Modern Denim Ltd. v. Commissioner Of Central Excise, Ahmedabad
[Order per : S.S. Sekhon, Member (T)]. - M/s. Modern Denim Ltd. (hereinafter referred to a MDL or EOU for shorts) is an 100% EOU engaged in the manufacture of Denim fabrics and have obtained necessary sanction licences and registrations as required under the Policy, the Custom Act, 1962 and the Central Excise Act, 1944. They were permitted towards the Self Removal Scheme.
1.2The Limited Company has another unit namely Modern Denim (hereinafter referred to as MD or DTA) which is working under the EPCG Scheme in the Domestic Tariff Area and has the required registration as under the Central Excise Act, 1944.
1.3MDL situated at village Moraiya, Sorbhaji Bevla Road, Dist. Ahmedabad, Gujarat and MD is also alleged to be a subsidiary is situated as same address Shri K.K. Sharma is Vice-President (Commercial) of MDL & MD and Shri R.K. Kalla is Executive Director of MDL.
1.4The officers, acting on basis of an intelligence to the effect that MDL & MD had been indulging in evasion of Central Excise Duty, searched the premises, rolls of Denim fabrics then recorded in the account of MDL & MD i.e. 2209 Rolls measuring 153197 meters and 81857 linear meter respectively. Two separate notices were issued to MDL & MD proposing confiscation of the seized goods as from the detailed enquiries made it appeared :-
(i) MDL had not recorded for entire production of Grey Denim fabrics in stock registers.
(ii) MD had recorded production of 634670 meters of Denim fabrics in RG 1 whereas their machine were not fully operational till July 1996 and they had not processed more than 25,000 meters during April to June 1996. Therefore excess production of 609670 meters (634670 - 25000) of finished Denim fabrics in their records were actually manufactured by MDL and clandestinely cleared to MD.
(iii) Even after the finishing section was fully operational, MD had continued to account for part of the production of MDL as they were still not able to account for 331934 meters of excess production (1230874 - 898340) shown in the accounts when production as per the register was much less and in no case they could have manufactured 934332 meters of finished Denim and of 10992144 meters of less production alleging 15% processing loss.
(iv) MDL should have recorded a production of about 2825062 meters of finished fabrics where by showing 1306312 meters 1518750 meters was shown less than actual i.e. 50% of production. This appeared to be a deliberate act, as MDL was 100% EOU, while MD was registered EPCG unit manufacturing same commodity and rate of duty on clearance for DTA was more than rate applicable on clearance for EPCG unit.
(v) Shri K.K. Sharma, could not explain the excess quantity on 29-12-97 in his statement as recorded in RG 1 than the loom record of MD & less production than loom record in MDL was explained as in process stock. Fabricated records were produced as an after thought & clarifications were not satisfactory.
(vi) The value of 474506 meters of Denim removed at Rs. 75 plus 930612 meters removed clandestinely worked out at Rs. 35587950 & Rs. 69795900 & Value of Grey Denim of 1101721 meters undervalued of Rs. 71611865.00.
(vii) The Concessional rate of duty to MDL for DTA removal was denied and they were required to pay Customs Duty amounting to Rs. 89117606 & CVD of Rs. 26876933 and additional duty of Rs. 2262362 along with interest and the period of limitation under proviso to Section 11A(11) was invocable.
(viii) Violation of Rules 100B; 100D & 100E of Central Excise Rules was alleged and liability to penalty under Section 11AC was proposed.
(ix) Shri K.K. Sharma, Vice-President & Shri R.K. Kalla Executive Director were found to be aware of switching of production of MDL to MD clandestinely and had thus rendered themselves liable to penalty under Rule 209A.
(x) MD was also asked to show cause why penalty under Rule 209A should not be imposed on them.
1.5The Commissioner, confirmed the demands of duty and imposed penalties. Hence these appeals.
2.1After hearing both sides and considering the material on record it is found -
(a) The allegation that MD was not capable of manufacturing the goods, as machinery was not installed, is based on the statement of Shri Sanjay Ghelebhai and Shri L.P. Parwani; these statements without verification of facts and from memory are in direct conflict with the Certificate dated 15-4-97 issued by the Assistant Commissioner of Central Excise, Ahmedabad, after due verification. The appellants have produced correspondence exchanged between MD and Range Superintendent dated 1-11-95 intimating installation of 155 sulzer looms in their premises; 1-2-96 of having started production; 25-3-96 about completion of erection. The Asstt. Commissioner in-charge of the unit for EPCG installation verification on 15-4-97 has issued an installation certificate. The annexure to this certificate gives the BE No. of import and dates of installation of Machines imported under EPCG Scheme. There installation dates range during the period September 95 to May 96. If that be so, and it is, since this certificate and date of installation have been verified by the Range Superintendent and found to be correct, then on 24/25-10-96, when the Anti-Evasion Officers visited the premises of MD, it could not have been said or alleged and upheld or there were any reasons to conclude that machinery was not installed in MD premises to manufacture. Parwani’s statement recorded on 25-10-96, is therefore false on record it cannot be relied. The jurisdictional officers certificate issued even after the search on 24/25-10-96, & the statements speak about the reliability of the same. No jurisdictional officer, after search of a factory by Anti-Evasion officers will venture to issue a certificate, contrary to records. We rely more on the certificate of the jurisdictional Assistant Commissioner in-charge and the verification of the installation by the Range Superintendent over the statements as relied upon by the ld. Commissioner. The ld. Commissioner’s rejection of this certificate issued by his own Assistant Commissioner only on ground of the same being dated 15-4-97 and statements recorded on 25-10-96 cannot be upheld. We find no material to confirm the allegation of no machinery installed in MD, in view of the documentary evidence, to the contrary which is based on contemporaneous verification and exchange of correspondence even before the search of MD took place.
(b) Sanjay G. Naik’s statement informing the diversion to be at behest behalf of Shri K.K. Sharma has not even been put to Sharma. No efforts have been made to ascertain work in process. The loom production reports & RG 1 figures and assumptions made thereafter cannot sustain the charges and quantification armed at. From loom production to RG 1 stage there are number of steps of verification i.e. in folding/packing departments, which have been ignored or not found fault with, as Commissioner has ignored the submissions of the appellants made as regards stocks in process. No correlation with raw materials received and consumed has been brought out to substantiate the quantity of production. Demands made on assumptions and presumptions as in this case cannot be upheld.
(c) The allegation of excess stocks allegedly made out and seized have been not upheld and the seizure had been vacated by the jurisdictional Assistant Commissioner. The Commissioner not finding this lifting of seizure to be relevant and an appeal had been filed, will not call for acceptance of his interpretation. No material on record in appeal filed has been shown to be in favour of Commissioner’s view.
(d) Reading of Board’s Circular 618/9/2002-CX. dtd. 13-2-2002 and the provision of Notification 125/84-CX. would indicate that the fabrics beyond the quota of DTA, allowed to be sold in India would be and should be levied to duty under the main Section 3(1) of the Central Excise Act, 1944 and that would grant the benefit of exemption of full duty of Excise as levied. Benefit under Notification 174/84-C.E. dtd. 26-5-84 granting exemption from Additional Duty of Excise (Goods of Special Importance) Act would be also available.
(e) The reliance of the appellant on the Tribunals decision in case NCC Blue Water Products Ltd. [ (Tri.-Bang.)] is well founded to arrive at levy of duty only under Section 3(1) of the Central Excise Act, 1944 on goods cleared from an EOU to DTA without obtaining permission of competent authority. That decision was arrived at after referring to and relying upon Sam Spintex’s Ltd. under (Tri. - Del.) which relied upon the decision of CCE v. Pratap Singh [] which has been affirmed by the Apex Court [].
(f) The ld. DRs. reliance on the case of Himalaya International Ltd. [] of the Larger Bench, to claim that following the same, the rate applicable whether the clearance is made with or without the permission obtained would be interims of proviso to Section 3(1) in case of EOU, cannot be upheld, since the Apex Court has set aside and remitted the referring Bench’s decision arrived at, after applying the above law, as laid down by the Larger Bench, with the observations -
“...... The matter is reverted back to the Commissioner for consideration of not only the rate but also it to decide the question whether the Respondent is entitled to exemption.......” (S.C.)” (Emphasis supplied)
Thus Himalaya International Larger Bench stipulation, as to rate with or without, being under proviso to Section 3(1) cannot be applied. The rate applicable under Section 3(1) is applicable. The same is NIL for Gray Denim fabrics or exempt under Act 125/84 read with 174/84-C.E.
(g) Once goods cleared from MDL the EOU are found to be at NIL duty or fully exempt, the question of demand on MDL does not arise. It was submitted that there was no charge of processed Denim having been cleared without payment of duly, if not exported under EPCG obligations. Thus when no duty demands under the Central Excise Act are to be upheld/found there can be no case/cause for penalty.
(h) The duty demands, interest or/& penalties imposed are to be set aside.
3.1In view of the finding the appeals are allowed.
(Pronounced in Court)