Madhya Pradesh State Electricity Board v. National Thermal Power Corporation Ltd.
Structured Summary of the Provided Opinion
Factual and Procedural Background
National Thermal Power Corporation Limited ("the petitioner") filed Petition No. 99/2002 seeking approval of tariff for Kawas Gas Power Station (Kawas GPS) for the period 1.4.1998 to 31.3.2001, based on the Ministry of Power notification dated 30.4.1994 (valid up to 31.3.1998). The Commission disposed of that petition by an order dated 18.5.2004, approving fixed charges (tables in the order set out interest on loan, interest on working capital, depreciation, return on equity and O&M expenses).
Two review petitions were later filed: Review Petition No. 76/2004 by Madhya Pradesh State Electricity Board ("the respondent") challenging the O&M charges approved by the Commission; and Review Petition No. 86/2004 by the petitioner challenging other aspects of the 18.5.2004 order. The opinion addresses these two review petitions, describes the admissibility of specific grounds, makes corrections for ministerial and inadvertent errors, and provides revised computations and substituted paras/tables for parts of the original order.
Legal Issues Presented
- Whether the Commission erred in taking O&M expenses for the year 1997-98 as the base (and applying 10% p.a. escalation) instead of using 1996-97 figures for computing O&M for the tariff period 1998-1999 to 2000-2001.
- Whether naphtha/NGL fuel stock should have been included in the computation of working capital for 1998-1999 (i.e., whether the Commission omitted fuel stocks inadvertently and whether those stocks should be valued and included).
- Whether interest on loan should be calculated on the basis of actual repayments or normative annual repayment (i.e., whether the Commission's methodology for interest on loan was an error subject to review).
- Whether the heat rate used by the Commission for open cycle operation (3150 Kcal/kWh without NOx control) was incorrect and should be 3190 Kcal/kWh (with NOx control) for the purpose of MOPA adjustment.
Arguments of the Parties
Respondent's (Madhya Pradesh State Electricity Board) Arguments
- The respondent urged that the actual O&M expenses for 1996-1997 (Rs. 18.36 crore as per audited accounts) should be taken as the base year for computation of O&M expenses for the tariff period 1998-1999 to 2000-2001. The respondent's position rested on the premise that tariff for those years was to be determined in advance (before 1.4.1998), so only 1996-1997 data could validly be considered.
- The respondent characterized the Commission's consideration of 1997-1998 as the base year as an error apparent on the face of record and sought review on that ground.
Petitioner's (NTPC) Arguments
- In the main petition, the petitioner sought approval of O&M charges for 1998-99, 1999-2000 and 2000-01 based on actuals (figures presented in the petition).
- In Review Petition No. 86/2004 the petitioner sought review on three aspects: (a) non-inclusion of stock of naphtha/NGL fuel in calculation of working capital, (b) calculation of interest on loan based on actual or normative annual repayment (whichever is higher), and (c) correction of heat rate (request to use 3190 Kcal/kWh instead of 3150 Kcal/kWh for open cycle operation).
- The petitioner produced an affidavit dated 23.7.2003 (filed in the main petition) asserting that naphtha stock had been maintained for 1997-98 and explaining that audited fuel oil stock of Rs. 2.49 crore included Rs. 1.71 crore as the cost of naphtha/NGL stock and Rs. 0.77 crore (77.18 lakh) as HSD stock; it contended that this value should be included in working capital calculations.
Table of Precedents Cited
No precedents were cited in the provided opinion.
Court's Reasoning and Analysis
The opinion proceeds by dealing with the two review petitions separately and follows these steps in reasoning:
-
Review Petition No. 76/2004 (challenge to O&M base year):
- The Commission had adopted a methodology (earlier considered by the Central Government, Ministry of Power) in which the actual O&M expenses for the year immediately preceding the tariff period are taken as the base and escalation of 10% p.a. is applied to derive O&M for the tariff years. Concretely, the Commission took O&M (including water charges) of Rs. 2,806 lakh for 1997-98 as the base and applied 10% escalation to arrive at Rs. 3,086 lakh, Rs. 3,395 lakh and Rs. 3,734 lakh for 1998-99, 1999-2000 and 2000-2001 respectively.
- The court noted that this methodology had been followed consistently by the Commission in all cases involving approval of tariff for the period ending 31.3.2001 and was the same procedure previously used by the Central Government. The methodology had "stood test of time." On that basis the court found no error in the order dated 18.5.2004 and rejected the respondent's contention that 1996-97 figures should have been used as base.
- As a result, the court held that Review Petition No. 76/2004 was not maintainable and dismissed it with no order as to costs.
- The court did, however, identify and corrected a discrepancy between paras 33 and 36 of the original order by substituting a corrected para 33 clarifying the adoption of 1997-98 actuals as base and the 10% escalation method; the amendment did not affect the O&M charges already approved.
-
Review Petition No. 86/2004 (petitioner’s challenges):
- The Commission admitted two of the petitioner's grounds for review (as per its order dated 14.10.2004): (a) non-inclusion of naphtha/NGL fuel in calculation of working capital; and (b) correction of heat rate from 3150 Kcal/kWh to 3190 Kcal/kWh for open cycle (as applied to MOPA adjustment). The ground relating to interest on loan methodology was not admitted because that methodology had been consistently adopted in many other cases and had therefore acquired finality and was deemed immune from review.
- Heat-rate correction: The Commission had allowed energy charges for combined cycle operation corresponding to 2,125 Kcal/kWh (with NOx control) and the corresponding open cycle heat rate was 3,190 Kcal/kWh. The Commission acknowledged that it had mistakenly mentioned 3,150 Kcal/kWh (without NOx control) in the MOPA adjustment paragraph (a ministerial error). The court ordered that the words "3150 Kcal/kWh (without NOx)" be substituted by "3190 Kcal/kWh (with NOx)" in para 40(ii) of the 18.5.2004 order.
- Working-capital / fuel-stock correction: The audited balance sheet for 1997-98 had shown naphtha stock as 'nil', and therefore the Commission had taken naphtha stock as zero when computing working capital for 1998-99. The petitioner produced an affidavit and additional explanation that the audited fuel oil stock of Rs. 2.49 crore included Rs. 1.71 crore attributable to naphtha/NGL and Rs. 0.77 crore to HSD stock. On review of the record, the Commission found that there had been an inadvertent omission of these fuel stocks from working capital and that such stocks (value Rs. 2.49 crore) ought to have been included. Consequently, the working capital and interest thereon were recalculated to include liquid fuel stock of Rs. 249 lakh (i.e., Rs. 2.49 crore), and revised computations were produced in tabular form for the tariff years. These revised computations produced adjusted figures for:
- Allowed working capital (e.g., 12,141 lakh for 1.4.1998 to 31.10.1998; 12,666 lakh; 12,654 lakh; 12,470 lakh for subsequent periods),
- Interest on allowed working capital (e.g., 1,578 lakh; 1,647 lakh; 1,518 lakh; 1,434 lakh), and
- Total interest on working capital after including WCM and return on WCM.
- Using the revised working-capital and interest figures, the court produced revised annual fixed charges tables for the four sub-periods within 1.4.1998 to 31.3.2001 (showing totals such as 27,261 lakh; 30,410 lakh; 30,180 lakh; 28,907 lakh respectively) and ordered substitution of the tables in paras 35 and 36 of the original 18.5.2004 order.
-
Final disposition reasoning:
- The court distinguished between errors that are legal or substantive (which might justify review) and errors that are ministerial or inadvertent (which may be corrected on review). It treated the choice of base-year methodology (1997-98 with 10% escalation) as a policy/methodology applied consistently and not an error, whereas it treated the misstatement of the open-cycle heat rate and the omission of fuel-stock value from working-capital calculations as ministerial/inadvertent errors requiring correction.
Holding and Implications
Holding: Both review petitions are disposed of.
More specifically:
- Review Petition No. 76/2004 (filed by the respondent challenging the Commission's use of 1997-98 as the base for O&M and the 10% escalation methodology) was dismissed. The Commission's methodology of taking 1997-98 actuals as base and applying 10% p.a. escalation was upheld as consistent with prior practice and not an error on the face of the record.
- Review Petition No. 86/2004 (filed by the petitioner) was partly allowed in respect of ministerial or inadvertent errors: (a) the open-cycle heat rate stated in para 40(ii) was corrected by substituting "3190 Kcal/kWh (with NOx)" in place of "3150 Kcal/kWh (without NOx)" for MOPA adjustment; and (b) the omission of naphtha/NGL/HSD fuel stock value (Rs. 2.49 crore) from working-capital calculations was found to be inadvertent and the working capital and interest on working capital were recalculated and substituted into the order. The petitioner's ground relating to the methodology for interest on loan was not admitted because that methodology had been consistently applied across other cases and had acquired finality.
- The court ordered specific substitutions to the original order dated 18.5.2004 (substituted para 33 and substituted tables in paras 35 and 36) to correct the identified errors; those substitutions do not change the Commission's accepted methodology for O&M escalation but do amend ministerial mistakes and the working-capital computation and resultant fixed-charge totals.
Implications:
- Direct effect on the parties: the O&M methodology adopted by the Commission remains intact; the petitioner obtained correction of the heat-rate reference and inclusion of fuel stocks in working-capital, resulting in revised and slightly higher fixed-charge totals for the tariff periods specified. The respondent's challenge on the O&M base-year was rejected.
- No new legal precedent or change in the Commission's long-standing methodology for O&M escalation or interest-on-loan computation is announced by this opinion; the opinion treats the established methodology as final insofar as it had been consistently applied.
Disposition
The opinion concludes by stating that, after making the specified substitutions and revised computations, both review petitions stand disposed of.
Note: This summary is compiled exclusively from the text of the provided opinion. No external material or inferences beyond the text have been added.
National Thermal Power Corporation Limited, hereinafter referred to as “the petitioner” had filed Petition No. 99/2002 for approval of tariff for the period 1.4.1998 to 31.3.2001 in respect of Kawas Gas Power Station (Kawas GPS) based on terms and conditions of tariff as contained in Ministry of Power notification dated 30.4.1994, valid up to 31.3.1998 The petition was disposed of by order dated 18.5.2004 The Commission approved the fixed charges as under:
(Rs. in lakh)
Sl No. 1 Particulars 1.4.1998 to 31.10.1998 1.11.1998 to 31.3.1999 1999-2000 2000-2001 1 Interest on Loan 2503 2503 1389 341 2 Interest on Working Capital 1780 1888 1763 1680 3 Depreciation 10740 10740 11299 11001 4 Return on Equity 9120 12160 12304 12122 5 O & M Expenses including water Charges 3086 3086 3395 3734 TOTAL 27229 30378 30150 28878
2. Madhya Pradesh State Electricity Board, hereinafter referred to as “the respondent”, in Review Petition No. 76/2004 has sought review of O & M charges approved by the Commission. Similarly, the petitioner in Review Petition No. 86/2004 has sought review of certain other aspects of the order dated 18.5.2004 We discuss these two review petitions separately in the succeeding paragraphs.
Review Petition No. 76/2004:
3. In the main petition, the petitioner had sought approval of O & M charges of Rs. 37.18 crore, 43.52 crore and 50.27 crore for the years 1998-1999, 1999-2000 and 200001 respectively, based on actuals, as an element of fixed charges. The respondent had urged that actual O & M expenses for the year 1996-1997, Rs. 18.36 crore, as per the audited accounts submitted by the petitioner should be considered as the base for computation of O & M expenses for the years 1997-1998 to 2001-2001. According to the respondent, tariff for the years 1998-1999 to 2000-2001 was to be determined in advance, that is, before 1.4.1998 and accordingly for this purpose, O & M data for the year 1996-1997 only could be considered.
4. While approving O & M expenses by order dated 18.5.2004, the Commission had adopted the methodology earlier considered by the Central Government in Ministry of Power for fixation of tariff for old generating stations. The methodology followed by the Central Government was to consider 10% escalation over the actual O & M expenses for the year immediately preceding the first year of the tariff period to arrive at the allowable O & M expenses for the first year. O & M expenses for the subsequent years of tariff period are determined by considering 10% escalation every year over O & M expenses of the previous year so determined. The Commission considered O & M expenses (including water charges) of Rs. 2806 lakh for the year 1997-1998 as the base. By applying the escalation factor of 10%, the Commission had allowed O & M expenses of Rs. 3086 lakh, 3395 lakh and 3734 lakh for the years 1998-1999, 1999-2000 and 2000-2001 respectively.
5. In the present review petition, the respondent has re-iterated that the escalation factor of 10% per annum should be applied on O & M expenses for the year 1996-1997 to arrive at O & M expenses payable for the tariff period, that is, 1998-1999 to 2000-2001. According to the respondent, consideration of O & M expenses for the year 1997-1998 by the Commission as the base, constitutes an error apparent on the face of record and hence there is sufficient ground for review of the order dated 18.5.2004 so far as computation of O & M expenses is concerned.
6. The methodology adopted for approval of O & M expenses in the present case, has been followed consistently by the Commission in all cases involving approval of tariff for the period ending 31.3.2001, without any exception. The same procedure used to be followed by the Central Government before establishment of the Commission. The methodology considered has stood test of time. Therefore, we do not find any error in the order dated 18.5.2004 in this regard and do not find any merit in the contention of the respondent to consider O & M expenses for the year 1996-1997 as the base for computation of O & M expenses for the tariff period starting on 1.4.1998 We are, therefore, of the opinion that review petition is not maintainable and is hereby dismissed with no order as to costs.
7. On perusal of the order dated 18.5.2004, we find that there is a discrepancy between the tables under paras 33 and 36 of the said order as regards O & M expenses. In order to bring these two paras at par, para 33 of the said order dated 18.5.2004 shall be substituted as under:
“In line with the methodology adopted by the Ministry of Power for various stations of NTPC, the actual O & M expenses including water charges for the year 1997-1998 are to be taken from the audited balance sheet of Kawas TPS and escalation @ 10% p.a is to be considered to work out the O & M expenses for the years 1998-1999 to 2000-2001. The O & M expenses for the years 1998-1999 to 2000-2001 as per above methodology work out as detailed below:
(Rs. in lakh)
1997-1998 1998-1999 1999-2000 2000-2001 O & M Expenses - Actuals as per B/S 2806 Escalation @ 10% per annum O & M expenses (including water charges) 3086 3395 3734
8. The above amendment does not in any manner affect O & M charges already approved by the Commission.
Review Petition No. 86/2004
9. The petitioner in this application sought review of the order dated 18.5.2004, on the following aspects, namely:
(a) Non-inclusion of stock of Naphtha/NGL fuel in calculation of working capital;
(b) Calculation of interest on loan based on actual or normative annual repayment, whichever is higher; and
(c) Provision of heat rate of 3190 Kcal/kWh in place of 3150 Kcal/kWh
10. The application was heard on 7.10.2004 on admission. The Commission in its order dated 14.10.2004 admitted the application on the following two issues, namely:
(a) Non-inclusion of Naphtha/NGL fuel in the calculation of working capital; and
(b) Provision of heat rate of 3190 Kcal/kWh in place of 3150 Kcal/kWh
11. So far as the alleged error in calculation of interest of loan is concerned, the Commission found that the same methodology was adopted in a number of other cases and, therefore, it had acquired finality and was immune from review.
12. We first consider the ground regarding correction of heat rate. The petitioner has pointed out that for open cycle operation of the generating station, the Commission has considered the heat rate of 3150 Kcal/kWh against the heat rate of 3190 Kcal/kWh prescribed in the notification dated 30.4.1994
13. The Commission in its order dated 18.5.2004 had allowed energy charges for combined cycle operation corresponding to heat rate of 2125 Kcal/kWh with NOx control. The corresponding heat rate for open cycle operation is 3190 Kcal/kWh. However, while providing for MOPA adjustment, the Commission inadvertently mentioned open cycle heat rate of 3150 Kcal/kWh without NOx control instead of 3190 Kcal/kWh with NOx control. The error pointed out by the petitioner is purely of ministerial nature. Therefore, for the words “3150 Kcal/kWh (without NOx)”, the words “3190 Kcal/kWh (with NOx)” shall be substituted for MOPA adjustment given in para 40 (ii) of the order dated 18.5.2004
14. The only issue left to be considered is regarding non-inclusion of naphtha/NGL fuel in calculation of working capital. Naphtha is one of the constituent of fuel cost, an element of working capital. From the audited accounts for the year 1997-98 pertaining to Kawas GPS, it was noticed that naphtha stock and fuel oil stock were shown separately. Naphtha stock as on 31.3.1998 was shown as ‘nil’. As such, the value of naphtha stock as on 31.3.1998 for the purpose of computation of working capital for the year 1998-1999 was taken as ‘zero’ based on audited accounts for the year 1997-98.
15. The petitioner has submitted that it had been maintaining naphtha stock for the year 1997-98 and had given details in this regard vide affidavit dated 23.7.2003 in the main petition (No. 99/2002) under the orders of the Commission. According to the petitioner, non-consideration of naphtha stock as contained in the said affidavit dated 23.7.2003 is an error apparent on the face of record. It has been clarified that in the audited accounts pertaining to Kawas GPS for the year 1997-98, fuel oil stock of Rs. 2.49 crore has been indicated. This amount includes Rs. 1.71 crore as the cost of naphtha/NGL stock and Rs. 77.18 lakh worth of HSD fuel stock. Therefore, the petitioner has contended that naphtha/NGL stock of Rs. 1.71 crore and HSD fuel oil stock of Rs. 77.18 lakh (total 2.49 crore) are to be taken into consideration while computing working capital.
16. On consideration of the material available on record, we are satisfied that there is an inadvertent omission on the part of the Commission while considering fuel stock as an element on working capital. Naphtha/NGL/HSD stock of a value of Rs. 2.49 crore ought to have been taken into consideration by the Commission as a part of fuel cost while computing working capital. Accordingly, in order to rectify the inadvertent mistake, the working capital and consequently the interest thereon need to be recalculated. The necessary revised computation in support of the working capital and interest on working capital are given hereunder:
1.4.1998 to 31.10.1998 1.11.1998 to 31.3.1999 1999-2000 2000-2001 Fuel Cost (Gas) 2886 2886 2886 2886 Liquid fuel stock 249 249 249 249 O & M expenses 257 257 283 311 Spares 464 464 464 464 Recievables 10315 10840 10802 10590 Total Working Capital 14171 14696 14684 14500 Working Capital Margin (WCM) 2030 2030 2030 2030 Total Working Capital allowed 12141 12666 12654 12470 Rate of Interest 13.00% 13.00% 12.00% 11.50% Interest on allowed Working Capital 1578 1647 1518 1434 Interest on WCM 112 112 113 113 Return on WCM 122 162 162 162 Total Interest on Working capital 1812 1921 1793 1709
17. The revised annual fixed charges for the period 1.4.1998 to 31.3.2001 allowed are summed up as below:
(Rs. in lakh)
Sl No. Particulars 1.4.1998 to 31.10.1998 1.11.1998 to 31.3.1999 1999-2000 2000-2001 1 Interest on Loan 2503 2503 1389 341 2 Interest on Working Capital 1812 1921 1793 1709 3 Depreciation 10740 10740 11299 11001 4 Return on Equity 9120 12160 12304 12122 5 O & M Expenses including water Charges 3086 3086 3395 3734 TOTAL 27261 30410 30180 28907
18. The tables given under para 16 and 17 above shall be substituted for the tables given under paras 35 and 36 of the order dated 18.5.2004
19. With the above, both the review petitions stand disposed of.