National Aluminum Co. Ltd. v. Subhash Infraengineers Pvt. Ltd. And Another

Punjab & Haryana High Court
Oct 22, 2016
Smart Summary (Beta)

Factual and Procedural Background

The dispute arose from a work order issued by the petitioner (NALCO) to respondent No.1, which included a requirement to return a signed duplicate copy of the work order within seven days as acceptance. Respondent No.1 received the work order but did not accept it, citing technical issues, and returned it with a refusal letter within the stipulated period. Despite repeated requests from the petitioner to execute the contract and commence work, respondent No.1 maintained its refusal. As no agreement was signed between the parties, the petitioner terminated the contract invoking relevant clauses of the General Conditions of Contract and proceeded to execute the work through another agency at the risk and cost of respondent No.1. The petitioner sought to recover the costs from respondent No.1 and invoked the arbitration clause to appoint an arbitrator. Respondent No.1 challenged the existence of an arbitration agreement and the validity of the dispute being arbitrable, leading to judicial proceedings and the present revision petition.

Legal Issues Presented

  1. Whether there existed a valid and concluded arbitration agreement between the parties under Section 7 of the Arbitration and Conciliation Act, 1996.
  2. Whether the dispute between the parties was an arbitrable dispute requiring reference to arbitration.
  3. Whether the judicial authority should refer the matter to arbitration merely based on the existence of an arbitration clause in the agreement.
  4. The extent of judicial intervention in determining the validity and existence of an arbitration agreement.

Arguments of the Parties

Respondent No.1's Arguments

  • There was no signed agreement between the parties, which is a prerequisite for arbitration.
  • The dispute was not an arbitral dispute as it was never part of a concluded contract.
  • The acceptance of the work order was conditional and amounted to a counter proposal, not an absolute and unqualified acceptance necessary for contract formation.
  • Since the acceptance was not absolute, no consensus ad idem existed between the parties.
  • The refusal to accept the work order was communicated timely and validly on technical grounds.
  • No arbitration agreement existed in writing or by conduct as required under Section 7 of the Arbitration and Conciliation Act, 1996.

Petitioner's Arguments

  • The petitioner relied on the arbitration clause under Clause 22.00 of NIT and WO and Clause 87 of General Conditions of Contract to invoke arbitration.
  • Petitioner asserted that the failure to accept the work order within the stipulated time and refusal amounted to breach, justifying termination and invocation of arbitration.
  • Petitioner contended that the absence of a signed agreement did not negate the existence of an arbitration agreement, which could arise from conduct or correspondence.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
M/s S.B.P and Companies Vs. M/s Patel Engineering Ltd. and another, 2005(4) RCR (Civil) 747 Judicial authority must consider objections to arbitration objectively and not mechanically refer disputes to arbitration merely due to arbitration clause. Supported the principle that existence of arbitral dispute is essential before referral to arbitration.
India Household and Healthcare Limited Vs. LG Household and Healthcare Ltd., 2007(2) RCR (Civil) 362 Judicial authority has jurisdiction to examine validity of arbitration agreement before referring disputes to arbitration. Reinforced the court’s power to scrutinize arbitration agreement validity in the present case.
Vishwa Industrial Company Private Ltd. Vs. Mahanadi Coalfields Limited and others, 2007 AIR (Orissa) 71 Acceptance with conditions is a counter proposal, not an absolute acceptance forming a contract. Applied to find no concluded contract between parties due to conditional acceptance.
Milestone Gears Pvt. Ltd. Vs. Industrial Finance Corporation of India, 2010 (8) RCR (Civil) 1521 Acceptance must be absolute and unqualified to form a valid contract. Supported the conclusion that no contract arose due to conditional acceptance.
Union of India Vs. M/s Uttam Singh Dugal and Company (Pvt.) Ltd., 1972 AIR (Delhi) 110 Principle that counter proposals do not convert into binding contracts without acceptance by original proposer. Used to demonstrate absence of consensus ad idem in the present case.
Forbes Gokak Limited Vs. Central Warehousing Corporation and another, 2003(1) RAJ 200 Acceptance with variation from offer does not create binding contract. Applied to conclude no valid contract existed between parties.
Govind Rubber Limited case (Supra) Arbitration agreement need not be signed if it can be inferred from exchange of letters, conduct or telecommunication under Section 7(4)(b) and (c) of Arbitration Act. Distinguished on facts: no conduct or correspondence inferred agreement in present case.
Union of India Vs. D.N. Revri and Co., (1976) 4 SCC 147 Commercial documents should be interpreted to give efficacy to contracts rather than invalidate them. Referenced to support interpretation principles though not directly applicable here.
Indowind Energy Ltd. Vs. Wescare (I) Ltd. and another Absence of written arbitration agreement precludes reference to arbitration. Applied to dismiss the revision petition for lack of arbitration agreement.
M/s Harsha Constructions Vs. Union of India and others Similar principle regarding necessity of written arbitration agreement for arbitration reference. Supported the court’s conclusion on absence of arbitration agreement.
P. Anand Gajapathi Raju and others case Judicial intervention in arbitration should be minimal and only where arbitration agreement exists. Reiterated limited judicial role in presence of valid arbitration agreement.

Court's Reasoning and Analysis

The Court carefully examined whether a valid arbitration agreement existed between the parties. It considered the requirement under Section 7 of the Arbitration and Conciliation Act, 1996, that an arbitration agreement must be in writing, which may include documents, exchanges of communication, or conduct evidencing agreement. The Court found that no signed or executed agreement existed, and the conditional acceptance by respondent No.1 was a counter proposal, not an absolute acceptance, thus no concluded contract or arbitration agreement arose.

The Court distinguished the Govind Rubber Limited case, noting that in the present facts, there was no conduct or correspondence amounting to agreement, and the parties were never ad idem. The Court also noted that Section 16 of the Arbitration Act empowers the arbitral tribunal to rule on its jurisdiction, but such power presupposes existence of a lawful arbitration agreement, which was absent here.

Accordingly, the Court held that the judicial authority was correct in refusing to refer the dispute to arbitration, as the essential prerequisite of an arbitration agreement was missing. The Court emphasized that judicial intervention in arbitration matters is limited and should occur only when a valid arbitration agreement exists. The absence of a concluded agreement meant no jurisdiction was conferred on the arbitrator, and the respondent's non-participation did not amount to acceptance of arbitral jurisdiction.

Holding and Implications

The Court DISMISSED the revision petition, upholding the order of the Lower Appellate Court.

The direct effect of this decision is that in the absence of a valid, concluded arbitration agreement, disputes cannot be referred to arbitration. The Court clarified that mere existence of an arbitration clause or conditional acceptance does not suffice to create an arbitration agreement. No new precedent was established beyond the application of existing principles concerning contract formation and arbitration agreements under the Arbitration and Conciliation Act, 1996.

Show all summary ...

Existence of arbitral dispute is sine quo non for adjudicating the same by an arbitrator. The judicial authority has to consider the objection objectively. The judicial authority is not supposed to act mechanically and refer the matter to arbitration simply because there is an arbitration clause in the agreement. [36]. Learned counsel stressed upon an issue that firstly there was a no signed agreement between the parties and secondly, the dispute was not worth an arbitral dispute as it was never part of a

16 of 27 CR No.2471 of 2016(O&M) 17 concluded contract. Learned counsel relied upon M/s S.B.P and Companies Vs. M/s Patel Engineering Ltd. and another, 2005(4) RCR (Civil) 747. [37]. Learned counsel further emphasized that in a question related to validity or otherwise of the arbitration agreement, judicial authority would have the jurisdiction to go into the question and pass appropriate order. Learned counsel relied upon India Household and Healthcare Limited Vs. LG Household and Healthcare Ltd., 2007(2) RCR (Civil) 362 in this context. [38]. At last, learned counsel relied upon Vishwa Industrial Company Private Ltd. Vs. Mahanadi Coalfields Limited and others, 2007 AIR (Orissa) 71, Milestone Gears Pvt. Ltd. Vs. Industrial Finance Corporation of India, 2010 (8) RCR (Civil) 1521, Union of India Vs. M/s Uttam Singh Dugal and Company (Pvt.) Ltd., 1972 AIR (Delhi) 110 and Forbes Gokak Limited Vs. Central Warehousing Corporation and another, 2003(1) RAJ 200 to submit that acceptance with a verification of a condition was not an acceptance. It was merely a counter proposal. In order to convert a proposal into a promise, the acceptance must be absolute or unqualified. It had to be accepted by the original proposer before a contract was made. The cancellation of conditional offer did not result in a valid and binding contract between the parties. An acceptance of an offer must be absolute. When there was variance with the offer and acceptance, even in respect of any material term,

17 of 27 CR No.2471 of 2016(O&M) 18 the acceptance could not be said to be absolute and unqualified. Such an offer would not result in the formation of a legal contract. Except in the eventuality of unconditional and unequivocal acceptance, it could not be contended that there was any consensus ad idem between the parties. On the strength of aforesaid reasoning, learned counsel for the respondent submitted that there was no existence of arbitral dispute between the parties and the revision petition is liable to be dismissed. [39]. Having considered the rival submissions made by the parties it is found that as per work order, two hard copies were sent through post on 09.11.2011. The later had the specific recital that respondent No.1 was required to return duplicate copy of work order duly signed by the authorized signatory holding power of attorney or proprietor of the firm within 7 days as token of acceptance and acknowledgment. If nothing was heard from the side of respondent No.1 within stipulated period of 7 days, it was to be presumed that the acceptance of the work order was accepted. The said work order was received by respondent No.1 on 30.11.2011 by registered post. Since the work order was not found to be technically sound, therefore, respondent No.1 did not accept the same and sent its refusal letter dated 02.12.2011 within 7 days of receipt of work order. In the intervening period from 09.11.2011 to 30.11.2011, petitioner also requested respondent No.1 to come forward for kick of meeting preferably on 18.11.2011 or 19.11.2011 and also to take

18 of 27 CR No.2471 of 2016(O&M) 19 necessary action for execution of agreement as per Clause 13.0 of the Contract Agreement under general instructions. [40]. On 21.11.2011, the petitioner also communicated respondent No.1 to come for kick of meeting and to submit master network of project schedule and execute the contract agreement by 26.11.2011, failing which NALCO may take suitable action as deemed fit as per terms and conditions of the subject contract. In response to the aforesaid letter dated 21.11.2011, respondent No.1 vide reply of even date communicated to the petitioner that respondent No.1 cannot give any firm programme unless the final specifications are adopted and conveyed to them. In case the specifications were not changed/revised, then respondent No.1 would not be interested to execute the work. Thereafter, petitioner again requested respondent No.1 to start activity of work order with immediate effect and meet the technical department for finalization of programme and submit the acceptance of work order by 26.11.2011, failing which NALCO would be constraint to take action as per terms and conditions of contract as deemed fit. Vide letter dated 02.12.2011, respondent No.1 on the basis of technical reasons explained earlier, showed its inability to accept the work and returned the same. [41]. As per Clause 13.0 of the Contract Agreement under general instructions, contractor was required to execute an agreement on non-judicial stamp of Rs.50/- under the jurisdiction of

19 of 27 CR No.2471 of 2016(O&M) 20 Orissa High Court in the specific format enclosed at Annexure VII. Deputy General Manager (Planning and Contracts) was required to sign the contract on behalf of NALCO. The agreement was required to be executed between 15 days of issuance of work order. The agreement was not required to be executed on work orders of value less than or equal to Rs.50,000/-. No such execution of agreement was executed between the parties as per the contract document under general instructions. [42]. Similarly, as per condition No.13.0 of General Conditions of Contract, successful tenderer was required to execute an agreement with the owner in the proforma attached with tender document within 10 days of receipt of the notification of acceptance of the tender. In the event of failure on the part of successful tenderer to sign the agreement within the above stipulated period, the earnest money or initial deposit was to be forfeited and acceptance of the tender was to be considered as cancelled. No bills were payable unless the agreement was executed. [43]. Admittedly, contract was not signed between the parties. In response to the letter dated 02.12.2011 issued by respondent No.1 refusing to accept the work order, NALCO/petitioner invoked Clause 25.1 of General Conditions of Contract. Contract was terminated from the date of refusal by respondent No.1. Petitioner proposed to take action as per Clause 25.2 of General Conditions of Contract, forfeiting the security deposit of respondent No.1.

20 of 27 CR No.2471 of 2016(O&M) 21 Thereafter, petitioner proceeded to get the work done by other agency at the risk and cost of respondent No.1. Petitioner also got the work executed by another agency and the work order issued to respondent No.1 was terminated at its risk and cost on 27.02.2012. Risk and cost of Rs.4,86,61,440/- was sought to be recovered from respondent No.1. Respondent No.1 was required to deposit the aforesaid amount in favour of NALCO payable at Angul, Orissa, failing which it was decided by the petitioner to invoke the arbitration clause under Clause 22.00 of NIT and WO and Clause 87 of General Conditions of Contract. CMD, NALCO would be requested to appoint arbitrator in the matter. Respondent No.1 communicated to the petitioner on 28.02.2015 to withdraw the recovery of Rs.4,86,61,440/- being illegal and unjustified. Thereafter, Arbitrator was appointed who issued notice to the parties. [44]. Evidently, the proposal was merely a counter proposal as the condition was not executed by respondent No.1. In order to convert a contract into promise, acceptance must be absolute and unqualified. It must be accepted by the original proposer before a contract is made. The acceptance of the offer must be absolute. The variance was suggested by respondent No.1, but the same was not adhered to by the petitioner. The variance between offer and acceptance was in respect of material term and in the event of non- acceptance of the same, the acceptance cannot be said to be absolute and unqualified. Such an offer would not result in the formation of legal contract as per Section 7 of the Indian Contract

21 of 27 CR No.2471 of 2016(O&M) 22 Act, 1872. In terms of Section 7 of the Indian Contract Act, except in the eventuality of unconditional and unequivocal acceptance, there cannot be any consensus ad idem between the parties. The offeree has to give unqualified consent to the exact terms of offer so as to bring about a concluded contract. There is a contrast distinction between arbitration agreement and a contract. Contract can be entered into even orally. The same can be spelt out from the conduct and correspondence between the parties. In case of arbitration agreement, it can come into existence only in the manner as contemplated under Section 7 of the Arbitration and Conciliation Act, 1996. Arbitration agreement has to be in writing. [45]. In Govind Rubber Limited case (supra), the Honble Apex Court held in the following manner:-

15. A perusal of the aforesaid provisions would show that in order to constitute an arbitration agreement, it need not be signed by all the parties. Section 7(3) of the Act provides that the arbitration agreement shall be in writing, which is a mandatory requirement. Section 7(4) states that the arbitration agreement shall be in writing, if it is a document signed by all the parties. But a perusal of clauses (b) and (c) of Section 7(4) would show that a written document which may not be signed by the parties even then it can be arbitration agreement. Section 7(4)(b) provides that an arbitration agreement can be culled out from an exchange of letters, telex, telegrams or other means of telecommunication which provide a record of the agreement.

22 of 27 CR No.2471 of 2016(O&M) 23 [16]. On reading the provisions, it can safely be concluded that an arbitration agreement even though in writing need not be signed by the parties if the record of agreement is provided by exchange of letters, telex, telegrams or other means of telecommunication. Section 7(4) (c) provides that there can be an arbitration agreement in the exchange of statements of claims and defence in which the existence of the agreement is alleged by one party and not denied by the other. If it can be prima facie shown that the parties are at ad idem, then the mere fact of one party not signing the agreement cannot absolve him from the liability under the agreement. In the present day of e-commerce, in cases of internet purchases, tele purchases, ticket booking on internet and in standard forms of contract, terms and conditions are agreed upon. In such agreements, if the identity of the parties is established, and there is a record of agreement it becomes an arbitration agreement if there is an arbitration clause showing ad idem between the parties. Therefore, signature is not a formal requirement under Section 7(4)(b) or 7(4)(c) or under Section 7(5) of the Act. [46]. In the aforesaid judgment, the Honble Apex Court held that in case of commercial document, it must be interpreted in such a manner so as to give efficacy to the contract, rather than to invalidate it. Reference was made to Union of India Vs. D.N. Revri and Co., (1976) 4 SCC 147.

23 of 27 CR No.2471 of 2016(O&M) 24 [47]. The view expressed in Govind Rubber Ltd. case (supra) was in respect of arbitration agreement, even though in writing need not be signed by the parties if the same was discernible from the conduct of the parties in support of existence of such agreement. If the parties were ad idem on the factum of agreement, then merely because one of the party did not sign the same was of no consequence. The ratio of aforesaid case does not apply to the facts and circumstances of the present case as the terms and conditions of the tender were not accepted by respondent No.1 being not considered viable by respondent No.1. There were no other supporting documents which infer from the conduct of the parties that the agreement was ever implemented by exchange of letters, telex, telegrams or other means of telecommunication. The parties were never ad idem on any agreed terms and conditions of the agreement, therefore, Govind Rubber Ltd. case (supra) operates in different fields and is not applicable in the facts and circumstances of the present case. [48]. It is true that Section 16 of the Arbitration and Conciliation Act, 1996 makes it explicitly clear that the Arbitral Tribunal has the power to rule on its own jurisdiction even when any objection with reference to existence or validity of arbitration agreement is raised. Sub Section (2), (4) and (6) of Section 16 of Arbitration and Conciliation Act would make it clear that such a decision would be amenable to be assailed within the ambit of Section 34 of the Arbitration Act. There cannot be any dispute with

24 of 27 CR No.2471 of 2016(O&M) 25 regard to aforesaid proposition, but for the applicability of the same, there must be a concluded document and lawful arbitration agreement. [49]. Since there was no arbitration agreement existed between the parties as per Section 7 of the Arbitration and Conciliation Act, no agreement was executed in writing as per Section 7(3) of the Arbitration Act, therefore, ratio laid down in Indowind Energy Ltd. Vs. Wescare (I) Ltd. and another case (supra) and M/s Harsha Constructions Vs. Union of India and others case (supra) squarely applied to the facts of the present case. In the absence of written agreement between the parties, agreed to refer any dispute arising for arbitration, the same cannot be referred to arbitrator for arbitration by the Court. [50]. In the instant case, no jurisdiction of the Court was invoked for seeking reference to the arbitrator. There was no participation in the proceedings by respondent No.1, therefore the same would not amount to acceptance of jurisdiction of the arbitrator in any manner. There was no agreement, neither any writing, nor there was any signing of documents between the parties, therefore, there was no concluded agreement/contract between the parties. It is equally true that the new act defined the extent of judicial intervention in the arbitration proceedings. No judicial authority can interfere except where so provided. The object of new act is to encourage resolution of disputes expeditiously and less expensively.

25 of 27 CR No.2471 of 2016(O&M) 26 When there is an arbitration agreement, the intervention of the Court should be minimal. The ratio laid down in P. Anand Gajapathi Raju and others case (supra) is applicable only in the event of an arbitration agreement. [51]. The entire controversy hinges upon a fact whether there was a lawful arbitration agreement between the parties or not. In the light of different precedents as discussed above, I am of the view that there was no arbitration agreement between the parties as provided under Section 7 of Arbitration and Conciliation Act, 1996, nor the arbitration agreement was in writing executed between the parties, therefore, a contract with regard to arbitration cannot be presumed. An Agreement which is enforceable in law is a contract. The alleged agreement between the parties is not enforceable in law being not a concluded agreement between the parties. It was not a case of acceptance with variance or a condition, but it was a case of counter proposal which was not adhered to or accepted and could not be converted into a promise. The acceptance must be absolute and unqualified. The counter proposal at variance was not accepted by the petitioner and there was no concluded agreement between the parties. Section 16 of the Arbitration and Conciliation Act would operate only in the event where there was a concluded agreement between the parties in terms of Section 7 of the Arbitration and Conciliation Act. There was no consensus ad idem between the parties with reference to any terms and conditions of the offer and acceptance.

26 of 27 CR No.2471 of 2016(O&M) 27 [52]. In view of aforesaid, I am of the view that the order dated 25.01.2016 passed by the Lower Appellate Court cannot be faulted with. This revision petition is accordingly, dismissed. 22.10.2016 (RAJ MOHAN SINGH) Prince JUDGE Whether reasoned/speaking Yes/No Whether reportable Yes/No