Ccpl Developers Pvt. Ltd. & Anr. Petitioners v. Gail (India) Limited

Delhi High Court
Dec 15, 2015
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Opinion: W.P.(C) No.11621/2015

Factual and Procedural Background

The petitioners, CCPL Developers Pvt. Ltd. and another, entered into gas supply contracts with the respondent, GAIL (India) Limited, initially by a standard form agreement dated 14 September 2004 and later by a Gas Sale Agreement (GSA) dated 26 December 2008. The petitioners operate a shopping mall (East Delhi Mall) and sought RLNG for power generation during power cuts. They alleged the respondent had a monopolistic position and that the 2008 GSA contained onerous, pre-determined terms, including (i) no right for the petitioners to terminate the contract when they no longer required gas, and (ii) an obligation to pay for allocated minimum quantities whether or not consumed.

The petitioners claim they substantially reduced RLNG requirement owing to improved grid power, and asked GAIL not to charge for minimum contracted quantity by a communication dated 14 May 2013. GAIL continued charging and invoked/attempted to encash a Letter of Credit / bank guarantee furnished by the petitioners. The petitioners challenged this conduct in earlier proceedings before this Court (including OMP(I) No.117/2015 and OMP(I) No.573/2015 under Section 9 of the Arbitration and Conciliation Act) and by an FAO (OS) appeal; some of those proceedings were dismissed or remain pending. The present writ petition seeks quashing of Article 14 and of parts of Article 19 of the GSA as being onerous, arbitrary, illegal, mala fide, unreasonable, harsh and against public policy.

The petition was heard by Mr. Justice Rajiv Sahai Endlaw, who considered maintainability of a writ under Article 226 given the contractual nature of the dispute and the existence of an arbitration clause and related proceedings.

Legal Issues Presented

  1. Whether Article 14 of the Gas Sale Agreement (obligation to pay for allocated minimum RLNG quantities even if not consumed) and that portion of Article 19 which does not give the petitioners a right of termination, are so onerous, arbitrary or violative of Article 14 of the Constitution as to justify quashing by writ.
  2. Whether a writ petition under Article 226 is maintainable in respect of contractual disputes (including monetary claims and challenges to contractual clauses) when an arbitration clause exists and arbitration proceedings have been invoked.
  3. Whether the court should restrain the respondent from encashing the bank guarantee / Letter of Credit given the contractual and arbitral remedies available.
  4. Whether the contract can be rectified / amended by exercise of writ jurisdiction where the petitioners seek judicial variation of contractual terms they had accepted earlier.

Arguments of the Parties

Petitioners' Arguments

  • The 2008 Gas Sale Agreement (GSA) was a standard-form contract imposed by GAIL (the only RLNG supplier in the relevant area at the time) and contained pre-determined, onerous and unfair terms without negotiation.
  • The contract does not permit the petitioners to terminate when they no longer need RLNG, and requires payment for minimum allocated quantities even if gas is not consumed — a provision said to be arbitrary, unreasonable and violative of Article 14 of the Constitution.
  • Because of improved grid power, the petitioners' RLNG requirement substantially reduced and many mall units remained vacant, yet GAIL insisted on charging the minimum contracted quantity and invoked the Letter of Credit / bank guarantee.
  • The petitioners attempted to resolve the matter (including negotiations and a settlement, and by filing OMP(I) No.117/2015 and OMP(I) No.573/2015), but GAIL continued to seek enforcement of the bank guarantee.
  • The petitioners contended that availability of arbitration does not preclude the writ remedy under Article 226 when the respondent qualifies as a "State" or instrumentality and acts arbitrarily or unfairly in contractual matters.
  • Reliance was placed on earlier authorities (including a Division Bench decision in Life Insurance Corporation of India v. Rajiv Khosla) to contend that an unfair clause may be amenable to judicial review.

Note: The opinion does not set out a detailed, separate statement of the respondent's pleaded arguments in the same enumerated format. The text shows that arbitration-related remedies and jurisprudence on maintainability were central to the Court's enquiry and reasoning.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Joshi Technologies International Inc. v. Union of India (2015) 7 SCC 728 Summarizes legal position on maintainability of writ petitions in contractual matters: (a) writ as against State/instrumentality arising out of contract is maintainable in appropriate cases; (b) disputed factual questions are not by themselves a ground to refuse a writ in all cases; (c) writ involving monetary relief can be maintainable; but High Court has discretion and normally will not exercise it where action is not arbitrary or unreasonable. It lists circumstances where writs "normally" would not be entertained (lack of public law character, existence of contractual dispute-resolution mechanism such as arbitration, serious disputed questions of fact requiring oral evidence, money claims per se). The Court relied heavily on Joshi to assess maintainability. It applied the principles to conclude this dispute lacked public law character, involved contractual remedies (including arbitration), and therefore the writ petition was not an appropriate forum to grant the relief sought.
ABL International Ltd. v. Export Credit Guarantee Corporation of India Ltd. (2004) 3 SCC 553 Referenced in Joshi as part of the legal position on writ maintainability in contractual disputes. Used within the Joshi summary quoted by the Court to support the proposition that High Courts have discretion and certain restrictions in entertaining writs in contractual matters.
Whirlpool Corporation v. Registrar of Trade Marks [1998 (8) SCC 1] Authority noting restrictions on the plenary power of the High Court under Article 226. Cited (through the Joshi summary) to underline that the High Court's plenary prerogative writ power is exercised subject to judicially recognized restrictions.
Life Insurance Corporation of India v. Rajiv Khosla, 186(2012) DLT 266 (DB) Held that an unfair and irrational clause in a contract (insurance policy) is amenable to judicial review; insurance seen as social security measure meriting public-law treatment. The petitioners relied on this decision. The Court distinguished it on facts, observing that Life Insurance involved insurance/social security considerations; the present dispute was essentially contractual and private in nature, so the Life Insurance rationale did not mandate writ relief here.
Japan Travel Services v. All Nippon Airways Co. Ltd. (MANU/DE/2953/2009) Invoked by petitioners to contend that an arbitrator, being a creature of the contract, cannot strike down contract clauses as unfair. The Court disagreed with that contention and noted Section 16(1)(b) of the Arbitration Act allowing the arbitral tribunal to rule on objections to the existence/validity of the arbitration agreement; thus the Court could not accept the Japan Travel Services proposition to the extent it suggested arbitrators could not rule on contractual validity.
R.L. Kalathia & Co. v. State of Gujarat (2011) 2 SCC 400 Where a discharge agreement is alleged to have been procured by fraud, coercion or undue influence, the allegation raises disputed questions of fact which require evidence and cannot be summarily disposed of. The Court relied on this principle to observe that the petitioners' allegations (e.g., about bargaining power, unfair terms, coercion) raise factual disputes requiring evidence and therefore are not suitable for summary resolution in writ proceedings.
Reva Electric Car Co. (P) Ltd. v. Green Mobil (2012) 2 SCC 93 Arbitration clause is to be treated as an agreement independent of other contract terms; Section 16(1)(b) permits the arbitral tribunal to rule on objections to the arbitration agreement's existence/validity and a finding that the contract is null and void does not ipso jure invalidate the arbitration clause. The Court invoked this authority to reject the petitioners' contention that an arbitrator (being a creature of the contract) could not rule on the unfairness or validity of clauses; it supported the independence of the arbitration clause and the role of arbitral forums.
Ashapura Mine-Chem Ltd. v. Gujarat Mineral Development Corporation (2015) 8 SCC 193 Reiterates the principle that arbitration clauses are independent and that findings about contract nullity do not automatically invalidate arbitration clauses (reinforcement of Section 16(1)(b) principles). The Court relied on Ashapura to further bolster the view that arbitration remains an available and appropriate remedy to adjudicate contractual challenges, including validity issues, and the presence of an arbitral clause militates against deciding the dispute by writ unless exceptional circumstances exist.
United India Insurance Co. Ltd. v. Manubhai Dharmasinhbhai Gajera (2008) 10 SCC 404 Clarified limits of judicial review: existence of power to strike down contract clauses was not in question in that case, but that power did not extend to modification, alteration or addition of contract terms; each case depends on facts. The Court used this authority to distinguish Life Insurance and to underscore that modification/rectification of contract terms is not a remedy to be lightly granted in writ proceedings.
M/s. Madhucon Projects Ltd. v. National Highways Authority of India (W.P.(C) No.8418/2010; Division Bench judgment dated 10 March 2011) A Division Bench of this Court had interfered with forfeiture of Bid Security by NHAI, reasoning that forfeiture by invocation of bank guarantee could not be effected without proof of damages. The Court referred to the Supreme Court's consideration of that Division Bench view and used the discussion to demonstrate that final adjudication of contractual monetary claims is not appropriate in writ jurisdiction and that civil courts may be better suited to decide whether damages were suffered.
National Highways Authority of India v. MEIL-EDB LLC (Civil Appeal No.3053/2015 arising out of SLP (C) No.15689/2011) — Order dated 18 March 2015 Supreme Court held that a writ court may take a preliminary view on whether a deduction/forfeiture is punitive, but the controversy about damages should be relegated to civil courts for detailed determination. The Court relied on this order to emphasize that final decisions on contractual monetary rights are generally not to be made in writ proceedings and that parties should be relegated to civil/arbitral fora to resolve such claims.
GAIL (India) Ltd. v. Petroleum and Natural Gas Regulatory Board (MANU/DE/3603/2015) The present Judge's own earlier decision dealing with the maintainability of writ petitions for interfering with bank guarantees, holding such writs not maintainable. The Judge referred to his earlier holding and indicated that the same reasoning applied here; he did not feel the need to repeat that detailed reasoning in the present order.

Court's Reasoning and Analysis

The Court proceeded through a stepwise analysis, grounded in the authorities cited:

  1. Nature of the claim: The Court observed that the petitioners' claim is founded on contract and that the real relief sought is effectively restraint upon the respondent from encashing the bank guarantee and a judicial amendment/rectification of contractual terms (Articles 14 and 19 of the GSA).
  2. Maintainability under Article 226: The Court queried whether the dispute was purely contractual without public law elements, and whether in such circumstances a writ petition was available, especially since the contract contains an arbitration clause and arbitration-related proceedings had been invoked.
  3. Review of jurisprudence: The Court extensively relied on the Supreme Court's decision in Joshi Technologies (and the authorities summarized therein) to outline the principles governing maintainability of writs in contractual disputes, including the High Court's discretion and the circumstances where writ jurisdiction would "normally" not be exercised.
  4. Application of principles to facts: Applying the cited principles, the Court concluded:
    • The dispute lacked public-law character; the petitioners did not seriously press a public law dimension.
    • The contract contains an arbitration clause and arbitration/suit remedies were available; this militated against entertaining the writ.
    • Many of the petitioners' contentions (monopolistic position of respondent, inequality of bargaining power, whether negotiations occurred, whether terms are onerous, whether reduced requirement is commercial, enforceability of the agreement) are factual controversies requiring evidence, witness examination and cross-examination — processes not suited to summary writ adjudication.
  5. On petitioners' contention that arbitrators (as creatures of the contract) could not strike down clauses: The Court relied on Section 16(1)(b) of the Arbitration and Conciliation Act and authorities such as Reva Electric Car Co. and Ashapura to hold that the arbitration clause is independent and arbitral tribunals can rule on objections regarding existence/validity of the arbitration agreement; a finding that the contract is null and void does not automatically invalidate the arbitration clause.
  6. On the argument invoking Life Insurance authority: The Court accepted that unfair contractual clauses may be amenable to judicial review in certain contexts (e.g., insurance as a social security measure) but distinguished that authority on facts — here the contract's private-law character did not warrant invocation of writ jurisdiction for amendment or rectification.
  7. On prior decisions relating to bank guarantees and forfeiture (Madhucon / NHAI and the Supreme Court order): The Court noted that final adjudication of contractual monetary claims and assessment of damages is generally to be left to civil or arbitral fora; a writ court may only take preliminary views in exceptional cases.
  8. On disputed factual issues such as fraud, coercion or undue influence in execution of contractual instruments (R.L. Kalathia): the Court emphasized that such disputes raise triable issues of fact and cannot be resolved without an opportunity to lead evidence.

Based on the foregoing, the Court concluded that the petition raised private contractual issues appropriately susceptible to adjudication in arbitration or civil proceedings, and that the extraordinary writ remedy under Article 226 should not be exercised to grant the reliefs sought.

Holding and Implications

Holding: DISMISSED.

Direct implications (as stated or necessarily implied by the opinion):

  • The writ petition was dismissed for lack of merit. No costs were awarded.
  • The Court concluded that the dispute is essentially contractual, contains an arbitration clause, and lacks the requisite public-law character to justify relief under Article 226 in the circumstances of this case; consequently, the petitioners' remedy is to pursue contractual relief through arbitration or civil proceedings, and factual disputes (including allegations of unfairness, coercion or monopoly) require evidence and appropriate adjudication in those forums.
  • The Court did not purport to set a new legal precedent; it applied and relied upon existing Supreme Court jurisprudence (notably Joshi Technologies and related authorities) and its own earlier ruling in GAIL v. PNGRB, and it noted that final contractual adjudication is not appropriate in writ jurisdiction.

This decision results in the dismissal of the petition and leaves the petitioners to pursue their monetary and contractual defenses and claims in the available arbitral or civil fora. The Court expressly noted that it saw no reason to revisit or repeat detailed reasoning dealt with in earlier authorities it had cited.


Summary prepared strictly from the contents of the provided opinion of the High Court of Delhi dated 15 December 2015 in W.P.(C) No.11621/2015 (CCPL Developers Pvt. Ltd. & Anr. v. GAIL (India) Limited).

Show all summary ...

W.P.(C) No.11621/2015 Page 1 of 21 *IN THE HIGH COURT OF DELHI AT NEW DELHI

% Date of decision: 15th December, 2015

+ W.P.(C) No.11621/2015 CCPL DEVELOPERS PVT. LTD. & ANR. ….. Petitioners

Through: Mr. Parag P. Tripathi, Sr. Adv. with Mr. Ashish Mohan and Mr. Mohit

Kumar, Advs.

Versus

GAIL (INDIA) LIMITED ….. Respondent

Through: Mr. Arvind Nayar, Mr. Shashi Mohan and Ms. Nanda Devi Deka, Advs.

CORAM:-

HON'BLE MR. JUSTICE RAJIV SAHAI ENDLAW CM No.30820/2015 (for exemption)

1. Allowed, subject to just exceptions.

2. The application is disposed of.

W.P.(C) No.11621/2015 & CM No.30819/2015 (for stay)

3. The petition seeks quashing of (i) Article 14 of the Gas Sales Agreement (GSA) dated 26thDecember, 2008 between the petitioner No.1 and the respondent GAIL (India) Limited on the ground of being onerous, arbitrary, illegal, mala fide, unreasonable, harsh and against public policy and thus void; and (ii) quashing of Article 19 of the said Agreement to the

1

extent that it does not provide for right of termination to the petitioners in the event of the petitioners being unable or unwilling to purchase / consume gas allocated by respondent particularly due to non-requirement, on the ground of being onerous, arbitrary, illegal, mala fide, unreasonable, harsh and against public policy and thus void.

4. It is the case of the petitioners:

(i) that the petitioners are engaged in the business of constructing and managing Shopping Complexes, Malls and other real estate and for the purposes of the various units in the East Delhi Mall, situated at plot No.1, Kaushambi, Ghaziabad, Uttar Pradesh were in need of Regenerated Liquefied Natural Gas (RLNG) as an alternate source for generation of electricity at the Mall during power cuts;

(ii) that the respondent at the relevant time was the only supplier of RLNG in the area where the aforesaid Mall is located and anyone, in the year 2004, if in need of RLNG, could enter into a contract for supply thereof with the respondent only; the respondent was thus then enjoying monopolistic position and had superior bargaining power;

2

(iii) that the petitioners accordingly approached the respondent and the respondent made the petitioners sign a standard form agreement dated 14thSeptember, 2004 with the price stated therein being valid until 1stJanuary, 2009 and a new agreement to be executed by 30thSeptember, 2008;

(iv) that the respondent made the petitioners sign a new contract namely Gas Sale Agreement (GSA) dated 26thDecember, 2008 on the dotted lines; the terms and conditions mentioned in the said agreement were pre-determined by the respondent and are patently onerous and formulated without discussing or taking consent of the petitioners; the respondent even then was the only supplier of RLNG in the area where the Mall of the petitioners is located;

(v) that the entire contract nowhere provides for termination of the same by the petitioners as buyer in the event of the petitioners not willing to buy RLNG or having no further requirement for the same or if unable to run their business for any reason whatsoever;

3

(vi) that the provision in the agreement for payment by the petitioners for allocated RLNG despite non-consumption thereof is patently unfair, unreasonable, illegal, arbitrary and unjust and against public policy and violative of Article 14 of the Constitution of India;

(vii) that the petitioners now, because of the better availability of the power supply from the grid, have no further requirement for RLNG and their requirement for RLNG has thus substantially reduced;

(viii) that even till now only 60% of the units in the mall are occupied and the balance 40% are lying vacant;

(ix) that the petitioners vide communication dated 14thMay, 2013 to the respondent informed of the aforesaid and requested the respondent not to charge the petitioners for the minimum quantity which the petitioners in the agreement had agreed to consume and / or pay for;

4

(x) that however inspite of repeated reminders of the petitioners, the respondent did not effect any change and has been demanding from the petitioners the price of minimum quantity of RLNG which the petitioners under the agreement aforesaid had agreed to pay for and has illegally and unauthorizedly invoked the Letter of Credit furnished by the petitioners in terms of the agreement aforesaid with the respondent;

(xi) that the petitioners challenged the said action of the respondent by filing OMP(I) No.117/2015 before this Court but which petition was dismissed vide order dated 27thMarch, 2015;

(xii) that thereafter negotiations were held between the parties and though a settlement was arrived at and the petitioners also paid the amounts in terms of settlement to the respondent but the respondent has continued to seek enforcement of the aforesaid Letter of Credit furnished by the petitioners, in a patently fraudulent and illegal manner;

5

(xiii) that the petitioners again filed a petition under Section 9 of the Arbitration and Conciliation Act, 1996 being OMP (I) No.573/2005 before this Court and vide interim order wherein the parties were directed to maintain status quo with respect to the Letter of Credit and the petitioners directed to revive the Letter of Credit;

(xiv) that aggrieved from the direction for revival of the Letter of Credit, the petitioners filed an appeal being FAO (OS) No.611/2015 but which was dismissed as not pressed on 4th November, 2015;

(xv) that upon the dismissal of the appeal, Canara Bank being the banker of the petitioners and which had at the instance of the petitioners furnished the Letter of Credit, for renewing the Letter of Credit asked the petitioners to furnish 100% margin money;

(xvi) that the petitioners made an application in OMP(I) No.573/2015 supra for impleadment of Canara Bank and a

6

direction was issued to Canara Bank to renew / revive the bank guarantee;

(xvii) that the proceedings in the said OMP are still pending;

(xviii) that the respondent being a State within the meaning of Article 12 of the Constitution of India is liable to act fairly even in contractual matters and cannot ask the petitioners to pay for the gas which has not been consumed by the petitioners.

5. The senior counsel for the petitioners has been heard.

6. It has been enquired from the senior counsel for the petitioners whether not the dispute between the parties is purely contractual, without any public law element therein and if that be so, how is the public law remedy of a writ petition under Article 226 of the Constitution of India available to the petitioners particularly when the petitioners, in relation to the same disputes, have also invoked the arbitration clause in the agreement between the parties. Attention of the senior counsel for the petitioners has been invited to the dicta of the Supreme Court in Joshi Technologies International Inc. Vs. Union of India (2015) 7 SCC 728

7

dealing not only with the aspect of maintainability of writ petitions in contractual matters but also with the aspect of variation / rectification of contracts, as the petitioners in the present case also are seeking. It has further been enquired, whether not the real relief which the petitioners are claiming by way of this writ petition is a restraint against the respondent from encashment of the bank guarantee furnished by the petitioners in favour of the respondent inasmuch as the monetary claims under the agreement of the respondent against the petitioners otherwise raised can always be disputed by the petitioners and will have to be enforced by the respondent either before the Civil Court or in arbitration.

7. The senior counsel for the petitioners of course has contended that the availability of the alternative remedy of arbitration under the contractual clause cannot be a ground to defeat the writ petition under Article 226 of the Constitution of India if otherwise maintainable. It is contended that if the respondent which qualifies as a State, in contractual matters also, acts arbitrarily and unfairly, a writ petition would be maintainable. A compilation of judgments is handed over though

8

reference during the hearing is made only to paras 23 and 24 of Life Insurance Corporation of India Vs. Rajiv Khosla 186(2012) DLT 266 (DB) to contend that the Division Bench of this Court therein in writ jurisdiction held the clauses in the insurance policy to be unfair and to

Japan Travel Services Vs. All Nippon Airways Co. Ltd.

MANU/DE/2953/2009 to contend that an arbitrator being a creature of an agreement cannot strike down any clause in the agreement as unfair, unreasonable and unjust.

8. I am unable to agree.

9. The claim of the petitioners in the writ petition is based on contract and as aforesaid is essentially an attempt to restrain the respondent from encashing the bank guarantee. Else, the respondent, to enforce its monetary claims under the agreement will have to resort to proceedings for recovery thereof either in a suit or in arbitration and the petitioners can defend the said claims on all grounds as are urged in this petition. Supreme Court in Joshi Technologies International Inc. supra after review of host of earlier judgments on the subject inter alia held as under:

9

"68. The Court thereafter summarized the legal position in the following manner: (ABL International Ltd. Vs. Export Credit Guarantee Corporation of India Ltd. (2004) 3 SCC 553 paras 27-28)

"27. From the above discussion of ours, following legal principles emerge as to the maintainability of a writ petition:

(a) In an appropriate case, a writ petition as against a State or an instrumentality of a State arising out of a contractual obligation is maintainable.

(b) Merely because some disputed questions of facts arise for consideration, same cannot be a ground to refuse to entertain a writ petition in all cases as a matter of rule.

(c) A writ petition involving a consequential relief of monetary claim is also maintainable.

28. However, while entertaining an objection as to the maintainability of a writ petition under Article 226 of the Constitution of India, the court should bear in mind the fact that the power to issue prerogative writs under Article 226 of the Constitution is plenary in nature and is not limited by any other provisions of the Constitution. The High Court having regard to the facts of the case, has a discretion to entertain or not to entertain a writ petition. The Court has imposed upon itself certain restrictions in the exercise of this power [See: Whirlpool Corporation Vs. Registrar of Trade Marks, [1998 (8) SCC 1]. And this plenary right of the High Court to issue a prerogative writ will not normally be exercised by the Court to the exclusion of other available remedies unless such action of the State or its instrumentality is arbitrary and unreasonable so as to violate the constitutional mandate of Article 14 or for other valid and legitimate reasons, for which the court thinks it necessary to exercise the said jurisdiction."

10

69. The position thus summarized in the aforesaid principles has to be understood in the context of discussion that preceded which we have pointed out above. As per this, no doubt, there is no absolute bar to the maintainability of the writ petition even in contractual matters or where there are disputed questions of fact or even when monetary claim is raised. At the same time, discretion lies with the High Court which under certain circumstances, can refuse to exercise. It also follows that under the following circumstances, "normally", the Court would not exercise such a discretion:

69.1. The Court may not examine the issue unless the action has some public law character attached to it.

69.2. Whenever a particular mode of settlement of dispute is provided in the contract, the High Court would refuse to exercise its discretion under Article 226 of the Constitution and relegate the party to the said made of settlement, particularly when settlement of disputes is to be resorted to through the means of arbitration.

69.3. If there are very serious disputed questions of fact which are of complex nature and require oral evidence for their determination.

69.4. Money claims per se particularly arising out of contractual obligations are normally not to be entertained except in exceptional circumstances.

70. Further, the legal position which emerges from various judgments of this Court dealing with different situations/aspects relating to contracts entered into by the State/public authority with private parties, can be summarized as under:

70.1. At the stage of entering into a contract, the State acts purely in its executive capacity and is bound by the obligations of fairness.

70.2. State in its executive capacity, even in the contractual field, is under obligation to act fairly and cannot practice some discriminations.

11

70.3. Even in cases where question is of choice or consideration of competing claims before entering into the field of contract, facts have to be investigated and found before the question of a violation of Article 14 could arise. If those facts are disputed and require assessment of evidence the correctness of which can only be tested satisfactorily by taking detailed evidence, involving examination and cross- examination of witnesses, the case could not be conveniently or satisfactorily decided in proceedings under Article 226 of the Constitution. In such cases court can direct the aggrieved party to resort to alternate remedy of civil suit, etc.

70.4. Writ jurisdiction of High Court under Article 226 was not intended to facilitate avoidance of obligation voluntarily incurred.

70.5. Writ petition was not maintainable to avoid contractual obligation. Occurrence of commercial difficulty, inconvenience or hardship in performance of the conditions agreed to in the contract can provide no justification in not complying with the terms of contract which the parties had accepted with open eyes. It cannot ever be that a licensee can work out the licence if he finds it profitable to do so: and he can challenge the conditions under which he agreed to take the licence, if he finds it commercially inexpedient to conduct his business.

70.6. Ordinarily, where a breach of contract is complained of, the party complaining of such breach may sue for specific performance of the contract, if contract is capable of being specifically performed. Otherwise, the party may sue for damages.

70.7. Writ can be issued where there is executive action unsupported by law or even in respect of a corporation there is denial of equality before law or equal protection of law or if can be shown that action of the public authorities was without giving any hearing and violation of principles of natural justice after holding that action could not have been taken without observing principles of natural justice.

12

70.8. If the contract between private party and the State/instrumentality and/or agency of State is under the realm of a private law and there is no element of public law, the normal course for the aggrieved party, is to invoke the remedies provided under ordinary civil law rather than approaching the High Court under Article 226 of the Constitutional of India and invoking its extraordinary jurisdiction.

70.9. The distinction between public law and private law element in the contract with State is getting blurred. However, it has not been totally obliterated and where the matter falls purely in private field of contract. This Court has maintained the position that writ petition is not maintainable. The dichotomy between public law and private law, rights and remedies would depend on the factual matrix of each case and the distinction between public law remedies and private law, field cannot be demarcated with precision. In fact, each case has to be examined, on its facts whether the contractual relations between the parties bear insignia of public element. Once on the facts of a particular case it is found that nature of the activity or controversy involves public law element, then the matter can be examined by the High Court in writ petitions under Article 226 of the Constitution of India to see whether action of the State and/or instrumentality or agency of the State is fair, just and equitable or that relevant factors are taken into consideration and irrelevant factors have not gone into the decision making process or that the decision is not arbitrary.

70.10. Mere reasonable or legitimate expectation of a citizen, in such a situation, may not by itself be a distinct enforceable right, but failure to consider and give due weight to it may render the decision arbitrary, and this is how the requirements of due consideration of a legitimate expectation forms part of the principle of non-arbitrariness.

13

70.11. The scope of judicial review in respect of disputes falling within the domain of contractual obligations may be more limited and in doubtful cases the parties may be relegated to adjudication of their rights by resort to remedies provided for adjudication of purely contractual disputes."

[Emphasis added]

10. The contract entered into by the petitioners with the respondent contains an arbitration clause and which has also been invoked by the petitioners. The Supreme Court, in the dicta aforesaid has clearly held that in such cases writ petitions are not to be entertained. Not only so, the issue arising for adjudication has no public law character attached to it. In fact, the senior counsel for the petitioners has not even attempted to argue so. Further, as aforesaid, the real claim in the writ petition is but to thwart encashment of bank guarantee furnished under a contract. The contract between the parties is strictly in the realm of private law.

11. Moreover, the petitioners in effect are seeking amendment / rectification of the contract entered into with the respondent. The said contract was entered into first on 14thSeptember, 2004 and renewed on 26thDecember, 2008. The petitioners have throughout been aware of the terms and conditions thereof and at no time objected thereto. A question

14

would arise whether the Court can order the contract to be rectified / amended. The said aspect also has been dealt with in Joshi Technologies International Inc. supra as under:

"54. As noted above, the contention of the Respondent is that PSCs are in the nature of a contract agreed to between the two independent contracting parties. It is also mentioned that before the signing of the PSCs, the approval of Cabinet is obtained which reflects that the PSC as submitted to the Cabinet has the approval of one of the contracting parties, namely, Government of India in this case. When it is signed by the other party it means that it has the approval of both the parties. Therefore, a contracting party cannot claim to be oblivious of the provisions of the law or the contents of the contract at the time of signing and, therefore, later on cannot seek retrospective amendment as a matter of right when no such right is conferred under the contract. Even the doctrine of fairness and reasonableness applies only in the exercise of statutory or administrative actions of the State and not in the exercise of contractual obligation and issues arising out of contractual matters are to be decided on the basis of law of contract and not on the basis of the administrative law. No doubt, under certain situations, even in respect of contract with the State relief can be granted Under Article 226. We would, thus, be dealing with this aspect in some detail.

55. Law in this aspect has developed through catena of judgments of this Court and from the reading of these judgments it would follow that in pure contractual matters extraordinary remedy of writ Under Article 226 or Article 32 of the Constitution cannot be invoked. However, in a limited sphere such remedies are available only when the non-Government contracting party is able to demonstrate that its a public law remedy which such party seeks to invoke, in contradistinction to the private law remedy simpliciter under the contract. Some of the case law to bring home this cardinal principle is taken note of hereinafter.

15

72. As pointed out earlier as well, the contract in question was signed after the approval of the Cabinet was obtained. In the said contract, there was no clause pertaining to Section 42 of the Act. The Appellant is presumed to have knowledge of the legal provision, namely, in the absence of such a clause, special allowances under Section 42 would be impermissible. Still it signed the contract without such a clause, with open eyes. No doubt, the Appellant claimed these deductions in its income tax returns and it was even allowed these deductions by the Income Tax Authorities. Further, no doubt, on this premise, it shared the profits with the Government as well. However, this conduct of the appellant or even the respondents, was outside the scope of the contract and that by itself may not give any right to the appellant to claim a relief in the nature of mandamus to direct the Government to incorporate such a clause in the contract, in the face of the specific provisions in the contract to the contrary as noted above, particularly, Article 32 thereof. It was purely a contractual matter with no element of public law involved thereunder."

[Emphasis added]

12. Mention may also be made of order dated 18thMarch, 2015 of the Supreme Court in Civil Appeal No.3053/2015 arising out of SLP (C) no.15689/2011 titled National Highways Authority of India Vs. MEIL- EDB LLC (JV) wherein the view taken by the Division Bench of this Court in judgment dated 10thMarch, 2011 in W.P.(C) No.8418/2010 titled M/s. Madhucon Projects Ltd Vs. National Highways Authority of India was for consideration. The Division Bench of this Court, in writ jurisdiction, had interfered with the action of the National Highways Authority of India (NHAI) of forfeiture of Bid Security reasoning that such forfeiture by way

16

of damages, by invocation of Bank Guarantee, could not be effected without the NHAI proving the damages. The Supreme Court held:

"We are confronted with a situation when there is a contract between the parties, duly signed by the Respondent which restricts forfeiture of 5% of the value of the Bid Security ostensibly not by way of a penalty. Of course, as is to be expected, the Respondent disagrees and on the contrary submits that the deduction / forfeiture is in terrorem and is punitive in nature. A Writ Court may at least as a temporary or preliminary view decide whether the damages imposed by an Authority amenable to writ jurisdiction such as NHAI indubitably are punitive or not, but it should abjure from going into the minute calculation. That controversy should be left to the Civil Court to decide, i.e. whether the deduction / forfeiture, in the present instance of 5% of the value of the Bid Security is punitive or otherwise. We think that the course that commends itself to us is to relegate the parties to the Civil Courts to determine whether any damages had been suffered by the National Highways Authority of India and if so whether the deduction of 5% was a fair pre-estimate or was punitive in nature. Since the parties have been bona fide prosecuting writ proceedings in the event of the plaintiff seeks enlargement / extension of time for filing of a Suit, the Courts in seisin will keep all the circumstances in view before passing an order."

13. From the aforesaid also it follows that a final decision with respect to the contractual rights of the parties is not permissible in writ jurisdiction.

14. Not only so, the pleas on the basis of which the petitioners claim the relief would require adjudication of i) whether the respondent at the relevant time was enjoying a monopolistic position; in this regard it would also have

17

to be considered what other sources of energy besides RLNG were available to the petitioners for generating power; ii) whether the parties were unequal in bargaining power; iii) whether or not any negotiations took place between the parties; iv) whether any of the terms of the contract are onerous to the petitioners; v) whether the non-requirement now of the petitioners of RLNG is on commercial considerations or otherwise; vi) whether the agreement between the parties is specifically enforceable by the respondent as is contended by the petitioners, and all of which are factual controversies and adjudication whereof can only be by giving an opportunity to the parties to lead evidence and cross-examine the witnesses of each other and for which also a writ petition is not the appropriate remedy.

15. Supreme Court in R.L. Kalathia & Co. Vs. State of Gujarat (2011) 2 SCC 400 has reiterated that if a party which has executed a discharge agreement or discharge voucher alleges that the execution of such discharge agreement or discharge voucher was on account of fraud, coercion or undue influence practiced by the other party and thus the said agreement / voucher is void and cannot be acted upon, raises a disputed question of fact and to establish which an opportunity to lead evidence has to be given and merely

18

on the basis of such agreement / discharge voucher, the claim cannot be summarily dismissed. The same is the position here.

16. No merit is also found in the contention of the senior counsel for the petitioners that the relief as sought in this petition, of certain clauses of the contract entered into by the petitioners with the respondent being void on the ground of being onerous, arbitrary, illegal, unreasonable, unjust and against the public policy, does not lie before the Arbitrator for the reason of the Arbitrator being a creature of the same contract. The said contention is in negation of Section 16(1)(b) of the Arbitration and Conciliation Act, 1996 which provides that the Arbitral Tribunal may rule on any objection with respect to the existence or validity of the arbitration agreement and for that purpose a decision by the Arbitral Tribunal that the contract is null and void shall not entail ipso-jure the invalidity of the arbitration clause.

17. Supreme Court in Reva Electric Car Co. (P) Ltd. Vs. Green Mobil (2012) 2 SCC 93, in exercise of jurisdiction under Section 11(4) and (6) of the Arbitration Act, held that the arbitration clause which forms part of the contract has to be treated as an agreement independent of the other terms of the contract and to ensure that there is no misunderstanding, Section

19

16(1)(b) of the Act further provides that even if the Tribunal concludes that the contract is null and void, it should not result as a matter of law in any automatic invalidation of the arbitration clause. The said principle was recently reiterated in Ashapura Mine-Chem Limited Vs. Gujarat Mineral Development Corporation (2015) 8 SCC 193. I am therefore with respect unable to agree with the observation to the contrary in Japan Travel Services supra.

18. As far as reliance by the petitioners on Life Insurance Corporation of India supra is concerned, all that was held therein was that an unfair and irrational clause in a contract is amenable to judicial review. In the facts of that case, finding that insurance is a social security measure and holding that it should be consistent with constitutional animation and conscience of socio-economic justice enshrined in the Constitution, public law remedy was deemed appropriate. However, in United India Insurance Company Ltd. Vs. Manubhai Dharmasinhbhai Gajera (2008) 10 SCC 404 on which reliance was placed by the Division Bench, it was specifically recorded that in that case existence of jurisdiction of power of judicial review to strike down a clause in the contract was not in question and it was clarified that

20

same would have no application for the purpose of modification, alterations and additions of a term of the contract and that each case must be considered on its own facts. Here, as aforesaid, the real motive behind this petition is to seek restraint against encashment of Bank Guarantee which appears to have been already invoked. I have recently in GAIL (India) Ltd. Vs. Petroleum and Natural Gas Regulatory Board MANU/DE/3603/2015 dealt in detail with the aspect of maintainability of writ petition for interfering with Bank Guarantee and held the same to be not maintainable. Need is not felt to reiterate the reasoning here.

19. There is thus no merit in the petition. Dismissed.

No costs.

RAJIV SAHAI ENDLAW, J.

DECEMBER 15, 2015

bs/gsr

(corrected and released on 12th January, 2016)

21