Umesh Sharma v. Bihar State Housing Board

Patna High Court
Jan 29, 2016
Smart Summary (Beta)

Judicial Opinion — Summary

Factual and Procedural Background

This opinion concerns two writ applications raising common questions of fact and law; both were heard together and this consolidated order governs them. The court draws the background primarily from C.W.J.C No. 22948 of 2011 (argued first).

The petitioner challenged, under Article 226 of the Constitution of India, the maintainability (described in the opinion as "pregnability") of an order dated 11.11.2011 (Annexure-8) issued by the Estate Officer of the Bihar State Housing Board, cancelling the allotment of Plot No. 6H/23 in Bahadurpur Housing Colony, Patna. The cancellation order relied on an earlier Division Bench order dated 2 September 2008 in C.W.J.C No. 12376 of 2007 (Annexure-9).

Key factual timeline (as recorded in the opinion):

  • The plot was allotted to the petitioner on 30.07.1981 and a Hire Purchase Agreement was executed on 23.01.1982 (Annexure-2).
  • The petitioner was put in possession on 23.05.1988.
  • The allotment had been earlier cancelled by the Board, which the petitioner challenged in C.W.J.C No. 86 of 1986; during that writ's pendency the Board purportedly resolved not to disturb the allotment and the petitioner withdrew the petition (communication dated 16.06.1990, Annexure-4).
  • The Board directed payment of Rs. 3,886/- on 13.05.1992, which was paid by demand draft; the petitioner claims to have constructed a two-bedroom house on the plot.
  • Despite alleged final payments, the Board did not execute the deed of conveyance. The Board issued the impugned cancellation communication on 11.11.2011 without prior individual notice to the petitioner.

Legal Issues Presented

  1. Whether the impugned order dated 11.11.2011 cancelling the allotment of Plot No. 6H/23 is maintainable under Article 226 of the Constitution.
  2. Whether the impugned order was passed in breach of the rules of natural justice because no prior individual opportunity of hearing was afforded to the petitioner.
  3. Whether the Division Bench order in C.W.J.C No. 12376 of 2007 (dated 2.9.2008) and the Board's public notice authorize the respondent Board to take action against alleged defaulting allottees without issuing individual notice.
  4. Whether the petitioner breached Clause 13 (construction timeline) and Clause 19(a) (consequences for non-compliance) of the Hire Purchase Agreement, and whether such breach justified cancellation.
  5. Whether the respondent Board was obliged to execute the conveyance (99 years lease) despite alleged defaults in payment schedule; specifically, whether non-execution of conveyance prevented the petitioner from complying with Clause 13.
  6. Whether arbitration (Clause 20 of the Agreement) was an available alternative remedy that the petitioner ought to have pursued.

Arguments of the Parties

Petitioner's Arguments (as advanced by Sri S.A. Narain, Senior Counsel)

  • The impugned cancellation order was passed in blatant breach of the rules of natural justice because the petitioner was not afforded an opportunity of hearing prior to cancellation.
  • The Division Bench order in C.W.J.C No. 12376 of 2007 would not apply to the petitioner because he was not a defaulter; given a chance he could have shown he was not in default.
  • There was no breach of Clause 13 of the Hire Purchase Agreement because the Board failed to execute the deed of conveyance even after final payment, and without conveyance the petitioner could not lawfully obtain the approvals (per Clause 12) necessary to commence construction within the time prescribed.
  • The Board was obliged to execute the conveyance before requiring compliance with Clause 13; therefore the petitioner was prevented from complying through no fault of his own.
  • Finally, the petitioner contended that the arbitration clause did not provide an appropriate forum for the issues raised in this writ.

Respondent Board's Arguments (as advanced by Board's counsel Mr. Anshuman Singh and Dr. Anand Kumar)

  • The petitioner was a "rank defaulter" because he did not pay the entire dues according to the payment schedule; the last instalment was paid late (31.07.2011, after a delay).
  • The petitioner constructed a temporary structure without prior permission from the Board and within five years of allotment, contrary to the Agreement's conditions.
  • Clause 13 required construction to begin within two years of possession and reach ground floor within a further three years; this was not complied with.
  • The Division Bench directed action against defaulters and a public notice was issued providing opportunity to defaulters to submit their cause; the petitioner did not take advantage of the public notice.
  • The Board was therefore entitled to cancel the allotment under Clause 19(a) and related powers; the petitioner is not entitled to relief.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
C.W.J.C No. 12376 of 2007 — Division Bench order dated 2 September 2008 (Annexure-9) Directed the Bihar State Housing Board to take steps against defaulting allottees who failed to construct in accordance with agreement clauses; it noted that the Board had issued a general notice on 14.03.2008 contemplating action under Clauses 13 and 19(a). The court treated this order and the Board's public notice as authorizing action against defaulters. The court found that because the Board had issued the public notice and Clause 19 vested cancellation powers in the Board, the petitioner could not successfully complain of breach of natural justice for lack of individual notice.

Court's Reasoning and Analysis

The court's analysis followed a structured assessment of the Agreement terms, relevant Regulations framed by the Board, the parties' pleadings, and the chronology of payments and conduct on record. The court proceeded in these principal steps (as recorded in the opinion):

  1. Identification of material contractual provisions: The court examined key clauses of the Hire Purchase Agreement (Clauses 3(a), 8, 12, 13 and 19) and Regulations (Regulation 2(ix), 2(xviii) and 36(4)).
  2. Interpretation of conveyance and obligation to execute lease/deed: The court observed that Clause 8 provided for a "Ninety years lease" (referred to as the conveyance deed) only "after full payment has been made and all dues cleared" and in the absence of any violation of the agreement or Board Regulations. Regulation 2(ix) clarified that a conveyance deed is an agreement in prescribed form and is not itself a title or sale deed. Regulation 36(4) gives the Board exclusive right over the hire purchase deposit until adjusted on execution of the conveyance or refunded.
  3. Assessment of payment compliance: The court considered the Board's schedule and record of payments. It noted the petitioner had defaulted on the instalment schedule and that the last instalment was paid on 31.07.2011 after a delay of 294 days (as recorded by the Board). The court emphasized that the Board was not obliged to execute the 99-year lease until dues were cleared as per the schedule and that a defaulting allottee cannot take advantage of his own default.
  4. Examination of petitioner's claimed inability to comply with Clause 13: The petitioner argued non-execution of conveyance prevented him from obtaining building-plan approvals (Clause 12) and hence complying with Clause 13 (start within two years, complete ground floor within further three years). The court found no evidence that the petitioner had applied for mutation or for building-plan approval and been refused due to non-execution of conveyance. The court described the petitioner's claim on this point as a "lame excuse" and noted the petitioner admitted no prior permission was sought or granted.
  5. Consideration of unauthorized construction: The court noted that the petitioner had carried out temporary construction and that, according to the Board's verification, the structure appeared newly constructed without prior permission. This constituted breach of the Hire Purchase Agreement's conditions and further supported the Board's characterization of the petitioner as a defaulter.
  6. Role of the Division Bench order and public notice: The court recounted the Division Bench's disposal of the PIL on 2.9.2008 which directed the Board to take steps against defaulting allottees and observed the Board's earlier public notice of 14.03.2008. The court concluded that Clause 19 vests the Board with the right to cancel allotment on non-compliance and that Clause 19 does not require issuance of an individual notice to each defaulting allottee prior to cancellation. Because the Board had issued a general/public notice and the Division Bench had directed action, the court held the petitioner could not complain of breach of natural justice on the ground of absence of individual notice.
  7. On arbitration: The Board argued the petitioner had an alternative remedy via the arbitration clause (Clause 20). The court reviewed Clause 20 and concluded that arbitration was not a sustainable alternative for the issues in this writ because arbitration could be resorted to only for matters not specifically stipulated in the agreement or not provided for in the relevant Rules/Regulations; the present dispute fell within provisions expressly provided for and therefore was unsuitable for arbitration in the court's view.
  8. Conclusion from the above: Synthesizing these points, the court found no good reason to interfere with the Board's impugned order of cancellation.

Holding and Implications

Holding: The writ application(s) lack merit and are dismissed. The court explicitly records: "The writ application(s) lacks merit. It is dismissed."

Implications and direct consequences:

  • The impugned order dated 11.11.2011 cancelling the allotment of Plot No. 6H/23 stands upheld by this court.
  • The court found that the Board was entitled to take action under Clauses 13 and 19(a) of the Hire Purchase Agreement and that the prior public notice and the Division Bench direction supported the Board's action; therefore the petitioner's challenge on natural justice grounds failed.
  • The court held the Board was not obliged to execute the conveyance (99-year lease) until dues were paid as per schedule and that petitioner could not rely on non-execution to justify his own non-compliance.
  • The court rejected the contention that arbitration was an available or appropriate remedy for the dispute before it.
  • No order as to costs was made: "No. order as to cost(s)." (as recorded in the opinion).
  • The opinion does not state that it sets any new binding precedent beyond applying the contractual provisions, the Board's Regulations and the Division Bench's prior direction; no broader legal principle beyond the immediate contractual and factual adjudication is articulated as a novel rule.

This summary has been compiled strictly from the information contained in the provided judicial opinion; no facts, arguments or legal authorities beyond the text have been added or inferred.

Show all summary ...

Kishore Kumar Mandal, J.:— Both the writ applications raise common question of fact and law, inasmuch as, the impugned order is the same. With the consent of the parties they have been heard together. The present order will govern them.

2. Relevant background facts for the purpose of disposal of the case shall be drawn from C.W.J.C No. 22948 of 2011 which was argued first.

3. The writ application filed under Article 226 of the Constitution of India questions the pregnability of the order dated 11.11.2011 (Annexure-8) issued by the respondent Estate Officer, Bihar State Housing Board (for short ‘the Board’) cancelling the allotment of plot No. 6H/23 allotted to the petitioner in Bahadurpur Housing Colony (for short ‘the Housing Colony’) in the township of Patna. The order was purportedly issued in the light of an order dated 2nd September, 2008 (Annexure-9), passed by a Division Bench of this Court in a Public Interest Litigation vide C.W.J.C No. 12376 of 2007. The petitioner was an applicant for allotment of a residential plot in the Housing Colony which was allotted to him on 30.07.1981 The Hire Purchase Agreement (Annexure-2) was entered between the respondent Board and the petitioner on 23.01.1982 He was handed over the plot on 23.05.1988 For the reasons disclosed in the order the land allotted to the petitioner was cancelled by the respondent Board which was challenged by him in C.W.J.C No. 86 of 1986. During pendency of the writ application the Board is stated to have resolved not to disturb the allotment of the petitioner inasmuch as a communication was issued in this context on 16.06.1990 whereafter the writ petition was withdrawn (Annexure-4). It is averred that the Board directed the petitioner to pay Rs. 3886/- on 13.05.1992 which was paid by demand draft. In the meantime, the petitioner claims to have constructed a two-bedroom house on the plot. Despite the final payment made, the respondent Board did not execute the deed of conveyance in favour of the petitioner. All of a sudden the impugned communication dated 11.11.2011 was issued by respondent no. 3 cancelling the allotment of Plot No. 6H/23. No. notice was earlier issued to the petitioner before passing such order.

4. I have heard Sri. S.A Narain, Senior Counsel in support of the writ petition assisted by Sri. Sandeep Kumar as also Mr. Anshuman Singh and Dr. Anand Kumar, the two Advocates who appeared on behalf of the respondent Board. Parties have exchanged pleadings.

5. Mr. Narain submitted that the order has been passed in blatant breach of the Rules of natural justice. Indisputably, No. opportunity of hearing was afforded to the petitioner before the impugned order was passed. Two reasons have been assigned in the impugned order. Firstly, it refers to an order passed in C.W.J.C No. 12376 of 2007 (Annexure-9) and secondly, breach of Clause 13 and 19(a) of the Hire Purchase Agreement entered between the petitioner and the respondent Board. In his submission, the order passed by the Division Bench would not apply to the case of the petitioner since the petitioner was not a defaulter. Given a chance, he could have demonstrated. There has not been breach of Clause 13 of the Hire Purchase Agreement as the respondent Board even after payment of all dues had not executed the deed of conveyance enabling the petitioner to construct the house as per the provisions within the time provided under the stipulations of the Hire Purchase Agreement. The impugned order is, therefore, erroneous both on facts and in law meriting interference.

6. Per contra, the counsel for the respondent Board supported the order. He would urge that the petitioner on his own showing was a rank defaulter, inasmuch as, the entire dues of the respondent Board was not paid off as per the schedule. In order to lay false claim the petitioner subsequently built temporary structure and that too without obtaining prior permission from the respondent Board within five (05) years of allotment. The petitioner was obliged to pay the entire dues. The same was not done. The writ petitioner has admitted that last payment of the pre-fixed dates was paid after long delay on 31.07.2011 As per Clause 13 of the agreement, he was required to complete the construction for which the allotment was made. It was not done. The Division Bench had directed for taking action against such defaulters. Public notice was issued affording opportunity to all such defaulters to submit their cause, which was not done by the petitioner. The petitioner is, thus, not entitled to any relief.

7. I have considered the rival contentions and perused the materials on record. Before, I deal with them, it is advisable to survey the relevant provisions of the Agreement (Annexure-2) as also the Regulation framed by the respondent Board under Section 115 of the Act referred to.

Hire Purchase Agreement:

8. On initial payment of Rs. 11,214/- the Hire Purchase Agreement was entered between the parties. Clause 3(a) reads as under:

“3(a) That the settlee will pay to the Board without waiting for any demand the balance cost beginning from the 1st day of the month of February, 1982 in 60 (sixty) monthly equated instalments of Rs. 731.50/- (Rupees Seven hundred thirty one and paise fifty) only to be paid within that month. A rebate shall be allowed if the payment is made by the 7th of that month on which the instalment is due, and the equated monthly instalments after allowing for the rebate, in such a case shall be Rs. 690.20/- (Rupees Six hundred ninety and paise twenty) only.

Clause 8 of the agreement provides as under:

“8. That after the full payment has been made and all dues cleared and if there has been No. violation of the terms of this agreement or of the Board's Regulations in these regards a Ninety years lease shall be executed in favour of the Settlee.

Clause 12 of the agreement states as follows:

“12. That the Settlee shall obtain the approval of the Housing Board and the authority prescribed in the Bihar Restriction of Uses of Land Act or any other authority prescribed in any other law for the time being in force to his building plan before starting any construction.”

Clause 13 of the Agreement provides as under:

“13. That the Settlee shall start construction within two years of having been put in possession of this plot of land and complete construction up to the ground floor within a further period of three years.

Relevant part of Clause 19 states as follows:

“19. That without prejudice to the Board's right under any other law, Rules and Regulations and besides recovering the amount due to the Board along with interest, penalty and damages to the Board shall have in addition, the right to cancel the allotment/settlement of the premises/plot of land made in favour of the Settlee and to evict him from the premises/plot of land and resume possession thereof in the event of any one or more of the following:-

(a) Non-compliance on the part of the Settlee of any of the terms and conditions of this agreement.

(b) Violation of any of the terms and conditions prescribed in the Rules and Regulations of the Board in this regard.”

Regulation:

Regulation 2(ix) defines conveyance deed to mean an agreement in the prescribed form between the Board and the allottee or hirer or the Housing State Agency as the case may be by which the title in the property is transferred to the allottee or hirer ….”

Regulation 2(xviii) defines hirer to mean a person who has participated in the hire purchase system who has signed the hire purchase tenancy agreement.

Regulation 36(4) states that the Board shall have the sole and exclusive right over the hire purchase deposit till such time it is adjusted on the execution of conveyance deed or refunded with or without deduction ……”.

9. The main contention of the counsel for the petitioner is that the respondent Board, in spite of payments made in full, did not execute the conveyance deed enabling the petitioner to start construction and complete the same up to the ground floor within the time frame as per the conditions set out in Clause 13 of the agreement. He has argued with vehemence that unless the title of the land was transferred by executing the deed of conveyance the petitioner could not have started construction as Clause 12 of the agreement specifically prohibits such construction unless approval of the authority prescribed in the Bihar Restriction of Uses of Land Act or any other authority prescribed in any other law for the time being in force to his building plan before starting any construction. Since in spite of payment of dues of the Board, No. such deed of conveyance was executed, the petitioner was restrained from complying with Clause 13 of the Hire Purchase Agreement, as he could not have applied and obtained approval of the building plan from the authority prescribed in any other law. He was not covered by the order passed by the Division Bench of this Court. In the circumstances, the petitioner started and completed temporary construction over the plot in question. The respondent Board was obliged to execute a deed of conveyance before asking the allottee to comply with the conditions set out in Clause 13. The question is whether the Board, in the facts of the case, defaulted in executing the conveyance deed. Vide Clause 8 of the Hire Purchase Agreement the Board was required to execute a 99 years lease which is referred to by the petitioner as the conveyance deed only upon full payment of the entire dues as per the schedule.

10. In the rejoinder to the counter affidavit the details of payment made by the petitioner furnished by the Board has been enclosed. The last payment of the instalment was made by the petitioner on 31 of July, 2011 after a delay of 294 days. The schedule of dates of payment of instalment provided by the Board was treated in blatant breach. If the dues of the respondent Board were not cleared then the Board was not obliged to execute the 99 years lease. The submission made on this aspect appears to be not well founded. The liability would shift on the respondent Board once the entire dues of the respondent Board are paid/cleared, as per the schedule, by the allottee. The petitioner would not be allowed to take advantage of his own default. Curiously enough, nothing has been shown to this Court that the petitioner, in fact, applied for mutation or approval of the building plan before the appropriate/competent authority to construct the house which was refused or declined in absence of the deed of conveyance or the 99 years lease document executed by the Board. To me, this appears a lame excuse of the petitioner. In a bid to overcome the apparent default, a temporary construction was got made by him over the plot which, according to the respondent Board, in course of physical verification, was found newly constructed for which No. prior permission was sought and granted. The submissions of the parties on this point would not be further noticed as they may not very relevant to decide the fate of the case. The Court shall only notice that even according to the petitioner No. such prior permission was sought and granted by the respondent Board. This was again a breach of the conditions of the Hire Purchase Agreement rendering the petitioner a defaulter. The stand of the respondent Board on this point is that after the order passed by the Division Bench and the public notice issued by the respondent Board the petitioner made such construction without getting prior sanction of the respondent Board.

11. A Public Interest Litigation was filed alleging that several allottees in Sector-6H were defaulters as they did not construct building/house as per the clause of the agreement, yet the respondent Board was failing in discharge of its duty in not invoking the relevant clause of the agreement to cancel such allotment(s). The allottees were, therefore, not in real need of housing accommodation. This Court, by a proceeding dated 2 September, 2008, appreciating the stand of the respondent Board, disposed of the writ petition directing the respondent Board to take steps against the defaulting allottee(s). The Court also noticed that the Board had already issued a general notice on 14 of March, 2008 contemplating action under Clauses 13 and 19(a) of the agreement. The counsel for the petitioner has submitted that the petitioner was required to be noticed again before passing the impugned order. Clause 19 clearly vests the respondent Board to take such action. It does not provide that the defaulting allottee is required to be noticed. The parties, in such matter, shall abide by the terms of the agreement. Moreover, it is not in dispute that the respondent Board had issued a public notice before taking the impugned action. In the aforesaid background the petitioner cannot be heard complaining breach of the principles of natural justice in taking the impugned action. No. fault, therefore, can be found in the order passed by the respondent Board on this count.

12. Conveyance deed as per the Regulation is an agreement in the prescribed form between the Board and the allottee or hirer providing terms and conditions therein. It is not, therefore, a title or sale deed. The Hire Purchase Agreement between the parties had already been executed on 23rd of January, 1982. The Balance of the dues of the Board was required to be paid in 60 monthly equal instalments without waiting for any demand notice in this regard. The petitioner, as noticed above, defaulted in doing so. The respondent Board was not obliged to create further document until the dues are cleared. Until the payments are made by the allottee, the Board has the sole and exclusive right thereover under Regulation 36(4).

13. The discussions made hereinabove, advise me to find No. good reason to interfere with the impugned order.

14. Before parting with the case, the Court would also notice the submission of the respondent Board that there is an alternative remedy to the petitioner by invoking the arbitration clause in the Hire Purchase Agreement. The petitioner ought to have resorted to the arbitral proceeding. The petitioner has, however, submitted that the issue raised herein could not have been raised and entertained by the Arbitrator. On going through the provisions contained in Clause 20, I am of the opinion that the contention of the respondent Board is not sustainable. The arbitration could have been resorted to in respect of the matter not specifically stipulated in the agreement or provided in the relevant Rules/Regulations of the Board. This is not the case in hand.

15. The writ application(s) lacks merit. It is dismissed.

16. No. order as to cost(s).