B.C. Biyani Projects Pvt. Ltd. v. State Of M.P. And Others

Madhya Pradesh High Court
Dec 10, 2015
Smart Summary (Beta)

Factual and Procedural Background

The petitioner, B.C. Biyani Projects Pvt. Ltd., a registered Class-2 A-5 Contractor, was blacklisted indefinitely by the Chief Engineer, Indira Sagar Project (Canal), Sanawad, by order dated 14.03.2013. The petitioner had undertaken various contracts worth Rs. 250 Crores, including prestigious projects such as the Indira Sagar Project Canal and Upper Veda Project. Some projects were pending adjudication before the Arbitration Tribunal, and the contract was terminated by the respondent authority. The petitioner challenged the blacklisting order, which was based on a State Government order dated 17.08.2011 and a government circular dated 19.11.1999. The petitioner filed an appeal before the Appellate Authority, which was dismissed by order dated 17.08.2015. The petitioner also filed writ petitions before this Court, including WP No. 903/2015, where interim protection was granted, and the appeal was directed to be decided within six weeks. The petitioner contended that no proper opportunity of hearing or show cause notice was given before blacklisting, and the blacklisting was for an indefinite period. The respondents contended that the petitioner’s performance was unsatisfactory, contracts were terminated due to breach, and blacklisting was justified under government policy and circulars. The appellate authority upheld the blacklisting order after considering all objections.

Legal Issues Presented

  1. Whether the impugned blacklisting order dated 14.03.2013 was valid despite the absence of a show cause notice and opportunity of hearing.
  2. Whether an indefinite period of blacklisting is permissible under law or should be limited to a time-bound period.
  3. Whether the principles of natural justice and the doctrine of proportionality were observed in passing the blacklisting order.

Arguments of the Parties

Petitioner’s Arguments

  • The blacklisting order was passed without issuing a show cause notice or granting an opportunity of hearing, violating principles of natural justice.
  • The blacklisting was for an indefinite period, which is impermissible and should be limited to a specific time frame.
  • The petitioner’s performance was adversely affected due to the respondents’ failure to acquire land timely, causing incomplete works.
  • The petitioner’s disputes are pending adjudication before competent authorities and arbitration tribunals.
  • Other tenders were awarded to different parties, preventing the petitioner from participating due to blacklisting.
  • The petitioner requested the Court to set aside the blacklisting order or restrict the blacklisting period.

Respondents’ Arguments

  • The petitioner’s performance was unsatisfactory and contracts were terminated after due process, including consultation with the General Administration Department.
  • Government dues were unpaid, mobilisation advances misused, and the petitioner abandoned work causing safety risks and delays.
  • Notice was properly issued as per government circulars and policy.
  • Blacklisting was justified due to repeated contract breaches and termination of three major projects awarded to the petitioner.
  • The appellate authority’s order dismissing the petitioner’s appeal was suppressed from the Court and fully supports the blacklisting order.
  • The petitioner does not deserve equity, and the blacklisting can be lifted only if the petitioner demonstrates expeditious completion of ongoing works.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Kulja Industries Ltd. Vs. Chief General Manager, W.T. Project, BSNL [(2014) 14 SCC 731] Requirement of fair play and opportunity of hearing before blacklisting; blacklisting subject to principles of natural justice and doctrine of proportionality; blacklisting period to be determined afresh by competent authority. The Court relied on this precedent to emphasize the need for fair procedure and allowed the petitioner to move a representation to curtail the blacklisting period. The Court distinguished the case to validate blacklisting where contracts were terminated due to breach.
Gorkha Security Services Vs. Government (NCT of Delhi) and others [(2014) 9 SCC 105] Blacklisting orders need not mandatorily include oral hearing; principles of natural justice apply unless expressly excluded; fairness and proportionality are grounds for judicial review. The Court cited this case to reject the petitioner’s contention that absence of oral hearing invalidates blacklisting, affirming that procedural fairness must be balanced with applicable rules.

Court's Reasoning and Analysis

The Court examined the petitioner’s failure to complete three major contracts, resulting in termination due to breach of contract terms. The Court acknowledged the petitioner’s argument about the absence of a show cause notice but distinguished the cited precedents by noting that the power to blacklist may be exercised if the contract or rules permit it without explicit show cause notice. The Court found that the petitioner’s abandonment of work, misuse of mobilisation advances, and safety risks justified blacklisting under government circular dated 19.11.1999. The appellate authority’s detailed order confirming these findings, including the petitioner’s suppression of the appeal outcome, weighed against the petitioner’s claim. The Court also applied the doctrine of proportionality, referencing Kulja Industries Ltd., and directed that the blacklisting period be reconsidered by the competent authority within three months. The Court declined to interfere with the blacklisting itself but allowed for a time-bound limitation on the blacklisting period as per the Apex Court’s guidance.

Holding and Implications

The Court disposed of the petition with the following rulings:

  • The blacklisting order dated 14.03.2013 and the appellate order dated 17.08.2015 are upheld on the grounds of breach of contract and justified government action.
  • The petitioner’s contention regarding violation of natural justice principles due to absence of show cause notice is rejected, given the procedural history and prior directions to prefer an appeal.
  • The indefinite blacklisting period is declared excessive, and the competent authority is directed to reconsider and determine a reasonable, time-bound blacklisting period within three months of receipt of the certified copy of this order.

The direct effect is that the petitioner remains blacklisted but may seek reduction of the blacklisting duration. No new precedent is created beyond the reaffirmation of established principles regarding blacklisting, natural justice, and proportionality.

Show all summary ...

(Passed on 10/12/2015) Per:Hon'ble Mrs. Justice S.R. Waghmare By this petition, the petitioner-B.C. Biyani Projects Pvt. Ltd. is aggrieved by order dated 14.03.2013 passed by respondent No.3-Registering Authority, NVDP, Bhopal in Case No.348/1-14/Yan/ Sa./N.Gha.Vi.Pra./05/Bhopal, whereby the petitioner has been blacklisted for an indefinite period by the Chief Engineer, Indira Sagar Project (Canal), Sanawad.

02. Briefly stated the factual matrix of the case is that the petitioner-Company is a registered Class- 2 A-5 Contractor; registered with respondent No.3- Registering Authority on 26.02.2008. Various works contract worth Rs.250 Crores were carried out by the petitioner-Company and he has also taken prestigious projects such as the Indira Sagar Project Canal and Upper Veda Project and is well known for his work. That, however some of the pending projects, there was adjudication before the Arbitration Tribunal and the respondent authority terminated the contract of the petitioner and the quantified claims have already been filed before the M.P. Arbitration Tribunal and consequently the petitioner has been served with the impugned ex-parte order dated 14.03.2013; without granting of proper opportunity of hearing, or show cause notice. The impugned order dated 14.03.2013 is also based on an order passed by the State Govt. vide Annexure P/8 dated 17.08.2011 which laid down the procedure for suspension, cancellation and blacklisting of a contractor; again an order dated 19.11.1999 applicable to all Govt. Departments, Corporations, Boards was passed and hence the petitioner has challenged both the orders dated 14.03.2013 and 17.08.2011. The impugned order dated 14.03.2013, however was also challenged before the Appellate Authority i.e. the Head of 3 Department, In-charge, Vice Chairman, NVDA. The appeal is pending consideration and being aggrieved by the inaction, the petitioner had filed petition bearing No.903/15, however, by order dated 13.02.2015 this Court was pleased to stay the impugned order of blacklisting dated 14.03.2013 also impugned in the present petition. The petition was disposed of with a direction to the Appellate Authority to decide the appeal within six weeks. The petitioner filed an additional submissions before the Appellate Authority on 08.06.2013. The respondents filed reply Annexure P/14 and rejoinder was also filed by the petitioner. However, by the impugned order dated 17.08.2011, the Appellate Authority upheld the order passed by the respondent No.4 and dismissed the petition without appreciating that no case for blacklisting could be made out against the petitioner. Relying on another order dated 23.06.2014 vide Ex.P/16, Counsel submitted that if the blacklisting order was passed for an unspecified period of time it ought to have been set aside has been held in the similar case. Similarly the suspension order of registering contractor in the light of the government policy has also been quashed in another case and the condition of the Circular 4 19.11.1999 have been clearly violated. Besides the performance of the petitioner has been defeated and dis-satisfactory, primarily because respondents did not acquire the land within time and were responsible for the incomplete canal for irrigation purposes. Besides the dispute raised by the petitioner also is pending for adjudication before various Competent Authorities/ Tribunals/ Arbitrations. Counsel vehemently urged that the tenders are being floated and granted to other parties by preventing the petitioner from being awarded the same and also being blacklisted. Counsel prayed that the impugned order requires to be set aside.

03. Counsel for the petitioner has vehemently urged the fact that interim protection is required to be granted to the petitioner and the business of the petitioner is affected due to the order of blacklisting. Moreover it was Respondent No.3 Registering Authority who was the Competent Authority to pass the order blacklisting of the petitioner whereas order dated 14.03.2013 has been passed by the Chief Engineer which is not the Registering Authority of the petitioner. Besides the ratio laid down by the Apex Court in the matter of Kulja Industries Ltd. Vs. Chief General Manager, W.T. Project, BSNL 5 [(2014) 14 SCC 731] the order of blacklisting required by fundamental principles fair play should be observed and person concerned should be given an opportunity to represent his case before being blacklisted. Besides relying on Gorkha Security Services Vs. Government (NCT of Delhi) and others [(2014) 9 SCC 105] Counsel submitted that the Apex Court had reiterated that unless a statutory provision either specifically or by necessary implication excludes the application of any rules of natural justice, any exercise of power prejudicially affecting another must be in confirmity with the Rules of natural justice and the principle was enshrined Article 14 of the Constitution of India. In the present case Counsel vehemently urged that no such notice was ever served on the petitioner. In the alternative, the petitioner also suggested that the blacklisting period suffered by the petitioner since 14.03.2013 may be restricted to a time bound period.

04. Per contra; Counsel for the State has vehemently urged the fact that the performance of the petitioner was not at all satisfactory and the Dy. Secretary to the Govt. of Public Works Department, Bhopal has at the time of cancellation of registration 6 vide Annexure P/7 passing the final order after suspension has categorically observed that the Government dues has not been paid. There hasn't been proper mobilisation of the advance and the order was passed after consultation with the General Administration Department. The notice was properly issued vide Annexure P/10.

05. Counsel for the respondents has vehemently urged the fact that the petitioner was well aware that the performance is not up to the mark and the disputed claims are already pending before the Arbitrary Tribunal and the respondent State had no other alternative but to blacklist the petitioner. And hence the petition does not deserve to be admitted. He prayed that the same be dismissed. Moreover Counsel for the respondents has fully supported the order passed by the appellate Court dated 17.08.2015. The order of blacklisting was passed way back in the year 2013; whereas the appeal filed by the petitioner has been dismissed by the appellate Authority vide order dated 17.08.2015. This order has been suppressed from this Court and Counsel prayed that three tenders were awarded to the petitioner and have resulted in termination of all the three tenders vide Annexure R-1, R-2 and R-3 filed 7 along with the reply. In all the three cases, the petitioner could not complete the work within the time, resulting in termination of the contract. The construction work on the left bank canal R.D. 0 to 30.427 Kms. whereas the second project pertains to earth work and concrete lining of Sanawad distributaries of Indira Sagar Project was awarded and the third project concerned to excavation and earthwork of Roopkheda, Delgaon, Baswa, Dhakalgaon, Nalwa and Neelkhant Distributary and its minor and sub-minor canals taking off from Indira Sagar Project. Counsel submitted that in almost all the cases despite grant of mobilisation advance, the petitioner was responsible for the delayed work and extension of time had also been granted to the petitioner from time to time, despite which all the three works ended in termination of the contract and, therefore, Counsel vehemently urged that the respondents were justified in passing the impugned order of blacklisting. It is his past conduct which has resulted in the blacklisting. Moreover he has not come to the Court with the clean hand. The appellate Court order passed on 17.08.2015 clearly demonstrates that the petitioner's services were never satisfactory and the order was passed in accordance 8 with the Circular issued by the State Government. The reply in detail in para 5.11 and 5.17 clearly indicated that the terms prescribed in the Circular dated 19.11.1999 have been misused and the petitioner has failed to perform his part of the contract. Moreover it was the petitioner who stopped the work, withdrew the machines, equipments and labour causing threat to the safety on the site and adversely affected the progress of work. All these things were considered in detail by the appellate Authority and the alternative prayer of the petitioner also cannot be adhered to because it is not possible for the petitioner to complete the work in a time bound manner. Similarly the name of the petitioner can always be deleted from the blacklist whenever he is able to demonstrate that he has expeditiously tried to complete the undergoing work awarded to it. Counsel prayed that the petitioner also does not deserve any equity since the order of the appellate Court has been suppressed by him and the very fact that the public exchequer would put to loss. Besides there is causing threat to the safety on the site by leaving incomplete works and the petition be dismissed.

06. On considering the above submissions, we 9 find that the Contractor was awarded three projects by the respondents and all the three contracts have resulted into failures and termination; since there was a breach in conditions and hence the contracts have been terminated. The freedom to contract or not to contract is unqualified in the case of private parties but when such a decision is subject to judicial review, since the decision is taken by the respondent Authority, the State or any other instrumentalities; then the decision will be open to scrutiny not only on the touchstone of the principles of natural justice but also on the doctrine of proportionality. (M/s. Kulja Industries (supra) relied on).

07. We also find that a serious objection has been raised by the Counsel regarding the fact that no show cause notice was issued prior to the issuance of the order of the blacklisting and a clear mandate of the provisions of law has been violated and he had relied on M/s. Kulja Industries (supra) and Gorkha Security Services (supra) to state that there has to be a specific stipulation regarding the imposition of penalty of blacklisting in the show cause notice and admittedly such a show cause notice was not issued in the present case. However, it is here that we have to distinguish the cases relied on 10 by the Counsel since the cases themselves referred to the fact that if the terms of the agreement provided for the power to disqualify or blacklist a supplier then, the same can be done in accordance with the provisions of the conditions and Rules. The punitive nature of the blacklisting was considered and the Apex Court in impugned para-16 had observed that, the power to disqualify or blacklist a supplier is available to the purchaser only in three situations as enumerated in Para 31, 32 of the tender documents, (in the said case) and the Apex Court also held that, if bidders who commit a breach of a lesser degree could be punished by an order of blacklisting; there is no reason why a breach of a more serious nature should go unpunished, be ignored or rendered inconsequential by reason only of an omission of such breach or violation in the text of paras 31 and

32 of the tender document. Paras 31 and 32 cannot, in that view, be said to be exhaustive; nor is the power to blacklist limited to situations mentioned therein. And in the instant case we find that the order of blacklisting is based on the fact that three previous contracts with the petitioner, were terminated by the respondents.

08. We find from the reply of the respondents 11 in para 5.9, the petitioner has been alleged to have violated the terms according to order dated 19.11.1999 and the mobilisation advances have been misused by him. Moreover it has been categorically alleged that the petitioner stopped the work, withdrew the machines, equipments and labour and causing threat to the safety on the site and the appellate Authority has considered all these objections in detail. Even if the Appendix-4, dated 19.11.1999 (Annex. P/7) is considered, it reads thus:- Registering authority may blacklist the contractor where:

(vii) When a contractor/firm leaves a work incomplete on some false pretext or in a manner where Government and public property and safety is put to a grave risk.

09. Then although the petitioner has alleged that he has not left any incomplete work, the respondents have filed Annexures R-1, R-2 & R-3 to indicate that the contract with the respondent- Government on three Projects with the petitioner have been terminated. Then in this light it cannot be said that the government is not put to a grave risk since the respondent Counsel has categorically stated that the termination of the contractual obligations of the petitioner has resulted heavy loss to the public exchequer and the impugned action has been taken only on this ground that three occasions were granted 12 to the petitioner and his performance never improved. Moreover his action of stopping work and withdrawal of machines was causing threat to the safety of the site and found to be adversely affecting the work of the respondents. The suppression of the appeal and its decision by the petitioner also are facts which are not conducive to sympathy for the petitioner. Considering the fact that the Government was entitled to blacklist the contractor in accordance with the Rules when he leaves work incomplete, then the respondent - Government was well within its right to have blacklisted the contractor. It cannot be said that the petitioner was not put to notice; the pendency of the appeal and its result have both been suppressed from this Court. Considering para 5.11 of the reply, we categorically find that the extension of time was granted to the petitioner and since he took away the machinery equipments and labour, then the order of blacklisting has been properly passed under the circumstances according to the policy.

10. However the Apex Court had also directed in the case of M/s. Kulja Industries Limited (supra) that:- 25......Even so permanent debarment from future contracts for all times to come may sound too harsh and heavy a 13 punishment to be considered reasonable especially when (a) the appellant is supplying bulk of its manufactured products to the respondent-BSNL and (b) The excess amount received by it has already been paid back. Further the Apex Court held thus:- 27......The order blacklisting the appellant shall stand affirmed, the period for which such order remains operative shall be determined afresh by the competent authority on the basis of guidelines which the Corporation may formulate for that purpose. The needful shall be done by the Corporation and/or the competent authority expeditiously but not later than six months from today. The parties are left to bear their own costs.

11. And in the present case also the appellant may move a representation to curtail the period of blacklisting and the respondent-Competent Authority shall consider the same in terms of the ratio laid down in the case of M/s. Kulja Industries Limited (supra) within a period of three months from the 14 date of receipt of certified copy of this order.

12. With the aforesaid observation and directions, the petition is disposed of to the extent herein above indicated. (Mrs. S.R. Waghmare) (Sujoy Paul) Judge Judge Hon'ble Shri Justice Sujoy Paul has supplemented this judgment and the same be maintained along with this judgment as a part of it. (Mrs. S.R. Waghmare) (Sujoy Paul) Judge Judge soumya 15 Per Justice Sujoy Paul (Supplementing) The petitioner has filed this writ petition challenging the order dated 14.03.2013 (Annexure P/1) whereby the petitioner's name is included in the blacklist for an indefinite period. The order dated 17.08.2015 (Annexure P/

2) is also called in question whereby the appeal of the petitioner against said order is rejected by the respondents.

2. Shri Vivek Dalal, Learned counsel for the petitioner advanced twofold contentions while arguing the matter. Firstly, he contended that in view of settled legal position, the order of blacklisting could not have been passed without issuing show cause notice and without following the principles of natural justice. Secondly, it is urged that the order of blacklisting the petitioner for indefinite period is impermissible in law. In support of his contention, he relied on (2014) 9 SC 105 ( Gorkha Security Services Vs. Government ( NCT of Delhi) and Ors.) and AIR 2014 SC 9 ( M/s. Kulja Industries Limited Vs. Chief General Manager, W.T. Proj., BSNL and Ors.). No other point was pressed by him during the course of arguments.

3. It is seen that this is second visit of the petitioner to this Court against the order dated 14.03.2013 (Annnexure P/1). The petitioner earlier filed WP No. 903/2015 which was decided on 18.06.2015. This Court disposed of the said petition by directing the petitioner to prefer an appeal before appellate authority. Interim order granted earlier was directed to be continued for a period of six weeks or till the final hearing of the appeal, whichever is earlier. In turn, appellant passed the order Annexure P/2. This order is put to test along with blacklisting order Annexure P/1 in the present matter.

4. It is seen that in the case of M/s. Kulja Industries (supra) the said petitioner earlier filed WP No. 4536 of 2010 before 16 the High Court of Judicature at Bombay in which he assailed the blacklisting order. The High Court allowed the petition on the ground that appellant had not been afforded any opportunity of hearing and therefore, without entering into the merits of the dispute, reserved liberty to the appellant to raise all such contentions before the respondent BSNL. In turn, BSNL was left free to pass a fresh order and take a final decision within the stipulated time. The BSNL after providing opportunity to the M/s. Kulja Industries Limited passed a final order. This order was put to test in the second round in the second round of litigation which is reported in AIR 2014 SC 9. It is seen that the order passed by this Court in first round in WP No. 903/2015 has attained finality. In obedience of that order, the petitioner preferred an appeal and appellate authority has passed a detailed order on the said appeal. Thus, as per order passed in WP No. 903/2015 the requirement of principles of natural justice are satisfied. In WP No. 903/2015 this Court did not direct for issuance of any show cause notice. The only direction issued was to prefer an appeal which was directed to be decided by the appellate authority. In this round of litigation, this Court cannot travel beyond and behind the said order and direct for issuance of show cause notice. If petitioner was aggrieved because of non-issuance of show cause notice, he should have put forth that grievance in the said round of litigation or could have challenged the said order before appropriate forum. The first contention of Shri Dalal regarding violation of principles of natural justice, therefore, must fail.

5. In (2014) 9 SCC 105 ( Gorkha Security Services Vs. Government ( NCT of Delhi) and Ors.), the Apex Court opined that in cases of blacklisting, it is not necessary / mandatory to provide oral hearing. For this reason also, no interference in warranted. In M/s. Kulja Industries Ltd. (supra) the Apex Court has 17 considered the relevant judgments on the point and opined that the order of blacklisting needs to be tested on the principles of natural justice and fair play in action. It is further held that the order of blacklisting can be tested on the doctrine of proportionality. In other words, whether the order is reasonable, fair and proportionate to the gravity of offence is also a ground on which order can be tested by the writ court.

6. The second limb of argument of Shri Dalal is relating to aspect of proportionality of indefinite blacklisting order. It is seen that three major contracts of the petitioner were already terminated. The petitioner has given description of these contracts in para 5.5 of the petitioner. The petitioner further contended that these disputes are pending adjudication before Arbitration Tribunal. In M/s. Kulja Industries Ltd. (supra) the Apex Court affirmed the blacklisting order. However, period for which said order should remain operative was directed to be determined afresh by the competent authority. Competent Authority was given liberty to formulate the guidelines for the said purpose.

7. I respectfully agree with the view taken by the Hon'ble sister Judge. Hence, I deem it apposite to issue the same directions which were given in para 11 of the order passed. Petition is accordingly disposed of. (Sujoy Paul) Judge sarathe