State Bank Of India & Ors. v. Neelam Nag
Factual and Procedural Background
Respondent 1, employed in the clerical cadre of the appellant State Bank of India, was working as an Assistant (Clearing) when, on 29-5-2006, she allegedly enabled fraudulent credits and misplaced clearing instruments, causing a loss of approximately Rs 44.40 lakh. She admitted her misconduct in a letter dated 8-11-2006, offering restitution.
An FIR (No. 1043/2006) under Sections 409 and 34 IPC was lodged on 5-12-2006 naming both Respondent 1 and the customer she had introduced, Laxman Parsad Ratre. Police filed a charge-sheet on 6-2-2007, and charges were framed on 12-6-2007.
Meanwhile, the Bank issued a departmental charge-sheet on 19-9-2008 and commenced disciplinary proceedings on 23-10-2008. Respondent 1 filed Writ Petition No. 4629/2009 before the Chhattisgarh High Court. The learned Single Judge, later affirmed by a Division Bench on 28-6-2010, stayed the disciplinary inquiry until completion of prosecution evidence in the criminal trial. The Bank appealed to the Supreme Court.
Legal Issues Presented
- Whether the High Court was justified in directing that the Bank’s disciplinary proceedings be stayed until the prosecution closed its evidence in the parallel criminal trial based on the same facts.
- Whether Clause 4 of the Memorandum of Settlement dated 10-4-2002 between banks and workmen bars or suspends disciplinary action while a criminal trial is pending.
Arguments of the Parties
Appellants’ Arguments (State Bank of India)
- Relying on Stanzen Toyotetsu India Pvt. Ltd. v. Girish V. (2014) 3 SCC 636, a disciplinary inquiry cannot be suspended indefinitely; prolonged delay in the criminal case (only 3 of 18 witnesses examined despite 133 hearing dates) warrants revival of departmental proceedings.
- The delay is largely attributable to the accused, including Respondent 1.
- Clause 4 of the 2002 Settlement does not create a legal bar; interpreting it to halt inquiries would defeat public interest in promptly addressing bank embezzlement.
Respondent 1’s Arguments
- The criminal charges and departmental charges arise from identical facts; forcing her to participate in the inquiry would compel disclosure of a defence that could prejudice her criminal trial.
- Clause 4 of the Settlement and the High Court’s order validly protect employees from simultaneous proceedings until prosecution evidence is closed.
- The complexity of the allegations justifies postponement of the disciplinary case.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Stanzen Toyotetsu India Pvt. Ltd. v. Girish V. (2014) 3 SCC 636 | Disciplinary proceedings should not remain stayed indefinitely; court may allow stay only up to a reasonable time and then permit inquiry to resume. | Formed the template for granting a one-year window: if the criminal trial is not completed within one year, the Bank may resume and conclude the inquiry. |
| Karnataka SRTC v. M.G. Vittal Rao (2012) 1 SCC 442 | Summarises governing principles: (i) no legal bar to parallel proceedings, (ii) stay only to avoid prejudice in complex cases, (iii) proceedings should conclude promptly. | Cited as the general statement of law guiding the balancing exercise between fair criminal trial and expeditious departmental action. |
| (2005) 10 SCC 471 | Principle not specified in the provided text. | Referenced as part of the line of authorities considered; no specific reasoning extracted in this opinion. |
| (1999) 3 SCC 679 | Principle not specified in the provided text. | Referenced generically with other cases. |
| (1997) 2 SCC 699 | Principle not specified in the provided text. | Referenced generically with other cases. |
| (1996) 6 SCC 417 | Principle not specified in the provided text. | Referenced generically with other cases. |
Court's Reasoning and Analysis
The Supreme Court reaffirmed that simultaneous criminal and disciplinary proceedings are not legally barred. The critical consideration is whether continuation of the inquiry would prejudice the employee’s criminal defence and whether the criminal trial is progressing with reasonable dispatch.
Applying the principles from Karnataka SRTC and Stanzen:
- The criminal trial has languished since 2007; only three of eighteen prosecution witnesses have testified despite 133 hearings, some 26 adjournments being attributable to the accused.
- Clause 4 of the 2002 Settlement is an enabling, not prohibitory, provision: it permits disciplinary action if the employee is not tried within one year of the offence or if trial is unreasonably delayed. Reading it as an absolute bar would undermine public interest and encourage delay.
- The gravity of the alleged misconduct—large-scale embezzlement from a public sector bank—demands timely departmental adjudication.
- Balancing equities, the Court adopted the Stanzen formula: maintain the stay for a strictly limited period while compelling the trial court to expedite the criminal case.
Holding and Implications
APPEAL PARTLY ALLOWED. The stay on disciplinary proceedings remains, but only for one year from the date of this order. The criminal court must record prosecution evidence on a day-to-day basis and conclude the trial within that year. If the trial is not finished within the stipulated time, the Bank is free to resume and finalise the disciplinary inquiry immediately thereafter.
Implications: The judgment limits the protective shield employees enjoy when parallel criminal and disciplinary actions are pending, emphasising that protracted criminal trials cannot indefinitely freeze departmental inquiries, especially in matters involving public sector embezzlement. No new legal doctrine is created, but the Court reinforces the time-bound approach outlined in Stanzen to balance fairness with institutional efficiency.
A.M. Khanwilkar, J.*— The short question involved in this appeal is: whether the High Court was justified in directing stay of the disciplinary proceedings initiated by the appellant Bank against Respondent 1 until the closure of recording of prosecution evidence in the criminal case instituted against Respondent 1, based on the same facts?
2.* Respondent 1 was appointed in the clerical cadre of the appellant Bank. At the relevant time, she was working as an Assistant (Clearing). Allegedly, sometime on 29-5-2006, Respondent 1 by her acts of commission and omission caused loss to the Bank in the sum of Rs 44,40,819 by granting credit to one Laxman Parsad Ratre (who was an employee of Bhilai Steel Plant). Respondent 1 herself introduced Laxman Parsad Ratre to open an account in the appellant Bank. On 7-11-2006, Respondent 1 was placed under suspension for indulging in gross irregularities and misconduct including of misplacing the clearing instruments relating to various customers.
3*. Respondent 1 vide letter dated 8-11-2006, not only admitted her misdeeds but assured the Chief Manager of returning the amount commensurate to the financial loss caused to the Bank because of her lapses at the earliest, failing which suitable action can proceed against her. The said communication reads thus:
“To,
Chief Manager
State Bank of India
Main Branch, Durg (Ch.G.)
Sir,
Context: Your memo number, serial number/branch/2006-07/196 dated 30-10-2006.
In context of your aforesaid memo I am sorry for the wrong ways adopted by me. I admit that I have done a wrong deed and I am suffering from the feeling of guilt.
1. Whatever amount comes in this context that I will try to pay as early as possible after obtaining the amount from the known sources. At present I am able to arrange Rs 60,000 and I am depositing the same.
2. By mortgaging the family movable and immovable property, arrangement for obtaining the amount, thoughts and efforts are continued for making such arrangement as early as possible. Because this work takes time, I should be given proper time to go further in effort and to finish the work of mortgage.
3. Our relatives staying nearby and far away and in other States, with them my contact is continued and arrangement for the amount is continued. This work is also taking time. Therefore to continue my effort proper time to be given to me.
4. Amount of my CPF and salary is to be used for compensating this amount. I will keep on informing you regarding my every effort and will deposit the money received in bank account.
I have done this work in mental stress and due to pressure of situation for which my heart is feeling sorry that I have used all wrong ways and means. I have two small children, a wife and old and ill mother and father, considering all this give me an opportunity to deposit the amount received from my aforesaid efforts for which I will be grateful to you for my whole life. I have not taken such a wrong step in fourteen years of my bank service but this step I have taken due to mental stress and situation. By giving me apology, proper time to accomplish my efforts.
I assure you that I will not commit this kind of mistake in future.
If I fail in the above efforts, you are independent for initiating proceedings on me.
Thanking you
Dated: 8-11-2006
sd/-
(Neelam Nag)
Senior Assistant”
4*. Nevertheless, an FIR was lodged in connection with the said irregularities and misdeeds committed by Respondent 1 bearing FIR No. 1043 of 2006, for the offences punishable under Sections 409 and 34 IPC by the appellant Bank. Laxman Parsad Ratre has also been named as an accused in the said FIR. It is alleged in the FIR that Laxman Parsad Ratre who had account in State Bank of India issued two cheques in favour of Tanishk Securities, both valued Rs 6,50,000, knowing that he did not have balance in his account. Those cheques were deposited by Tanishk Securities in their UTI Branch, Bhilai for clearance. UTI Branch dispatched those cheques to State Bank of India at Durg, Bhilai. Respondent 1 was posted in that Branch at the relevant time, who in connivance with the co-accused dispatched those cheques to State Bank of India, Malviya Nagar Branch even though Laxman Parsad Ratre did not have account in that Branch. The cheques were returned by that Branch. The respondent intentionally did not immediately return those cheques to UTI Branch at Bhilai. Resultantly, UTI Branch at Bhilai, as per the settled practice, assumed that the cheques have been cleared and released the payment to Tanishk Securities by endorsing payment in the name of State Bank of India. Thereby causing a loss of Rs 13 lakhs to State Bank of India. That was revealed only on 28-10-2006 during reconciliation of accounts of the two Banks. Further, the respondent herself had introduced Laxman Parsad Ratre for opening an account in the appellant Bank. She has admitted her lapse in the communication sent by her to the Chief Manager of the appellant Bank dated 8-11-2006. In a written admission given on 6-11-2006, Laxman Parsad Ratre mentioned that he was involved in a criminal activity in connivance with the respondent. The FIR has been registered for offence of possible loss of Rs 29,53,262.
5*. After registration of the FIR, the local police proceeded with the investigation and filed Charge-Sheet No. 63 of 2007, under Section 173 of the Criminal Procedure Code, 1973, on 6-2-2007, before the Magistrate. Criminal Complaint No. 1043 of 2006 was registered for the offences punishable under Sections 409 and 34 IPC. The competent court then proceeded to frame charges against Respondent 1 on 12-6-2007. Thereafter, on 7-4-2008, the appellants, through Appellant 2, called upon Respondent 1 to offer an explanation about the alleged irregularities and misdeeds committed by her. Respondent 1 vide communication dated 15-4-2008 simply denied all the allegations.
6*. The competent authority, therefore, decided to initiate departmental enquiry against Respondent 1, for which, charge-sheet dated 19-9-2008 was issued to Respondent 1, which reads thus:
“Shri Neelam Nag,
Senior Assistant
(Suspended)
Indian State Bank,
Bhilai Steel Plant Area Branch,
Bhilai
Sl. No. Ankara/Area 3/Anushansha/820Dated: 19-9-2008
Charge-sheet
I, in the capacity of disciplinary authority, charge following charges upon you.
You have committed following mistakes during working in Durg Branch:
(i) You have given identification to Lachhman Parsad Ratre for opening the account, thereafter through this account through accounts you have managed the operation of the fund of other administrative accounts.
(ii) Through Savings Account No. 01119-0021348 two cheques bearing Nos. 4635553 and 4635554, which is, amounting to Rs 6,50,000.00 each in favour of Tanishk Securities on 29-5-2006 which were due to Durg Branch which was submitted by UTI Bank for adjustment, due to not insufficient amount in Durg Branch instead of returning to Bhilai Branch intentionally for making the balance of adjustment had transferred to Malviya Nagar Durg Branch with responding.
(iii) Two cheques bearing Nos. 4635553 and 4635554 each amounting to Rs 6,50,000 which were due to Durg Branch, Malviya Nagar Branch had returned with TR on 31-5-2006, which should have been returned by you to Head Branch Bhilai without any proceeding, but you intentionally kept them with you.
(iv) The above incident detail (information came to light) on 28-10-2006 held branch clearing of the general account in clearing it make clear that in Udhavi schedule 07 Rupees 13,00,000 entries which was originated by Malviya Nagar Durg Branch, it was not responded by Durg Branch.
(v) You had attached with Tanishk Securities commodity trading and you by misusing the amount of Chhattisgarh State Electricity Division got deposited in the account of Shri Lachhman Parsad Ratre. You have removed the original slip of deposit of the account of Chhattisgarh State Electricity Division and in place of it install the slip of Shri Ratre savings bank account therefore the dealing and clearing of the savings bank account which has been committed by you, the complete detail is clear and enclosed in Annexure 2.
(vi) Therefore you, with the intention of cheating, have diverted the total amount of Rs 4,80,000 of 16 challan of State Government on 4-5-2006 [Annexure 2(11)].
(vii) The Head Branch Bhilai through clearing house has closed to submit due cheque in Durg Branch, thereafter the cheques of various banks situated at Bhilai which have been deposited in Durg Branch should be presented for collection, you changing the deposit slip of Chhattisgarh State Electricity Division current account preparing the deposit slip of Lachhman Ratre has changed. Therefore the FDR of current account of Chhattisgarh State Electricity Division has been misused [Annexure 2 (12)].
(viii) On 9-8-2006 Chhattisgarh State Electricity Division has deposited two cheques total amounting to Rs 1,25,916 of other banks for deposit in their current account, you by changing the slip. Due to reference on the same day Cheque No. 463549 amounting to Rs 1,25,916 IDBI Branch, Bhilai has submitted these cheques in Durg Branch which was in the savings bank account of Shri Ratre, due to not having insufficient fund in the account of Shri Ratre returned but the above cheque through clearing by not returning but by you in the deposit of clearing scroll and transfer both sides with cunning make balance. Therefore, you by not returning the cheque intentionally with cheating have tampered the current account cheque of Chhattisgarh State Electricity Division.
(ix) Therefore with well-planned manner the amount of Rs 44,40,891 have been deposited in the fake account of Shri Ratre and misused the above amount and fixed in commodity market. Clear detail is enclosed in Annexures 1 & 2 in which the current account of Chhattisgarh State Electricity Division and the amount of government challan with cheating deposited in the account of Shri Ratre and misused by you. Therefore the current amount of Chhattisgarh State Electricity Division amounting to Rs 16,53,262 which has not cleared until now, in the same manner branch clearing general account amounting to Rs 13,00,000 which is still unclear pending in Malviya Nagar Durg Branch. Therefore a huge amount loss has been suffered by the Bank, for which you are completely liable. Your above conduct against the bank interest and second party compromise dated 6-8-2002 para Sardi/P&HRD/57 p. 7 para 5(a) and J comes under gross misconduct and is punishable.
(2) In this regard you are hereby directed in regard to charge-sheet submit your written reply within 7 days of the receipt of this letter. In case during this period you did not give your reply then I should admit that in regard to this letter you did not want to say nothing and in this regard Bank shall be free to take action.
(3) In the second copy of this letter by making complete signature and date, give the acknowledgment.
sd/-
Disciplinary Officer and
Assistant Chief Managing Director (Administration)
sd/-
Enclosure: above.
57/dpc/staff
Signature 20-9-2008”
7*. Appellant 2 then instituted disciplinary proceedings against Respondent 1 on 23-10-2008, which fact was notified to Respondent 1 on 31-10-2008 by Appellant 3 calling upon her to attend the same. Respondent 1 did not cooperate and instead protested the initiation of such disciplinary proceedings against her. She was then advised to file a writ petition bearing Writ Petition No. 4629 of 2009 before the High Court of Chhattisgarh at Bilaspur. The learned Single Judge found merits in the stand taken by Respondent 1 that the facts involved in the criminal case registered against Respondent 1 and initiation of disciplinary proceedings, was based on the same facts. The learned Single Judge also adverted to Clause 4 of the memorandum of settlement dated 10-4-2002 which grants protection to the employees of the appellant Bank from facing departmental proceedings until the completion of the trial of the criminal case. On that reasoning, the learned Single Judge allowed the writ petition and directed the appellants to forbear from proceeding with the disciplinary proceedings until completion of the trial.
8*. This decision was challenged by the appellants by way of Writ Appeal No. 80 of 2010 before the Division Bench. The Division Bench affirmed the view taken by the learned Single Judge and negatived the stand taken by the appellant in her favour. The Division Bench held that Respondent 1 may suffer disadvantage and prejudice if she was compelled to disclose her defence in the departmental proceedings, which is likely to be used in the criminal case pending against her. The Division Bench, however, modified the operative order passed by the learned Single Judge by passing the following directions:
“Therefore, we dispose of this appeal by upholding the order of the learned Single Judge with the following directions:
(i) The ACJM, Durg is directed to conclude the trial which is pending since 2006 on day-to-day basis, in which we have been informed that one witness has already been examined.
(ii) The writ appellants would be free to proceed further in the disciplinary proceedings as soon as the case from the prosecution side is closed.”
(emphasis supplied)
9*. The appellants relying on a recent decision of this Court in Stanzen Toyotetsu India (P) Ltd. v. Girish V. (2014) 3 SCC 636 contend that the departmental proceedings cannot be suspended indefinitely or delayed unduly. It is contended that in spite of the direction given by the Division Bench to the criminal court concerned to take up the case pending since 2006 on day-to-day basis, the trial is still pending and only 3 witnesses out of total 18 prosecution witnesses cited in the charge-sheet have been examined. There is no hope of an early completion of the trial nor of completion of prosecution evidence. The delay is attributable to the accused in the said criminal case, including Respondent 1 herein. In the backdrop of this grievance vide order dated 1-7-2016 2016 SCC OnLine SC 1708, the State of Chhattisgarh was directed by this Court to file a status report regarding the criminal proceedings launched against Respondent 1, giving details of the total number of prosecution witnesses cited in the charge-sheet; number of witnesses examined so far; and the cause for delay in the completion of trial.
10*. The State of Chhattisgarh has filed an affidavit of the Additional Superintendent of Police dated 1-8-2016. From this affidavit, it is noticed that Criminal Trial No. 1043 of 2006 before framing of charge on 12-6-2007, was listed on 13 dates. After framing of charge, the matter has proceeded before the Sessions Court on 133 dates. In Paras 9 to 11 of the affidavit, the break-up has been given as under:
“9. It is further respectfully submitted that the perusal of court proceedings of 133 dates reveal that the delay in completion of trial was due to multiple reasons. It is submitted that on some dates, the case was adjourned due to absence of accused persons. On some dates, the case was adjourned as the prosecutor was absent. The case was also adjourned due to non-availability of files as it was sent to the Sessions Court for deciding the bail application under Section 439 CrPC. The case was also adjourned on the application made by the accused persons to make available some documents. The case was also adjourned due to the learned Presiding Officer on leave, the transfer of Presiding Officer, the change of court. The case was also adjourned due to strike by the Lawyers or due to court holiday. In the gist of dates on which the case was listed before the learned trial court, are as follows:
Sl. No. Particulars (Reason for delay) Dates 1. Accused Laxman Ratre not present 06 2. Accused Neelam Nag not present 14 3. Prosecution witnesses not present 10 4. Accused persons not present 05 5. ADPO not present 23 6. Documents 07 7. Arguments 05 8. Application for bail 07 9. Receiving of demand letter 06
10. Case diary sent to the Magistrate 05 11. Receiving of diary 04 12. Court holiday 03 13. Strike of advocates 02 14. Service of copy of the case 01 15. Change of charges 01 16. Time sought by the advocates of accused persons 01 17. Presiding officer on leave 05 18. Transfer of presiding officer 03 19. Reply 04 20. Keeping current status 04 21. Evidence 10 22. Case sent to copying department 03 23. Issuance of instruction regarding case handover 01 24. Receiving of case on transfer 01 25. Framing of charges 01 26. Order 01 Total = 133 Days
10. It is further submitted that the perusal of the court proceedings reveal the dates on which the prosecution witnesses were present and the outcome on that date:
30-6-2007 Prosecution witnesses Joy C. Aryakara and Pushpkala present in court, however, since the matter was fixed for 2-7-2007, they were asked to come again on that date. 2-7-2007 The above two prosecution witnesses were present, however, they could not be examined due to non-availability of case diary and seized documents. 18-7-2008 Prosecution witness Pushpkala present in court however, she could not be examined since the learned Presiding Officer was on leave. 9-3-2009 Prosecution witness Pushpkala present in court however, she could not be examined. 8-10-2010 Prosecution witnesses Joy C. Aryakara and Ms Pushpkala present in court, however, they could not be examined since co-accused Laxman Ratre was not present nor any advocate appeared on his behalf. 22-7-2011 Prosecution witness Pushpkala was examined. Prosecution witness Joy C. Aryakara also present in court however, the defence refused to cross-examine on the ground of non-availability of certain bank documents. This prosecution witness therefore could not be cross-examined. 15-9-2011 Prosecution witness K.G. Goswami present in court however, the examination could not take place due to absence of Respondent 1-accused Neelam Nag.
24-9-2011 Prosecution witnesses K.G. Goswami and N. Chandrashekhar present in court. The co-accused Laxman Ratre is absent. Witness N. Chandrashekhar could not be examined due to non-availability of some documents. 4-11-2011 Witness N. Chandrashekhar present. The examination could not take place due to non-availability of certain documents. 1-9-2012 Prosecution witness A.S. Jitendra present in court. The accused Respondent 1 Neelam Nag was absent, however, at the request of his counsel, the examination of prosecution witness was deferred. 3-9-2015 Prosecution witness Ramesh Kumar present in court. The accused Neelam Nag was absent. Examination of witness did not take place. 2-11-2015 Prosecution witness Ramesh Kumar present. The accused Neelam Nag was absent. Examination of witness did not take place.
11. It is submitted that three prosecution witnesses have been examined. The delay in completion of trial is due to reasons mentioned in the above paras.”
(emphasis supplied)
Relying on these facts, the appellants contend that no further indulgence can be shown to Respondent 1 and the protection given to Respondent 1 by the High Court should be vacated keeping in mind the exposition in the abovementioned reported decision.
11*. As regards the argument of Respondent 1 that the disciplinary proceedings must be suspended in view of Clause 4 of the memorandum of settlement dated 10-4-2002, arrived at by the management of 52 ‘A’ Class Banks as represented by the Indian Banks' Association and their workmen under Section 2(p) and Section 18(1) of the Industrial Disputes Act, that cannot be considered as a legal bar at least in the fact situation of the present case. The interpretation of Clause 4 of the said settlement, as put forth by the appellant, would further the cause of justice and in particular the larger public interest, considering the fact that the misconduct is in relation to embezzlement of substantial amount by an employee of the public sector bank—which has caused financial loss not only to the bank but resultantly to the public exchequer. It is in the interest of all concerned that the action, as permissible in law, must be taken forward in connection with the gross misconduct and the provision in the memorandum of settlement such as Clause 4 cannot be treated as an impediment thereto. Any other interpretation of Clause 4 of the settlement would be against public policy and also encouraging unscrupulous employees of the bank to stall the disciplinary proceedings by taking advantage of the pending criminal case, which is an independent action in law. Respondent 1 being named as an accused in the criminal case; and also responsible for prolonging the trial of the criminal case, cannot be permitted to take advantage of her own wrong.
12*. Respondent 1, on the other hand, supported the view taken by the High Court and contends that, in view of Clause 4 of the memorandum of settlement and the settled legal position, the disciplinary proceedings must be put on hold at least until the recording and closure of evidence of prosecution witnesses in the criminal case, as directed by the Division Bench. That is essential because the charge framed against Respondent 1 in the criminal case and the charge-sheet issued by the disciplinary authority against Respondent 1 is based on the same set of facts. The defence of Respondent 1 in disciplinary proceedings may cause serious prejudice to Respondent 1 in the criminal case. According to Respondent 1, in view of the complexity of the facts and the evidence necessary to substantiate the same, it is advisable and essential to protect Respondent 1 from being exposed to disclosure of her defence which may be identical to one to be taken in the criminal case or for that matter compel her to depose against herself on those facts.
13. We have heard the learned counsel for the parties at some length. The only question that arises for consideration is no more res integra. It is well settled that there is no legal bar to the conduct of the disciplinary proceedings and criminal trial simultaneously. However, no straitjacket formula can be spelt out and the Court has to keep in mind the broad approach to be adopted in such matters on case-to-case basis. The contour of the approach to be adopted by the Court has been delineated in a series of decisions.
14. This Court in Karnataka SRTC v. M.G. Vittal Rao (2012) 1 SCC 442 has summed up the same in the following words:
(i) There is no legal bar for both the proceedings to go on simultaneously.
(ii) The only valid ground for claiming that the disciplinary proceedings may be stayed would be to ensure that the defence of the employee in the criminal case may not be prejudiced. But even such grounds would be available only in cases involving complex questions of facts or law.
(iii) Such defence ought not to be permitted to unnecessarily delay the departmental proceedings. The interest of the delinquent officer as well as the employer clearly lies in a prompt conclusion of the disciplinary proceedings.
(iv) Departmental proceedings can go on simultaneously to the criminal trial, except where both the proceedings are based on the same set of facts and the evidence in both the proceedings is common.
(emphasis supplied)
15. The recent decision relied on by the appellant in Stanzen (2014) 3 SCC 636, has adverted to the relevant decisions (2005) 10 SCC 471, (1999) 3 SCC 679, (1997) 2 SCC 699, (1996) 6 SCC 417 including M.G. Vittal Rao (2012) 1 SCC 442. After adverting to those decisions, in para 16, this Court opined as under: (Stanzen case (2014) 3 SCC 636)
“16. Suffice it to say that while there is no legal bar to the holding of the disciplinary proceedings and the criminal trial simultaneously, stay of disciplinary proceedings may be an advisable course in cases where the criminal charge against the employee is grave and continuance of the disciplinary proceedings is likely to prejudice their defence before the criminal court. Gravity of the charge is, however, not by itself enough to determine the question unless the charge involves complicated question of law and fact. The court examining the question must also keep in mind that criminal trials get prolonged indefinitely especially where the number of accused arraigned for trial is large as is the case at hand and so are the number of witnesses cited by the prosecution. The court, therefore, has to draw a balance between the need for a fair trial to the accused on the one hand and the competing demand for an expeditious conclusion of the ongoing disciplinary proceedings on the other. An early conclusion of the disciplinary proceedings has itself been seen by this Court to be in the interest of the employees.”
(emphasis supplied)
16. The Court then went on to examine the facts of that case and observed in para 18 as follows: (Stanzen case (2014) 3 SCC 636)
“18. … The charge-sheet, it is evident from the record, was filed on 20-8-2011. The charges were framed on 20-12-2011. The trial court has ever since then examined only three witnesses so far out of a total of 23 witnesses cited in the charge-sheet. Going by the pace at which the trial court is examining the witnesses, it would take another five years before the trial may be concluded. The High Court has in the judgment 2012 SCC OnLine Kar 8817 under appeal given five months to the trial court to conclude the trial. More than fifteen months has rolled by ever since that order, without the trial going anywhere near completion. The disciplinary proceedings cannot remain stayed for an indefinitely long period. Such inordinate delay is neither in the interest of the appellant Company nor the respondents who are under suspension and surviving on subsistence allowance.”
(emphasis supplied)
In para 19, the Court proceeded to conclude thus:
“19. In the circumstances and taking into consideration all aspects mentioned above as also keeping in view the fact that all the three courts below have exercised their discretion in favour of staying the ongoing disciplinary proceedings, we do not consider it fit to vacate the said order straightaway. Interests of justice would, in our opinion, be sufficiently served if we direct the court dealing with the criminal charges against the respondents to conclude the proceedings as expeditiously as possible but in any case within a period of one year from the date of this order. We hope and trust that the trial court will take effective steps to ensure that the witnesses are served, appear and are examined. The court may for that purpose adjourn the case for no more than a fortnight every time an adjournment is necessary. We also expect the accused in the criminal case to cooperate with the trial court for an early completion of the proceedings. We say so because experience has shown that the trials often linger on for a long time on account of non-availability of the defence lawyers to cross-examine the witnesses or on account of adjournments sought by them on the flimsiest of the grounds. All that needs to be avoided. In case, however, the trial is not completed within the period of one year from the date of this order, despite the steps which the trial court has been directed to take the disciplinary proceedings initiated against the respondents shall be resumed and concluded by the inquiry officer concerned. The impugned orders shall in that case stand vacated upon expiry of the period of one year from the date of the order.”
17*. Reverting to the facts of the present case, indisputably, the alleged misconduct has been committed as far back as May 2006. The FIR was registered on 5-12-2006 and the charge-sheet was filed in the said criminal case on 6-2-2007. The contents of the charge-sheet are indicative of involvement of Respondent 1 in the alleged offence. Resultantly, the criminal court has framed charges against Respondent 1 as far back as 12-6-2007. The trial of that case, however, has not made any effective progress. Only 3 witnesses have been examined by the prosecution, out of 18 witnesses cited in the charge-sheet filed before the criminal court. Indeed, listing of criminal case on 133 different dates after framing of charges is not solely attributable to Respondent 1. From the information made available by the Additional Superintendent of Police on affidavit, it does indicate that at least 26 adjournments are directly attributable to the accused in the criminal case. That is not an insignificant fact. This is in spite of the direction given by the Division Bench on 28-6-2010, to the criminal court concerned to proceed with the trial on day-to-day basis. The progress of the criminal case since then, by no means, can be said to be satisfactory. The fact that the prosecution has named 18 witnesses does not mean that all the witnesses are material witness for substantiating the factum of involvement of Respondent 1 in introducing the co-accused for opening a new bank account, to misplace the clearing instruments relating to various customers or for the payment released to the undeserving customer causing huge financial loss to the Bank. The charge in the criminal case is for the offences under Sections 409 and 34 IPC, one of criminal breach of trust by a public servant.
18*. In the peculiar facts of the present case, therefore, we accede to the contention of the appellants that the pendency of the criminal case against the respondent cannot be the sole basis to suspend the disciplinary proceedings initiated against Respondent 1 for an indefinite period; and in larger public interest, the order as passed in Stanzen case (2014) 3 SCC 636 be followed even in the fact situation of the present case, to balance the equities.
19*. The next question is: whether Clause 4 of the settlement would denude the appellants from continuing with the disciplinary proceedings pending against Respondent 1? Clause 4 of the settlement reads thus:
“4. If after steps have been taken to prosecute an employee or to get him prosecuted, for an offence, he is not put on trial within a year of the commission of the offence, the management may then deal with him as if he had committed an act of “gross misconduct” or of “minor misconduct”, as defined below; provided that if the authority which was to start prosecution proceedings refuses to do so or comes to the conclusion that there is no case for prosecution it shall be open to the management to proceed against the employee under the provisions set out below in Clauses 11 and 12 infra relating to discharge, but he shall be deemed to have been on duty during the period of suspension, if any, and shall be entitled to the full wages and allowances and to all other privileges for such period. In the event of the management deciding, after enquiry, not to continue him in service, he shall be liable only for termination with three months' pay and allowances in lieu of notice as provided in Clause 3 above. If within the pendency of the proceedings thus instituted he is put on trial, such proceedings shall be stayed pending the completion of the trial, after which the provisions mentioned in Clause 3 above shall apply.”
(emphasis supplied)
20*. Ordinarily, the scope of Clause 4 of the memorandum of settlement pressed into service would be a matter of an industrial dispute, to be adjudicated by the competent forum, if Respondent 1 can be termed as a workman. Respondent 1 herein was appointed in a clerical cadre of the appellant Bank; but when the alleged misconduct was committed on 29-5-2006, she was working as Assistant (Clearing). Neither before the learned Single Judge, the Division Bench nor before us any argument has been canvassed on the factum of whether Respondent 1 can be treated as a workman within the meaning of the Industrial Disputes Act, 1947. Both sides, however, have relied on the said clause and invited us to spell out its purport.
21. On the plain language of Clause 4, in our opinion, it is not a stipulation to prohibit the institution and continuation of disciplinary proceedings, much less indefinitely merely because of the pendency of criminal case against the delinquent employee. On the other hand, it is an enabling provision permitting the institution or continuation of disciplinary proceedings, if the employee is not put on trial by the prosecution within one year from the commission of the offence or the prosecution fails to proceed against him for want of any material.
22. As can be culled out from the last sentence of Clause 4, which applies to a case where the criminal case has in fact proceeded, as in this case, for trial. The term “completion of the trial” thereat, must be construed as completion of the trial within a reasonable time-frame. This clause cannot come to the aid of the delinquent employee—who has been named as an accused in a criminal case and more so is party to prolongation of the trial.
23*. Notably, in the present case in spite of a peremptory direction of the Division Bench given on 28-6-2010 to the criminal court concerned to proceed with the trial on day-to-day basis, as noted above, no effective progress has been made in that trial (except recording of evidence of three prosecution witnesses out of eighteen witnesses) so far. In the last six years, evidence of only two additional prosecution witnesses has been recorded. Respondent 1 has not pointed out any material on record to even remotely suggest that she had tried her best to dissuade the criminal court from adjourning the trial, in breach of direction given by the Division Bench of the High Court to proceed on day-to-day basis and to conclude the trial within one year from 28-6-2010. Pendency of criminal trial for around 10 years, by no means, can be said to be a reasonable time-frame to withhold the disciplinary proceedings. We are fortified in taking this view on the principle underlying the former part of the same clause, which envisages that if the Authority which has to start the prosecution refuses (read fails) to do so within one year from the commission of the offence, the departmental action can proceed under the provisions as set out in Clauses 11 and 12 of the settlement.
24*. In the fact situation of the present case, it is possible to take the view that the first part of Clause 4 is attracted. In that, Respondent 1 has been put on trial in connection with the alleged offence, by framing of charges on 12-6-2007. That has happened after one year from the commission of the offence.
25*. Be that as it may, the remedy of writ being an equitable jurisdiction and keeping in mind the larger public interests (at least in cases of involvement of the employees of the public sector banks in offence of breach of trust and embezzlement), the arrangement predicated in Stanzen (2014) 3 SCC 636 would meet the ends of justice. For, the disciplinary proceedings instituted against Respondent 1 cannot brook any further delay which is already pending for more than 10 years.
26. We make it clear that we may not be understood to have expressed any final view on the scope of Clause 4 of the settlement.
27*. Accordingly, we exercise discretion in favour of Respondent 1 of staying the ongoing disciplinary proceedings until the closure of recording of evidence of prosecution witnesses cited in the criminal trial, as directed by the Division Bench of the High Court and do not consider it fit to vacate that arrangement straightaway. Instead, in our opinion, interests of justice would be sufficiently served by directing the criminal case pending against Respondent 1 to be decided expeditiously but not later than one year from the date of this order. The trial court shall take effective steps to ensure that the witnesses are served, appear and are examined on day-to-day basis. In case any adjournment becomes inevitable, it should not be for more than a fortnight, when necessary.
28*. We also direct that Respondent 1 shall extend full cooperation to the trial court for an early disposal of the trial, which includes cooperation by the advocate appointed by her.
29*. If the trial is not completed within one year from the date of this order, despite the steps which the trial court has been directed to take, the disciplinary proceedings against Respondent 1 shall be resumed by the enquiry officer concerned. The protection given to Respondent 1 of keeping the disciplinary proceedings in abeyance shall then stand vacated forthwith upon expiry of the period of one year from the date of this order.
30. In the result, we partly allow this appeal to the extent indicated above. The parties are left to bear their own costs.
31. A copy of this order be forwarded to the Sessions Court concerned for information and necessary action for ensuring compliance with the direction.
Alert