Dina Iron & Steel Ltd. v. Commissioner Of Central Excise, Patna
Structured Summary of the Tribunal Order (Member: V.K. Agrawal)
Factual and Procedural Background
M/s. Dina Iron & Steel Ltd. (the Appellants) commenced manufacture of non-alloy steel ingots/billets (sub-heading 7206.90) from 17-7-1998. In a declaration under Rule 173B of the Central Excise Rules they stated they had a composite plant comprising an induction furnace with secondary refining facility and continuous casting facility within the same premises, and accordingly claimed duty treatment under Section 3 of the Central Excise Act read with Notification No. 30/97-C.E.(N.T.), dated 1-8-1997, as amended by Notification No. 43/97-C.E.(N.T.), dated 30-8-1997.
The Assistant Commissioner ordered provisional assessment under Rule 9B of the Central Excise Rules, 1944. The Deputy Commissioner, by Adjudication Order dated 7-3-2000, held that the Appellants did not fall within Section 3 and required them to discharge duty under Section 3A. The Commissioner (Appeals), by Order dated 31-8-2000, remanded the matter to the Deputy Commissioner for de novo adjudication with specific directions. The Tribunal (Appellate Tribunal) also remanded the matter by Final Order dated 8-9-2000 on grounds of natural justice.
Subsequently a show cause notice dated 20-2-2001 sought demand of duty for 1998-99 and 1999-2000 under Section 3A. The Commissioner (Adjudicating Authority) issued the impugned order dated 18-12-2001 confirming the demand and imposing penalty, holding assessment under Section 3A. The Appellants challenged non-compliance with remand directions and the refusal to accept their technical expert's report; the Revenue relied on a joint inspection team report.
Legal Issues Presented
- Whether the Appellants are liable to discharge Central Excise duty under Section 3 of the Central Excise Act (i.e., as manufacturers in a composite plant with induction furnace plus secondary refining and continuous casting) or under Section 3A of the Act (on the basis of annual capacity of production).
- Whether the Appellants' unit qualified as a "composite plant" consisting of an induction furnace with secondary refining facility and possessing continuous casting facility within the same premises at the relevant time.
- Whether the Adjudicating Authority complied with the specific directions given in the Commissioner (Appeals) remand order (including supply of the joint inspection report, discussion of the appellants' expert opinion, and drawing/testing of samples) before passing de novo adjudication.
Arguments of the Parties
Appellant's Arguments
- The Appellants declared the plant as a composite plant (induction furnace + secondary refining + continuous casting) in Rule 173B and claimed benefit under Section 3 read with Notification No. 30/97 (as amended).
- The Deputy Commissioner had ordered provisional assessment; the Deputy Commissioner's Adjudication Order (7-3-2000) held they did not fall under Section 3; Commissioner (Appeals) remanded the matter with directions including sample-drawal and discussion of the expert opinion.
- The show cause notice dated 20-2-2001 was issued on the basis of the Deputy Commissioner's order which had already been remanded by the Commissioner (Appeals), and the Adjudicating Authority failed to comply with the remand directions.
- The Commissioner (Appeals) specifically directed that samples from the induction furnace and from the ladle (finished product) be drawn and tested; the Adjudicating Authority did not draw these samples, wrongly claiming sample-drawal was irrelevant at a belated stage.
- The appellants submitted a technical expert report (Shri Mukund V. Sampat, B.Sc., B.E. (MET)) explaining how ladle/secondary refining occurred in their factory and asserting that secondary refining was necessary to produce their product; this expert report should be accepted and discussed rather than being rejected on factual mischaracterisations.
- The Appellants contested the technical competence of the Joint Director of Industries to opine on secondary refining, arguing that the joint inspection team's technical conclusions were not authoritative and that the expert report should be considered.
Revenue's Arguments (Respondent / Department)
- The Adjudicating Authority complied with the directions contained in the remand orders of both the Appellate Tribunal and the Commissioner (Appeals), and supplied the report of the joint inspection team to the Appellants.
- The Appellants had challenged only the technical qualifications of the Joint Director but not the reasons or conclusions in the joint inspection report; the Adjudicating Authority discussed the expert report and gave reasons for not accepting it.
- The Adjudicating Authority explained why drawing of samples would be of no use (e.g., a test report of finished goods does not prove whether a particular factory has a refining facility), and accordingly did not draw samples.
Table of Precedents Cited
No precedents were cited in the provided opinion.
Court's Reasoning and Analysis
The Tribunal first identified the governing statutory framework: Notification No. 30/97-C.E.(N.T.), as amended by Notification No. 43/97-C.E.(N.T.), provides for levy and collection of excise duty on ingots and billets of non-alloy steel manufactured in an induction furnace in accordance with Section 3A of the Central Excise Act, but the Notification's Explanation excludes from that Notification a composite plant consisting of an induction furnace with secondary refining facility and possessing continuous casting facility within the same premises (i.e., such composite plants would fall under Section 3 treatment).
The Tribunal reviewed the procedural history: the Deputy Commissioner had held the Appellants lacked a secondary refining facility (Adjudication Order dated 7-3-2000); the Commissioner (Appeals) then remanded the matter with four specific directions (supply joint inspection report and hear the appellant; discuss merits of the appellants' expert opinion and pass speaking order; draw samples from induction furnace and from the ladle/finished product and have them tested at a recognised laboratory with results given to the appellant; permit further study of the manufacturing process).
The Tribunal evaluated whether the Adjudicating Authority complied with those remand directions. It found that the impugned de novo order had been passed without complying with the Commissioner (Appeals)' directions because no samples were drawn or tested as directed. The Adjudicating Authority had justified its refusal to draw samples by reference to the inapplicability of the Compounded Levy Scheme and the possibility of subsequent modifications to plant and machinery, but the Tribunal held that it was not open to the Adjudicating Authority to judge the relevancy of directions issued in a remand order — those directions must be complied with before adjudicating de novo unless and until set aside by a higher forum.
The Tribunal further observed that the dispute is essentially technical (whether the unit was a composite plant having secondary refining and continuous casting within the same premises). The Revenue relied on a joint inspection team report comprised of the Joint Director, Dept. of Industries, Bihar and the Deputy Commissioner, Central Excise. The Appellants produced a technical expert's report (Shri Mukund V. Sampat) asserting that ladle refining took place and that secondary refining was necessary for their product quality. The Tribunal noted that the Revenue had not produced any report from a technical person.
Given (a) non-compliance with the Commissioner (Appeals)' remand directions (in particular non-drawal/testing of samples), (b) the technical nature of the question, and (c) the competing technical reports with no technical report from Revenue on record, the Tribunal concluded that the matter should be remanded. It directed that the Adjudicating Authority obtain an examination of the appellants' plant by a Technical Expert to ascertain the factual position as to whether the plant was a composite plant (induction furnace with secondary refining and continuous casting within the same premises) at the relevant time, and then adjudicate afresh after observing principles of natural justice. The Appellants were directed to inform the Department about any modifications to plant and machinery during/after the relevant period.
Holding and Implications
Holding (final disposition): The appeal was allowed by the Tribunal by way of remand. The Tribunal remanded the matter to the Adjudicating Authority with directions as described above. The Stay Petition was also disposed of.
Core Ruling: APPEAL ALLOWED BY WAY OF REMAND.
Direct consequences and implications for the parties:
- The Adjudicating Authority must re-adjudicate the matter de novo after complying with the remand directions of the Commissioner (Appeals), including supply and consideration of the joint inspection report, discussion of the appellants' expert opinion, drawing and testing of samples (induction furnace metal and ladle/finished product) at a recognised laboratory, and any further study of manufacturing processes as necessary.
- The Adjudicating Authority must obtain examination of the plant by a Technical Expert to ascertain whether the unit was a composite plant possessing secondary refining and continuous casting facilities within the same premises at the relevant time.
- The Appellants must inform the Department of any modifications or changes to plant and machinery during or after the relevant period; the Adjudicating Authority must follow principles of natural justice in the fresh adjudication.
- No broader legal precedent was set or discussed by the Tribunal beyond the direct instructions to comply with remand directions and obtain proper technical examination; the decision effects an order for fresh consideration rather than a substantive determination on the merits.
[Order per : V.K. Agrawal, Member (T)]. - The issue involved in this appeal, filed by M/s. Dina Iron & Steel Ltd., is whether they are to discharge Central Excise duty liability under Section 3 of the Central Excise Act or under Section 3A of the Act on the basis of the Annual Capacity of Production.
2. Shri B.N. Chattopadhyay, learned Advocate, submitted that the Appellants commenced manufacture of non-alloy steel ingots/billets falling under sub-heading 7206.90 of the Schedule to the Central Excise Tariff Act from 17-7-98; that in their declaration filed under Rule 173B of the Central Excise Rules, they mentioned that they had a composite plant having induction furnace with secondary refining facility and continuous casting facility within the same factory premises and accordingly claimed the benefit of payment of duty under Section 3 of the Act read with Notification No. 30/97-C.E.(N.T.), dt. 1-8-97 as amended by Notification No. 43/97-C.E. (N.T.), dt. 30-8-97; that, however, the Assistant Commissioner ordered for provisional assessment under Rule 9B of the Central Excise Rules, 1944; that Deputy Commissioner under Adjudication Order No. 47/2000, 15199, 100/99, 207/2000, dt. 7-3-2000, held that they did not fall within the provisions of Section 3 of the Act and were to discharge duty as per the provisions of Section 3A of the Act; that on appeal, the Commissioner (Appeals), under Order No. 285/Pat/C.Ex./ Appeal/2000, dt. 31-8-2000 remanded the matter to the Dy. Commissioner for de novo adjudication with certain directions. He also mentioned that consequent upon Adjudication Order dt. 7-3-2000 of the Dy. Commissioner, the Commissioner, under Order dt. 31-3-2000 determined their annual capacity of production provisionally for the financial years 1998-99 and 1999-2000; that however, the Appellate Tribunal, vide Final Order No. A-1482-Cal/2000, dt. 8-9-2000 remanded the matter to the Commissioner for readjudication, as principles of natural justice were not followed by the Commissioner. The learned Advocate, further, mentioned that another show cause notice dt. 20-2-2001 was issued to them for demanding duty for the financial years 1998-99 and 1999-2000 under Section 3A of the Act; that the Commissioner, under the impugned order dt. 18-12-2001 has confirmed the demand of duty and imposed penalty holding that they are liable for assessment under Section 3A of the Act. The learned Advocate contended that the show cause notice dt. 20-2-2001 was issued to the Appellants on the basis of Order passed by the Dy. Commissioner which had already been remanded by the Commissioner (Appeals); that without complying with the specific directions given by the Commissioner (Appeals), the matter cannot be decided; that the Commissioner (Appeals) had given the direction, while remanding the matter, that the sample of the metal from the induction furnace as well as of the product coming from the ladle i.e. the finished product should be drawn and got tested by a recognised laboratory for verifying the extent of impurities; that no such samples were drawn as the Adjudicating Authority in the impugned Order was of the view that at the belated stage there was no point or relevancy in drawing samples as the Appellants might have made modifications; that the direction in the remand Order has to be complied with. He further, submitted that the Commissioner (Appeals) had also directed that the expert opinion [of Shri Mukund V Sampat B.Sc., B.E. (MET)] filed by them should be discussed; that the findings in the impugned order to the effect that the said Report had made a detailed discussion about various theoretical aspects of secondary refining and had not anywhere mentioned or certified that the assessees were having secondary refining facility in their factory premises, are not factually correct; that the Technical Expert has clearly opined in his report as to how in their factory ladle refining took place; that according to Expert, the Appellants are making low carbon high quality billets mainly for reeling by patra mills up to 1 mm thickness and such their final product needs very pure and high quality billets and so secondary refining is a must. He finally submitted that the Adjudicating Authority has not disputed that the Joint Director of Industries had no technical qualification to furnish an opinion about the secondary refining in their factory; that the report of Shri Sampat is, therefore, required to be accepted in deciding the matter.
3. Countering the arguments, Shri A.K. Pandit, ld. DR, reiterated the findings as contained in the impugned order and pointed out that the Adjudicating Authority had complied with all the directions contained in both the remand Orders passed by the Appellate Tribunal and the Commissioner (Appeals); that the report of the joint inspection team had been supplied to the Appellants; that the Appellants have only challenged the technical capabilities of the Joint Director and have not challenged the reasons contained therein and the conclusion arrived at; that the Adjudicating Authority has discussed the Report given by Shri Sampet and given his reasons for not accepting the same; that the Adjudicating Authority has also mentioned the reasons in the impugned order as to why drawing of samples would be of no use; that a test report of finished goods would not lead to the conclusion that a particular factory is having a refining facility or not.
4. We have considered the submissions of both the sides, Notification No. 30/97-C.E. (N.T.) as amended by Notification No. 43/97-C.E. (N.T.), dt. 30-8-97 provided for levy and collection of excise duty on ingots and billets of non-alloy steel falling under sub-heading Nos. 7206.90 and 7207.90 of the Schedule to the Central Excise Tariff Act, manufactured in an induction furnace in accordance with the provisions of Section 3A of the Central Excise Act. However, Explanation to the Notification provided that Notification would not apply to a composite plant consisting of induction furnace with secondary refining facility and possessing continuous casting facility within the same premises. The Deputy Commissioner, under Order dt. 7-3-2000, held that the Appellants did not possess the secondary refining facility. The Commissioner (Appeals) remanded the said order with specific directions as under : -
(1) The report of the Joint Inspection team consisting of the Joint Director of Deptt. of Industries, Bihar and the Deputy Commissioner, Central Excise, Patna to be supplied to the appellant and the case should be decided after hearing from them (appellant).
(2) The merits of the expert opinion filed by the appellants should be discussed and a speaking order passed.
(3) The sample of the metal from the induction furnace as well as of the product coming from the ladle, i.e. finished product, should be drawn after observing required formalities. The sample so drawn may be sent to a recognised laboratory for testing/verifying the extent of the impurities in both the samples. The test results may also be communicated to the appellant and their submission thereon obtained before deciding the case.
(4) The Deputy Commissioner is also at liberty to make further study of the manufacturing process before passing the de novo order.
5. We find substance in the submissions of the ld. Advocate for the Appellants that the impugned order has been passed without complying with the directions contained in the order passed by the Commissioner (Appeals) inasmuch as no samples of the metal from the induction furnace as well as ladle were drawn and tested. The ld. Adjudicating Authority has not found the drawal of samples relevant as Compounded Levy Scheme is no longer in force and the assessee might have made modifications or that the plant and machineries had undergone changes. It is not open to the Adjudicating Authority to judge the relevancy of the directions given in the remand order. The directions given by the Commissioner (Appeals) are to be complied with before adjudicating the matter de novo unless and until those directions have been set aside by the higher appellate forum. Further, the ld. Adjudicating Authority has not found it necessary to draw samples on presumption and assumptions of modification without any basis. We, therefore, hold that the impugned order has not been passed after complying with the directions confessed in the remand order passed by the Commissioner (Appeals). Accordingly, the matter has to go back to the Adjudicating Authority. We also observe that the issue involved in the present dispute is a technical dispute as to whether the Appellant's unit is a composite plant consisting of induction furnace with secondary refining facility and possessing continuous casting facility, within the same premises. The Revenue is relying upon a report of Joint Inspection Team consisting of the Joint Director, Deptt. of Industries, Government of Bihar and Deputy Commissioner, Central Excise. The ld. Advocate has claimed that both these officers are not technically qualified to express an opinion on the issue involved and on the other hand they have submitted a report of a Technical Expert certifying that the quality of the steel manufactured by them can be made only by intermediate process of secondary refining. The Revenue has not brought on record any report from a technical person. In view of this, we remand the matter to the Adjudicating Authority with direction to get the plant of the Appellants examined by a Technical Expert to ascertain the factual position as to whether it is a composite plant consisting of induction furnace with secondary refining facility and possessing continuous casting facility, within the same premises at the relevant time and then adjudicate the matter afresh after following the principles of natural justice. The Appellants will also inform the Department about any modification/changes made by them in the plant and machinery during/after the relevant period. The appeal is thus allowed by way of remand. The Stay Petition also stands disposed of.