S.K. Sharma (Dr.) v. Union Of India
Dr. S. K. Sharma, working as Superintending Engineer in the Central Public Works Department (CPWD, for short), the Applicant herein, has approached this Tribunal for the second time under Section 19 of the Administrative Tribunals Act, 1985. First time he visited this Tribunal in OA 1476/2007 which was decided on 08.10.2007 directing the Respondents to decide the disciplinary case within 3 months. The Competent Authority decided the disciplinary case on 20.3.2008 by inflicting on him penalty of reduction to a lower stage in the time scale of pay by one stage for 2 years without cumulative effect and not adversely affecting his pension. Being aggrieved by the said order and having been denied of vigilance clearance for his promotion he has come up with the following prayers :- 1. Quash and set aside order dated 20.3.2008 of respondent No.1 punishing the applicant by imposing penalty of reduction to a lower stage in the time scale of pay by one stage for two years without cumulative effect and not adversely affecting his pension being violative of Articles 14 and 16 of the Constitution of India. To declare the departmental proceedings holding the applicant guilty and consequent imposition of minor penalty of reduction to a lower stage in the time scale of pay by one stage for two years without cumulative effect and not adversely affecting his pension against the applicant void and non-est being in disregard and violation of CPWD Works Manual and CCS (CCA) Rules, 1965. To declare that there is error apparent on the face of record in respondent No.1s decision to initiate and to conclude departmental proceedings against applicant as there is procedural irregularity/infirmity in the manner enquiry was initiated by respondent No.2 and penalty inflicted after more than 8 years by respondent No.1 of the alleged misconduct relating to the year 1999 is violative of well-settled norms set by the Honble Supreme Court that delay in departmental enquiry causes prejudice to the employee (P. V. Mahadevan v. M. D. T. N. Housing Board, (2005) 6 SCC 636, State of M. P. v. Bai Singh and Anr., 1990 (Supp.) SCC 738 & M. V. Bijlani case decided on 5.4.2006. Respondent No.1 in imposing the penalty ignored the decisions in B. L. Sharma case O. A. No.683/2007 decided on 5.6.2007 by this Honble Tribunal. To declare that imposition of minor penalty of reduction to a lower stage in the time scale of pay by one stage for two years without cumulative effect and not adversely affecting his pension ought not to be an impediment for the applicants promotion to Chief Engineer. To declare that holding the applicant guilty of misconduct is illegal and is a result of procedural illegality after a lapse of more than 8 years. To declare that Clause 7 of Govt. of Indias Guidelines regarding grant of vigilance clearance to members of the Central Civil Services/Central Civil Posts vide G. I. Dept. of Per. & Trg. O. M. No.11012/11/2007-Estt.(A) dated 14.12.2007 to the effect that in case of minor penalty cases vigilance clearance will not be given normally for 3 years after the currency of punishment is null and void, unconstitutional, illegal and non-est as against the applicant. Any other relief, which this Honble Tribunal may deem fit and proper in the circumstances of the case may be awarded in favour of the applicant and against the respondents.
2. The Applicant in this OA sought the directions with interim relief and submitted that the Respondents be directed to consider and promote the Applicant in the Departmental Promotion Committee (DPC) likely to be held for the post of Chief Engineer without prejudice to his contention that he was eligible to be promoted earlier and to that effect recommendation of the earlier DPC was kept in the sealed cover dated 1.10.2007. Accordingly, learned Counsel for the rival parties were heard on 4.11.2008 only on interim relief. While considering the interim relief sought for, the Tribunal noted that the Applicant was well within the zone of consideration and as per the guidelines of the Department of Personnel & Training (DOP&T), the persons who were within the zone of consideration would be considered by the DPC. Learned Counsel for the Respondents took note of the same and submitted that the candidature of the Applicant for promotion would be considered by the DPC but whether he would be selected or not could not be stated at that stage. Accordingly I directed the Respondents that in case the Applicant was found eligible as per the extant Rules his case would be considered for promotion by the DPC.
3. Notice was issued to the Respondents who submitted detailed counter reply on 31.3.2009 and the Applicant filed on 17.04.2009 rejoinder to the counter and an additional affidavit was filed by the Respondent on 15.5.2009. The Applicant filed his reply to the said additional affidavit on 26.5.2009. The case was finally heard on 9.09.2009.
4. Shri G.D. Gupta, learned Senior Counsel assisted by Shri S.K. Sinha, the learned counsel for the Applicant gave an exhaustive setting of the events and the alleged mis-conduct which took place in 1999-2000 on the basis of which the Applicant was proceeded with the disciplinary proceedings. He highlighted the investigation conducted by the Director General, Central Public Works Department, who came to the conclusion that the Applicant tried his best to stop use of proprietary, unauthorized and unapproved superior material from the initial stage itself and there was no evidence in the records that the Applicant had ordered huge deviation to the extent of Rs.31 lakhs. The extra work was actually executed by EE/Assistant Engineer/JE using Zigmamat and gilsonate. The Applicant did admit to have allowed a limited quantity of gilsonate and zigmamat use for 1000 sq. metres for Rs.2.65 lakhs for which a proposal was sent by Executive Engineer on 8.5.2000 which was within his financial powers and for such deviations, he was not to get prior orders from Chief Engineer. Shri Gupta brought out the point that the Applicant was proceeded under Rule 16 of the CCS (CCA) Rules for minor penalty where regular departmental inquiry was not needed and, as such, he relied more on the findings recorded by the Director General of Works (pages 55 to 67 of the paper book). He contended that the Applicants subordinates were interested to use the costly materials such as gilsonate and zigmamat for which they ignored the Applicant while sending estimates incorporating the proprietary items, but the Applicant suggested use of light materials/cheaper alternatives; and he granted sanction for use of such material for 1000 sq. metres for arsenal depot and alleged that it was the Engineers at site in collusion with the client department, exceeded the quantity. He was submitted an estimate for an extra item statement of Rs.265000/- for the 1000 square meters area, which he sent to the Planning Division on the same day which was received by Executive Engineer (Planning) on 8.5.2000. It is stated that the Planning Division slept over the issue for almost 7 months and reply sent to him only on 22.12.2000. It was also contended that in the reply to the charge sheet he informed that the question whether he granted permission to the Executive Engineer on the issue of revised extra item statement raised on 8.12.2000 to which the Executive Engineer replied on 22.12.2000 and the EE did not indicate that it was the Applicant on whose instructions he had carried out the work. On the other hand, he admitted that a joint inspection of the building in the campus was carried out by client department and Central Public Works Department in which leakages in terraces of quarters, office of commandant, 4th signal was reported and early action was required to be taken. The Executive Engineer stated that sanction could not be obtained from the competent authority and it was executed in the interest of safety of building and as per requirement of client department. He drew my attention to the reply of Executive Engineer dated 22.12.2000 (Annexure A-1). Shri Gupta contended that the Applicant had no malafide intention nor ulterior motive to cause any wrongful gain or loss to anyone, at best, it could be said that there was a judgmental error by the Applicant when he did not issue clear orders to Executive Engineer. He informed that the Applicant was supervising half of Madhya Pradesh and Uttar Pradesh which was keeping him busy. Another contention raised in favour of the Applicants case was that the Respondents took more time to decide the minor penalty in disciplinary case for which Applicant was not at fault. Shri Gupta drew my attention to the Vigilance Commission guidelines dated 23.5.2000 where it was prescribed to pass final orders in minor penalty cases within two months from receipt of defence statement. Thus, he contended that the departmental inquiry should have been concluded by the end of 2004 but the Respondents took more than 4 years, as a result of which, the Applicant was superceded in the years 2007 and 2008. He highlighted that the delay in taking decision in the said case prejudiced the Applicant and he had lost the chance of his promotion.
5. Shri Gupta referred and relied on the following judgments and decision in support of the contentions :-
(i) Ramesh Grover versus Union of India and others (OA No. 179/2006) decided by this Tribunal on 11.1.2007.
(ii) Dinesh Kumar Patnaik versus Union of India and Others (OA No. 1955/2006) decided by this Tribunal on 16.05.2007.
(iii) Anil Kumar Sharma versus Union of India and Another (OA No. 606/2008) decided by this Tribunal on 07.07.2009.
(iv) P.K. Mathur versus Union of India & Ors. (WP (Civil) No. 7982/2007) judgment delivered by Honble High Court of Delhi on 23.10.2007.
(v) P.K. Mathur versus Union of India & Another (OA No. 1600/2007) decided on 27.8.2009 by this Tribunal.
6. Per Contra, Shri H.K. Gangwani, the leaned Senior Central Government Counsel representing the Respondents opposed the contentions of Shri Gupta. Narrating the background of the disciplinary case against the Applicant Shri Gangwani highlighted that the water proofing treatment in the roof of residential and non-residential buildings in Group Centre and CTC-I at CRPF, Neemuch was to be executed as per agreement amounting to Rs.1875000 but the Applicant issued oral instructions for execution of an extra items of the said works. The Executive Engineers letter dated 8.5.2000 including extra item of work for 1000 sq.m at a cost of Rs. 2.65 lakh, though received by the Applicant, he did not issue any inspection nose and recorded on the side margin of the said nose Instructions issued during inspection at site. Further, as against the tendered and agreement amount of Rs. 18.75 lakh, extra items to the tune of RS. 3,170050 were executed as proprietary items without going for the tenders. Shri Gangwani refuted the contentions of bilated disciplinary action. He submitted that there was no delay but consultation with the CVC, UPSC and CBI took time and as per the directions of the Tribunal in OA No. 1476/2007, the Respondents took prompt action. He contended that on receipt of Applicants reply dated 25.5.2004, the Applicant filed OA 1476/2007 which caused some delay but the case processing was expedited. He further brought up that the penalty imposed on the applicant would be operative till 5.5.2010 and the after effect would be also on the vigilance clearance and Shri Gangwani referred to DOP&T OM No. 11012/11/2007 Estt (A) dated 14.12.2007 to state that vigilance clearance would not be available for the Applicant for a period 3 years after the currency of punishment. He argued that there was no merit in the Applicants claims and the OA should be dismissed.
7. Applicant was issued a Memorandum dated 28.4.2004 (Annexure-A3). For my proper adjudication of this case, more specifically the controversies involved therein. I, therefore, take the extracts of the following two Articles of Charges:- ARTICLE I The tender of M/s Dropex (India) Tar Product Private Limited, Indore amounting to Rs.18,75,000/- for the work Water Proofing Treatment in roof of Residential and Non-Residential Buildings in Group Centre and CTC-I, CRPF, Neemuch was accepted by the said Dr. S.K. Sharma, Superintending Engineer, Indore Central Circle, Central P.W.D., Indore vide letter No.23(91)/99-ICC/594, dated 30.12.1999. The work was executed by M/s Dropex (India) Tar Product Private Limited, Indore under Agreement No.40/EE/ICD-I/99-2000. The Executive Engineer, Indore Central Division-I vide letter No.19(9-PB)/2000/ICD.I/140 dated 8.5.2000 submitted an Extra Item Statement No.II pertaining to the said Agreement No.40/EE/ICDI/99-2000 amounting to Rs.2,65,000/-. The EIS was containing a single item of P/L water proofing treatment with chop glass fibre mat with quantity as 1000 sqm. The Extra Item Statement No.II amounting to Rs.2,65,000/- was seen by Dr. S.K. Sharma on 8.5.2000. But it was not approved by Dr.S.K. Sharma even after a lapse of 7 months after its receipt in Indore Central Circle till 8.12.2000. During processing of Extra Item Statement No.II in Circle Office, the said Dr. S.K. Sharma in the margin of note-sheet at Page No.39 of Part File No.23(91) recorded the following remarks against Para-4 of note: Instructions issued during inspection at site. The Executive Engineer, Indore Central Division-I in the absence of any specific instructions by Dr. S.K. Sharma, Superintending Engineer in regard to the restriction of quantity of extra item to be executed and also in the absence of sanction of Extra Item Statement No.II (submitted by the Executive Engineer on 8.5.2000) by Dr. S.K. Sharma, allowed the execution of a proprietary item of water proofing work chop glass fibre mat as extra item to the extent of 8,748.08 sqm., and one more extra item, which was also a proprietary item, of Providing & applying two coats Gilsonate to the extent of 11,668.82 sqm. and submitted the revised Extra Item Statement No.II vide letter No.19(9-PB)/2000/ICD/2522 dated 8.12.2000 amounting to Rs.31,70,050/-. Although the said Dr. S.K. Sharma saw the Extra Item Statement No.II on 8.5.2000 but failed to sanction the same even after a lapse of 7 months. The said Dr. S.K. Sharma violated the provisions of Para 25.8 of CPWD Manual, VoI.II (1988 Edition). ARTICLE II The Extra Item Statement after scrutiny in the Planning Unit of Indore Central Circle was put up to the said Dr. S.K. Sharma on 31.10.2000. The Assistant Engineer (P) in Para-4 of note at page 39 of Part File No.23(91), on 16.5.2000, raised the following objection regarding non-compliance of provision of Para 25.4 of CPWD Manual, VoI.II. According to Para 25.4 of CPWD Manual, VoI.II, no deviation should be made from original agreement without prior permission of competent authority (SE, Indore Central Circle in this case). From the file, it is seen that neither EE/Indore Central Division-I has asked for permission for such deviation nor SE/Indore Central Circle has given any permission. It was subsequently endorsed by the Executive Engineer (P&A) on 31.10.2000. The said Dr. S.K. Sharma, in the margin of note-sheet at Page No.39 of Part File No.23(91) recorded the following remarks against Para-4 of note: Instructions issued during inspection at site. But the said Dr.S.K. Sharma did not issue any inspection note confirming such instructions in violation of the instructions contained in Para 37(a) of CPWD Code. He also failed to confirm the above instructions, in writing.
8 The Applicant submitted an exhaustive reply denying his responsibilities and highlighting that the Executive Engineer should have taken the prior sanction and approval of the Chief Engineer who was competent for the said extra works. On the other hand, the EE executed the works without proper sanction and shifted the blame on the Applicants head. He, therefore, submitted that the EE and AE were at fault and pleaded for dropping the charges against him. The Disciplinary Authority in consultation with the Union Public Service Commission (UPSC) and agreeing with UPSC advice, imposed the punishment vide order dated 20th March 2008 the penalty of reduction to a lower stage in the time scale of pay by one stage for two years without cumulative effect and not adversely affecting his pension.
9. One of the contentions raised by the Counsel for the Applicant related to the years of delay in taking decision in the minor penalty disciplinary proceeding which prejudiced the Applicants case for promotion as Chief Engineer. In order to address the issue of delay at different stages, the following chronology of events has been compiled: 1999-2000 The alleged misconduct was committed 28.4.1999-24.7.2002 The Applicant worked as Supdtg. Engineer Central Circle 11.4.2002 CBI submits its report recommending departmental action against the Applicant along with others. 8.1.2003 The CVC recommended for minor penalty proceedings against the Applicant. 16.1.2003 Director General of Works, CPWD, submitted his Investigation Report along with comments on the Report of the CBI. 23.1.2003 The DG (Workss) Report was transmitted to CVC 28.4.2004 A Chargesheet under Rule 16 was issued against the Applicant. 25.5.2004 The Applicant submitted his explanation to the charges. 19.3.2007 The Applicant represented to decide his disciplinary case since he was due for promotion. 29.3.2007 & 5.12.2007 Advice of UPSC was sought in the disciplinary case. June 2007 The Applicant moved the Tribunal in OA No. 1476/2007 to direct the Respondents to decide the case. 8.10.2007 This Tribunal passed order in the Applicants first OA No. 1476/2007 directing the Respondents to conclude the disciplinary proceedings enquiry and pass orders within 4 months. 24.1.2008 UPSC provided its advice to the Disciplinary Authority 20.3.2008 The Applicant was inflicted minor penalty in the disciplinary case. 12.8.2008 The OA No. 2206/2008 was filed by the Applicant.
10. An important contention raised by Shri Gupta supporting the Applicant revealed that the Investigation Report of the DG Works, which were relevant facts, were not considered by the CVC and Disciplinary Authority. DG of Works submitted an analytical investigation report dated 16.1.2003 running to 12 pages on the alleged misconduct. DG of Works is the technical head who went into the details which has been explained in the Note dated 23.1.2003 sent to CVC. These undisputedly bring out the facts that the EE, AE and JE committed grave lapses right from the initial stage of preliminary estimate submitted to CRPF up to the execution of work including unauthorised and extra items. The Report of the DG (Works) gave his comments on the Report of the CBI after a thorough investigation and the said report revealed that the Applicant frequently emphasized the use of authorised schedule items of DSR instead of promoting use of proprietary items for water proofing, whose efficacy in long term was not even tested and such proprietary material was not approved by CPWD. Recommendation of DG (Works) on the Applicant was to caution him to be careful in future. For proper adjudication of this case, I feel it appropriate to take extract of DG (Works) Investigation Report on the Applicant:- 3. Role of Shri S.K. Sharma, SE CBI in their report has recommended initiation of major penalty against Shri S.K. Sharma, SE. From the records of the case it clearly established that SE tried his level best to stop use of proprietary, unauthorized & unapproved superior material from the initial stage itself inspite of the fact that A/A & E/S was accorded by client department on the basis of unauthorized preliminary estimate sent by AE directly. While according technical sanction. SE provided an approved item of DSR 97 i.e. cement based integral water proofing which is approved by CPWD and whose rates and specifications were also available in CPWD Specifications and schedules. However, on the observation of CE during a site inspection that the building being old. Additional load should not be allowed on the roofs. SE modified his technical sanction and provided a lighter fiber based material which is also available in the approved specifications and schedule of CPWD. It appears that SE wanted to avoid use of such superior specification and proprietary items, which were not even approved by CPWD. There is no evidence in the records that Superintending Engineer has ordered huge deviation to the extent of Rs.31 lakhs, which were actually executed by EE AE JE using zigma mat and Gilsonate. Superintending Engineer has already admitted having allowing limited quantity using zigma mat and Gilsonate for which EIS for Rs.2,65 lakhs was prepared and sent by Executive Engineer on 8.5.2000. Such deviation ordered by Superintending Engineer comes within his financial powers so delegated to him and for such deviations. Superintending Engineer does not need prior orders from Chief Engineer. The SE never authorised use of above extra items to the extent of Rs.31.70 lakhs executed by the Executive Engineer without the express knowledge and approval of the SE. The SE came to know about the execution of these items only on 8.12.2000 when revised extra item statement was forwarded to him by EE for Rs.31.70 lakhs after actual execution of work. SE had very clearly instructed Executive Engineer while conveying the acceptance of tender that no deviation extra item/substituted items shall be initiated without the written permission from his office. Such instructions of Superintending Engineer have not been followed by Executive Engineer and his verbal statement in CBI does not hold good in view of above directions. SE raised certain objections and forwarded the items to CE without his recommendations but the O/O CE directed him to sent the statement duly scrutinised and signed and therefore, SE had to forward the extra item statement to CE but in his forwarding letter he had very clearly pointed out fait accompli. Since SE was not even aware that such huge items were being carried out by the EE of his own, SE cannot be held responsible. However, Dr. S.K. Sharma, Superintending Engineer should have specified the quantum of extra item allowed by him for which it is recommended to caution him to be careful in future. The CE though described the extra items as unauthorized but approved the same for Rs.19,64,572/- for zigma mat and directed SE to approve the item of Gilsonate for Rs.7,55.198/- without ascertaining revised expenditure sanction of the client covering the unauthorized execution of extra item.
11. On perusal of the CVCs advice at Page 68 of the paper book, I find that the CVC OM No. 002-W8H-Y6 was issued on 08.1.2003 much before the submission of DG (Works)s Investigation Report dated 16.1.2003, transmitted to CVC on 23.1.2003. It can be safely inferred that the CVC did not have the opportunity to examine the report of the DG (Works) of CPWD, before tendering its advice to the Competent Authority. Further, DG (Works) took up the case of the Applicant in a Note dated 24.2.2004 on the subject and wrote to Deputy CVO of the Ministry of Urban Development and Poverty Alleviation as follows:- 3. In this connection, it is pointed out that the Executive Engineer, Assistant Engineer & Junior Engineer were primarily responsible for gross irregularities committed by them as earlier pointed out in Investigation Report also, and for which major penalty proceedings were recommended against them. The only lapse on the part of SE was that while allowing extra item during sites inspection, he did not specify the quantum of extra item to be carried out, and further, he did not confirm his verbal orders in writing and the same are brought out in the draft charge-sheet enclosed. It is felt that to equate the role of SE alongwith that of EE, AE & JE appears to be quite unreasonable and unfair, and particularly, keeping in view the fact that CVC has diluted the penalty proceedings against the EE, AE & JE into Minor in place of Major as recommended by this Unit. Charge-sheeting the Superintending Engineer for such a minor lapse, especially when the officers who are actually responsible for the major irregularities are being proceeded against them under minor penalty proceedings, would be unfair and demoralizing for the Superintending Engineer. It is, therefore, once again urged that the CVC may please be approached to reconsider their earlier advice. This issues with the approval of DG (W), CPWD.
12. The Counsel representing the Respondents could not respond as to whether further advice of CVC was sought after receipt of CVCs OM dated 8.1.2003 or any advice could be given by CVC. This gap in the initiation of the disciplinary proceeding continue. It is noted that the records do not show whether the UPSC, or the Disciplinary Authority considered the Investigation Report of the DG (Works) before coming to the conclusion to impose penalty on the Applicant. In the administrative process, this important Report from the technical and factual aspects of the case, seems to have been lost sight of, which in my considered opinion has vitiated the disciplinary proceeding against the Applicant.
13. The counsel for the Respondents raised an issue that the Applicant after inspection of the site did not submit his inspection note, nor he confirmed his oral instructions in writing which violated the provisions of Para 25.8 of CPWD Manual Vol.II (Para 11 at Page 177 of the paper book). On perusal of the said para, it reveals that it prescribes procedure to avoid delays and reads as follows: 25.8 Delays in the sanctioning of rates for extra/substituted items of work should be avoided at all levels. To minimize such delays the following procedure should be followed:- Proposal for fixing rates for the extra and substituted items of works should be submitted by the Sub-Divisional Officer as and when any extra/substituted item is foreseen. This should be done by him within a week of such foreseeing and in any case not later than a week of taking up of the work on such item. He must also submit a complete analysis etc. to the Executive Engineer who should approve the rate within a week of receipt of reference from the SDO if the sanction is within his competence. The Executive Engineer should take orders from the next higher authority, if the rates for the extra items are not within his competence of sanction. This can be done by personal contact/making a reference in writing within a week of receipt from the Sub-Division according to the exigencies/situation of work.
14. The reading of the para justifies the Applicants point of view that the responsibility lies on the EE and non the SE. The administrative practice on the follow up action of the site inspection provides two alternatives. The 1st alternative, the normal practice, is that the officer inspecting the site must submit detailed inspection note including his findings and instructions within a reasonable time. In case he has not submitted any inspection note but has given some oral instructions which have not been confirmed by the concerned officer, the 2nd alternative can be adopted. The subordinate officer can solicit the confirmation of the oral instructions given by the inspecting office, or, while submitting his proposal, he can clearly and unambiguously indicate the oral instruction as per which he is acting. In the present case, there is absence of both alternatives. Therefore, it is difficult to identify what were the oral instructions by the Applicant? In my considered view, this does not come in support of the Respondents/ averment.
15. On the basis of the chronology of events analysis, I find that there has been delay of more than 4 years in issuing the charge sheet against the Applicant for the alleged misconduct that took place in 1999-2000. Though the Applicant submitted his explanation on 25.5.2004 only after 28 days of the receipt of the charge sheet, the Disciplinary Authority did not pass order even by the date, (8.10.2007) the Applicants previous OA No.1476/2007 was decided by this Tribunal. The consultation with UPSC though started on 29.3.2007 and clarification given on 5.12.2007 after more than 2= years of pendency. The minor penalty charge sheet does not mandate any enquiry to be conducted, but there is no clarification as to why the competent authority took more than 3 = years (28.4.2004 to 20.3.2008) to decide the matter. The inaction for such a long time has surely prejudiced the Applicant. He has lost one opportunity for his promotion to the post of Chief Engineer. I find that there are two stages of delay viz. (i) at the stage of issue of the charge sheet, and (ii) finalization of the disciplinary case in the said charge sheet after so many years of submission of explanation by the Applicant. This is a minor penalty charge sheet pertaining to be alleged misconduct which took place in the years 1999-2000. I sought from both parties the chronology of events and statement of written arguments. The Applicant complied with the directions, but the Respondents did not submit. As such, with the help of the pleadings I could compile the above chronology of events.
16. In disciplinary proceedings, the nature of the charge and the alleged misconduct makes each case to come within one of the two types of misconducts viz. serious and grave misconduct involving corruption etc. and the second type are procedural and supervisory lapses. In case of grave charges, this Tribunal would generally not intervene in the disciplinary cases of the delinquent officials even if there is delay in completion of the disciplinary case. The Honble Supreme Court considered such types of cases in B.C. Chaturvedi vs Union of India, (1995 (6) SCC 749); Secretary to Government Prohibition & Excise Department vs. L. Srinivasan (1996 (3) SCC 157); and Food Corporation of India vs V.P. Bhatia (JT 1998 (8) SC 16) where it was held that the delay was not found to be a justifiable ground for the Courts and Tribunals to quash the disciplinary proceedings and the punishments imposed. The Applicants case does not come under this type of cases. The second type of cases, to which the case of the Applicant case falls, are not serious or grave. The disciplinary case in the present OA revolves round (a) delay in clearance of extra item of works (b) non-submission of inspection notes and (c) the associated supervisory lapses, so much so he was issued only a minor penalty chargesheet. The alleged misconducts seem to have taken place in 1999-2000, for which he was punished only on 20.3.2008 after a lapse of about 8 years. Even from the date of his explanation (25.5.2004) in a minor penalty chargesheet where enquiry is not called for, if took more than 3 years and 9 months to decide the case and that too only after the directions of this Tribunal. The question arises should the Applicant suffer for inaction of the Respondents over the years of delay? There is no plausible reason adduced by the Respondents for the delay. I like to refer to a case Delhi Development Authority & Ors vs D.P. Bambah & Anr {LPA 39/1999) decided on 29.9.2003 where the Honble High Court of Delhi has dealt very extensively the delayed action in disciplinary cases and laid down certain parameters which I consider very much relevant in this case and thus I take below the extract of Para 15 of the judgment:- 15. In our opinion the legal position, when an action is brought seeking quashing of a charge sheet on grounds of issuance of the charge-sheet or grounds of inordinate delay in completion of the disciplinary inquiry may be crystallized as under:- Unless the statutory rules prescribe a period of limitation for initiating disciplinary proceedings, there is no period f limitation for initiating the disciplinary proceedings. Since delay in initiating disciplinary proceedings or concluding the same are likely to cause prejudice to the charged employee, courts would be entitled to intervene and grant appropriate relief where an action is brought. If bona fide and reasonable explanation for delay is brought on record by the disciplinary authority, in the absence of any special equity, the court would not intervene in the matter. While considering these factors the court has to consider that speedy trial is a part of the facet of a fair procedure to which every delinquent is entitled to vis-`-vis the handicaps, which the department may be suffering in the initiation of the proceeding. Balancing all the factors, it has to be considered whether prejudice to the defence on account of delay is made out and the delay is fatal, in the sense that the delinquent is unable to effectively defend himself on account of delay. In considering the factual matrix, the Court would ordinarily lean against preventing trial of the delinquent who is facing grave charges on the mere ground of delay. Quashing would not be ordered solely because of lapse of time between the date of commission of the offence and the date of service of the charge sheet unless, of course, the right of defence is found to be denied as a consequence of delay.
(vi) It is for the delinquent officer to show the prejudice caused or deprivation of fair trial because of the delay. The sword of Damocles cannot be allowed to be kept hanging over the head of an employee and every employee is entitled to claim that the disciplinary inquiry should be completed against him within a reasonable time. Speedy trial is undoubtedly a part of reasonableness in every disciplinary inquiry.
17. The Honble Supreme Court in catena of judgments held that if there was no justification as to the inordinate delay in initiating enquiry, the departmental proceeding would be illegal. We rely on P.V. Mahadevan versus M.D. T.N .Housing Board ( 2005 SCC (L&S) 891), M.V. Bijlani versus Union of India and others ( 2006 (3) SLR SC 105), and the State of Andhra Pradesh Versus N.Radhakrishnan [1988 (4) SCC 154].
18. Having considered the settled legal position on the issue, I now take up CVC and DOP&T guidelines. The CVC has prescribed time limits for processing of cases of disciplinary proceedings in its letter No.000/VGL/18 dated 23.5.2000 taking into account of delays occurring in disposal of disciplinary cases which effect the morale of the charged official and others. In the said letter 15 items/stages in the disciplinary cases where the time limit has been delineated. The relevant items are extracted below for my easy reference for adjudication of this OA. S.No. State of Investigation/Inquiry Time Limit
4. Departments comments on the CBI reports in cases requiring Commissions advice. One month from the date of receipt of CBIs report by the CVO/Disciplinary Authority
5. Referring departmental investigation reports to the Commission for advice One month from the date of receipt of Investigation Report
6. Reconsideration of the Commissions advice, if required. One month from the date of receipt of Commissions advice
7. Issue of charge sheet, if required. (i) One month from the date of receipt of Commissions advice.
(ii) Two months from the date of receipt of investigation report.
8. Time for submission of defence statement. Ordinarily ten days or as specified in CDA Rules
9. Consideration of defence statement. 15 (Fifteen) days
10. Issue of final orders in minor penalty cases. Two months from the receipt of defence statements.
19. The Department of Personnel and Training (DOP&T) while considering the subject of accountability in decision making, issued an office Memorandum dated 16.2.2004 stressed that any officer adopting dilatory attitude leading to delay in decision making could be subjected to disciplinary proceeding.
20. In this backdrop of CVC and DOPT guidelines, if the present case is analysed, the Respondents would be highly embarrassed. The Applicant has been chargesheeted for not approving even after a lapse of 7 months after he had received the extra item Statement No.II amounting to Rs.2.65 lakh. He submitted that on receipt of the said statement of EE, marked to the Planning Unit on the same day and clarification was sought on 8.12.2000. Question arises who is going to be chargesheeted for taking belated action in this disciplinary case. Though CVC guidelines indicate 2 months time for taking decision in minor penalty chargesheet from the date of receipt of defence statement, in the present case, the Applicant sent his defence statement on 25.5.2004 but final order was passed on 28.3.2008, after a lapse of 3 years 10 months 2 days. One may not ask for strict compliance of 2 months, but obviously more than 3 years is neither acceptable nor tolerable by any standard. Should not there be accountability for the delay? This is left as a point for the Respondents to ponder over. But, what is the result for the Applicant? The Applicant having been promoted as SE in 1994 has reasonable expectation for promotion but the chargesheet hanging as Damocless Sword on his head has so far deprived him the promotion to CE. In this peculiar circumstances of delay, prejudice has been caused to him, as such remanding the case to reconsider will further prejudice, and decision is to be taken on this in the OA. All the facts and factors, on balance, go in favour of the Applicant and his agony and trauma should not be allowed to last Report coupled with belated action in all fronts, as balance, go against the Respondents.
21. I find that in the present case the delay is abnormal and there is no explanation for delay for initiation and finalization of the disciplinary proceeding. I also find that the Disciplinary Authority, having received the explanation on 25.5.2004 took prolonged period to decide the matter that too after the intervention of this Tribunal that the processing was expedited and penalty imposed on the Applicant. The Applicant, I find is not responsible for the belated action in the disciplinary proceedings against him. On the contrary, he is made to undergo mental agony and monetary loss when the case is unnecessarily prolonged without any fault on his part. Delay has already caused prejudice to the Applicant. I, therefore, come to the considered conclusion that mainly on the grounds of prolonged delay in deciding the minor penalty disciplinary proceeding serious prejudice has been caused to the Applicant and, therefore, the order dated 20.3.2008 and chargesheet dated 25.5.2004 are liable to be quashed and set aside.
22. In so far as the promotion issue of the Applicant to the post of Chief Engineer is concerned, I note that the Applicant was not promoted to the post of Chief Engineer, since the said charge sheet was pending against him. It is stated that vigilance clearance for the Applicant could not be given due to the pendency of the said charge sheet. In the preceding para, I have already come to the considered conclusion that belated action in issuing charge-sheet and in finalizing the disciplinary case against the Applicant being not sustainable in the eyes of law, the order dated 20.3.2008 wherein penalty was imposed and the charge sheet dated 25.5.2004 have been quashed and set aside. There is no bar for the Applicant to get vigilance clearance, if he is otherwise eligible. In view of the discussions within, there is need for this Tribunal to intervene in the matter and set right the administrative process which has been faulted by non- promotion of the Applicant to the post of Chief Engineer. Therefore, I direct that the Applicant must be considered for the promotion to the post of Chief Engineer by opening the sealed cover, if the DPC recommendation has been kept in that. Otherwise the Respondents would convene a review DPC and if he is found otherwise suitable for promotion, the same shall be given effect to from the date on which his immediate junior was promoted to the post of Chief Engineer. This process shall be completed within a period of one month from the date of receipt of a copy of this order.
23. In view of the above discussion for the facts and circumstances of the case and well settled legal position, the Original Application having sufficient merit is allowed in terms of above directions. No costs. (Dr. Ramesh Chandra Panda) (Shanker Raju) Member (A) Member (J) /uma/