Court On Its Own Motion Petitioner v. Nct Of Delhi, Dda And Djb

Delhi High Court
Nov 17, 2017
Smart Summary (Beta)

Factual and Procedural Background

The Court initiated suo motu public interest proceedings on 21.04.2005 after a newspaper report that the Delhi Development Authority (DDA) was unable to secure its land and that as much as 42,000 acres were either encroached or not taken possession of. An amicus curiae, Mr. A.S. Chandhiok, senior counsel, was appointed. The Court directed the Union Land and Development Office (L&DO) and the DDA to file affidavits detailing lands acquired since 1950 and lands placed at DDA's disposal. Over multiple hearings and affidavits, substantial discrepancies in figures and inadequate explanations were noted.

The Court recorded that at various points it was informed that: - 1,398.538 acres were encroached and not in possession; - 15,103.95 acres (referred throughout the order) acquired for DDA had not been handed over to it; - A larger scheme of land acquisition involved 6,17,817 bighas (approx. 1,23,000 acres) with DDA's share stated as 85,867.20 acres and 69,348.29 acres reported as handed over.

Multiple committees and reconciliation exercises were ordered, including a Committee of officers of DDA and the Land & Building (L&B) Department, digitization directions and frequent status hearings. Despite repeated directions (including orders dated 13.11.2006, 12.03.2010, 10.09.2010, 13.07.2012 and others), the Court found insufficient progress in securing possession and resolving discrepancies. Various specific directions were issued, including convening meetings between the Secretary, L&B Department, GNCTD and the Vice Chairman, DDA; filing of affidavits within fixed periods; and the Court ultimately disposed of the writ petition subject to new directions to create a standing unit/cell to manage land.

Legal Issues Presented

  1. Why had possession of lands acquired for the DDA, in particular 15,103.95 acres, not been handed over to or taken by the DDA despite long-standing acquisition orders and repeated Court directions?
  2. How should lands acquired prior to 1961 be compiled, reconciled and accounted for given delays in record compilation and digitization?
  3. What is the legal and practical impact of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (notably Section 24(2)) and the National Capital Territory of Delhi Laws (Special Provisions) Act provisions (notably the definition of "encroachment" and Section 3(3) injunctions) on the ability to recover possession and remove encroachments?

Arguments of the Parties

DDA's Positions (as disclosed in affidavits)

  • The DDA stated that possession of 15,103.95 acres acquired for it had not been handed over by the Land Acquisition Collector (LAC)/Land & Building Department because such lands were either built up, part of unauthorized colonies awaiting regularization by the GNCTD, subject to stay or status quo orders from various courts, or for "reasons best known to LAC/L & B Department." (Para 7 of the order summary)
  • The DDA filed zone-wise charts indicating details of encroachment and areas of which possession had not been handed over; it also indicated progress in computerizing records at one stage but did not provide a satisfactory comprehensive explanation in various affidavits.

Land & Building Department / LAC / GNCTD Positions

  • The L&B Department indicated that large areas were notified for acquisition (in 1957, 1959 and 1961) and that compilation of data for lands acquired since 1950 would take a long time and that in some cases complete records were not available.
  • In its affidavit it provided charts showing totals notified and handed over (e.g., a chart indicating 6,6237-10-14 bighas notified and 44,0902-10 bighas handed over in a certain chart accompanying the affidavit referred to in the order).

Amicus Curiae / Other Observations

  • The learned Amicus Curiae analysed the affidavits and pointed out significant discrepancies between the figures reported by the L&B Department and the DDA; for example, the L&B figures showed 38,628 acres yet to be handed over to DDA whereas DDA's figure was 16,810.51 acres. (Para 11–12)
  • The Comptroller and Auditor General (CAG) had prepared a report highlighting deficiencies in DDA land management; the CAG made recommendations and the DDA filed a response as directed. (Para 6)

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The Court's reasoning proceeded along discrete factual and legal observations explicitly recorded in the order:

  1. The Court found persistent, material discrepancies between the records and affidavits of the DDA and the Land & Building Department concerning the extent of lands acquired, lands handed over to DDA and lands in possession. These discrepancies persisted despite repeated judicial directions and multiple hearings over many years (para 1–3, 10–12).
  2. The Court observed that the L&B Department had earlier claimed that compilation of pre-1961 acquisition data would take a long time, but since then the Court had ordered digitization of records and the Court was informed that considerable progress had been made — so the L&B Department should not continue to use lack of compilation as an excuse (para 13–14).
  3. The Court noted that, over nearly 12 years, no satisfactory explanation had been provided for why possession of lands (notably 15,103.95 acres acquired for DDA) had not been handed over; available explanations by DDA included built-up status, unauthorized colonies, interim court orders or other unspecified reasons attributed to LAC/L&B (para 6–9, 14–15).
  4. The Court took into account statutory developments that materially affected the issue: the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Section 24(2)) which deems acquisition to have lapsed where appropriate government had not taken possession or paid compensation within the specified timeframe (para 8), and the National Capital Territory of Delhi Laws (Special Provisions) Act which defines "encroachment" and includes a statutory injunction (Section 3(3)) preventing removal of encroachments made up to 1 June, 2014, until 31 December 2017 except in limited circumstances (para 9–10). The Court regarded these provisions as adding urgency and complexity to the task of determining which acquisitions remained enforceable and which lands could be cleared of encroachments.
  5. Given the persistent failures, conflicting figures and the interplay of statutory limitations and injunctions, the Court concluded that a focused institutional mechanism was necessary. It reasoned that an inter-governmental standing unit or cell, with appropriate software, high-ranking officers, statutory status and a clear mandate, was the only useful direction to evolve effective land management policies, ensure real-time data and to implement systematic, time-bound clearance of encroachments (para 11).
  6. The Court imposed specific, pragmatic directions to operationalize oversight and accountability: convening a high-level meeting within one month (Secretary, L&B Department and Vice Chairman, DDA), filing of separate affidavits within eight weeks providing timelines and non-contradictory, zone-wise statements of remaining possession issues, and requiring an action taken report from DDA after consultation with central and local authorities within ten weeks (para 15–17, 25).
  7. The Court emphasized that despite public expense and intended public projects, the DDA's record in securing and keeping acquired lands encroachment-free had been "appalling" and that implementation failures had impeded public projects (para 20).

Holding and Implications

Final Disposition: The writ petition was disposed of, subject to the directions issued by the Court in the order. (Para 27)

Direct consequences and orders given:

  • The Secretary, Land & Building Department, GNCTD and the Vice Chairman, DDA were directed to convene a meeting within one month with their officers to ascertain progress in light of affidavits and Court orders. (Para 15)
  • Both the Secretary, L&B Department and the Vice Chairman, DDA must file separate affidavits within eight weeks explaining steps taken and proposed steps to ensure possession of lands acquired prior to and after 1961, with zone-wise timelines and non-contradictory facts and figures. (Para 16–17)
  • The Court directed creation of a standing unit or cell (with appropriate software and task forces), to evolve effective land management policies, monitor implementation, clear encroachments systematically and in a time-bound manner, to be manned by high-ranking officers and to function under the authority of the DDA; the Central Government was asked to consider creating such a body with suitably experienced personnel. An action taken report was to be filed by the DDA after consultation with concerned authorities within ten weeks. (Para 11, 25)
  • The matter was directed to be listed on 19.01.2018 to ensure consequential action is taken. (Para 26)

Implications: The decision imposes specific administrative and procedural measures on the DDA, the GNCTD (L&B Department) and the Central Government to reconcile records, produce zone-wise timelines for delivering possession and to create institutional capacity for real-time land management and encroachment clearance. The order also recognises statutory constraints created by the 2013 Land Acquisition Act (Section 24(2)) and the NCT provisions (Section 3(3)) which affect the legality and feasibility of taking possession and removing encroachments; these statutory developments materially informed the Court's directions. The opinion itself does not purport to establish a new legal precedent beyond the directions and administrative measures imposed.

This summary has been prepared strictly on the basis of material contained in the provided opinion. No information beyond the text of the opinion has been added.

Show all summary ...

S. Ravindra Bhat, J.:— This Court initiated suo motu proceedings, in public interest, on 21.04.2005 due to a newspaper report that the Delhi Development Authority (DDA) was unable to secure its land and that a large extent of up to 42,000 acres was either encroached or not taken possession of. An amicus curiae, Mr. A.S Chandhiok, senior counsel, was appointed to assist the Court. Thereafter, the matter was adjourned on several occasions.

2. On 13.11.2006, the Union Land and Development Office [hereafter L&DO] was directed to provide details about the extent and location of lands acquired since 1950, in an affidavit; correspondingly, DDA was also directed to disclose details of lands provided at its disposal, through notifications, by the L&DO. These details were placed on record after some time; it was noticed that there were discrepancies between the extent of lands mentioned by the two agencies. This Court, therefore, granted time to them to resolve the discrepancies, and even noted by its order dated 23.05.2007 that the reconciliation of the figures had glossed over vital details. Likewise, on 26.09.2007, it was noticed that DDA did not appear to have a uniform policy to evict encroachers or clear its lands; the statement that 1398.538 acres were encroached, was also noticed.

3. Thereafter, repeated hearings took place; no effective progress was made. As many as 32 hearings took place between 26.09.2007 and 12.03.2010 In these, the only discernable progress noticed is that DDA had filed some further affidavits and indicated that its records were being computerized. On 12.03.2010, a Bench of this Court directed DDA to explain its inability to take possession of 1398.538 acres of land. The order of 10.09.2010 reflects that the Court sought explanation from DDA why over 11,000 acres were not taken possession of, though acquired. The affidavit filed had indicated that large tracts of land were encroached or could not be taken possession of, because of interim orders given by the Court. Likewise, the Court took note of the fact that 6,17,817 bighas had been notified for acquisition (approximately 1,23,000 acres) of DDA's share was 85,867.20 acres. DDA had indicated that 69,348.29 acres were handed over to it. After a series of further hearings, during which it was noted that DDA and L&DO had co-ordinated meetings, the Court made a detailed order on 13.07.2012

4. The relevant extracts of the said order are as follows:

“3. In the affidavit filed on 15th October 2005, the DDA stated that the possession of 15,103,95 acres of land acquired for the DDA by the Land Acquisition Collector (‘LAC’) and Land & Department, GNCTD had not been handed over to it. Subsequently, on 13 November 2006 this Court was informed that L&B Department has still not supplied the complete details of the land acquired right from 1950 till date. Both the DDA and Land & Building Department were asked to file detailed statements as to the land placed at the disposal of the DDA by Land & Building Department, how much of the land of the DDA was under its possession and how much of the said land was not under its occupation or had been encroached.

4. Pursuant to the above order, the DDA filed an affidavit on 12 December 2007 enclosing a chart showing the details of encroachment of land acquired for the DDA in acres, zone-wise. However, the explanation offered was only in respect of 1398.53 acres of land of which possession was not given to DDA.

5. On 7 February 2007 the Land & Building Department filed an affidavit. In para 6 of the said affidavit it was stated that a large area was notified by the Government for acquisition in 1957, 1959 and 1961 for the Interim General Master Plan and the planned development of Delhi. It was further stated that although the area acquired was large and was spread all over the Delhi, “the compilation of the data in respect of each land would take long time and in some cases the Respondent does not have the complete records.” The L&B Department filed an affidavit on 7 February 2007 in respect of the areas covered by Section 6 declaration of the Land Acquisition Act, 1894 (‘LA Act’) after 1961. In the enclosed chart it was indicated that the total land measuring about 6,6237-10-14 bighas was notified and of this 44,0902-10 bighas of land was handed over.

6. Nearly three years later, on 12 March 2010 this Court was constrained to note that there was no explanation still forthcoming as to why the DDA had not been handed over possession of 15,103.95 acres of land acquired for it by the L&B Department. The DDA was asked to file a further affidavit.

7. The affidavit filed on 15 July 2010 by the DDA did not still contain a satisfactory explanation. In para 3(viii) of the said affidavit, DDA stated that the land admeasuring 15,103.95 acres acquired for DDA had not been handed over to by LAC/L & B Department for the reason of either being built up, or being part of an unauthorized colony awaiting regularization by the GNCTD or that stay or status quo order has been ordered by various courts or for reasons best known to LAC/L & B Department.

8. The Court passed a detailed order on 10 September 2010 noting the above facts requiring the DDA to file an interim report indicating the steps taken by it within a period of two months.

9. A Committee had been constituted comprising the officers of the DDA and Land B Department to verify the land records and filed a report of compliance. This Court passed an order on 21st January 2011 directing that the said Committee should meet at least once in ten days to monitor the progress of the work and file a report with complete details.

10. For the last nearly seven years since the Court has been seized of the issue, no tangible progress has been made to restore possession of land admeasuring 15,103.95 sq.m to the DDA. In the affidavit filed on 5 May 2011 the DDA pointed out the discrepancies in the figures produced by the LAC. The learned Amicus Curiae has also analyzed the affidavit filed by the DDA on 8 July 2011. This gives the details of the land of which possession has not handed over to the DDA, zone wise.

11. Learned Amicus Curiae informs the Court that as per figures of the Land & Building Department, possession of 38,628 acres of land is yet to be handed over to the DDA whereas according to the DDA the figure is 16,810.51 acres of land.

12. It appears to this Court that the officers concerned of the Land & Building Department of the GNCTD with the DDA have not addressed the issue with the degree of seriousness it deserves. The financial implication of the DDA not being put in possession of 15,103.95 acres of land in the Delhi, acquired for it by the L&B Department, can well be imagined. One would have expected the GNCTD as well as DDA to have tackled this problem on a priority basis. However, their collective inaction in this regard in the past seven years is telling.

13. There are two major issues that need to be addressed. One concerns land acquired prior to 1961, in respect of which the L&B Department claimed more than five years ago that compilation of the relevant data would take time. Since then this Court has issued directions in the connected matters for digitization of the entire land records and awards. This Court has been told that considerable progress has been achieved in this regard. Consequently, the L&B Department should not have any further excuse about not being able to compile the data in relation to the lands acquired prior to 1961.

14. The second issue is about of DDA not being put in possession of 15,103.95 acres of land, despite this Court being seized of the issue for more than seven years. On both issues, the Court finds that the steps taken thus far are not satisfactory, to say the least. We are in the same position for the last seven years.

15. Accordingly, this Court directs the Secretary, L&B Department, GNCTD as well as the Vice Chairman, DDA to immediately convene a meeting of both of them, with their officers, and discuss the above issues in light of the various affidavits filed by them in the Court in these proceedings from time to time and in light of the orders passed by this Court. The meeting of the Secretary, L&B Department and the Vice Chairman, DDA should take place within one month from today, on a mutually convenient date and time. The purpose of the meeting is to ascertain the progress of the steps taken in the matter.”

16. Both the Secretary, L&B Department, GNCTD as well as the Vice Chairman, DDA will file separate affidavits in this Court within eight weeks from today explaining the steps taken thus far and those that they propose to take to ensure that all the lands that have been acquired prior to 1961 and thereafter are in the possession of the L&B Department or the DDA as the case may be. The affidavits will set out a time line for the various proposed steps leading to DDA being put in possession of the 15,103.95 acres of land which was acquired for it. The affidavits will be comprehensive and will not be mutually contradictory in terms of facts and figures. The affidavits will indicate zone-wise when the possession of the remaining lands acquired will be taken. They will indicate the reasons why possession thereof has still not been handed over to the DDA or taken by the Land & Building Department till date.”

5. The subsequent proceedings and orders have shown that the direction of the Court orders, has been to somehow gather all facts to arrive at the correct figure of lands that were acquired and transferred to DDA and the lands which were handed over to it; the lands where leases were to be managed and those where lease tenure ended or were likely to end; the extent of encroachment of such lands, etc. Each of these - and the responses of various authorities, including the DDA have highlighted that substantial parts of acquired lands were facing encroachment; it is unclear whether the lands (of which possession was taken) were occupied or were later encroached upon (after vacant land was taken possession of). Some orders have dealt with the problem relating to encroachment by religious structures; the Court noticed that in terms of extent policy, recommendations were made for removal of several such structures.

6. On 11.01.2017, the amicus appointed by the Court drew pointed attention to the fact the Comptroller and Auditor General of India had prepared a report on the issue of land management policies and practices of the DDA and had made a series of recommendations, towards improvement and strengthening of systems. The DDA was required to file its response, by way of affidavit, which it did.

7. This Court notices that the long, 12 year saga of this case, has revealed that DDA's record in securing lands acquired by it (and in taking over possession as well as in ensuring them to be encroachment free) has been appalling. At one stage, there was ambiguity about the total extent of land acquired and what was indeed in its possession. Even as on date, precise details are not forthcoming, readily. Without using strong language, it is clear that at considerable public expense and cost, acquisition proceedings are undertaken, with a view to execute a planned public project. Even before the implementation of such project (be it extension of roads, construction of highways or any other public utility work) acquired land-vacant or otherwise is encroached upon - in most cases, partly. The DDA or the concerned agency is unable to execute the project - at least in a timely manner. In other cases (the Rohini Residential Scheme being the most spectacular one) the public project cannot progress and is impeded to a great extent.

8. A new dimension to this entire issue has been added with the enactment of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (hereafter “the Act”), especially Section 24(2), wherever the appropriate government had not taken possession of the acquired lands or paid compensation to the land owners (interpreted by the Supreme Court as actual payment of compensation) within five years prior to coming into force of the Act, the acquisition of such land is deemed to have lapsed. This Act has led to the Supreme Court and this Court, declaring in several hundreds of cases, that land acquisition is deemed to have lapsed.

9. The other development is that since 2007, the National Capital Territory of Delhi Laws (Special Provisions) Act has been in force. It defines encroachment as follows:—

“(c) “encroachment” means unauthorised occupation of Government land or public land by way of putting temporary, semi-permanent or permanent structure for residential use or commercial use or any other use…”

10. A statutory injunction to refrain from taking any action for removal of encroachments-made up to 1 June, 2014, till 31 December, 2017 is given by Section 3(3). These provisions were extended from time to time, in 2011 and 2014. As on date, these provisions are in force, which means that except for the exceptions provided, (i.e, to complete or execute a project of public utility) no encroachment removal can be undertaken.

11. In these circumstances, the Court is of opinion that the only useful direction that can be issued is to require the DDA, the Govt of NCT of Delhi (through the Land and Building Department) and the Central Government to create a standing unit or cell, which is tasked to evolve effective land management policies and for the purpose, also ensure that appropriate software is designed to cater, real time, to the needs of the agencies. This cell shall also evolve the appropriate task force (or task forces), which shall clear encroachments on public lands in a systematic, and time-bound manner. The task force or cell, in the opinion of the Court, should be given statutory status and manned by high ranking officers; it should have a separate office, all under the authority of the DDA. The Central Government shall consider the feasibility of creating such a body, with its personnel (drawn from such disciplines and with appropriate experience). This unit or cell, in the opinion of the Court, should continuously monitor the land management policies of DDA and ensure that wherever needed, Court orders are implemented and also oversee all other relevant aspects. An action taken report shall be filed by DDA, in this regard, after consultation with all concerned parties (i.e the Central Government, Govt. of NCT of Delhi, the Delhi Police and the other local and municipal bodies operating in Delhi) in ten weeks.

12. List on 19.01.2018 to ensure that consequential action is taken.

13. The writ petition is disposed of, but subject to the above directions.