Power Grid Corporation Of India Limited v. Bihar State Electricity Board, Patna

Central Electricity Regulatory Commission
Jan 17, 2006
Smart Summary (Beta)

Structured Summary of the Provided Opinion (Petition No. 118/2004)

Factual and Procedural Background

The petition seeks approval of transmission charges for the Rangit Transmission System in the Eastern Region for the tariff period 1 April 2004 to 31 March 2009, to be determined under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004 ("the 2004 regulations"). The petitioner also sought permission to continue billing transmission charges on the same basis as charged on 31 March 2004 pending determination of the tariff in the present petition. In an affidavit dated 15 February 2005 the petitioner additionally prayed for approval to reimburse expenditure incurred towards publishing statutory notices in newspapers.

Procedurally, the petition refers to an earlier Commission order dated 6 August 2003 in Petition No. 62/2002, which had decided annual transmission charges for the period 1 April 2001 to 31 March 2004 at a cost of Rs. 4,530.85 lakh. The petitioner relied on admitted capital expenditure from that order. The petition included detailed itemized claims (depreciation, interest on loan, return on equity, interest on working capital, O&M) for two groupings of assets: (a) the 66 kV single‑circuit Rangit–Melli line and 132 kV single‑circuit Rangit–Rammam line (combined length 64 ckt‑km for O&M); and (b) the 132 kV double‑circuit Rangit–Siliguri line (183 ckt‑km).

A reply to the petition was filed by Bihar State Electricity Board. The public notices published by the petitioner pursuant to the Commission's procedure attracted no comments from the general public. The present order disposes of Petition No. 118/2004.

Legal Issues Presented

  1. Whether transmission charges for the Rangit Transmission System for the period 1.4.2004 to 31.3.2009 should be approved in accordance with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004.
  2. Whether the petitioner should be permitted to continue provisional billing of transmission charges on the basis applied as on 31.3.2004 pending final determination of tariff in the present petition.
  3. Whether the petitioner is entitled to reimbursement of expenditure incurred for publication of statutory notices in newspapers, and if so, the manner of recovery from beneficiaries.
  4. How the various tariff components (capital cost, debt‑equity mix, return on equity, interest on loan, depreciation, advance against depreciation, O&M expenses, interest on working capital, maintenance spares and receivables) should be computed and applied to determine the annual transmission charges for the assets in question under the 2004 regulations.

Arguments of the Parties

The opinion does not contain a detailed account of the parties' legal arguments.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The Commission's analysis proceeds by applying the specific provisions of the 2004 regulations to the factual and accounting inputs submitted by the petitioner. The reasoning steps, as reflected in the order, are as follows:

  1. Capital cost basis: Pursuant to clause (2) of regulation 52 of the 2004 regulations, for projects existing up to 31.3.2004 the capital cost admitted by the Commission for tariff prior to 1.4.2004 forms the basis for tariff determination. The petitioner did not claim additional capitalisation or FERV for 2001–04; therefore the admitted capital costs from the earlier order (6.8.2003) were used as the capital base (total Rs. 4,530.85 lakh split between elements as shown in the petition).
  2. Debt‑equity ratio: The Commission applied regulation 54. For these existing projects the debt‑equity ratio considered by the Commission for the period ending 31.3.2004 (as per the earlier order) was adopted. Because there was no additional capitalisation, the actual loan and equity as on 1.4.2004 were used for tariff calculations. The order records the specific debt:equity for the elements (for example, 53.96:46.04 and 53.03:46.97) and the equity amounts considered (Rs. 802.00 lakh and Rs. 1,309.85 lakh).
  3. Return on equity: Regulation 56(iii) prescribes return on equity at 14% per annum on the equity base determined under regulation 54. The petitioner sought return on the basis of the earlier order (6.8.2003) and the Commission found that claim admissible; the annual return figures are recorded (e.g., Rs. 112.28 lakh and Rs. 183.38 lakh for the two asset groups).
  4. Interest on loan: The Commission computed interest on loan in accordance with regulation 56(i). The methodology involved:
    • Taking gross loans and cumulative repayments as admitted previously as opening balances on 1.4.2004.
    • Working out weighted average rates of interest on the actual loan portfolio and applying that rate to notional loan balances for the tariff years.
    • Calculating normative repayments for 2004–09 by a formula that takes the maximum of depreciation or a pro rata repayment based on actual repayment patterns.
    The order sets out year‑wise loan opening/closing, average loan, weighted rates and the interest amounts allowed (for example, interest on loan for 2004‑05 and 2005‑06 for the two asset groups).
  5. Depreciation: The Commission applied Regulation 56(ii) which prescribes straight‑line depreciation on historical cost, 90% of gross asset value as depreciable base, residual value 10%, and charging depreciation from the first year of operation on a pro rata basis where relevant. Because the loans are fully repaid during 2005–06 for the assets, the remaining depreciable value was spread over the remaining useful life as required by the regulation. The order provides the rates and year‑wise depreciation amounts (e.g., Rs. 47.29 lakh, Rs. 37.57 lakh, Rs. 73.36 lakh, Rs. 64.00 lakh in respective years).
  6. Advance Against Depreciation (AAD): The Commission applied sub‑clause (b) of clause (ii) of Regulation 56. The petitioner had not claimed AAD; consequently the Commission considered entitlement as nil.
  7. Operation & Maintenance (O&M) expenses: The Commission applied clause (iv) of Regulation 56 which prescribes normative O&M rates per ckt‑km and per bay for each year. The petitioner claimed O&M for 247 ckt‑km and 4 bays; the Commission allowed O&M on that basis. The petitioner also raised a potential future wage revision (effective 1.1.2007) and sought revision or actual cost relief; the Commission did not decide that issue at this stage, noting it did not arise for consideration then.
  8. Interest on working capital: The Commission applied Regulation 56(v). Working capital components were maintenance spares (1% of historical cost escalated at 6% p.a. from DOCO), one month O&M, and receivables equivalent to two months' average billing. The rate of interest on working capital was fixed on a normative basis equal to SBI PLR as on 1.4.2004 (10.25%). The petitioner’s claim at 10.25% was accepted and interest on working capital was computed year‑wise.
  9. Aggregation and final transmission charges: The Commission aggregated the allowed components—depreciation, interest on loan, return on equity, interest on working capital, and O&M—to determine the annual transmission charges for each asset grouping for each year of 2004–09. The order provides detailed year‑wise totals (e.g., totals for the combined 66 kV/132 kV single lines and for the 132 kV double circuit line).
  10. Additional administrative matters: The petitioner was allowed to claim reimbursement of Rs. 1,39,283/‑ incurred for publication of notices directly from respondents in one instalment in the ratio applicable for sharing of transmission charges. The petitioner’s provisional billing (already being done under the Commission’s interim directions) was to be adjusted retrospectively in light of the final tariff approved in this order.

Holding and Implications

Holding: The petition is DISPOSED OF. The Commission approved the transmission charges for the Rangit Transmission System for the period 1 April 2004 to 31 March 2009 in accordance with the calculations and application of the 2004 regulations as set out in the order.

Immediate consequences for the parties:

  • The Commission allowed the annual transmission charges for each year 2004–05 through 2008–09 for the asset groupings. The order records the detailed component‑wise and year‑wise amounts (depreciation, interest on loan, return on equity, interest on working capital, O&M) and the resulting totals (for example, totals such as Rs. 244.08 lakh for 2004‑05 for the 66 kV S/C & 132 kV S/C group and Rs. 375.71 lakh for 2004‑05 for the 132 kV D/C line are set out in the order's tables).
  • The allowed transmission charges are to be included in the regional transmission tariff for the Eastern Region and shared by regional beneficiaries in accordance with the 2004 regulations.
  • The petitioner is entitled to reimbursement of Rs. 1,39,283/‑ for newspaper publication charges, to be claimed from the respondents in one instalment in the same ratio used for sharing transmission charges.
  • The petitioner’s provisional billing already being undertaken pursuant to earlier interim directions shall be adjusted to reflect the final tariff approved in this order.

Broader implications and precedent: The order applies the 2004 regulations and makes no pronouncement of new legal principle beyond the application of those regulations to the facts and accounting inputs in this petition. The order does not indicate that a new precedent has been set.

Administrative/Documentary Notes

- The order disposes of Petition No. 118/2004. The computations and summary sheet (capital cost, admitted capital cost as on 1.4.2004, debt/equity break‑up, loan schedules, depreciation recovery schedules and year‑wise component amounts) are annexed to and form part of the order as reproduced in the text.

Show all summary ...

The petition has been filed for approval for transmission charges for the Rangit Transmission System (the transmission system) in Eastern Region for the period from 1.4.2004 to 31.3.2009, based on the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004, (hereinafter referred to as “the 2004 regulations”). The petitioner has also prayed that it be permitted to continue the billing of transmission charges on the same basis as charged on 31.3.2004, pending determination of tariff in the present petition. The petitioner in its affidavit dated 15 Febraury, 2005 has prayed to approve the reimbursement of expenditure from the beneficiaries towards publishing of notices in newspapers.

2. The revised cost estimate for the transmission system was approved by the Board of Directors of the petitioner company under its letter dated 2.2.1999 at a cost of Rs. 5075.00 lakh. The annual transmission charges from 1.4.2001 to 31.3.2004 were decided by the Commission in its order dated 6.8.2003 in Petition No. 62/2002 at a cost of Rs. 4530.85 lakh. The scope of work included in the transmission system and the date of commercial operation of the respective transmission line are as stated below:

S. No. Name of the transmission line Date of commercial operation Line length in Ckt-km (for O&M) (i) 66 kV S/C Rangit-Melli transmission line 1.4.1997 37 (ii) 132 kV S/C Rangit-Rammam transmission line 1.1.1998 27 (iii) 132 kV D/C Rangit-Siliguri transmission line 1.12.1998 183 Total 247

3. The petitioner has claimed the transmission charges as under:

(Rs. in lakh)

66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Depreciation 47.29 47.29 47.29 47.29 47.29 73.36 73.36 73.36 73.36 73.36 Interest on Loan 8.04 6.55 5.06 3.57 2.08 12.70 10.35 8.00 5.65 3.30 Return on Equity 112.28 112.28 112.28 112.28 112.28 183.38 183.38 183.38 183.38 183.38 Advance against Depreciation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Interest on Working Capital 7.49 7.70 7.93 8.16 8.42 11.20 11.50 11.82 12.15 12.52 O&M Expenses 70.77 73.60 76.58 79.58 82.82 97.78 101.69 105.86 109.93 114.48 Total 245.86 247.42 249.14 250.88 252.89 378.42 380.28 382.42 384.47 387.03

4. The details submitted by the petitioner in support of its claim for interest on working capital are given hereunder:

(Rs. in lakh)

66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Maintenance Spares 26.19 27.76 29.43 31.20 33.07 38.07 40.35 42.77 45.34 48.06 O&M expenses 5.90 6.13 6.38 6.63 6.90 8.15 8.47 8.82 9.16 9.54 Receivables 40.98 41.24 41.52 41.81 42.15 63.07 63.38 63.74 64.08 64.51 Total 73.07 75.14 77.34 79.64 82.12 109.29 112.21 115.33 118.58 122.10 Rate of Interest 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% Interest 7.49 7.70 7.93 8.16 8.42 11.20 11.50 11.82 12.15 12.52

5. The reply to the petition has been filed by Bihar State Electricity Board. In response to the public notices published by the petitioner in accordance with the procedure specified by the Commission, no comments have been received from the general public.

CAPITAL COST

6. As per clause (2) of regulation 52 of the 2004 regulations in case of the projects existing up to 31.3.2004, the project cost admitted by the Commission for determination of tariff prior to 1.4.2004 shall form the basis for determination of tariff.

7. The petitioner has considered the capital expenditure admitted by the Commission in the order dated 6.8.2003 ibid. The petitioner has not claimed additional capitalisation on works. The petitioner has also not considered additional capitalization on account of FERV as there are no foreign loans. Accordingly, the capital expenditure considered by the petitioner for tariff purpose is given hereunder:

Name of the Element Admitted capital cost Capital expenditure (i) 66 kV S/C Rangit-Melli transmission line 1013.00 1742.00 (ii) 132 kV S/C Rangit-Rammam transmission line 729.00 (iii) 132 kV D/C Rangit-Siliguri transmission line 2788.85 2788.85 Total 4530.85 4530.85

DEBT-EQUITY RATIO

8. Regulation 54 of the 2004 regulations inter alia provides that,—

(1) In case of the existing project, debt-equity ratio Considered by the Commission for fixation of tariff for the period ending 31.3.2004 shall be considered for determination of tariff.

(2) In case of the transmission system for which investment approval was accorded prior to 1.4.2004 and which is likely to be declared under commercial operation during the period 1.4.2004 to 31.3.2009, debt-equity in the ratio of 70:30 shall be considered:

Provided that where deployment of equity is less than 30%, the actual equity deployed shall be considered for the purpose of determination of tariff. Provided further that the Commission may in appropriate case consider equity higher than 30% for the purpose of determination of tariff, where the transmission licensee is able to establish to the satisfaction of the Commission that deployment of equity more than 30% was in the interest of general public;

(3) In case of the transmission system for which investment approval is accorded on or after 1.4.2004, debt-equity in the ratio of 70:30 shall be considered for the purpose of determination of tariff:

Provided that where deployment of equity is less than 30%, the actual equity deployed shall be considered for the purpose of determination of tariff.

(4) The debt and equity amount arrived at in accordance with above sub-clause (1), (2) or (3), as the case may be, shall be used for calculation of interest on loan, return on equity, advance against depreciation and foreign exchange rate variation.”

9. The petitioner has claimed tariff based on debt-equity ratio as considered by the Commission in its order dated 6.8.2003 ibid. Based on this, the debt-equity considered by the petitioner for different assets for the purpose of determination of tariff in the present petition is indicated below:

Name of the Element Debt-equity ratio (i) 66 kV S/C Rangit-Melli transmission line 53.96:46.04 (ii) 132 kV S/C Rangit-Rammam transmission line (iii) 132 kV D/C Rangit-Siliguri transmission line 53.03:46.97

10. As there is no additional capital expenditure and FERV during 2001–04, the actual loan and equity have been considered for tariff calculations. Therefore, debt-equity ratio and the equity considered for the purpose of tariff in each case is as under:

Name of the Element Debt-equity ratio considered Equity (Rs. in lakh) (i) 66 kV S/C Rangit-Melli transmission line 53.96:46.04 802.00 (ii) 132 kV S/C Rangit-Rammam transmission line (iii) 132 kV D/C Rangit-Siliguri transmission line 53.03:46.97 1309.85

RETURN ON EQUITY

11. As per clause (iii) of regulation 56 of the 2004 regulations, return on equity shall be computed on the equity base determined in accordance with regulation 54 @ 14% per annum. Equity invested in foreign currency is to be allowed a return in the same currency and the payment on this account is made in Indian Rupees based on the exchange rate prevailing on the due date of billing.

12. The petitioner has claimed return on the basis of order dated 6.8.2003 ibid, which has been found to be admissible. Thus, the return on equity each year during the tariff period is given hereunder:

Name of the Element Equity Return in Equity (i) 66 kV S/C Rangit-Melli transmission line 802.00 112.28 (ii) 132 kV S/C Rangit-Rammam transmission line (iii) 132 kV D/C Rangit-Siliguri transmission line 1309.85 183.38

INTEREST ON LOAN

13. As per clause (i) of regulation 56 of the 2004 regulations, interest on loan capital is to be computed loan wise on the loans arrived at in the manner indicated in regulation 54. Further, the loan outstanding as on 1.4.2004 is worked out as the gross loan as per regulation 54 minus cumulative repayment as admitted by the Commission up to 31.3.2004 The repayment for the period 2004–09 needs to be worked out on normative basis.

14. The petitioner has claimed interest on loan in the following manner:

(i) Gross loans, cumulative loan repayment up to previous year as admitted by the Commission in petition No. 62/2002 have been taken as the Opening Balance as on 01.04.2004

(ii) On the basis of actual rate of interest on actual average loan, the weighted average rate of interest on loan is worked out for various years.

(iii) Gross loans as admitted by the Commission in petition No. 62/2002 have been considered as notional loan and the weighted average rate of interest on loan for the year 2004–2005 as per above has been applied to arrive at interest on loan.

15. In our calculations, the interest on loan has been worked out as details below:

(i) Details of net outstanding loan as on 31.3.2004, repayment schedule for the period 2004–09, rate of interest as on 1.4.2004 etc. have been taken as per the loan allocation considered, for working out weighted average rate of interest.

(ii) The repayment of notional loan up to 31.3.2004 has been considered in proportion to repayment up to that date of actual loan.

(iii) Repayment for the years 2001–2002 to 2003–2004 of the notional loan component of FERV has been considered in proportion to total actual loan repaid during 2001–04.

(iv) The repayment for the year 2004–2005 to 2008–2009 of the total notional loan has been worked out as per the following formula:

Maximum of depreciation or (Notional net loan at the beginning of the year X (actual repayment of the respective loan/actual net respective loan at the beginning of the year)).

(v) Weighted average rate of interest on actual loan worked out as per (i) above is applied on the notional average loan during the year to arrive at the interest on loan.

16. Based on the above, the year wise details of interest worked out are given hereunder:

66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line Details of loan Up to 31.3.2004 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Up to 31.3.2004 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Interest on loan Gross Loan as on 1.4.2001 940.00 1479.00 Addition due to Additional Capitalisation 0.00 0.00 Addition due to FERV 0.00 0.00 Gross Loan 940.00 940.00 940.00 940.00 940.00 940.00 1479.00 1479.00 1479.00 1479.00 1479.00 1479.00 Cumulative Repayment up to Previous Year 856.13 903.42 940.00 940.00 940.00 1346.63 1419.99 1479.00 1479.00 1479.00 Net Loan-Opening 83.87 36.58 0.00 0.00 0.00 132.37 59.01 0.00 0.00 0.00 Repayment during the year 47.29 36.58 0.00 0.00 0.00 73.36 59.01 0.00 0.00 0.00 Net Loan-Closing 36.58 0.00 0.00 0.00 0.00 59.01 0.00 0.00 0.00 0.00 Average Loan 60.22 18.29 0.00 0.00 0.00 95.69 29.50 0.00 0.00 0.00 Weighted Average Rate of Interest on Loan 10.51% 10.61% 10.76% 11.06% 11.86% 10.52% 10.61% 10.77% 11.07% 11.87% Interest 6.33 1.94 0.00 0.00 0.00 10.06 3.13 0.00 0.00 0.00

DEPRECIATION

17. Sub-clause (a) of clause (ii) of Regulation 56 of the 2004 regulations provides for computation of depreciation in the following manner, namely:

(i) The value base for the purpose of depreciation shall be the historical cost of the asset.

(ii) Depreciation shall be calculated annually based on straight line method over the useful life of the asset and at the rates prescribed in Appendix II to these regulations. The residual value of the asset shall be considered as 10% and depreciation shall be allowed up to maximum of 90% of the historical capital cost of the asset. Land is not a depreciable asset and its cost shall be excluded from the capital cost while computing 90% of the historical cost of the asset. The historical capital cost of the asset shall include additional capitalisation on account of Foreign Exchange Rate Variation up to 31.3.2004 already allowed by the Central Government/Commission.

(iii) On repayment of entire loan, the remaining depreciable value shall be spread over the balance useful life of the asset.

(iv) Depreciation shall be chargeable from the first year of operation. In case of operation of the asset for part of the year, depreciation shall be charged on pro rata basis.

18. As the entire loan for the assets gets repaid during 2005–2006 in both assets, the remaining depreciation has been worked out by following manner:

Name of the Element Weighted average life (years) Amount for the year 2006–09 (Rs. in lakh) Used life as on 1.4.2004 Remaining useful life as on 1.4.2004 (i) 66 kV S/C Rangit-Melli transmission line 34 37.57 7 27 (ii) 132 kV S/C Rangit-Rammam transmission line (iii) 132 kV D/C Rangit-Siliguri transmission line 35 64.00 5 30

19. The calculations in support of depreciation allowed are appended below:

66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line Details of Depreciation Up to 31.3.2004 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Up to 31.3.2004 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 As per order dated 6.8.2003 1742.02 2788.85 Additions during 2001–04 due to Additional Capitalisation 0.00 0.00 Addition during 2001–04 due to FERV 0.00 0.00 Gross Block as on 31.3.2004 1742.02 1742.02 1742.02 1742.02 1742.02 1742.02 2788.85 2788.85 2788.85 2788.85 2788.85 2788.85 Rate of Depreciation 2.714% 2.630% Depreciable Value 90% 1567.82 1567.82 1567.82 1567.82 1567.82 90% 2509.97 2509.97 2509.97 2509.97 2509.97 Balance Useful life of the asset 27.00 27.00 26.00 25.00 24.00 23.00 30.00 30.00 29.00 28.00 27.00 26.00 Remaining Depreciable Value 1033.90 986.62 939.33 901.76 864.18 1938.71 1865.35 1791.99 1727.99 1663.99 Depreciation 47.29 47.29 37.57 37.57 37.57 73.36 73.36 64.00 64.00 64.00

ADVANCE AGAINST DEPRECIATION

20. As per sub-clause (b) of clause (ii) of Regulation 56 of the 2004 regulations, in addition to allowable depreciation, the transmission licensee is entitled to Advance Against Depreciation, computed in the manner given hereunder:

AAD = Loan repayment amount as per regulation 56(i) subject to a ceiling of 1/10th of loan amount as per regulation 54 minus depreciation as per schedule

21. It is provided that Advance Against Depreciation shall be permitted only if the cumulative repayment up to a particular year exceeds the cumulative depreciation up to that year. It is further provided that Advance Against Depreciation in a year shall be restricted to the extent of difference between cumulative repayment and cumulative depreciation up to that year.

22. The petitioner has not claimed Advance Against Depreciation. Accordingly, its entitlement is considered as ‘nil’

OPERATION&MAINTENANCE EXPENSES

23. In accordance with clause (iv) of Regulation 56 the 2004 regulations, the following norms are prescribed for O&M expenses

Year 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 O&M expenses (Rs. in lakh per ckt-km) 0.227 0.236 0.246 0.255 0.266 O&M expenses (Rs. in lakh per bay) 28.12 29.25 30.42 31.63 32.90

24. The petitioner has claimed O&M expenses for 247(37+27+183) ckt-km of line length and 4 bays (1 at Melli, 1 at Rammam and 2 at Siliguri Sub-stations), which has been allowed. Accordingly, the petitioner's entitlement to O&M expenses has been worked out as given hereunder:

66 kV S/C Rangit-Melli transmission line 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line 2004-2005 2005-2006 2004-2005 2005-2006 2006-2007 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 O&M expenses for line length 14.53 15.10 15.74 16.33 17.02 41.54 43.19 45.02 46.67 48.68 O&M expenses for bays 56.24 58.50 60.84 63.26 65.80 56.24 58.50 60.84 63.26 65.80 TOTAL 70.77 73.60 76.58 79.59 82.82 97.78 101.69 105.86 109.93 114.48

25. The petitioner has submitted that the wage revision of its employees is due with effect from 1.1.2007 Therefore, according to the petitioner, O&M expenses should be subject to revision on account of revision of employee cost from that date. In the alternative, it has been prayed that the increase in employee cost due to wage revision be allowed as per actuals for extra cost to be incurred consequent to wage revision. We are not expressing any view, as this issue does not arise for consideration at this stage. The petitioner may approach for a relief in this regard at an appropriate stage in accordance with law.

INTEREST ON WORKING CAPITAL

26. The components of the working capital and the interest thereon are discussed hereunder:

(i) Maintenance spares

Regulation 56(v)(1)(b) of the 2004 regulations provides for maintenance spares @ 1% of the historical cost escalated @ 6% per annum from the date of commercial operation. In the present case, element wise capital expenditure on the date of commercial operation which has been considered as the historical cost for the purpose of the present petition and maintenance spares have been worked out accordingly by escalating 1% of the historical cost @ 6% per annum. The necessary details are given hereunder:

Name of the Element Date of Commercial Operation Capital Expenditure (Rs. in lakh) on the date of commercial operation Escalated spares Cost as on 1.4.2004 (Rs. in lakh) (i) 66 kV S/C Rangit-Melli transmission line 1.4.1997 1013.00 25.73 (ii) 132 kV S/C Rangit-Rammam transmission line 1.1.1998 729.00 (iii) 132 kV D/C Rangit-Siliguri transmission line 1.12.1998 2771.56 37.83

(ii) O&M expenses

Regulation 56(v)(1)(a) of the 2004 regulations provides for operation and maintenance expenses for one month as a component of working capital. The petitioner has claimed O&M expenses for 1 month of O&M expenses of the respective year as claimed in the petition. This has been considered in the working capital.

(iii) Receivables

As per Regulation 56(v)(1)(c) of the 2004 regulations, receivables will be equivalent to two months average billing calculated on target availability level. The petitioner has claimed the receivables on the basis 2 months' transmission charges claimed in the petition. In the tariff being allowed, receivables have been worked out on the basis 2 months' transmission charges.

(iv) Rate of interest on working capital

As per Regulation 56(v)(2) of the 2004 regulations, rate of interest on working capital shall be on normative basis and shall be equal to the short-term Prime Lending Rate of State Bank of India as on 1.4.2004 or on 1st April of the year in which the project or part thereof (as the case may be) is declared under commercial operation, whichever is later. The interest on working capital is payable on normative basis notwithstanding that the transmission licensee has not taken working capital loan from any outside agency. The petitioner has claimed interest on working capital @ 10.25% based on SBI PLR as on 1.4.2004, which is in accordance with the 2004 regulations and has been allowed.

27. The necessary computations in support of interest on working capital are appended herein below.

(Rs. in lakh)

66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Maintenance Spares 25.73 27.27 28.91 30.64 32.48 37.83 40.10 42.51 45.06 47.76 O&M expenses 5.90 6.13 6.38 6.63 6.90 8.15 8.47 8.82 9.16 9.54 Receivables 40.68 40.45 39.01 39.55 40.14 62.62 62.15 60.79 61.53 62.35 Total 72.30 73.85 74.30 76.83 79.52 108.60 110.73 112.12 115.75 119.66 Rate of Interest 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% 10.25% Interest 7.41 7.57 7.62 7.87 8.15 11.13 11.35 11.49 11.86 12.26

TRANSMISSION CHARGES

28. A summary sheet showing basic details of capital cost and other related aspects is annexed to this order. The transmission charges being allowed for the transmission system are summarized below.

(Rs. in lakh)

66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Depreciation 47.29 47.29 37.57 37.57 37.57 73.36 73.36 64.00 64.00 64.00 Interest on Loan 6.33 1.94 0.00 0.00 0.00 10.06 3.13 0.00 0.00 0.00 Return on Equity 112.28 112.28 112.28 112.28 112.28 183.38 183.38 183.38 183.38 183.38 Advance against Depreciation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Interest on Working Capital 7.41 7.57 7.62 7.87 8.15 11.13 11.35 11.49 11.86 12.26 O&M Expenses 70.77 73.60 76.58 79.58 82.82 97.78 101.69 105.86 109.93 114.48 Total 244.08 242.68 234.05 237.31 240.82 375.71 372.91 364.73 369.17 374.12

29. In addition to the transmission charges, the petitioner shall be entitled to other charges like income-tax, incentive, surcharge and other cess and taxes in accordance with the 2004 regulations. These transmission charges shall be included in the regional transmission tariff for Eastern Region and shall be shared by the regional beneficiaries in accordance with the 2004 regulations.

30. The petitioner has sought approval for the reimbursement of expenditure of Rs. 1,39,283/- incurred on publication of notices in the newspapers. The petitioner shall claim reimbursement of the said expenditure directly from the respondents in one installment in the ratio applicable for sharing of transmission charges

31. The petitioner is already billing the respondents on provisional basis in accordance with the Commission's interim directions. The provisional billing of tariff shall be adjusted in the light of final tariff now approved by us.

32. This order disposes of Petition No. 118/2004.

SUMMARY SHEET

Name of the Element: 66 kV S/C Rangit-Melli transmission line and 132 kV S/C Rangit-Rammam transmission line 132 kV D/C Rangit-Siliguri transmission line Actual DOCO: 1.1.2000 1.8.2000 Tariff setting Period: 2004-09 2004-09 (Rs. in lakh) (Rs. in lakh) 1 Capital Cost of the Project 1742.02 5075.00 2 Admitted Capital Cost as on 1.4.2004 for Calculation of Debt and Equity 1742.02 2788.85 3 Additional Capitalisation(works) 0.00 0.00 For the year 2001–02 0.00 0.00 For the year 2002–03 0.00 0.00 For the year 2003–04 0.00 0.00 Total 0.00 0.00 4 Additional Capitalisation(FERV) 0.00 0.00 For the year 2001–02 0.00 0.00 For the year 2002–03 0.00 0.00 For the year 2003–04 0.00 0.00 Total 0.00 0.00 5 Total Capital Cost as on 01.04.2004(2+3+4) 1742.02 2788.85 6 Means of Finance: Debt 53.96% 940.00 53.03% 1479.00 Equity 46.04% 802.00 46.97% 1309.85 Total 100.00% 1742.00 100.00% 2788.85 7 Gross Loan as on 01.04.2004 940.00 1479.00 Cumulative Repayment up to 31.3.2009: 940.00 1479.00 Repaid up to 31.03.2004 856.13 1346.63 From 01.04.01 to 31.03.2004 (ACE & FERV) 0.00 0.00 From 01.04.2004 to 31.03.2009 83.87 132.37 Total 3732.7226 940.00 1479.00 8 Balance Loan to be repaid beyond 31.03.2009: 0.00 0.00 9 Depreciation recovered up to 31.03.09: 741.21 909.97 Dep AAD Total Dep AAD Total Recovered up to 31.03.2004 502.87 31.04 533.91 521.37 41.89 571.26 From 01.04.01 to 31.03.2004 (ACE & FERV) 0.00 0.00 0.00 0.00 0.00 0.00 From 01.04.2004 to 31.03.2009 207.29 0.00 277.29 338.71 0.00 338.71 Total 741.21 909.97 10 Balance Depreciation to be recovered beyond 31.03.2009: 826.61 1599.99 Capital cost for the purpose of Depreciation 1742.02 2788.85 ACE + FERV 0.00 0.00 Capital cost as 01.04.2004 1742.02 2788.85 Less: Land Cost 0.00 0.00 1742.02 2788.85 90% of Capital Cost as above 1567.82 2509.97 Cum. Depreciation to be recovered up to 31.03.2009 741.21 909.97 Balance 826.61 1599.99