- Bookmark
- Share
- CaseIQ
Measures For Prevention Of Fatal Accidents Of Smal...
Order
1. Heard the learned amicus curiae and the learned Additional Solicitor General appearing for the Union of India.
2. It has been brought to the notice of this Court that in a number of cases children had been trapped and fallen into borewells and tubewells or abandoned wells. These reports have been coming from various States. Accordingly, we took suo motu initiative and issued notice to the various States to take immediate measures to prevent such kind of incidents.
3. The Union of India has filed its counter-affidavit giving certain guidelines to be followed by the States. We have perused the affidavit and the guidelines suggested by the Union of India.
4. Having regard to the number of incidents that have taken place during the recent past and the immediate need for preventing such incidents in future, we direct that the following safety measures/guidelines are to be observed by all the States:
4.1* The owner of the land/premises, before taking any steps for constructing borewell/tubewell must inform in writing at least 15 days in advance to the authorities concerned in the area i.e District Collector/District Magistrate/Sarpanch of the Gram panchayat/any other statutory authority/officers concerned of the Department of Groundwater/Public Health/Municipal Corporation, as the case may be, about the construction of borewell/tubewell.
4.2** Registration of all the drilling agencies viz. government/semi-government/private, etc. should be mandatory with the district administration/statutory authority wherever applicable.
4.3 Erection of signboard at the time of construction near the well with the following details:
(a) Complete address of the drilling agency at the time of construction/rehabilitation of well.
(b) Complete address of the user agency/owner of the well.
4.4 Erection of barbed wire fencing or any other suitable barrier around the well during construction.
4.5 Construction of cement/concrete platform measuring 0.50 m × 0.50 m × 0.60 m (0.30 m above the ground level and 0.30 m below the ground level) around the well casing.
4.6 Capping of well assembly by welding steel plate or by providing a strong cap to be fixed to the casing pipe with bolts and nuts.
4.7 In case of pump repair, the tubewell should not be left uncovered.
4.8 Filling of mud pits and channels after completion of works.
4.9 Filling up abandoned borewells by clay/sand/boulders/pebbles/drill cuttings, etc. from bottom to the ground level.
4.10 On completion of the drilling operations at a particular location, the ground conditions are to be restored as before the start of drilling.
4.11 District Collector should be empowered to verify that the above guidelines are being followed and proper monitoring check about the status of boreholes/tubewells are being taken care through the State/Central Government agencies concerned.
4.12 District/Block/villagewise status of borewells/tubewells drilled viz. number of wells in use, number of abandoned borewells/tubewells found open, number of abandoned borewells/tubewells properly filled up to the ground level and balance number of abandoned borewells/tubewells to be filled up to the ground level is to be maintained at the district level.
4.13 In rural areas, the monitoring of the above is to be done through Village Sarpanch and the Executive from the Agriculture Department. In case of urban areas, the monitoring of the above is to be done through Junior Engineer and the Executive from the Department concerned of Groundwater/Public Health/Municipal Corporation, etc.
4.14 If a borewell/tubewell is “abandoned” at any stage, a certificate from the Department concerned of Groundwater/Public Health/Municipal Corporation/private contractor, etc. must be obtained by the aforesaid agencies that the “abandoned” borewell/tubewell is properly filled up to the ground level. Random inspection of the abandoned wells is also to be done by the Executive of the agency/department concerned. Information on all such data on the above are to be maintained in the District Collector/Block Development Office of the State.
5. The abovementioned guidelines shall be given wide publicity through the national television channels. A copy of this order be sent to the Chief Secretaries of all the States/Union Territories who shall forward the same to the District Collectors of all districts of their respective States.
6. For further directions post this matter after 12 weeks.