Mahavir Singh v. State Of U.P Through The Chief Secretary, Lucknow, U.P And Others

Allahabad High Court
Dec 11, 2009
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Provided Opinion

Factual and Procedural Background

The petitioners are Bhumidhars of land in revenue estate of Village Makaura, Pargana Dadri, District Gautam Budh Nagar. They filed writ petitions challenging notifications dated 12.3.2008 published under section 4(1) of the Land Acquisition Act, 1894, wherein the State Government expressed the opinion that the provisions of sub-section (1) of section 17 and sub-section (4) of section 17 were applicable and that section 5-A of the Act shall not apply, because the land was urgently required for “Planned Industrial Development” through Greater NOIDA.

The section 4(1) notification of 12.3.2008 was also published in newspapers on 18.3.2008. A notification under section 6 read with section 17(1) was issued on 19.11.2008 and published in newspapers on 27.11.2008. After publication, a notice under section 9(1) was issued on 7.2.2009 and possession was taken on 16.2.2009. The writ petitions were filed on 8.6.2009.

The petitioners alleged (a) that the acquisition was not for public purpose, (b) that the proposed “Planned Industrial Development” plans were not notified and conflicted with the Master Plan 2021 which showed the land as reserved for residential purposes, (c) that there was no real or extreme urgency to dispense with the enquiry under section 5-A by invoking section 17(4), (d) that the proceedings were tainted with mala fides and issued in abuse of power, and (e) that some petitioners had extensive abadi constructions and residences and that acquisition was confiscatory violating Articles 14, 19 and 300-A of the Constitution.

The State respondents and Greater NOIDA Industrial Development Authority opposed the petitions. The State contended acquisition proceedings were in accordance with law and that there was no abadi on petitioners' lands (only borings, some trees and kuchcha boundary constructions), that clusters of abadi had been excluded from acquisition and that the Government's subjective satisfaction under section 17 was not ordinarily susceptible to judicial re-appraisal. Greater NOIDA submitted that the Master Plan classification did not displace the power of the State to acquire land for planned industrial development and that possession had been taken and handed over free from encumbrances, rendering section 48(1) inapplicable.

The Court heard counsel for petitioners, State and Greater NOIDA, considered the material placed before the State (including the Collector's recommendation and survey results), reviewed relevant authorities regarding section 17 and section 5-A, found there was sufficient material on record and that authorities had applied their minds, and dismissed all writ petitions. The Court also held that since possession was taken and land handed over to Greater NOIDA, the land vested in the State free from encumbrances and section 48(1) did not apply.

Legal Issues Presented

  1. Whether the State validly invoked section 17(4) of the Land Acquisition Act, 1894 to dispense with the enquiry under section 5-A on the ground of urgency.
  2. Whether the acquisition of the petitioners' land was for a valid public purpose (i.e., "Planned Industrial Development") and whether the Master Plan designation as residential invalidated the acquisition.
  3. Whether there was mala fide exercise of power or abuse of process in issuing the notifications and invoking urgency provisions.
  4. Whether the presence of abadi constructions/ residences on the land required invoking section 48 or warranted quashing of the acquisition.
  5. Whether subsequent taking of possession and handing over to Greater NOIDA affected the applicability of section 48(1) of the Act.

Arguments of the Parties

Petitioners' Arguments

  • The acquisition was not for any public purpose; the “Planned Industrial Development” plans were not notified and conflicted with the Master Plan 2021 which reserved the land for residential use.
  • There was no (extreme) urgency to justify dispensing with the mandatory enquiry under section 5-A; the use of section 17(4) was improper.
  • The acquisition proceedings were tainted with mala fides and constituted an abuse of power; mandatory legal provisions were not followed.
  • Some petitioners had extensive abadi constructions and residences; acquisition would render them homeless and violate Articles 14, 19 and 300-A of the Constitution.
  • Relied on authorities (e.g., Om Prakash, Krishan Lal Arneja, Mukesh Hans, Nandeshwar Prasad, Munshi Singh, Babu Ram and others) establishing the importance of the right to be heard under section 5-A and the need for genuine urgency before invoking section 17(4).

Respondents' Arguments (State and Greater NOIDA)

  • The acquisition proceedings were initiated and carried out in strict conformity with the Act to acquire 205.0282 hectares for Planned Industrial Development; there was no abadi on petitioners' land except a few kuchcha constructions and trees.
  • The State excluded clusters of abadi from the acquisition; only agricultural land and some scattered abadi constructions were acquired.
  • The question of urgency under section 17(1) and (4) is a matter of the Government's subjective satisfaction and ordinarily not open to court scrutiny unless mala fide or non-application of mind is shown; reliance on Nirodhi Prakash Gangoli and other authorities.
  • The Collector and District Magistrate collected material and recommended invoking section 17(4) due to urgency and possibility of encroachments; the State applied its mind to that material.
  • Master Plan classification does not preclude the State from changing user or acquiring land for the declared public purpose.
  • After possession was taken and handed to Greater NOIDA free from encumbrances, section 48 has no application; a detailed survey was conducted and lands with original abadi were not proposed to be acquired.
  • Relied upon various precedents (e.g., Nirodhi Prakash Gangoli, Jage Ram, Sheikhar Hotels, State of T.N. v. L. Krishnan) for propositions that large-scale planned development does not require fully detailed schemes and that notification of public purpose is sufficient for section 5-A objections.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Nandeshwar Prasad v. Government of U.P (AIR 1964 SC 1217) Recognised that ordinarily procedural requirements under section 5-A must be followed. Referenced as foundational authority for the importance of section 5-A in acquisition proceedings.
Union of India v. Mukesh Hans ((2004) 8 SCC 14) Cited among authorities emphasising procedural protections under section 5-A. Used to support the proposition that s.5-A rights are important and must be dispensed with only on proper material.
Om Prakash v. State of U.P (1998) 6 SCC 1 Held that possibility of encroachment is not a good ground to dispense with enquiry; where extensive constructions exist section 48 may be invoked. Relied upon by petitioners; Court noted the case while discussing limits on invoking s.17(4) where abadi exists.
Krishan Lal Arneja (Union of India v. Krishan Lal Arneja) (2004) Right of representation and hearing under section 5-A is valuable; decision to dispense must be based on material on record. Cited and its para 16 principles summarised and applied in assessing the need for genuine urgency and proper material before invoking s.17(4).
Munshi Singh v. Union of India (1973) 2 SCC 337 Cited in support of the importance of hearing/representation rights under s.5-A. Referenced as supporting authority in the discussion on section 5-A rights.
Essco Fabs Pvt. Ltd. v. State of Haryana (2008) XII AD (SC) 481 The opinion cited the case; specific rule or principle not detailed in the provided text. Cited by petitioners among other decisions; specific application not elaborated in the opinion excerpt.
Mahendra Pal v. State of Haryana (2009) Cited in list of authorities dealing with s.17(4) and s.5-A; specific principle not fully restated in the provided text. Referenced in support of the petitioners' submissions; the Court noted the decision among relevant authorities.
Babu Ram v. State of Haryana (2009) Held that right under section 5-A has the flavour of fundamental rights under Articles 14 and 19; authorities must be satisfied that urgency is of such nature it brooks no delay. Discussed at length by the Court and used to emphasise care required before invoking s.17(4); Court noted occasions where s.5-A should not be dispensed with.
First Land Acquisition Collector v. Nirodhi Prakash Gangoli (2002) 47 ALR 758 (SC) Held that urgency under sections 17(1) and (4) is a matter of subjective satisfaction of the Government and ordinarily not open to objective scrutiny by courts unless mala fide or non-application of mind is shown. Relied upon by respondents; Court recited the principle and treated the Government's subjective satisfaction as entitled to weight unless shown to be mala fide or lacking application of mind.
Jage Ram v. State of Haryana (1971) 1 SCC 671 Cited for proposition that government conclusion about urgency is entitled to weight. Referenced by the Court when summarising the standard of review for governmental satisfaction under s.17.
Deepak Pahwa v. Lt. Governor of Delhi (1984) 4 SCC 308 The opinion cited the case; specific rule or principle not detailed in the provided text. Cited by respondents among other authorities; the Court included it in the catalogue of supportive precedents.
S.S. Darshan v. State of Karnataka (1996) 1 SCC 9 The opinion cited the case; specific rule or principle not detailed in the provided text. Referenced among authorities relied upon by the State; specific application not elaborated.
Union of India v. Praveen Gupta (1997) 9 SCC 78 The opinion cited the case; specific rule or principle not detailed in the provided text. Cited among precedents relied upon by respondents; the opinion did not expand upon its specific application in the excerpt.
Bhagat Singh v. State of U.P (1999) 2 SCC 384 The opinion cited the case; specific rule or principle not detailed in the provided text. Included in respondents' list of supporting authorities; no separate detailed application set out in the provided text.
Amar Singh v. State of U.P (2003 ALR 486) The opinion cited the case; specific rule or principle not detailed in the provided text. Referenced by counsel for respondents; the opinion did not detail specific application here.
Sheikhar Hotels Gulmohar Enclave v. State of U.P (2008 (72) ALR 490 (SC)) Illustrated that invocation of section 5-A or section 17 must be judged case-by-case; where objective satisfaction and supporting planning approvals exist invocation may be proper. Cited by respondents and relied upon by the Court to support that, with proper planning/survey material, invocation of urgency provisions can be appropriate.
Smt. Manju Lata Aggarwal v. State of U.P (2007) 9 ADJ 447 Summarised that the Government must be satisfied bona fide and persons should not be deprived of objection rights to avoid administrative lethargy; scope of judicial review is limited to procedure. The Court stated it has consistently followed this Court's summary of legal position and incorporated the procedural review limits into its analysis.
Sudhir Chandra Agarwala v. State of U.P (2008) 3 ADJ 289 Held that courts should not re-weigh material placed before the State; sufficiency is not for court to appraise if material is relevant and not mala fide. Applied by the Court to decline substitution of its own view where relevant material existed before the State Government.
Munshi Singh v. State of U.P (2009 ADJ 360) Cited as a local precedent following Supreme Court authorities on limits of judicial review and procedural safeguards. Cited among local decisions the Court followed in approaching s.17 invocation analysis.
Anand Buttons Ltd. v. State of Haryana (2005) Cited by Greater NOIDA to support that abadi land can be acquired for planned industrial development; specific elaboration not detailed in text. Placed before the Court by respondent to show the Act does not restrict acquisition of abadi land for planned industrial use; Court noted the reliance.
State of T.N. v. L. Krishnan (1996) 1 SCC 250 Held that acquisition for planned development does not depend upon preparation and approval of a final scheme; notification that land is needed for public purpose suffices for section 5-A objections. Relied upon by the Court to support that acquisition of a large area for planned development need not await finalisation of all detailed schemes.
Aflatoon v. Lt. Governor of Delhi (1975) 4 SCC 285 Constitution Bench held acquisition for planned development does not require that a final and effective scheme be framed before acquisition proposal. Used by the Court (via citation in State of T.N. v. L. Krishnan) to support the proposition that detailed notified plans are not a prerequisite for acquisition for planned development.
Leela Ram v. Union of India (1975) 2 SCC 547 Held that a public purpose can be sufficiently specified even for a large area and does not necessarily suffer from vagueness. Quoted by the Court in support of the proposition that large-area notifications need not have excessive precision regarding specific uses of each plot.
Mahadevappa Lachappa Kinagi v. State of Karnataka (2008) Cited in Mahender Pal to indicate the High Court should enter into merits when extraordinary powers are used to dispense with s.5-A; specific context referenced by the Court. Referenced in discussing the scope of judicial review where s.17(4) is invoked; the Court took this into account in framing its review limits.

Court's Reasoning and Analysis

The Court proceeded by reviewing and summarising the legal principles established by the Supreme Court and this Court regarding the invocation of section 17(4) of the Land Acquisition Act and the dispensing with the enquiry mandated by section 5-A. The Court extracted and reiterated the key principles:

  • Section 17 confers extraordinary powers to dispense with the normal section 5-A enquiry in cases of real and genuine urgency; such powers must not be lightly resorted to (summary of Krishan Lal Arneja, para 16).
  • The satisfaction under section 17(4) is principally subjective to the Appropriate Government and ordinarily entitled to great weight; however, courts may inquire whether the authority applied its mind to relevant factors or acted mala fide (summary of Nirodhi Prakash Gangoli and related authorities).
  • For large-area planned development acquisitions, it is not necessary that a final scheme or detailed plan for each plot be prepared and notified before acquisition; a notification stating the public purpose suffices for triggering section 5-A objections (State of T.N. v. L. Krishnan; Aflatoon).
  • The scope of judicial review is limited to the decision-making procedure rather than reevaluation of evidence; courts can intervene only to correct errors of law or fundamental procedural defects that lead to manifest injustice (Manju Lata Aggarwal; Sudhir Chandra Agarwal).

The Court then evaluated the material actually placed before the State Government: the Collector's records and recommendation, office notes, surveys and spot inspections by District Administration and Greater NOIDA, Form 'X' justification and concerns about possible future encroachments. The Court found:

  • There was sufficient material collected and placed before the State Government on which it recorded subjective satisfaction that urgency existed to acquire the land for planned industrial development.
  • All concerned authorities considered the material and agreed with the recommendation to invoke section 17(4) and dispense with the enquiry under section 5-A; the record shows application of mind by the District Magistrate and State.
  • The authorities had excluded clusters of thick residential abadi from acquisition and had surveyed and otherwise considered the presence of constructions, trees and crops; only agricultural land and some scattered constructions were acquired.
  • The Master Plan 2021 classification as residential did not, in the Court's view, affect the State's power to acquire land for planned industrial development.
  • Possession had been taken and the land handed to Greater NOIDA free from encumbrances; therefore, section 48(1) was not applicable.

Applying these conclusions and the limits of judicial review drawn from precedents, the Court concluded that there was no basis to hold that the State had failed to apply its mind, or had acted mala fide, and that the invocation of section 17(4) was supported by relevant material. The Court therefore dismissed the writ petitions.

Holding and Implications

Holding: The writ petitions are dismissed.

Implications and direct effects:

  • The Court upheld the validity of the State's invocation of section 17(4) to dispense with the enquiry under section 5-A on the facts and material before it.
  • The acquisition for "Planned Industrial Development" in District Gautam Budh Nagar / Greater NOIDA was sustained as a public purpose in the circumstances of this case.
  • The Court found that the authorities had applied their minds, had carried out surveys, and had excluded dense abadi clusters; the possession taken and handing over to Greater NOIDA resulted in the land vesting in the State free from encumbrances, rendering section 48(1) inapplicable (as stated in the opinion).
  • No new legal precedent was laid down by this decision; the Court applied and followed existing Supreme Court and this Court precedents to adjudicate the petitions. The decision's immediate consequence is dismissal of the petitions and validation of the acquisition steps taken in this matter.
Petitions Dismissed.
Show all summary ...

Sunil Ambwani and Virendra Singh, JJ.:— We have heard Shri N.P Singh and Shri K.P Singh, learned Counsel for the petitioners. Learned Standing Counsel appears for the State respondents. Shri Ramendra Pratap Singh appears for Greater NOIDA Industrial Development Authority.

2. The petitioners are Bhumidhars of land in revenue estate of Village Makaura, Pargana Dadri, District Gautam Budh Nagar. By these writ petitions, they have challenged the notifications dated 12.3.2008 published in official Gazettee of Uttar Pradesh under section 4(1) of the Land Acquisition Act, 1894 (in short, ‘the Act’) with the opinion of the State Government that the provisions of sub-section (1) of section 17 of the Act are applicable, and that the land is urgently required for the ‘Planned Industrial Development’ in District Gautam Budh Nagar through Greater NOIDA, and in order to eliminate the delay likely to be caused for an enquiry under section 5-A of the Act, provisions of sub-section (4) of section 17 of the Act are invoked and that the provisions of section 5-A of the Act shall not apply. The notification dated 12.3.2008, was published in daily newspapers ‘Amar Ujala’ and ‘Rashtriya Sahara’ on 18.3.2008 The notification under section 6 read with sub-section (1) of section 17 of the Act was issued on 19.11.2008, and was published in daily newspapers ‘Dainik Jagaran’ and ‘Rashtriya Sahara’ on 27.11.2008

3. The petitioners have challenged notifications on the ground that the compulsory acquisition of the land is not for any public purpose. The plans of the alleged ‘Planned Industrial Development’ have not been notified and does not conform to the ‘Master Plan, 2021’ in which the land is reserved for residential purposes. There was no urgency much less extreme urgency to dispense with provisions of section 5-A of the Act invoking sub-section (4) of section 17 of the Act to the acquisition. The entire acquisition proceedings are tainted with mala fides. The notifications have been issued in abuse of the powers vested in the respondents. The mandatory provisions of law have not been followed. Section 5-A of the Act instructs the decision making authority with regard to need of particular land for a public purpose and also for safeguarding the authority against any ill formed action. Ordinarily the procedural requirements under section 5-A must be followed as has been recognised by the Apex Court in the case of Nandeshwar Prasad v. Government of U.P AIR 1964 SC 1217 upto the judgments in Union of India v. Mukesh Hans (2004) 8 SCC 14.

4. It is stated in the writ petition and has been argued vehemently that there are extensive constructions on the abadi site owned by the petitioners. They have their houses and are using the land both for residence and for keeping their cattle and agricultural produce. The acquisition of land is confiscatory and leave the petitioners home less to accommodate others violating Articles 14, 19 and 300-A of the Constitution of India. The petitioners have relied upon judgments in Om Prakash v. State of UP (1998) 6 SCC 1 , 1998 (34) ALR 1 (Sum.) (SC); Union of Page: 115India v. Mukesh Hans (2004) 8 SCC 14; Union of India v. Krishan Lal Arneja 2004 (56) ALR 401 (SC) , 2004 (19) AIC 578 (SC); Essco Fabs Private Ltd. v. State of Haryana (2008) XII AD (SC) 481, Mahendra Pal v. State of Haryana 2009 (4) AWC 3464, and the latest decisions in Babu Ram v. State of Haryana (2009) XI AD (SC) 37 delivered by the Supreme Court on 7.10.2009 It is submitted that in Om Prakash (supra) the land was acquired for ‘Planned Development of City or Town’. It was held that ground of possibility of encroachment with the area is not a good ground to dispense with the enquiry and that where there are extensive constructions and residential houses, the powers under section 48 of the Act may be invoked for withdrawing from acquisition of any land of which possession has not been taken. In Krishan Lal Arneja and Mukesh Hans (supra) the Supreme Court held relying upon Nandeshwar Prasad's case and Munshi Singh v. Union of India (1973) 2 SCC 337, in holding that right of representation and hearing under section 5-A is a very valuable right of a person whose property is sought to be acquired. He should have appropriate and reasonable opportunity of persuading the authorities concerned that the acquisition of the property belonging to that person should not be made. If the appropriate Government decides to take away this minimal right than its decision to do so must be based on material on record to support the same and bearing in mind the object of section 5-A.

5. In Babu Ram (supra) following Krishan Lal Arneja (supra) and Mukesh Hans (supra) the Supreme Court held that the right under section 5-A is not merely statutory but also has the flavour of fundamental rights under Articles 14 and 19 of the Constitution of India. In reference to the observations made in State of Punjab v. Gurdial Singh (1980) 2 SCC 471 and Om Prakash (supra) and keeping in mind that even if the right to property was no longer a fundamental right, the observations relating to Article 14 will continue to apply in full force with regard to section 5-A of the Act. In these decisions the right to property was elevated to the status of a fundamental right and that is sufficient to indicate that care had to be taken by the authorities before resorting to section 17(4) of the Act, and that they had to satisfy themselves that there was an urgency of such nature as indicated in section 17(2) of the Act which could brook no delay whatsoever.

6. Learned Standing Counsel submits that the land acquisition proceedings had commenced strictly as per the provisions of the Act to acquire land measuring 205.0282 hectares in village Makaura for ‘Planned Industrial Development’ of District Gautam Budh Nagar. There is no abadi on the land of any of the petitioners. There are only boring and a few trees and in some cases the boundary walls covering kuchcha constructions and that the petitioners are not residing on the land in dispute. The State Government has excluded all the clusters of abadi from acquisition. He relies upon First Land Acquisition Collector v. Nirodhi Prakash Gangoli 2002 (47) ALR 758 (SC) , JT 2002 (2) SC 620 in which it was laid down, The question of urgency of an acquisition under section 17(1) and (4) of the Act is a matter of subjective satisfaction of the Government and ordinarily it is not open to the Court to make a scrutiny of the propriety of that satisfaction on an objective appraisal of facts. He has also relied upon the judgments in Jage Ram Page: 116v. State of Haryana (1971) 1 SCC 671 , AIR 1971 SC 1033; Deepak Pahwa v. Lt. Governor of Delhi (1984) 4 SCC 308 , AIR 1984 SC 1721; S.S Darshan v. State of Karnataka (1996) 1 SCC 9 , AIR 1996 SC 697; Union of India v. Praveen Gupta (1997) 9 SCC 78 , AIR 1997 SC 170; Bhagat Singh v. State of U.P (1999) 2 SCC 384 , AIR 1999 SC 436; and Amar Singh v. State of U.P 2003 ALR 486, Sheikhar Hotels Gulmohar Enclave v. State of U.P 2008 (72) ALR 490 (SC) , 2008 (68) AIC 169 (SC) and the judgment of this Court in Smt. Manju Lata Aggarwal v. State of U.P 2007 (9) ADJ 447 , 2007 (69) ALR 35 (Sum.), in Sudhir Chandra Agarwala v. State of U.P 2008 (3) ADJ 289 (DB) , 2008 (71) ALR 33 (Sum.) and in Munshi Singh v. State of U.P (2009) ADJ 360 , 2009 (77) ALR 32 (Sum.).

7. Shri M.C Tripathi has relied upon the records and the material submitted by the District Magistrate for acquisition of the land for ‘Planned Industrial Development’ collected by the Collector and forwarded to the State Government and the consideration of such materials by the State Government by application of mind on record. The Collector found that the land is urgently required for ‘Planned Industrial Development’ of District Gautam Budh Nagar and that there is possibility of continued encroachments on the land.

8. After the notifications were published, notice under section 9(1) of the Act was issued on 7.2.2009 and the possession of the land was taken on 16.2.2009

9. Shri Ramendra Pratap Singh appearing for Greater NOIDA Industrial Development Authority states that the fact, that the land is shown as residential in the master plan, is not a ground on which the acquisition for ‘Planned Industrial Development’ can be questioned. The amendment of master plan or the change of user of the land is within the powers of the State Government.

10. In the counter-affidavit of Shri G.P Srivastava, Land Consultant in Greater NOIDA Industrial Development Authority, Gautam Budh Nagar it is stated that after the publication of notifications of the notice under section 9 the possession was taken and handed over by the State Government to Greater NOIDA Industrial Development Authority free from all encumbrances and that after the possession has been taken the provisions of section 48 have no application. A survey was made by the Greater NOIDA Industrial Development Authority along with the District Administration and where there was original abadi the land was not proposed to be acquired. He has given details of the trees and kuchcha constructions standing on each of the plot of the petitioners. In all the cases the Gata numbers show that there were crops sown in 1398 Fasali. He submits that there is no restriction in the Act to acquire abadi land for the ‘Planned Industrial Development’. The abadi land can also be acquired by the State Government and that there is no policy of the State Government to exempt the entire land on which constructions are made. He has relied upon Anand Buttons Ltd. v. State of Haryana 2005 (58) ALR 333 (SC) , 2005 (25) AIC 16 (SC).

11. Where a large area is acquired for planned industrial development, the public purpose cannot be said to be vague on the ground that a detailed plan as to how each and every bit of the land would be used has not been prepared and notified. In State of T.N v. L. Krishnan 1996 (27) ALR 28 (SC) , (1996) 1 SCC 250 , AIR 1996 SC 497, the land Page: 117was acquired for Tamil Nadu Housing Board, the public purpose stated in the notification was the implementation of the housing schemes to meet the demand made by various sectors of the population under ‘Kalaignar Karunanidhi Nagar Further Extension Scheme’ and for increasing housing accommodation for the development. It was held after noticing the judgment in Aflatoon v. Lt. Governor of Delhi (1975) 4 SCC 285 , AIR 1974 SC 2077, in which the land was acquired for planned development of Delhi, that the acquisition of land does not depend upon the preparation and approval of a scheme and that it is not necessary that a final and effective scheme is framed by the Housing Board before the proposal for acquisition is given. In Aflatoon (supra) the Constitution Bench dealt with the question whether the acquisition of a large extent of land is for public purpose viz. ‘Planned Development of Delhi’. The Supreme Court held that it is only necessary to state in the notification that the land is needed for a public purpose for filing objections under section 5-A. In Leela Ram v. Union of India (1975) 2 SCC 547 , AIR 1975 SC 2112, another Constitution Bench held that the public purpose mentioned in the notification concerned therein viz. ‘for the execution of the Intermediate General Plan for the Greater Delhi’ is specific in the circumstances and does not suffer from any vagueness. The Court pointed out that where the notification does not pertain to a small plot but a huge area covering thousands of acres, it is difficult to insist upon greater precision for specifying the public purpose because it is quite possible that various plots covered by the notification may have to be utilised for different purposes set out in the Intermediate General Plan.

12. It was also pointed out in State of Tamil Nadu v. K. Krishnan (supra) that if public purpose is not sufficiently specified, the Court should enquire whether the petitioner made a grievance of it, at the appropriate time. If the appellant had really been prejudiced by the non-specification of the public purpose, they should have taken steps to get the notification quashed within a reasonable time. They should not wait until declaration under section 6 is published and the notices under section 9 are issued. In this case the notification under section 4 was published on 12.3.2008 The writ petitions were filed on 8th June, 2009, after the notice under section 9(1) was issued on 7.2.2009, and possession of the land was taken on 16.2.2009

13. The Greater Noida Industrial Development Authority has been constituted under the U.P Industrial Development Act, 1976, for the purposes of planned industrial development in the notified area. In this case the land in village Makaura, Pargana Dadri, District Gautam Budh Nagar was required for the purpose of planned industrial development which is without any doubt a public purpose. There are no pleadings or any material brought on record to show that the land in village Makaura has been selected for any other purpose or that the respondents have used the powers of acquisition of land for any collateral purpose. There are no pleadings of mala fide exercise of powers for acquisition of land. So far as invoking the urgency provisions under the Land Acquisition Act, 1894 are concerned, the legal position for invoking the powers under section 17 has come up for consideration of the Supreme Court in many cases. The principles of law laid down by the Supreme Court may be summerised with reference to the decided cases as follows.

14. In para 16 of Krishan Lal Arneja's case (Supra) the Supreme Court held:

“Section 17 confers extraordinary powers on the authorities under which it can dispense with the normal procedure laid down under section 5-A of the Act in exceptional case of urgency. Such powers cannot be lightly resorted to except in case of real urgency enabling the Government to take immediate possession of the land proposed to be acquired for public purpose. A public purpose, however, laudable it may be by itself is not sufficient to take aid of section 17 to use this extraordinary power as use of such power deprives a land owner of his right in relation to immovable property to file objections for the proposed acquisition and it also dispenses with the inquiry under section 5-A of the Act. The Authority must have subjective satisfaction of the need for invoking urgency clause under section 17 keeping in mind the nature of the public purpose, real urgency that the situation demands and the time factor i.e Whether taking possession of the property can wait for a minimum period within which the objections could be received from the land owners and the inquiry under section 50-A of the Act could be completed. In other words, if power under section 17 is not exercised, the very purpose for which the land is being acquired urgently would be frustrated or defeated. Normally urgency to acquire a land for public purpose does not arise suddenly or overnight but sometimes such urgency may arise unexpectedly, exceptionally or extraordinarily depending on situations such as due to earthquake, flood or some specific time bound project where the delay is likely to render the purpose nugatory or infructuous. A citizen's property can be acquired in accordance with law but in the absence of real and genuine urgency, it may not be appropriate to deprive an aggrieved party of a fair and just opportunity of putting forth its objections for due consideration of the acquiring authority, while applying the urgency clause, the State should indeed act with due care and responsibility. Invoking urgency clause cannot be a substitute or support for the laxity, lethargy or lack of care on the part of the State Administration.”

15. In Nirodhi Prakash Gangoli (supra) the Supreme Court held in para 5 as under:

“The question of urgency of an acquisiton under sections 17(1) and (4) of the Act is a matter of subjective satisfaction of the Government and ordinarily it is not open to the Court to make a scrutiny of the propriety of that satisfaction on an objective appraisal of facts. In this view of the matter when the Government takes a decision, taking all relevant considerations into account and is satisfied that there exists emergency for invoking powers under sections 17(1) and (4) of the Act, and issues notification accordingly, the same should not be interfered with by the Court unless the Court comes to the conclusion that the appropriate authority had not applied its mind to the relevant factors or that the decision has been taken by the appropriate authority mala fide. Whether in a given situation there existed urgency or not is left to the discretion and decision of the concerned authorities. If an order invoking power under section 17(4) is assailed, the Courts may enquire whether the appropriate authority had all the relevant materials before it or whether the order has been passed by non-application of mind. Any post notification delay subsequent to the decision of the State Government dispensing with an enquiry under section 5-A by invoking powers under section 17(1) of the Act would not invalidate the decision itself specially when no mala fides on the part of the Government or its officers are alleged. Opinion of the State Government can be challenged in a Court of law if it could be shown that the State Government never applied its Page: 119mind to the matter or that action of the State Government is mala fide. Though the satisfaction under section 17(4) is a subjective one and is not open to challenge before a Court of law, except for the grounds already indicated, but the said satisfaction must be of the Appropriate Government and that the satisfaction must be, as to the existence of an urgency. The conclusion of the Government that there was urgency even though cannot be conclusive but is entitled to great weight, as has been held by this Court in Jage Ram v. State of Haryana (1971) 1 SCC 671 , AIR 1971 SC 1033. Even a mere allegation that power was exercised mala fide would not be enough and in support of such allegation specific materials should be placed before the Court. The burden of establishing mala fides is very heavy on the person who alleges it. Bearing in mind the aforesaid principles if the circumstances of the case in hand are examined it would appear that the premises in question was required for the students of National Medical College, Calcutta and the notification issued in December, 1982 had been quashed by the Court and the subsequent notification issued on 25.2.1994 also had been quashed by the Court. It is only thereafter the notification was issued under sections 4(1) and 17(4) of the Act on 29.11.1994 which came up for consideration before the High Court. Apart from the fact that there had already been considerable delay in acquiring the premises in question on account of the intervention by Courts, the premises was badly needed for the occupation of the students of National Medical College, Calcutta. Thus, existence of urgency was writ large on the facts of the case and therefore, said exercise of power in the case in hand, cannot be interfered with by a Court of law on a conclusion that there did not exist any emergency. The conclusion of the Division Bench of Calcutta High Court, therefore, is unsustainable.”

16. In Mahender Pal v. State of Haryana (supra) following the judgments in Mukesh Hans (supra) and Krishan Lal Arneja (supra) the Supreme Court held in paras 13 and 14 as follows:

“13. The purported public purpose for which the land is to be acquired is for laying down a road. We are not unmindful of the fact that the road connection is one of the purposes mentioned in sub-section (2) of section 17 of the Act in respect whereof sub-section (4) thereof would apply. But the same would not mean that for the purpose of road connection irrespective of the nature of cases and/or irrespective of the nature of the road to be constructed; sub-section (4) of section 17 of the Act could be invoked.

14. As an extraordinary power has been conferred upon the Appropriate Government in terms whereof the normal procedure laid down under section 5-A of the Act could be dispensed with, the High Court, in our opinion, should have entered into the merit of the matter. (See Mahadevappa Lachappa Kinagi v. State of Karnataka 2008 (72) ALR 792 (SC) , 2008 (69) AIC 245 (SC)).”

17. In Sheikhar Hotels Gulmohar Enclave (supra) the Supreme Court held:

“Therefore, it depends upon case to case where in a given situation section 5-A has been correctly invoked and the authorities were satisfied in an objective manner. In the present case, there is no two opinion that because of the globalization of economy Indian economy is progressing with fast speed, therefore, in order to keep pace with the speed, invocation of section 5-A has become imperative. Traffic congestion is a common experience of Page: 120one and all and it is very difficult to negotiate with the traffic congestion in Delhi and National Capital region. Therefore, in the present situation, it cannot be said that the invocation of section 5-A was for ulterior purpose or was arbitrary exercise of the power. Since the Master Plan has already been prepared and it has been approved by the Planning Board and they have sanctioned a sum of Rs. 20.65 crores for the development of this Transport Nagar and widening of the National Highway No. 91 into four lanes. Therefore, the proposal was approved by the Board and it got the sanction from the National Capital Region Planning Board and ultimately the Government invoked the power under section 17(4) read with section 5-A of the Act dispensing with the objections. In the light of these facts it cannot be said that invoking of power was in any way improper exercise. There is need for decongestion of the traffic and it is really the dire need of the hour and earliest it is implemented, better for the people at large.”

18. In Babu Ram (supra) the Supreme Court held:

“In the present case, we are not concerned with technicalities but the likelihood of a health-hazard to the inhabitants of the area if the STP was set up in the acquired site. The stand taken by the respondent that the appellants could have filed objections to the proposed acquisition is difficult to appreciate since the right to file such objections had, in fact, been taken away by invoking the provisions of section 17(4) of the L.A Act. Such a stand taken on behalf of the respondent authorities only serve to strengthen the case of the appellants that an opportunity should have been given to them to file objections to the proposed acquisition. As indicated hereinabove in the various cases cited by Mr. Pradip Ghosh and, in particular, the decision in Krishan Lal Arneja's case (supra), in which reference has been made to the observations made by this Court in Om Prakash's case (supra), it has been emphasized that a right under section 5-A is not merely statutory but also has the flavour of fundamental rights under Articles 14 and 19 of the Constitution. Such observations had been made in reference to an observation made in the earlier decision in Gurdial Singh's case (supra) and keeping in mind the fact that right to property was no longer a fundamental right, an observation was made that even if the right to property was no longer a fundamental right, the observations relating to Article 14 would continue to apply in full force with regard to section 5-A of the L.A Act.

The observations made both in Gurdial Singh's case (supra) and in Om Prakash's case (supra) assign a great deal of importance to the right of a citizen to file objections under section 5-A of the L.A Act when his lands are being taken over under the provisions of the said Act. That in the said decisions, such right was elevated to the status of a fundamental right, is in itself sufficient to indicate that great care had to be taken by the authorities before resorting to section 17(4) of the L.A Act, and that they had to satisfy themselves that there was an urgency of such nature as indicated in section 17(2) of the Act, which could brook no delay whatsoever.

Since section 5-A of the L.A Act had been dispensed with, the stage under section 9 was arrived at within six months from the date of the notice issued under sections 4 and 17(2)(c) of the L.A Act. While such notice was issued on 23rd November, 2005, the Award under section 11 was made on 23rd May, 2006. During this period, the appellants filed a suit, and, thereafter, withdrew the same and filed a writ petition in an attempt to protect Page: 121their constitutional right to the property. It cannot, therefore, be said that there was either any negligence or lapse or delay on the part of the appellants.

The only other aspect of the matter which requires consideration is whether the lands in question have already been utilized for the Sewage Treatment Plant. From the averments made and photographs which were brought to our notice, it appears that the site is still lying unutilized. In such circumstances, we consider it only proper that the appellants should get an opportunity to file their objections to the proposed acquisition under section 5-A of the L.A Act and the respondents would be at liberty to take consequential steps after disposal of the same.

We, accordingly, dispose of the appeal by directing that notwithstanding the invocation of section 17(2)(c) of the L.A Act in its application to the States of Punjab and Haryana, the appellants will be at liberty to file objections under section 5-A of the L.A Act within a month from the date before the concerned authority, who will, thereafter, dispose of the same upon giving the objectors, if any, an opportunity of hearing and placing their respective cases.

The learned Advocate for the appellants is directed to communicate this order to the L.A Collector-cum-District Revenue Officer, Jind, Haryana, within a week from date.

There will be no order as to costs.”

19. This Court has consistently followed the judgments of the Supreme Court in the matter of invoking section 17(4) and dispensing with enquiry under section 5-A of the Act. In Smt. Manju Lata Agrawal v. State of U.P 2007 (9) ADJ 447 (DB) , 2007 (69) ALR 35 (Sum.); Sudhir Chandra Agrawal v. State of U.P 2008 (3) ADJ 289 (DB) , 2008 (71) ALR 33 (Sum.) and Munshi Singh v. State of U.P 2009 (8) ADJ 360 (DB) , 2009 (77) ALR 32 (Sum.). In Manju Lata Agrawal (supra) this Court summed up the legal position as follows:

“Thus, from the aforesaid settled legal propositions, it is apparent that the Government must be satisfied that demand of land by invoking urgency powers is bona fide and persons interested cannot be deprived of their legal right to file objection just to avoid lethargy on the part of the officers of the State Government or for achieving some other ulterior purpose.

It is a settled legal proposition that the scope of judicial review is limited to the decision making procedure and not against the decision of the authority. The Court could review to correct errors of law of fundamental procedural requirements, which may lead to manifest injustice and can interfere with the impugned order in exceptional circumstances. In judicial review, the Court cannot trench on the jurisdiction to appreciate the evidence and arrive at its own conclusion as it is not an appeal from a decision. Review of the decision is not permissible where the findings are recorded by an authority on the basis of legal evidence and the said findings are not based either on ipsi dixit or conjectures or surmises. The Court cannot interfere on the ground that the matter requires appraisal of evidence. “Between appraisal of evidence and total lack of evidence, there is an appreciable difference which could never be lost sight of.”

20. In Sudhir Chandra Agrawal (supra) once again the legal position was summed up as follows:

“The sufficiency or insufficiency of the material, and the names of industries, which may have applied with concrete proposals for establishment of industrial units, is not material for the purposes of judicial review of the subjective satisfaction of the State Government. When there exists material before the State Government, in the shape of recommendations and that material is relevant for applying the mind for recording subjective satisfaction of invoking the urgency clause for acquisition of the land, the law does not permit the Court to consider the material as if it was weighing the evidence for the purposes of recording subjective satisfaction of invoking the urgency clause for acquisition of the land. If the material is relevant, on which competent authority, as reasonable person may invoke the urgency clause for acquisition of the land, the Court would not put such material on the scales, to weigh or measure such urgency. The Court is not competent to carry out judicial review of the sufficiency or insufficiency on the material placed before it. What the Court required to see is whether such material is relevant, and that the competent authority in the State Government could have formed an opinion without their being any motive or ill-will for invoking the urgency clause. In the present case the State has given in the counter affidavit, the material on which it had placed reliance and has produced the material before us, which we find to be relevant for the purpose of invoking urgency clause. Even if we may, after perusing the record arrive on different conclusion, we would restrain ourselves from interfering, as in such case we would be substituting our opinion in place of opinion of the competent authority in the State Government. If we do so, we would be sitting in appeal over the subjective satisfaction recorded by the State Government. The legal position obtained from the judicial precedents restrain us from doing so.”

21. In these cases we are satisfied that there was sufficient material before the State Government on which it recorded its subjective satisfaction that there was urgency to acquire the land for ‘Planned Industrial Development’ in District Gautam Budh Nagar of Greater NOIDA. The competent authorities in the State Government considered the entire materials collected by the District Magistrate with justification for invoking section 17(4) given along with the Form ‘X’ for acquisition of the land.

22. All the relevant and concerned authorities agreed with the office note, giving details of the material on the file with the recommendation of the District Magistrate to invoke section 17(4) and to dispense with the enquiry under section 5-A of the Act. The record clearly demonstrates that after considering the object of acquisition and making enquiries and spot inspections including the survey of the revenue records, District Magistrate had recommended that looking into the purpose of the acquisition and the large area involved, as well as the fact that in future there is strong possibility of encroachments over the subject land, section 17(4) was required to be invoked for dispensing with the enquiry.

23. The State Government and Greater NOIDA authorities had carried out detailed survey. They were conscious and have excluded the land covered with clusters of thick residential areas, and have only acquired the agricultural land with some abadi constructions far and in between. The land use shown in the Master Plan 2021 does not affect the power of the State Government to acquire the land for ‘Planned Industrial Development’ in District Gautam Budh Nagar through Greater NOIDA. We further find that since the possession of Page: 123the land has been taken by the State Government and handed over to Greater Noida the land has vested in the State free from all encumbrances, the provisions of section 48(1) of the Act are not applicable.

24. All the writ petitions are dismissed.