, within a period of one month from the date of removal of such goods from the place of manufacture or production.

6. It was found by the Revenue that the appellants failed to fulfil the conditions (ii) and (iii) above and the Range Supdt. in his letter dated 11-5-07, requested the appellant to furnish proof of export and otherwise pay Central Excise duty. Further, the Assistant Commissioner made an enquiry with the Development Commissioner, Kandla SEZ on 17-7-07 and he received a reply on 1-8-07 that there was no unit by name as ‘CWC Kandla’ functioning as SEZ unit in Mundra. He also clarified that even if CWC is functioning in SEZ, it had not acquired the status of SEZ unit to be eligible for tax concession. There is no dispute that the appellants are not eligible under the above notification as claimed and the goods were cleared under ARE-1 as well as invoices by the appellant.

7. It is the appellant’s claim that subsequently they realized that it was a mistake on their part to have obtained registration and cleared the goods under ARE-1 and invoices to claim exemption under Notification No. 58/03 and actually the goods were not at all excisable. This claim was made before the original adjudicating authority after a show cause notice was issued by the Revenue requiring them to show cause as to why the duty with interest should not be recovered from them and why penalty should not be imposed upon them. The Commissioner has taken the claim into consideration and has elaborately discussed the issue in the impugned order and has come to the conclusion that the goods supplied by the appellant to CWC were actually manufactured and are classifiable under CETH 7308 and are liable to duty.

8. It is the appellant’s claim that the goods were not at all manufactured. In support of this, the learned advocate submitted that in ARE-1 they had mentioned only ‘structure ‘ in the column of description. However, we find that it is the Commissioner’s finding that in ARE-1 as well as invoices, the description of the goods given was ‘columns, portal, canopy, truss. The Commissioner has also said that he has gone through all the ARE-1s and invoices. In the appeal memorandum submitted by the appellant, not a single copy of ARE-1s or invoices has been submitted. In the appeal memorandum, the appellant has stated that in the ARE-1, they had mentioned as “Supplying at site steel work in built up square and rectangular closed hollow sections structures, trusses including cutting, welding and applying a priming coat of approved steel primer welded and bolted including special shape washers etc.” instead of mentioning steel plates in the ARE-1s. The submission of the appellant is that ARE-1 did not represent identity of the goods but the same was shown for ease of understanding further activity at the site. The explanation given by the appellant is not at all convincing. The invoices issued by the appellant covers the goods while being transported from the factory to the CWC. Therefore, it is normal and appropriate to assume that the correct description of the goods would be given in the invoice. It has to be noted that there is no need to alter the description to make an understanding easy for activity at site since the activity on the site and activity in the factory both are undertaken by the same company and the whole design and design of each and every part of the structure in the form of drawing has already been given by the buyer viz. CWC and therefore this explanation cannot be accepted.

9. Further, the appellants also relied upon a certificate issued by CWC in support of their contention that there was no manufacture at the site. The CWC certificate says that CWC has awarded the contract to the appellant for the work of fabrication of trusses of hollow section and plate structure at their site. The fabrication work of hollow sections, trusses and plate structure are being carried out at their site by the appellant against above mentioned work order since 18-11-06 as per their instructions and specifications.

10. When we see the work order issued to the appellant by CWC, in the first work order, it was mentioned that order was for supplying and stacking of pre-engineered steel system for warehouse in super structure including roof sheeting, wall cladding and canopy. While releasing the order, it has been stated in the second paragraph “You are requested to start the supply immediately and ensure completion of supply as per Programme mentioned in terms and conditions of Schedule of Quantity which is enclosed herewith.” Further, the Schedule of Quantities also shows the quantity as 18,750 sq. mtrs. and the description starts with the words “Supplying of fabricated pre-engineered steel structures” which also proceeds and says that it includes supply of columns, steel rafter, ties, bracing, purlins, sag rods, nuts and bolts, washers etc. Further, in the Terms & Conditions, the CWC has clearly mentioned that rate shall be quoted by the contractor for supplying at site and is inclusive of all necessary applicable taxes. Further, it is also stated that no water and electricity will be supplied by the department to the contractor/supplier.

11. The second work order, issued on the same date 18-10-06, which is made for supply of trusses. In this order also, the appellants have been requested to start the supply immediately and ensure completion of supply as per Programme mentioned in terms and conditions. In this case also, the description of the items of works starts with the words “Supplying at site, steel work in built up square and rectangular closed hollow sections structures”. In this case also, in terms and conditions, it has been stated that all materials will be received at site as per specifications and in sound condition.

12. When we look at the work orders and ARE-1 and invoices, they are in harmony with each other. Nowhere, the work order or contract speaks of fabrication at site. The order is for supply and not for fabrication at site. The certificate issued by the CWC is also carefully worded and certificate says clearly that the appellants have completed the work as per the work order. It has to be noted that both the work orders include several items whereas certificate covers only two items. Therefore, the certificate issued by CWC is not of any help to the appellant in the face of document and records which are clearly against their claim.

13. Learned advocate relied upon several decisions of the Tribunal. In CCE, Hyderabad v. M/s. Deepak Galvanising Engg. Indus. P. Ltd., (Tri.-Bang.), the Tribunal held that cutting of duty paid angles, rods, channels, plates as per specification and then drilling of holes to the cut pieces to facilitate fastening with bolts and nuts while erecting towers, does not amount to manufacture since the item remains the same even after carrying out the process. It is not the case of the appellant that they had purchased angles, rods, channels, plates etc. and drilled holes in them. Therefore, on facts, this decision is not applicable.

14. Another decision cited by the learned advocate was in the case of CCE, Pune v. M/s. TELCO Ltd., (Tri.-Mumbai). I find that this decision is also not relevant in view of the facts as explained in the order which are totally different and not comparable to the present case.

“....assessee are bringing duty paid aluminium corrugated sheets and aluminium plain sheets and other aluminium material. These sheets are used for the purpose of covering the structure of the factory shed and to provide proper outlet for rain water and flashings at the corner ends of the structure respectively. The corrugated sheets are used by the assessee by cutting the sheets to the required length/width wherever required. Similarly other aluminium materials are shaped/sized and attached to the roof structure for providing necessary drainage. This activity which merely involved cutting of sheets for the purpose of covering the shed cannot be considered as a manufacture and the decision in the Mahindra & Mahindra case cited by learned S.D.R. is not relevant as none of these items comes into existence here.”
As may be seen, M/s. Telco was manufacturing only roof structures by cutting the sheets.

15. On the other hand, learned SDR has relied upon the decision of Hon’ble Supreme Court in case of CCE, Jaipur v. M/s. Man Structurals Ltd., (S.C.), Tribunal’s decision in the case of M/s. Aarti Steels Ltd. v. Collr. of C.E., Chandigarh - (Tri.-Del.) and Larger Bench decision of the Tribunal in case of Mahindra & Mahindra Ltd. v. CCEs, (Tri.-LB). The decision of the Larger Bench is very relevant to the facts of the present case and is applicable. The relevant portion of the said Larger Bench decision is extracted below :

“10.... In the making of an immovable structure or building are used a variety of movable. Raising iron and steel structures like sheds involves fabrication work and many of the articles used in raising the structure come into existence through fabrication as per the pre­determined design to be fitted into the structure that is to be raised. For example, roof frame may be fabricated for the roof structure of a shed. Such fabrication of frames may be done at the construction site or at some factory premises. The iron and steel frames fabricated at the factory premises away from the site of construction would be brought to the site for their use in erecting the structure. The frames prefabricated and brought at the site and frames fabricated the site of erection both are goods manufactured. There will be variety of parts of structures of iron and steel, that can be fabricated either at the site or at some factory premises away from the site. The iron and steel raw material, such as angles, plates, tubes, etc., are used in making parts of structures and they acquired a distinctly different shape to suit the structural designs. For example, if iron or steel angles and plates are cut to make a steel table or chair which can be dismantled, it cannot be said that there are no goods manufactured because the iron and steel angles or plates remain such angles and plates though of different sizes, and merely holes are punched and screws fitted. Unlike in liquid mixtures, the raw material of iron and steel or wood will retain their identity, but it is precisely their being cut, and designed, punched and fitted to make an article commercially known that involves manufacture of an article distinct from the angles, sheets, tubes etc. used in it. Mere drilling holes or mere cutting jobs in isolation may not by themselves involve manufacture of an article, but, converting raw material like angles, tubes, plates etc. to bring about a distinct commodity will surely amount to manufacture as it is not “mere” drilling holes or cutting, but the activity is aimed, at bringing about a distinct commodity. Thus, making of porta cabin from iron and steel angles with, roof frame-work i.e. trusses, doors, windows, ladders in it made by drilling holes and cutting the raw material, will be a movable structure having identity as a distinct marketable commodity. When the porta cabin is dismantled it nonetheless remains the manufactured products i.e. porta cabin dismantled or disassembled. The material such as angles, rods, shades, sections plates, tubes, etc. of such designed, structure in their pre-assembled or disassembled form are prepared for use in the said structure, namely porta cabin. One cannot, with any conviction or authority, say that these dismantled parts of the structures are raw material used in its original form and that mere cutting or drilling holes has made no difference. The items in the parenthesis of Heading 7308 described as excisable goods include roofs, roofing frame-work, doors, windows and their frames, thresholds for doors, shutters, pillars, column, balustrades pillars, sheets of iron arid steel, each one of these items has a complete distinct identity.
11......when a truss is fabricated a distinct article is brought into existence different from mere raw material, namely angles or lubes used in making of the truss.”

16. We, therefore, find no reason to set aside the impugned order and the decision of the Commissioner regarding clarification and excisability are upheld. However, we find that the appellant had a bona fide belief that they were eligible for exemption and therefore cleared the goods under Notification No. 58/03. Subsequently, when the show cause notice was issued, they have tried to claim that the goods were not excisable. Basically, the dispute involves interpretation of law and applicability of exemption notification and therefore we find that there is no justification for imposition of penalty under Section 11AC of CEA, 1944. We also find that the claim of the appellant for Cenvat credit should have been considered by the Commissioner and therefore, we direct that the appellants may be given the benefit of Cenvat credit admissible subject to production of necessary documents. We also allow the claim for treatment of price charged by the appellant as cum-duty-price.

17. Appeal is partially allowed in above terms.

(Pronounced in Court on 3-9-2009)