Krishan Petitioner v. Union Of India And Others S

Himachal Pradesh High Court
Jul 26, 2016
Smart Summary (Beta)

Judgment Summary — Tarlok Singh Chauhan, J.

Factual and Procedural Background

The petitions (disposed of together) arise from alleged damage to petitioners' properties (houses, orchard, agricultural land) caused by tunneling work for development of a four-lane road on NH-21 (Kiratpur to Ner Chowk Section from Km 73.200 to Km 186.500) in the States of Punjab/Himachal Pradesh. With consent of parties, CWP No. 2983 of 2015 was taken as the lead case. The petitioners sought directions to acquire or protect their property, appointment of an expert committee to assess damage, compensation for loss due to construction of tunnel-5, production of records and costs.

Respondent State authorities placed on record joint inspection reports: a spot inspection on 16.5.2015 (in presence of petitioners and representatives of the executing agency) recorded some minor cracks in houses and cowsheds which were observed to be old and not due to blasting vibrations. A committee constituted by the Sub-Divisional Collector (letter dated 31.7.2015) assessed amounts for restoration for certain houses (a list of assessed restoration amounts was produced).

The Executing Agency (respondent No.7) averred that petitioners' grievances had been redressed, that tunneling work was stopped on 13.9.2015 and that precautionary measures had been taken; it admitted a small portion of land had sunk in the tunnel alignment due to collapse of muck at the tunnel face but asserted no other damage was noticed. A Mining Officer's inspection report (sought to be placed on record) observed that many houses lay 50–150 metres from the tunnel alignment: some cracks were old and concentric (not due to blasting) whereas cracks in cowsheds and one house (Sh. Fiun Ram) were new, vertical, and wide and "might have been developed due to blast induced ground vibrations."

Legal Issues Presented

  1. Whether the reliefs claimed by the petitioners (including protection/acquisition of property, appointment of an expert committee, assessment of damage, and compensation) can be granted in writ petitions under Article 226 when there are seriously disputed questions of fact that require evidence to be led.
  2. Whether the High Court, in exercise of writ jurisdiction, may appoint an expert committee to collect evidence and assess damage for adjudicating such claims.
  3. Whether, given the nature of the disputed facts and availability of other remedies, the writ petitions are maintainable or should be relegated to civil courts.

Arguments of the Parties

Petitioners' Arguments

  • The tunneling work for the NH-21 project (particularly tunnel-5) has directly and indirectly damaged petitioners' properties (houses, orchards, agricultural land).
  • They sought directions to acquire or protect their properties, appointment of an expert committee to assess damage, compensation for losses, production of records and imposition of costs on respondents.
  • Learned counsel for the petitioners relied on a number of judgments to contend that a writ court can go into disputed facts and award compensation.

Respondents' Arguments

  • State authorities presented joint inspection reports showing some minor cracks observed on 16.5.2015 which were old and not due to blasting; many houses are old and cracks are attributable to natural aging or settlement.
  • A committee constituted by the Sub-Divisional Collector assessed restoration amounts for specific houses (a tabulated assessment was placed on record).
  • The Executing Agency contended petitioners' grievances had been redressed, tunneling work was stopped on 13.9.2015, precautionary measures were taken, and only a small portion of land had sunk due to collapse of muck at the tunnel face; otherwise no damage was noticed.
  • The Mining Officer's inspection (sought to be placed on record) indicated both old cracks (not due to blasting) and some new cracks in certain structures which "might have been developed due to blast induced ground vibrations," demonstrating factual disputes on causation and extent of damage.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
State of Kerala v. M.K. Jose (2015) 9 SCC 433 Summarised a range of authorities on when a writ court may entertain disputed questions of fact and when it should refrain; used as the principal reference for the legal position examined in this case. The Court relied on this decision as the primary guide to decide whether the present writ petitions involving disputed facts and claims for compensation should be entertained in writ jurisdiction.
State of Bihar v. Jain Plastics and Chemicals Ltd. (2002) 1 SCC 216 Writ petition under Article 226 is not the proper proceeding for adjudicating disputes of the contractual variety; when alternative equally efficacious remedies exist, those should ordinarily be pursued. Cited to support the principle that contractual or fact-intensive disputes are generally not appropriate for adjudication under Article 226 and that alternative remedies are a strong ground for refusing writ relief.
National Highways Authority of India v. Ganga Enterprises (2003) 7 SCC 410 Disputes relating to contracts cannot ordinarily be agitated under Article 226; writ courts are not the proper forum for contractual disputes. Used to reinforce that writ jurisdiction is not generally appropriate for disputes grounded in contract or fact-intensive claims such as those here.
Kerala SEB v. Kurien E. Kalathil (2000) 6 SCC 293 Authority cited in the context of limits on writ jurisdiction for contractual disputes. Included among authorities showing that contractual disputes are ordinarily not cognizable in writ jurisdiction.
State of U.P. v. Bridge & Roof Co. (India) Ltd. (1996) 6 SCC 22 Authority cited for the settled law that contractual disputes are not generally to be decided by writ courts. Relied upon as part of the body of precedent limiting writ jurisdiction in contract or fact-heavy matters.
Bareilly Development Authority v. Ajai Pal Singh (1989) 2 SCC 116 Authority cited for the principle that contractual disputes are not ordinarily suitable for Article 226 adjudication. Referred to as part of the jurisprudence delineating the limits on writ remedies.
Verigamto Naveen v. Govt. of A.P. (2001) 8 SCC 344 Cited as an example of cases where writ courts were enforcing statutory rights or duties (distinguished from pure contractual disputes). Cited to indicate the distinction between enforceable statutory rights (where writ relief may lie) and ordinary contractual disputes.
Harminder Singh Arora v. Union of India (1986) 3 SCC 247 Cited in the context of cases where writ jurisdiction was used to enforce statutory rights. Used to contrast factual situations where writ relief is appropriate from those which are contractual or factually disputed.
Gunwant Kaur v. Municipal Committee, Bhatinda (1969) 3 SCC 769 High Court has jurisdiction to try issues of both fact and law in writ petitions; but when facts are complex and require oral evidence, the High Court may decline to try the petition and direct a suit. Cited to support the proposition that writ courts can in appropriate cases determine disputed facts (including by taking oral evidence) but may decline where the dispute is complex and better suited to a suit.
ABL International Ltd. v. Export Credit Guarantee Corpn. of India Ltd. (2004) 3 SCC 553 Confirmed that writ courts may, in appropriate cases, entertain disputed questions of fact and even take oral evidence; set out cautionary limits on exercising Article 226 where other remedies exist; emphasized plenary nature of Article 226 but the exercise of discretion. Applied to show that while writ jurisdiction is plenary and can address disputed facts in suitable cases, the Court must exercise restraint and consider alternative remedies and the public law element.
Century Spg. & Mfg. Co. Ltd. v. Ulhasnagar Municipal Council (1970) 1 SCC 582 Authority referenced in relation to the circumstances where disputed facts in writ petitions may be addressed. Included among precedents illustrating the limits and scope of factual inquiry in writ jurisdiction.
Noble Resources Ltd. v. State of Orissa (2006) 10 SCC 236 Discussed the development of law regarding judicial review, public interest considerations, and circumstances where writ courts may or may not entertain disputed factual matters. Cited to emphasize that whether judicial review is permissible depends on facts; serious disputed factual questions may render a writ petition unsuitable.
Dwarkadas Marfatia & Sons v. Board of Trustees, Port of Bombay (1989) 3 SCC 293 Referred to in the jurisprudential context of ABL International and limits to writ review in contractual disputes. Used as part of the chain of authorities delineating when a writ court may examine facts or interpret contractual clauses.
Mahabir Auto Stores v. Indian Oil Corp. (1990) 3 SCC 752 Referenced among authorities concerning the scope of judicial review and jurisdictional limits. Referred to in support of the broader legal discussion on writ jurisdiction and disputed facts.
Jamshed Hormusji Wadia v. Board of Trustees, Port of Mumbai (2004) 3 SCC 214 Included in the list of authorities considered when delineating the scope of writ jurisdiction in fact-intensive matters. Referred to as part of precedent analysis leading to the conclusion that serious disputed questions of fact are not ordinarily to be tried in writ petitions.
Binny Ltd. v. V. Sadasivan (2005) 6 SCC 657 Referenced as an authority discussing public law element and judicial review. Referred to in the wider discussion on circumstances where writ jurisdiction may be invoked when public law considerations are involved.
G.B. Mahajan v. Jalgaon Municipal Council (1991) 3 SCC 91 Cited in relation to public law elements permitting judicial review. Included to show that public interest factors may justify exercise of writ jurisdiction in some cases.
Whirlpool Corpn. v. Registrar of Trade Marks (1998) 8 SCC 1 Referred to for the principle that Article 226 is plenary but subject to judicial restraint and that the High Court should exercise discretion prudently. Used to underscore the caution courts must exercise in invoking writ jurisdiction where alternative remedies exist or where the matter is primarily contractual/fact-intensive.

Court's Reasoning and Analysis

The Court first identified the pivotal question: whether the reliefs sought by the petitioners can be granted in writ petitions, given the presence of seriously disputed questions of fact that can only be resolved by leading evidence (including oral testimony and cross-examination). The Court noted that this was not a case that could be resolved on affidavits and counter-affidavits alone because the Court would be required to determine whether petitioners' properties were in fact damaged and, if so, quantify individual claims for compensation — matters requiring evidence.

The Court analysed relevant Supreme Court authorities (summarised in State of Kerala v. M.K. Jose) addressing:

  • That writ jurisdiction under Article 226 is plenary but discretionary and should be exercised with restraint, particularly where alternative equally efficacious remedies exist;
  • That while writ courts may, in appropriate cases, try disputed questions of fact (and even take oral evidence), such intervention is justified only in limited circumstances (for example, where facts are clear on record, where public interest or statutory rights are involved, or where interpretation of documents does not require external evidence);
  • That appointing committees or conducting "roving enquiries" to collect evidence in a contractual controversy or private dispute is impermissible; and
  • That writ courts may award compensation where facts are not in dispute and where negligence or violation of constitutional mandates is established on the record.

Applying these principles to the present facts, the Court observed that:

  • The respondents had disputed the petitioners' allegations and there existed conflicting material on record (inspection reports, committee assessments, executing agency's averments, Mining Officer's mixed findings), rendering resolution dependent on evidence that must be tested by cross-examination.
  • The Court emphasised that it cannot appoint an expert committee to collect evidence in aid of the petitioners, since such a course would amount to using the Court to gather evidence for one side and is impermissible.
  • Because the rival claims involve seriously disputed questions of fact about causation and extent of damage, these disputes are more appropriately investigated and determined in a properly instituted civil suit rather than by the High Court in exercise of writ jurisdiction.

Consequently, the Court concluded that the writ petitions were not maintainable and that petitioners should pursue civil remedies. At the same time, the Court provided procedural relief to protect petitioners' limitation rights if they proceeded to file suits within a specified period.

Holding and Implications

Core Ruling: The Court held that the writ petitions are not maintainable and disposed of the petitions in the terms set out in the judgment.

Implications and Consequences:

  • Direct consequence: The petitioners' writ petitions were disposed of and are to be pursued, if at all, by instituting civil suits in an appropriate forum.
  • If the petitioner(s) approach the civil court within thirty days from receipt of this judgment, they shall be entitled to the benefit of Section 80(2) of the Code of Civil Procedure and the period of limitation spent pursuing these writ proceedings shall be excluded.
  • The Court directed that any suit filed within the time frame granted should be decided as expeditiously as possible and in no event later than 31 March, 2017.
  • All interim orders passed in these petitions were vacated. Any amounts paid to petitioners pursuant to interim orders shall be refunded forthwith to the authorities by those petitioners.
  • The Court expressly stated that nothing in its observations should be construed as an opinion on the merits; if petitioners file civil suits, the trial court shall determine the merits uninfluenced by these observations (which were made only for disposal of the writ petitions).
  • No new legal precedent was created; the decision applies established principles about the limits of writ jurisdiction to the facts before the Court.

Disposition: The petitions were disposed of in the terms described above; all interim orders were vacated and refund directions were given as stated.

Show all summary ...

Tarlok Singh Chauhan, J.:— Since common question of law and fact arises for consideration in these petitions, they were all taken up together for hearing and are being disposed of by a common judgment.

2. With the consent of parties, CWP No. 2983 of 2015 is taken as the lead case.

3. The precise grievance of the petitioner is that on account of tunneling work being carried out by the respondents for development of four lane road from Kiratpur to Ner Chowk Section of NH-21 from Km 73.200 to Km 186.500 in the State of Punjab/Himachal Pradesh, their properties (houses, orchard, agricultural land) have directly and indirectly been damaged and therefore, should be compensated for the same and have prayed for the following reliefs:-

“(i) That the respondents may be directed to take immediate steps either to acquire or to protect the property (houses, orchard and agricultural land etc.) of the petitioner.

(ii) That necessary direction may be issued to appoint some expert committee to assess the damage caused to the property of the petitioner because of the act of the respondents.

(iii) That the respondents may be directed to compensate the petitioner for the loss he has suffered because of damage of his property due to the construction of tunnel-5.

(iv) That the respondents may be directed to produce entire record pertaining to the case and they may burden with cost.”

4. The State authorities, who have been arrayed as respondents No. 4 to 6 in the petitions have placed on record various joint inspection reports and it is averred that during the spot inspection by respondent No. 6 on 16.5.2015 in the presence of petitioners, local residents and representatives of respondent No. 7 (Executing Agency), some minor cracks were seen in the houses and cowsheds of the residents, which were observed to be old and not due to blasting vibration and had been caused naturally with passage of time, as most of the houses were old. It is further submitted that respondent No. 6 i.e Sub Divisional Collector, Sunder Nagar had constituted a committee vide letter dated 31.7.2015 for evaluating the loss/damage incurred to the houses of the petitioners, which reads thus:-

“The Executive Engineer, HPPWD, Sundernagar, Mandi, H.P has verified and approved the loss in the shape of restoration of the damages to these built up structures as under:-

Sr. No.Name of owner with addressAmount for restoration for the damage assessed1.House of Sh. Phiun Ram s/o late Sh. Jindu Ram resident of village Gamohu, P.O Kangoo, Tehsil Sundernagar, Distt. Mandi, H.PRs. 25,612.002.House of Sh. Basant Ram s/o Krishan resident of village Gamohu, P.O Kangoo, Tehsil Sundernagar, Distt. Mandi, H.PRs. 891.003.Residential house of Smt. Nikki Devi D/o Durga Ram resident of village Gamohu, P.O Kangoo, Tehsil Sundernagar, Distt. Mandi, H.PRs. 8216.004.House of Sh. Hari Singh s/o late Sh. Shawanu Ram resident of village Gamohu, P.O Kangoo, Tehsil Sundernagar, Distt. Mandi, H.PRs. NIL5.House of Sh. Krishan Chand s/o late Sh. Sadh Ram resident of village Gamohu, P.O Kangoo, Tehsil Sundernagar, Distt. Mandi, H.PRs. 872.006.House of Sh. Paras Ram s/o late Sh. Dhungal resident of village Gamohu, P.O Kangoo, Tehsil Sundernagarh, Distt. Mandi, H.PRs. 1370.007.House of Smt. Soma Devi w/o late Sh. Dagu Ram resident of village Gamohu, P.O Kangoo, Tehsil Sundernagar, Distt. Mandi, H.PRs. 2049.00

5. On the other hand the Executing Agency i.e respondent No. 7 in its reply has clearly averred that the grievance of the petitioners have already been redressed, as the work of the tunnel was stopped on 13.9.2015 and earlier to that all precautionary measures had been taken, so as to ensure that no direct or indirect damage is caused to the property of the petitioners as well as the residents of the area. It is averred that the small portion of land has sunk in tunnel alignment due to collapse of muck at tunnel face, but no other damage was noticed in the area.

6. In addition to the aforesaid, we may also make mention of CMP No. 2641 of 2016 preferred by the petitioner for placing additional particulars on record whereby report submitted by Mining Officer is sought to be placed on record, wherein he has made the following pertinent observations:-

“2. The houses of Smt. Reshmo Devi, Sh. Krishan, Sh. Basant Ram, Sh. Seema Devi, Sh. Fiun Ram, Smt. Nikki Devi and other peoples, were visited during the course of inspection. It was observed that the said houses are at the horizontal surface distance of 50 to 150 metrs. from the Tunnel alignment. Most of the Houses are single or double story structures, out of which few are new buildings but majority of them are older. Houses are constructed with stone/brick masonry with clay and cement having slates on roof. House of Sh. Fiun Ram is newly constructed pakka house with brick masonry and concrete roof structure. Cowsheds are constructed with rough stone/brick masonry with clay as jointing material.”

7. After making the aforesaid observation, the relevant conclusion on this aspect of the matter is summed up as under:-

“However, in view of fact prevailing on the spots, it was observed that cracks developed in the houses of Smt. Reshmo Devi, Sh. Krishan and Sh. Basant Ram were old and concentric, and it appears that these cracks are not developed due to the impact of blasting but may be due to the re-settlement of foundation or some design problems.

And the cracks developed in the cowsheds of said villagers and house of Sh. Fiun Ram were found new. These cracks were extending vertical and wide. Therefore these cracks might have been developed due to blast induced ground vibrations.”

8. We have heard the learned counsel for the parties and have also gone through the records of the case.

9. The moot question that arises for consideration in wake of replies filed by the respondents is as to whether the reliefs as claimed by the petitioners can in fact be granted in these writ petitions, in view of the seriously disputed question fact which otherwise can only be proved by leading evidence.

10. The Court herein is not dealing with simple case where the dispute between the parties can be decided on the basis of affidavits and counter affidavits, as the Court would be required to determine as to whether the properties of the petitioners have in fact been damaged and only after determining the same, the individual claims with respect to the compensation, if any, can be determined. However, these questions can only be determined after the parties are given an opportunity to lead evidence, which includes cross-examining the witnesses.

11. Though, the learned counsel for the petitioners had cited number of judgments to canvass that not only can the writ Court go into the disputed facts, but it can also award compensation. However, we find that majority of judgments as relied upon by the petitioners have already been considered by the Hon'ble Supreme Court in its decision in State of Kerala v. M.K Jose (2015) 9 SCC 433, relevant paragraphs whereof read as under:-

“14. In State of Bihar v. Jain Plastics and Chemicals Ltd., (2002) 1 SCC 216 a two-Judge Bench reiterating the exercise of power under Article 226 of the Constitution in respect of enforcement of contractual obligations has stated: (SCC p. 217, para 3)

“3…..It is to be reiterated that writ petition under Article 226 is not the proper proceedings for adjudicating such disputes. Under the law, it was open to the respondent to approach the court of competent jurisdiction for appropriate relief for breach of contract. It is settled law that when an alternative and equally efficacious remedy is open to the litigant, he should be required to pursue that remedy and not invoke the writ jurisdiction of the High Court. Equally, the existence of alternative remedy does not affect the jurisdiction of the court to issue writ, but ordinarily that would be a good ground in refusing to exercise the discretion under Article 226.”

In the said case, it has been further observed: (SCC p. 218, para 7)

“7….It is true that many matters could be decided after referring to the contentions raised in the affidavits and counter-affidavits, but that would hardly be a ground for exercise of extraordinary jurisdiction under Article 226 of the Constitution in case of alleged breach of contract. Whether the alleged non-supply of road permits by the appellants would justify breach of contract by the respondent would depend upon facts and evidence and is not required to be decided or dealt with in a writ petition. Such seriously disputed questions or rival claims of the parties with regard to breach of contract are to be investigated and determined on the basis of evidence which may be led by the parties in a properly instituted civil suit rather than by a court exercising prerogative of issuing writs.”

15. In National Highways Authority of India v. Ganga Enterprises, (2003) 7 SCC 410 the respondent therein had filed a writ petition before the High Court for refund of the amount. The High Court posed two questions, namely, (a) whether the forfeiture of security deposit is without authority of law and without any binding contract between the parties and also contrary to Section 5 of the Contract Act; and (b) whether the writ petition is maintainable in a claim arising out of breach of contract. While dealing with the said issue, this Court opined that: (SCC p. 415, para 6)

“6…It is settled law that disputes relating to contracts cannot be agitated under Article 226 of the Constitution of India. It has been so held in the cases of Kerala SEB v. Kurien E. Kalathil, (2000) 6 SCC 293, State of U.P v. Bridge & Roof Co. (India) Ltd. (1996) 6 SCC 22 and Bareilly Development Authority v. Ajai Pal Singh (1989) 2 SCC 116. This is settled law. The dispute in this case was regarding the terms of offer. They were thus contractual disputes in respect of which a writ court was not the proper forum. Mr. Dave, however, relied upon the cases of Verigamto Naveen v. Govt. of A.P (2001) 8 SCC 344 and Harminder Singh Arora v. Union of India (1986) 3 SCC 247. These, however, are cases where the writ court was enforcing a statutory right or duty. These cases do not lay down that a writ court can interfere in a matter of contract only. Thus on the ground of maintainability the petition should have been dismissed.”

16. Having referred to the aforesaid decisions, it is obligatory on our part to refer to two other authorities of this Court where it has been opined that under what circumstances a disputed question of fact can be gone into. In Gunwant Kaur v. Municipal Committee, Bhatinda (1969) 3 SCC 769, it has been held thus: (SCC p. 774, paras 14-16)

“14. The High Court observed that they will not determine disputed question of fact in a writ petition. But what facts were in dispute and what were admitted could only be determined after an affidavit-in-reply was filed by the State. The High Court, however, proceeded to dismiss the petition in limine. The High Court is not deprived of its jurisdiction to entertain a petition under Article 226 merely because in considering the petitioner's right to relief questions of fact may fall to be determined. In a petition under Article 226 the High Court has jurisdiction to try issues both of fact and law. Exercise of the jurisdiction is, it is true, discretionary, but the discretion must be exercised on sound judicial principles. When the petition raises questions of fact of a complex nature, which may for their determination require oral evidence to be taken, and on that account the High Court is of the view that the dispute may not appropriately be tried in a writ petition, the High Court may decline to try a petition. Rejection of a petition in limine will normally be justified, where the High Court is of the view that the petition is frivolous or because of the nature of the claim made dispute sought to be agitated, or that the petition against the party against whom relief is claimed is not maintainable or that the dispute raised thereby is such that it would be inappropriate to try it in the writ jurisdiction, or for analogous reasons.

15. From the averments made in the petition filed by the appellants it is clear that in proof of a large number of allegations the appellants relied upon documentary evidence and the only matter in respect of which conflict of facts may possibly arise related to the due publication of the notification under Section 4 by the Collector.

16. In the present case, in our judgment, the High Court was not justified in dismissing the petition on the ground that it will not determine disputed question of fact. The High Court has jurisdiction to determine questions of fact, even if they are in dispute and the present, in our judgment, is a case in which in the interests of both the parties the High Court should have entertained the petition and called for an affidavit-in-reply from the respondents, and should have proceeded to try the petition instead of relegating the appellants to a separate suit. (emphasis supplied)

17. In ABL International Ltd. v. Export Credit Guarantee Corpn. of India Ltd. (2004) 3 SCC 553, a two-Judge Bench after referring to various judgments as well as the pronouncement in Gunwant Kaur (supra) and Century Spg. And Mfg. Co. Ltd. v. Ulhasnagar Municipal Council (1970) 1 SCC 582, has held thus: (ABL International case, SCC pp. 568-69 & 572, paras 19 & 29)

“19. Therefore, it is clear from the above enunciation of law that merely because one of the parties to the litigation raises a dispute in regard to the facts of the case, the court entertaining such petition under Article 226 of the Constitution is not always bound to relegate the parties to a suit. In the above case of Gunwant Kaur this Court even went to the extent of holding that in a writ petition, if the facts require, even oral evidence can be taken. This clearly shows that in an appropriate case, the writ court has the jurisdiction to entertain a writ petition involving disputed questions of fact and there is no absolute bar for entertaining a writ petition even if the same arises out of a contractual obligation and/or involves some disputed questions of fact.

27. From the above discussion of ours, the following legal principles emerge as to the maintainability of a writ petition:

(a) In an appropriate case, a writ petition as against a State or an instrumentality of a State arising out of a contractual obligation is maintainable.

(b) Merely because some disputed questions of fact arise for consideration, same cannot be a ground to refuse to entertain a writ petition in all cases as a matter of rule.

(c) A writ petition involving a consequential relief of monetary claim is also maintainable.

While laying down the principle, the Court sounded a word of caution as under: (ABL International case, SCC p. 572, para 28)

“28. However, while entertaining an objection as to the maintainability of a writ petition under Article 226 of the Constitution of India, the court should bear in mind the fact that the power to issue prerogative writs under Article 226 of the Constitution is plenary in nature and is not limited by any other provisions of the Constitution. The High Court having regard to the facts of the case, has a discretion to entertain or not to entertain a writ petition. The Court has imposed upon itself certain restrictions in the exercise of this power. (See Whirlpool Corpn. v. Registrar of Trade Marks (1998) 8 SCC 1.) And this plenary right of the High Court to issue a prerogative writ will not normally be exercised by the Court to the exclusion of other available remedies unless such action of the State or its instrumentality is arbitrary and unreasonable so as to violate the constitutional mandate of Article 14 or for other valid and legitimate reasons, for which the Court thinks it necessary to exercise the said jurisdiction.”

18. It is appropriate to state here that in the said case, the Court granted the relief as the facts were absolutely clear from the documentary evidence brought which pertain to interpretation of certain clauses of contract of insurance. In that context, the Court opined: (ABL International Ltd. case SCC p. 578, para 51)

“51 …. The terms of the insurance contract which were agreed between the parties were after the terms of the contract between the exporter and the importer were executed which included the addendum, therefore, without hesitation we must proceed on the basis that the first respondent issued the insurance policy knowing very well that there was more than one mode of payment of consideration and it had insured failure of all the modes of payment of consideration. From the correspondence as well as from the terms of the policy, it is noticed that existence of only two conditions has been made as a condition precedent for making the first respondent Corporation liable to pay for the insured risk, that is: (i) there should be a default on the part of the Kazak Corporation to pay for the goods received; and (ii) there should be a failure on the part of the Kazakhstan Government to fulfil their guarantee.”

And it eventually held: (SCC pp. 578-79, para 51)

“51 ….. We have come to the conclusion that the amended clause 6 of the agreement between the exporter and the importer on the face of it does not give room for a second or another construction than the one already accepted by us. We have also noted that reliance placed on sub-clause (d) of the proviso to the insurance contract by the Appellate Bench is also misplaced which is clear from the language of the said clause itself. Therefore, in our opinion, it does not require any external aid, much less any oral evidence to interpret the above clause. Merely because the first respondent wants to dispute this fact, in our opinion, it does not become a disputed fact. If such objection as to disputed questions or interpretations is raised in a writ petition, in our opinion, the courts can very well go into the same and decide that objection if facts permit the same as in this case.

19. In this regard, a reference to Noble Resources Ltd. v. State of Orissa (2006) 10 SCC 236 would be seemly. The two-Judge Bench referred to the ABL International, Dwarkadas Marfatia & Sons v. Board of Trustees, Port of Bombay, (1989) 3 SCC 293, Mahabir Auto Stores v. Indian Oil Corp. (1990) 3 SCC 752 and Jamshed Hormusji Wadia v. Board of Trustees, Port of Mumbai, (2004) 3 SCC 214 and opined thus: (Nobal Resources case SCC p. 246, para 29)

“29. Although the scope of judicial review or the development of law in this field has been noticed hereinbefore particularly in the light of the decision of this Court in ABL International Ltd. case, however, must be decided on its own facts. Public interest as noticed hereinbefore, may be one of the factors to exercise the power of judicial review. In a case where a public law element is involved, judicial review may be permissible. (See Binny Ltd. v. V. Sadasivan (2005) 6 SCC 657 and G.B Mahajan v. Jalgaon Municipal Council, (1991) 3 SCC 91)

Thereafter, the court in Noble Resources case, proceeded to analyse the facts and came to hold that certain serious disputed questions of facts have arisen for determination and such disputes ordinarily could not have been entertained by the High Court in exercise of its power of judicial review and ultimately the appeal was dismissed.”

12. It would be noticed that the Hon'ble Supreme Court after taking into consideration the whole gamut of law, has thereafter made the following pertinent observations:-

“20. We have referred to the aforesaid authorities to highlight under what circumstances in respect of contractual claim or challenge to violation of contract can be entertained by a writ court. It depends upon facts of each case. The issue that had arisen in ABL International was that an instrumentality of a State was placing a different construction on the clauses of the contract of insurance and the insured was interpreting the contract differently. The Court thought it apt merely because something is disputed by the insurer, it should not enter into the realm of disputed questions of fact. In fact, there was no disputed question of fact, but it required interpretation of the terms of the contract of insurance. Similarly, if the materials that come on record from which it is clearly evincible, the writ court may exercise the power of judicial review but, a pregnant one, in the case at hand, the High Court has appointed a Commission to collect the evidence, accepted the same without calling for objections from the respondent and quashed the order of termination of contract.

21. The procedure adopted by the High Court, if we permit ourselves to say so, is quite unknown to exercise of powers under Article 226 in a contractual matter. We can well appreciate a Committee being appointed in a Public Interest Litigation to assist the Court or to find out certain facts. Such an exercise is meant for public good and in public interest. For example, when an issue arises whether in a particular State there are toilets for school children and there is an assertion by the State that there are good toilets, definitely the Court can appoint a Committee to verify the same. It is because the lis is not adversarial in nature. The same principle cannot be taken recourse to in respect of a contractual controversy. It is also surprising that the High Court has been entertaining series of writ petitions at the instance of the respondent, which is nothing but abuse of the process of extraordinary jurisdiction of the High Court. The Appellate Bench should have applied more restraint and proceeded in accordance with law instead of making a roving enquiry. Such a step is impermissible and by no stretch of imagination subserves any public interest.”

13. It would be evidently clear from the aforesaid exposition of law that the writ Court may in appropriate case award compensation where the facts are not in dispute; there is established negligence in the acts and omissions of the respondent authority/authorities on the face of record and there is a consistent deprivation of a fundamental right of the petitioner or his legal representative. That apart, the Court cannot appoint an expert committee to assess the damage if any caused to the properties of the petitioners as such course would be totally impermissible as the Court cannot be used to collect evidence in favour of the petitioners.

14. It would be noticed that the respondents have disputed all the allegations as set out by the petitioners and therefore, in such circumstances, it is not safe or even prudent for this Court to rely upon any of the material placed on record, that too without affording either of the parties a chance of cross-examination.

15. Even otherwise, it is more than settled that the High Court in exercise of its writ jurisdiction under Article 226 should not interfere with the matters, which are in the realm of private laws and it can otherwise be taken to be well settled that where there is disputed question of fact, which require evidence before the same can be established, then as a matter of practice, the Court would not entertain such writ petition.

16. It is equally settled law that when an alternative and equally efficacious remedy is open to the litigant, he should be required to pursue that remedy and not invoke the writ jurisdiction of the High Court. Equally, the existence of alternative remedy does not affect the jurisdiction of the Court to issue writ, but ordinarily that would be a good ground for refusing to exercise the discretion under Article 226.

17. These petitions involve seriously disputed questions of fact and even otherwise the rival claims of the parties are such, which can only be investigated and determined on the basis of evidence, which may be led by the parties in a properly instituted civil suit rather than by a court exercising prerogative of issuing writs.

18. In view of the aforesaid discussion, we are of the considered view that all these writ petitions are not maintainable, as the proper remedy for the petitioners is to approach the civil court for redressal of their grievances. However, we make it clear that in the event of the petitioner(s) approaching the civil Court within a period of thirty days from the receipt of this judgment, not only shall the petitioner(s) be entitled to benefit of Section 80(2) of the Code of Civil Procedure, but even the period of limitation spent in pursuing these litigations shall be excluded. We further make it clear that in the event the aforesaid suit being filed within the time frame as granted by this Court, the Court where such suit(s) are instituted shall decide the same as expeditiously as possible and in no event later than 31st March, 2017.

19. Before parting, we may observe that nothing observed herein above shall be construed to be an opinion on merits of the case and in the event of the petitioners filing civil suit(s), the Court shall proceed to determine the case on merits without being persuaded or influenced by any of the observations made herein above, which essentially have been made only for the determination and disposal of these writ petitions.

20. The petitions are disposed of in the aforesaid terms. All interim orders vacated and in case any amount is paid to any of the petitioners herein pursuant to the interim orders passed by this Court the same shall be refunded by them forthwith to the authorities.