K. Devakimma And Others v. Tirumala Tirupati Devasthanams And Another
Factual and Procedural Background
The appellants are small landowners and shopkeepers whose plots—situated on Tirumala Hills in close proximity to the Tirumala temple—were acquired by the State of Andhra Pradesh for the benefit of the Tirumala Tirupati Devasthanams (TTD). Section 4 notifications were issued between 1985 and 1992, followed by Section 6 declarations, for the stated public purpose of developing temple-related infrastructure such as roads, kalyana-mandapams and choultries.
The Land Acquisition Officer (LAO) awarded compensation at a uniform rate of Rs 11 per sq ft (plus separate amounts for superstructures). Dissatisfied, the landowners sought references under Section 18 of the Land Acquisition Act, 1894. The Reference Court relied on earlier awards relating to adjacent lands and, incorporating an annual escalation of Rs 3 per sq ft, fixed compensation between Rs 80 and Rs 100 per sq ft.
TTD appealed to the High Court under Section 54, and the landowners filed cross-objections seeking Rs 150 per sq ft. A Division Bench of the High Court partly allowed TTD’s appeals, reducing the compensation to a flat Rs 30 per sq ft and dismissing the cross-objections. The present civil appeals by special leave challenge that reduction.
Legal Issues Presented
- Whether the High Court was justified in reducing the market value of the acquired land from the Reference Court’s rate of Rs 80–100 per sq ft to Rs 30 per sq ft.
- If the reduction was unjustified, what uniform rate of compensation should be fixed for all appellants’ lands?
Arguments of the Parties
Appellants’ Arguments
- The Reference Court had correctly applied the escalation method based on earlier awards for adjacent lands and could have awarded an even higher rate; there was no factual or legal basis for the High Court to interfere.
- TTD’s own counsel before the Reference Court recorded “no objection” to compensation at Rs 90 per sq ft, undermining TTD’s later challenge.
- A statutory ban on private transfers under Section 123 of the Andhra Pradesh Charitable and Hindu Religious Institutions and Endowments Act, 1987, meant there were virtually no contemporaneous sale deeds; reliance on earlier awards was therefore legitimate.
- The High Court misapplied principles governing escalation and ignored the pilgrimage-driven potentiality of the location.
Respondent (TTD) Arguments
- The High Court’s reasoning—questioning the legality of relying on past awards and finding no proof of escalating land prices—was sound and warranted no interference.
- Compensation at Rs 30 per sq ft was just, fair and equitable given the absence of market transactions.
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| ONGC Ltd. v. Rameshbhai Jivanbhai Patel, (2008) 14 SCC 745 | Permissibility of determining market value by applying calibrated escalation to earlier comparable instances when no contemporaneous sales are available. | Used to endorse the Reference Court’s approach of applying annual escalation over previous awards for adjacent lands. |
| Valliyammal v. Tahsildar (L.A.), (2011) 8 SCC 91 | Recognition that escalation in land value may legitimately be considered, especially where the land possesses special potentiality. | Cited to reinforce that Tirumala’s status as a significant pilgrimage centre justified assuming price appreciation over time. |
Court’s Reasoning and Analysis
Justice Abhay Manohar Sapre held that the Reference Court’s methodology conformed to settled legal principles:
- Reliance on prior awards: Earlier Reference Court awards (1957–1987) involved adjacent lands acquired for the same public purpose. Because statutory restrictions prevented private sales, these awards constituted the best available evidence.
- Escalation technique validated: Consistent with ONGC and Valliyammal, an annual increment of Rs 3 per sq ft over a 25-year span was reasonable to account for appreciation.
- Error in High Court’s approach: The High Court wrongly re-examined settled earlier awards, discounted the area’s potentiality, and assumed static prices, contrary to record evidence and governing precedent.
- Need for uniformity: While endorsing the Reference Court’s range (Rs 80–100), the Supreme Court observed that all acquired parcels were similar and, absent evidence of differential advantages, a single uniform rate should apply.
Holding and Implications
Holding: Appeals allowed in part. The High Court’s judgment is set aside. Compensation is fixed uniformly at Rs 90 per sq ft for all appellants, while amounts awarded for superstructures remain undisturbed. The respondents must calculate and disburse the enhanced compensation within three months.
Implications: The decision reaffirms that, in the absence of contemporaneous market sales—particularly where statutory prohibitions suppress transactions—courts may legitimately derive market value from earlier awards, applying a reasonable escalation factor. Although the judgment clarifies application of existing principles, it does not announce a new legal rule; its primary effect is an enhancement of compensation for the present landowners.
Abhay Manohar Sapre, J.— These appeals are filed against the common judgment and order dated 5-7-2004 passed by the High Court of Judicature, Andhra Pradesh at Hyderabad in Tirumala Tirupathi Devasthanams v. N. Munikrishna Reddy Tirumala Tirupathi Devasthanams v. N. Munikrishna Reddy, 2004 SCC OnLine AP 494.
2. By the impugned judgment/order, the Division Bench of the High Court, partly allowed the first appeals filed by the respondents herein and reduced the rate of compensation payable to the claimants/landowners (appellants herein) at Rs 30 per sq ft, which was fixed by the Reference Court (civil court) between Rs 80 to Rs 100 per sq ft for the land acquired by the State under the Land Acquisition Act, 1894 (hereinafter referred to as “the Act”). Dissatisfied with the judgment/order passed by the High Court, the claimants/landowners have filed these appeals for enhancement of the compensation.
3. The question that arises for consideration in these appeals is whether the High Court was justified in partly allowing the appeals filed by the respondents herein by reducing compensation at the rate of Rs 30 per sq ft for the land which was acquired by the State or the rate should have been more than Rs 30 and, if so, how much i.e the one determined by the Reference Court (civil court) between Rs 80 to Rs 100 per sq ft or it should be more than that?
4. In order to appreciate the controversy involved in these appeals, it is necessary to state the relevant facts infra. For the sake of convenience, we shall first advert to the factual matrix of CA No. 5769 of 2006 [P. Sreenivassulu Naidu v. Collector (LA)].
5. The appellant in CA No. 5769 of 2006 is the owner of the land measuring 4176 sq ft as per the State whereas 5220 sq ft as per the appellant. This land is situated in TS No. 40/2, Ward No. 3, Block E in Village Tirumala. Likewise, the appellants in other two appeals are also owners of the similar land as described in the memo of appeals. The appellants were having their small shops and hutments on their land wherein they used to carry on their small business for their livelihood.
6. In exercise of the powers conferred under Section 4 of the Act, the State Government issued a Notification on 15-1-1987 and acquired the appellant's aforementioned land along with the land of other landowners alike the appellant situated in the same area. The land was acquired for the benefit of the Tirumala Tirupati Devasthanams (in short “the TTD”) to enable them to develop Balaji temple town by constructing roads, kalyanamandapam, choutries and for providing other civic amenities in the town for the benefit of large number of devotees, who regularly visit the temple for having darshan of Lord Balaji.
7. In other appeals, similar notifications under Section 4 were issued by the State on 19-6-1985, 23-12-1985, 26-5-1986, 29-8-1986, 25-5-1987, 5-8-1987, 21-8-1989 and 26-10-1992 for accomplishing the same public purpose. By these notifications, a large chunk of land was acquired in the same area where the land of the appellant in CA No. 5769 of 2006 was situated. So far as the land belonging to the present appellants was concerned, it was of small dimension.
8. The notification under Section 4 was followed by the declaration under Section 6 of the Act published on 5-8-1987 and likewise it was published on other dates in relation to the notifications issued under Section 4 of the Act for adjacent lands.
9. This led to initiation of the proceedings for determination of compensation payable to each landowner including that of the appellants herein by the Land Acquisition Officer (in short “the LAO”). The notices under Section 9 of the Act were issued to the appellants calling upon them to participate in the land acquisition proceedings to enable the LAO to determine the fair market value of the land on the date of acquisition as provided under Section 23 of the Act so that compensation would be paid to the landowners at such determined rate. Accordingly, the LAO held an enquiry and after affording an opportunity to the appellants herein passed an award on 12-3-1991 and also on different dates as mentioned in the memo of appeals fixing the market value of the acquired land at Rs 11 per sq ft. So far as the structure built by the appellant in CA No. 5769 of 2006 on the land in question was concerned, it was valued at Rs 45,936. The LAO, therefore, fixed Rs 11 per sq ft as the uniform rate for awarding compensation for the land to all the landowners. So far as the compensation for built-up structure on the land of individual landowners was concerned, it varied in cases of individual landowner and was accordingly calculated on the basis of extent and quality of construction made by each landowner. The appellants were, accordingly, paid the compensation for their land and superstructure standing on their land in addition to other statutory compensation such as solatium, interest, etc. payable under the Act.
10. Feeling aggrieved by the award, the appellants in all the appeals sought reference to the civil court under Section 18 of the Act for redetermination of the compensation made by the LAO. The Reference Court, on the basis of the evidence adduced, partly answered the reference in favour of the appellants by award dated 15-7-2002 and accordingly enhanced the rate of the compensation from Rs 11 per sq ft to Rs 86 per sq ft. In other words, the Reference Court held that the appellant was entitled to get compensation for his land at the rate of Rs 86 per sq ft being the fair market value of his land on the date of notification issued under Section 4 of the Act. In other two appeals, the Reference Court by awards passed on different dates enhanced the compensation and fixed it between Rs 80 to Rs 100 per sq ft.
11. Challenging the legality and correctness of the awards of the Reference Court, the TTD, for whose benefit the land was acquired, filed appeals before the High Court under Section 54 of the Act. So far as the appellants (landowners) were concerned, they filed cross-objections and prayed for enhancement in the compensation at the rate of Rs 150 per sq ft as against Rs 80 to Rs 100 per sq ft awarded by the Reference Court.
12. The Division Bench of the High Court, by common impugned judgment/order partly allowed the appeals filed by the TTD (respondent herein) and reduced the compensation payable to the appellants to Rs 30 per sq ft. In other words, in the opinion of the High Court, the Reference Court was not right in determining the compensation payable between Rs 80 to Rs 100 per sq ft instead it should have been paid at the rate of Rs 30 per sq ft uniformly to all the landowners (appellants). In this way, the appellants were held entitled to get the compensation at the uniform rate of Rs 30 per sq ft for their respective lands. As a consequence, the cross-objections filed by the appellants herein (landowners) for enhancement of the compensation at Rs 150 per sq ft were dismissed. Against this judgment/order, the claimants/landowners have filed these appeals by way of special leave petitions.
13. Heard the learned counsel for the parties.
14. Mr B. Adinarayana Rao, learned Senior Counsel appearing for the appellants in CA No. 5769 of 2006 contended that the High Court erred in partly allowing the appeals filed by the TTD. According to the learned counsel, no case was made out by the TTD either on facts or in law for reduction of rate of compensation, which was rightly fixed by the Reference Court between Rs 80 to Rs 100 per sq ft. He submitted that the Reference Court had rightly appreciated the evidence on record for enhancing the rate of compensation and on such appreciation itself, it could have awarded still higher than what was awarded but in no case it could have been less than the same as was done by the High Court, which has no basis. The learned counsel further pointed out that apart from the evidence adduced by the claimants/appellants herein before the Reference Court to prove the fair market value of the land, even the counsel appearing for the TTD did not raise any objection for payment of compensation at the rate of Rs 90 per sq ft.
15. The learned counsel also pointed out that by virtue of the ban contained in Section 123 of the Andhra Pradesh Charitable and Hindu Religious Institutions and Endowments Act, 1987 (for short “the A.P Act”) for sale of the land situated in Tirumala Hills, it was not possible to any person to sell his land privately and it was for this reason, the appellants were not able to file copies of any sale deeds of the lands which did not take place between the two private parties except one or two. This aspect, according to the learned counsel, was rightly taken note of by the Reference Court while determining the value of the land but was not so taken note of in its proper perspective by the High Court resulting in committing an error while determining the value of the land. The learned counsel, therefore, contended that this Court should restore the award of the Reference Court.
16. The learned counsel for the appellants in other two appeals adopted the arguments of Mr Adinarayana Rao.
17. In contra, Mr G. Prabhakar, learned counsel for the respondent (TTD) supported the impugned judgment and contended that no case is made out on facts or/and in law to call for any interference in the impugned judgment of the High Court. This submission was elaborated by the learned counsel by referring to the reasoning contained in the impugned judgment.
18. Having heard the learned counsel for the parties and on perusal of the record of the case, we find force in the submission of the learned Senior Counsel appearing for the appellants (landowners) and hence are inclined to allow these appeals in part by restoring the award of the Reference Court with part modification as detailed infra by enhancing the compensation.
19. In our considered opinion, the reasoning and the conclusion arrived at by the Reference Court (civil court) while fixing the rate of compensation between Rs 80 to Rs 100 per sq ft for the land in question was just and proper and hence the same should not have been disturbed by the High Court in appeals filed by the TTD for reducing the rate to Rs 30 per sq ft. In other words, in our considered view, if the Reference Court was right in fixing the rate of compensation between Rs 80 to Rs 100 per sq ft for the entire acquired land in question, the High Court was not right in interfering with this finding of the Reference Court and reducing it to Rs 30 per sq ft. This we say so for the following reasons.
20. In order to prove the market rate of the land in question, the appellants landowners had adduced evidence by filing certified copies of sale deeds and several awards passed by the Reference Court (civil court) wherein the Reference Court had determined the fair market value of the adjacent similar lands which were acquired prior to acquisition of the lands in question. Exts. B-7, 8, 9, 10 and 11 (marked in Award No. 46/90-91) are the copies of the orders/awards passed by the Reference Court in relation to the lands which were acquired in the years 1957, 1962 and 1976. The rate fixed by the Reference Court for the lands acquired in the year 1957 was at Rs 30 per sq ft. Likewise the rate fixed for the land acquired in the year 1962 was at Rs 40 per sq ft and for the lands acquired in the year 1976, the rate was at Rs 73 per sq ft. Exts. B-12, 13 and 15 are the copies of the orders/awards passed by the Reference Court in relation to the lands acquired in 1986 and 1987. The rate fixed for the land acquired in the year 1986 was at Rs 100 per sq ft and for the land acquired in the year 1987, the rate was Rs 106 per sq ft.
21. It is not in dispute that so far as the orders/awards (Exts. B-7 to B-11) were concerned, it pertained to lands adjacent to the lands in question and had attained finality whereas the orders/awards (Exts. B-12, 13 and 15) were sub judice in pending appeal.
22. The Reference Court, therefore, took into consideration the rates of lands prevailing in the years 1957, 1962 and 1976 (without taking into account the rates of lands prevalent in the years 1986 and 1987 though they related to lands sold in near proximity with acquisition of the lands in question on the ground that the appeals were pending in relation to these lands against the orders/awards) and then taking into account the appreciation in the value of land in the last 25 years at Rs 3 per sq ft per annum fixed the fair market value of land in question between Rs 80 to Rs 100 per sq ft.
23. It is pertinent to mention that the learned counsel appearing for the TTD had given his no-objection to the rate fixed by the Reference Court which was duly recorded by the court in para 8 of the award dated 14-3-2001 (Award No. 46/90-91). It reads as under:
“8. The advocate for the claimants argued that the market value of the site at Tirumala during 1962 was Rs 40 per sq ft as per Ext. B-3 and since the site in question is acquired in 1987 i.e 25 years after the land acquisition covered by Ext. B-3, the market value of the site acquired in this case can be fixed more than Rs 100 per sq ft by considering the appreciation in the value of the site since 25 years at Rs 3 per sq ft per annum. The advocate for R-2.beneficiary argued that in similar cases, this Court fixed the market value of the site at Rs 90 per sq ft and he has no objection to fix the same market value at Rs 90 per sq ft for the site acquired in this case….”
(emphasis supplied)
24. The High Court, however, while reversing the aforesaid view of the Reference Court held that the Reference Court erred in relying upon the orders/awards passed in other cases for determining the value of the lands in question. The High Court then went on to the extent of finding fault in the orders/awards. The High Court also did not agree with the Reference Court to hold that the prices of the land escalate with passage of time every year though it held that the Tirupati (Tirumala) has acquired potential due to pilgrimage. It is apposite to state what the High Court held on this issue: (Tirumala Tirupathi Devasthanams case, SCC OnLine AP para 74)
“74. As observed above, the very basis in determining the market value of the land by the Reference Courts is erroneous in law and is contrary to the settled principles. Reference Courts have proceeded in the matter assuming abnormal rise in prices and erroneously placed reliance upon the judgments in OP No. 34 of 1964 or OP No. 23 of 1969 and batch. Reliance was placed erroneously on the alleged statement of LAO made in OP No. 30 of 1982. There was no evidence adduced by the claimants evidencing any escalation in price from 1957 till respective dates of acquisition. Evidence on record, as discussed above, suggest that prices have remained static at Tirumala irrespective of the place gaining considerable importance or the place being visited by innumerable pilgrims. Pilgrims visit the holy place only for the purpose to have darshan of the deity and not with a view to settle there. No evidence is let in to show that there was heavy demand for land in the area. Therefore, there was no justification on the part of the Reference Courts in fixing the market value on the basis of the market value fixed in the earlier judgments. May be that in one case i.e in OP No. 23 of 1969 and batch appeals were filed and there was no interference by this Court in the assessment of the market value, but, that alone could not have been made the basis for arriving at the market value in these cases. There was absolutely no evidence to have proceeded to fix the market value more than what was offered by the LAO. Considering the facts and circumstances of the case and the offer of TTD, we are of the view that instead of accepting the offer and fixing the market value at Rs 23 per sq ft we are inclined to take in all cases the market value of the land at Rs 30 per sq ft, which would be just, fair and equitable and to that extent the respective awards of the Reference Courts deserve to be modified.”
25. We do not agree with the aforesaid finding of the High Court for the following reasons detailed infra.
26. As mentioned above, the reasoning of the Reference Court is in conformity with the principle of law laid down by this Court wherein this Court has in no uncertain terms held that recourse can be taken in appropriate cases to the mode of determining the market value of the acquired land by providing appropriate escalation over the proved market value of nearby lands in previous years where there is no evidence of any contemporaneous sale transactions or acquisition of comparable lands in the neighbourhood. The percentage of escalation may vary from case to case so also the extent of years to determine the rates [see ONGC Ltd. v. Rameshbhai Jivanbhai Patel ONGC Ltd. v. Rameshbhai Jivanbhai Patel, 2008 14 SCC 745 and Valliyammal v. Tahsildar (LA) Valliyammal v. Tahsildar LA, 2011 8 SCC 91].
27. We find that the Reference Court, therefore, rightly relied on the rates determined by it in relation to adjacent lands and applied the principle of giving escalation to the rates determined yearly and worked out the rates between Rs 80 to 100 per sq ft. It was not in dispute that the public purpose for acquisition of both the lands was the same and secondly, all these lands were in the close proximity with each other being situated in Tirumala.
28. The High Court having rightly held that the Tirumala Tirupati Devasthanam has acquired immense potential due to its pilgrimage status in the country was not right in holding that its potentiality cannot be taken into consideration for holding that the prices of the land are also escalated due to such reason. As held by this Court in ONGC and Valliyammal cases, the escalation in price of the land which depends upon the nature of land and its surrounding, its benefit should have been given for determining the price of the land in question by taking into account the rate of land fixed by the Reference Court in relation to land acquired in the past years as was rightly done by the Reference Court. It was all the more because no sale deeds were available for filing due to peculiar reason that there was a statutory ban imposed by section 123 of the a.p act on sale of private land in the area in question. It was for this reason, no private sale had taken place of any parcel of land at the relevant time barring one or two. Similarly, the High Court further erred in finding fault in the orders/awards which were rightly relied on by the Reference Court. The High Court failed to see that they were not hearing the appeals arising out of those orders/awards to examine their legality or/and correctness which had become final and were also given effect to. The High Court was required to see as to whether the land involved in those cases was similar to the one which was the subject-matter of present proceedings and secondly, what was the rate fixed therein by the Reference Court for the lands.
29. The appellants (landowners) were, therefore, justified in filing the copies of orders/awards passed in relation to the adjacent lands for proving the market rate of the land in question because as mentioned above, these lands were situated in the same area nearer to the lands in question and were also acquired for the same public purpose.
30. In the light of foregoing discussion, we are of the considered opinion that the rate fixed by the Reference Court between Rs 80 to Rs 100 per sq ft for the lands in question was just and proper and the High Court erred in reducing the same to Rs 30 per sq ft.
31. We are, however, of the view that the Reference Court having held that the appellants were entitled to compensation at the rate varying between Rs 80 to Rs 100 per sq ft, should have fixed one uniform rate for the entire land rather than to fix different rates such as Rs 80, Rs 86, Rs 90 and Rs 100 per sq ft for different landowners. In our view, since the land of all the appellants was more or less similar in nature and no evidence was adduced by the appellants to prove any significant improvement/addition or/dissimilarity in the land or its quality, the Reference Court should have fixed one uniform rate.
32. Having regard to the totality of factual undisputed scenario which has emerged from the evidence and taking into account the extent of the land held by each landowner, we are of the considered opinion that the appellants are entitled to get the compensation for their respective lands at the rate of “Rs 90 per sq ft”. So far as the compensation awarded by the Reference Court for superstructure built on each appellant's land is concerned, it does not call for any interference. In our view, it was rightly upheld by the High Court and we also uphold the same, calling no interference.
33. The learned Senior Counsel for the appellants (landowners) then submitted that the appellants are all small shopkeepers who were carrying on their small business for their livelihood but now due to the acquisition, they are deprived of their land and therefore unable to do their business. The learned counsel, therefore, submitted that the TTD may be directed to provide any alternate space/shop/land to the appellants herein in the nearby area on any terms and conditions which will enable them to start business for their livelihood. The learned counsel for the TTD has, however, opposed this prayer.
34. Having taken note of the submission of the learned counsel for the appellants, all that we wish to observe is that in case if any of the appellants apply for allotment of any land/shop/space to TTD for doing any business in the area under their ownership or/and control then the TTD would be at liberty and may consider their case for providing them a shop or land or space, as the case may be, pursuant to any of their scheme, if any in force, on suitable terms and conditions alike others as a fine gesture on the part of the TTD, for compliance.
35. We, however, make it clear that the observations made in para 34 are only in the nature of observations and not an order/writ issued against the TTD.
36. In view of the foregoing discussion, the appeals succeed and are allowed in part. The impugned judgment/order of the High Court is set aside and the awards passed by the Reference Court (civil court) are restored with the modification indicated above. The respondents are directed to calculate the payment of compensation payable to each appellant (landowner) as directed above and pay the compensation money to each of the appellants within three months from the date of the receipt of copy of this judgment.