A.I.A Enterprise And Anr. v. Guwahati Metropolitan Development Authority And Ors.

Gauhati High Court
Jan 28, 2004
Smart Summary (Beta)

Concise Analytical Summary of the Opinion

Factual and Procedural Background

This writ petition challenges an order dated 7 October 2003 issued by the Chief Executive Officer of the Guwahati Metropolitan Development Authority (G.M.D.A.) terminating an agreement executed on 8 October 2002 with the petitioner No. 1 for improvement and operation of G.M.D.A.'s Truck Parking Yard at Gotanagar on a Build‑Operate‑Transfer (B.O.T.) basis.

Relevant factual chronology included in the opinion:

  • A notice inviting tenders (N.I.T.) was issued for improvement of the Parking Yard on B.O.T. terms. The successful bidder would construct the yard, operate it for a fixed period, pay agreed annual revenue to the authority from collected revenues and hand over the yard on expiry.
  • The petitioner submitted the successful bid (contemplating investment of Rs. 1,07,06,125 and offering annual revenue of Rs. 43.50 lakh), an agreement was executed on 8.10.2002, construction was undertaken and the yard was inaugurated on 9.4.2003. The period of operation was five years and parking fees were fixed at Rs. 50 for eight hours.
  • The authority served a show cause notice dated 25.8.2003 alleging extortion by the petitioner’s employees, referring to police reports/F.I.R., and invoked contravention of contractual additional clauses 5 and 9. The petitioner sought copies of police correspondence (not provided by the authority), obtained the F.I.R., and replied to the show cause on 12.9.2003.
  • On 7.10.2003 the authority issued an order cancelling the contract and directed taking possession of the Parking Yard; possession was taken on the materials on record.
  • The writ petition challenges the cancellation on grounds of violation of natural justice and alleged confiscation contrary to Article 300A; respondents contended non‑maintainability of the writ petition because the contract is determinable and the petitioner’s remedy is in damages.

Legal Issues Presented

  1. Whether the impugned termination order dated 7.10.2003 is vitiated for non‑compliance with the principles of natural justice (in particular because police reports/letters relied upon were not furnished and certain allegations were not put to the petitioner).
  2. Whether the writ petition is maintainable in view of the respondents' contention that the contract is determinable in nature and, accordingly, relief under Article 226 is inappropriate in light of Section 14(1)(c) of the Specific Relief Act, 1963.
  3. Whether actions taken in execution/termination of a contract involving a State authority are amenable to writ scrutiny under Article 226 (and Article 14), or must be confined to contractual remedies (civil action for damages).
  4. Whether the impugned cancellation was a quasi‑judicial act requiring prior notice, and if so, whether the notice/opportunity actually afforded was adequate.
  5. Whether the termination and subsequent takeover without reimbursement amounted to illegal confiscation of property within the meaning of Article 300A of the Constitution (as pleaded by the petitioner).

Arguments of the Parties

Petitioner's Arguments (as advanced by Mr. N. Dutta)

  • The show cause notice and subsequent cancellation rested on police reports/letters (including Officer‑in‑Charge Jalukbari Police Station report dated 7.8.2003 and the Superintendent of Police letters dated 8.8.2003 and 15.9.2003) which were not furnished to the petitioner; refusal to provide the Superintendent's letter hampered the petitioner's ability to reply effectively.
  • The cancellation order relied on materials (including names and particulars) contained in the examining police officer's report; those detailed materials were not put to the petitioner.
  • The contract is terminable only upon occurrence of specified contingencies and is not terminable at the volition of the parties; therefore it is not a “determinable” contract within the meaning of Section 14(1)(c) of the Specific Relief Act, 1963 — so the writ remedy must be available (relying on the ratio of Amritsar Gas Service as interpreted by petitioner).
  • The agreement was entered into under statutory powers (Section 36 of the G.M.D.A. Act, 1985), and therefore actions by the statutory authority must comply with the principles of natural justice; non‑compliance vitiates the cancellation.
  • The petitioner invested substantial funds (Rs. 1,07,06,125 as alleged) and takeover without reimbursement effectively confiscates the petitioner’s property rights (Article 300A challenge raised).

Respondents' Arguments (as advanced by Mr. K. N. Chaudhury)

  • A preliminary objection of non‑maintainability: the contract was terminable on contingencies and, in the respondents' analysis, determinable in nature so the petitioner’s remedy lies in a civil action for damages rather than writ relief; reliance placed on Section 14(1)(c) of the Specific Relief Act and precedent (Indian Oil Corp. v. Amritsar Gas Service and Star India Ltd. v. Arup Bora).
  • Under Article 226 the courts should not ordinarily scrutinise actions taken in execution of a contract merely because one contracting party is the State; contracting parties should be left to contractual remedies (reliance on Radhakrishna Agarwal and Mahavir Auto Stores decisions).
  • The precedent in Shrilekha Vidyarthi was distinguished: writ scrutiny under Article 14 is available when a public element exists; therefore scope for writ intervention is narrower in pure contractual terminations (reliance also on Assistant Commissioner v. Issac Peter).
  • Clauses 5 and 9 did not require prior notice to cancel, and cancellation of the agreement is not necessarily a quasi‑judicial act requiring prior notice in all situations; in any event the petitioner was given a show cause notice and submitted a reply.
  • The respondents denied the investment figure pleaded by the petitioner and maintained that there were sufficient materials to justify cancellation of the agreement.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Indian Oil Corporation Ltd. v. Amritsar Gas Service, (1991) 1 SCC 533 Illustrates the distinction between clauses terminating a contract on contingencies and clauses permitting termination at will (termination by notice). The ratio was used to explain the statutory bar in Section 14 of the Specific Relief Act. The court relied on the Amritsar Gas ratio to hold that where a contract is terminable only on specified contingencies and has no clause for termination at the volition of the parties, it is not a "determinable" contract within the meaning of Section 14(1)(e) (as applied here to reject the respondents' preliminary objection).
Star India Ltd. v. Arup Bora, (2003) 1 GLR 619 (Assam High Court) Applied the rationale of the Specific Relief Act's statutory bar (Section 14) in the context of contracts terminable either on contingencies or by notice. The court used the reasoning in Star India to support the interpretation of Section 14 and to distinguish the present contract (which lacks a termination‑at‑will clause) from contracts that are determinable by notice.
M/s Radha Krishna Agarwal v. State of Bihar, (1977) 3 SCC 457 Authority cited for the proposition that writ scrutiny of contractual execution by the State may be limited; but the case also contains an exception for contracts entered into by the State in exercise of statutory powers. The court noted that Radhakrishna Agarwal does not lay down a blanket exclusion of Article 14 scrutiny and that an exception exists when the State acts under statutory powers — a point relied upon by the petitioner.
Mahavir Auto Stores v. Indian Oil Corporation, (1990) 3 SCC 752 Holds that even long subsisting commercial relationships/civil contracts may require adequate opportunity/notice before termination. The court cited Mahavir Auto to support the proposition that termination of supply/contractual relationships may require notice/opportunity, thereby undermining the respondent’s contention that no notice was needed in the present circumstances.
Shrilekha Vidyarthi v. State of U.P., (1991) 1 SCC 212 Establishes that the doctrine of fairness and reasonableness inherent in Article 14 can attract judicial review even where there is no obvious public element; appointments and their concomitants can attract Article 14. The court relied on Shrilekha to assert that Article 14/Article 226 scrutiny may apply to state actions in contractual contexts and that mere contractual form does not exclude scrutiny for arbitrariness or unreasonableness.
Assistant/Asst. Excise Commissioner v. Issac Peter, (1994) 4 SCC 104 Clarifies that Shrilekha does not compel the State to perform acts not contemplated in the agreement; used by respondents to argue for a narrower reading of Shrilekha. The court considered Issac Peter but rejected the respondents' narrow understanding of Shrilekha: Issac Peter does not preclude Article 14 review where appropriate facts and statutory context apply.
Jarban Das v. Assam Fisheries Development Corporation, (1999) 1 GLR 1 (Assam High Court) Used in argument to suggest cancellation may not be quasi‑judicial; in the reported decision the court assumed natural justice applied and treated the notice as adequate. The court observed Jarban did not decide the broader question whether cancellation is inherently non‑quasi‑judicial and therefore Jarban cannot be read to support a general rule contrary to natural justice requirements.
State of Gujarat v. M.P. Shah Charitable Trust, (1994) 3 SCC 552 Holds that termination of a long‑standing privilege (favour) conferred on a private body did not require quasi‑judicial procedure or prior notice in the particular context of that case. The court distinguished the Shah Trust case as context‑specific (a termination of a long‑standing privilege) and held it inapplicable to the present facts where a statutory contract was terminated and natural justice obligations arise.
D.F.O., South Kheri v. ... (1971) 3 SCC 864 Referenced on the point that contracts entered by the State in exercise of statutory powers attract certain public law obligations. The court relied on the principle in D.F.O., South Kheri to support the conclusion that this contract was entered under Section 36 of the G.M.D.A. Act and therefore statutory obligations (including natural justice) are engaged.
J.P. Unnikrishnan v. State of Andhra Pradesh, (1993) 1 SCC 645 Referred to in the context of the Shah Trust privilege and its negation; evidences the contextual nature of decisions about privileges. The court noted the Shah Trust decision had continued a privilege despite earlier negation by J.P. Unnikrishnan, underscoring the context‑sensitivity of precedents relied upon by respondents.

Court's Reasoning and Analysis

The court's reasoning proceeded in a structured manner addressing maintainability, the applicability of writ scrutiny, the question whether cancellation required prior notice, and finally the adequacy of the notice/opportunity actually afforded.

  1. Maintainability under Section 14 of the Specific Relief Act:

    The respondents argued the petition was not maintainable because the contract was determinable and remedies should be confined to civil damages.

    The court reviewed the authority in Indian Oil Corporation v. Amritsar Gas Service which distinguished clauses terminating on contingencies from clauses permitting termination by notice. The court found the present contract was terminable only on specified contingencies and contained no clause allowing termination at the volition of either party. Applying the Amritsar Gas rationale (and Star India), the court concluded the contract was not determinable in the statutory sense relied upon by respondents; accordingly the maintainability objection failed.

  2. Applicability of Article 14 / Writ Scrutiny in contractual dealings with the State:

    Respondents sought to limit writ review in contract execution contexts.

    The court analysed the jurisprudential debate (Radhakrishna Agarwal, Mahavir Auto, Shrilekha, Issac Peter). It rejected the respondents' submission that once a contract is entered into the relationship is purely private law and beyond Article 14 scrutiny. The court emphasised that when the State acts under statutory powers (here, Section 36 of the G.M.D.A. Act, 1985), public law obligations (including Article 14/ fair procedure) can apply. It relied on Shrilekha to show Article 14 can apply even without an obvious public element and rejected a narrow reading of Issac Peter that would displace this application.

  3. Whether cancellation is a quasi‑judicial act and the adequacy of notice:

    Respondents argued clauses 5 and 9 did not require prior notice; cancellation is not necessarily quasi‑judicial.

    The court found that the authorities relied upon by respondents (including Jarban and Shah Trust) do not establish a universal rule exempting cancellations from natural justice obligations; Jarban in fact assumed natural justice applied. Shah Trust was context‑specific and therefore not on point. The court held that whether notice/opportunity is required and what constitutes adequacy depends on facts; no fixed formula exists — the core requirement is that the person proceeded against must have a reasonable opportunity to answer the allegations.

  4. Application of facts (the core finding):

    Factual materials produced in original were examined by the court.

    The court examined the records: the investigating officer's report dated 7.8.2003 contained specific details (names, relationships to petitioner) which were omitted in the Superintendent of Police's letter dated 8.8.2003. The recommending note‑sheet and cancellation order relied on the Officer‑in‑Charge's report and on Superintendent's letters dated 8.8.2003 and 15.9.2003. None of these detailed materials (Officer‑in‑Charge's report or the Superintendent's letters) were furnished to the petitioner. The court concluded the petitioner was not afforded a full, complete and adequate opportunity to meet all the allegations, in particular the second Superintendent's report dated 15.9.2003 which was referred to in the cancellation order but not put to the petitioner prior to cancellation.

    On this basis the court held the cancellation order was vitiated by breach of natural justice and therefore legally infirm.

  5. Relief fashioned:

    The court set aside/interfered with the impugned order of cancellation and remitted the matter to Respondent No. 1 for re‑determination after giving the petitioner an opportunity to be heard in conformity with the directions. The court ordered that the re‑determination be completed within 30 days of receipt of a certified copy of the order. Having regard to the limited time and the allegations against the petitioner, the court directed that the petitioner need not be restored to possession of the Parking Yard until the re‑determination is complete.

Holding and Implications

Primary Holding: The Writ Petition was allowed in part. The impugned cancellation order dated 7.10.2003 was held to be vitiated for breach of the principles of natural justice and the matter was remitted to the Respondent No. 1 for fresh consideration after affording the petitioner a full opportunity to be heard.

Direct consequences and directions:

  • The cancellation order dated 7.10.2003 is interfered with and the matter is remitted for re‑determination by Respondent No. 1.
  • The re‑determination must be completed expeditiously and, in any case, within 30 days from receipt of a certified copy of the court's order.
  • Pending that re‑determination, the petitioner is not to be restored to possession of the Parking Yard (possession remains with the authority during the interim period).

Broader legal implications:

  • The court rejected a categorical bar to writ scrutiny simply because a contract exists between a State authority and a private party, particularly where the authority acted under statutory powers (Section 36, G.M.D.A. Act, 1985). Article 14 and principles of natural justice may apply in such contexts.
  • The judgment emphasises fact‑sensitive assessment of whether cancellation engages quasi‑judicial obligations and whether the opportunity afforded was adequate — there is no one‑size‑fits‑all formula for notice under such circumstances.
  • The opinion does not purport to lay down a novel general precedent displacing existing law; it applies established authorities to the facts and directs remedial process consistent with natural justice. The decision's effect is directed at the parties and the particular contract; no sweeping new rule was proclaimed beyond the legal reasoning applied.

If any specific sub‑issue or citation within this opinion needs further extraction (for example: verbatim passages relied upon from Shrilekha), please indicate which portion you wish to see reproduced from the provided opinion and a precise extract will be summarised.

Show all summary ...

1. An order dated 7.10.2003 passed by the Chief Executive Officer, Guwahati Metropolitan Development Authority (hereinafter referred to as the “G.M.D.A”) terminating an agreement dated 8.10.2002 executed in favour of the writ petitioner No. 1 for improvement of G.M.D.A's Truck Parking Yard at Gotanagar on build, operate and transfer basic (B.O.T) has been put to challenge in the present writ petition. The facts, in brief, may be noted at the outset:—

2. A notice inviting tenders was published by the respondent No. 2 inviting bids for the work of improvement of G.M.D.A's Truck Parking Yard at Gotanagor on B.O.T basis. As per the N.I.T, the successful bidder was required to complete the Parking Yard with its own resources as per the specifications given by the respondent authority. After completion of the work, the successful bidder was to be allowed to operate the Parking Yard for a fixed period and during the period of such operation, the successful bidder was required to pay an agreed amount to the authority out of the revenue collected by him. On the completion of expiry of the period of operation, the Parking Yard was required to be handed over by the contractor to the respondent authority.

3. The petitioner No. 1 submitted its tender pursuant to the N.I.T dated 22.4.2002 contemplating an investment of Rs. 1,07,06,125 as the total costs involved in the project. Payment of annual revenue to the tune of Rs. 43.50 lakh was offered by the petitioner No. 1. There were several other tenderers, who had submitted their respective bids. The authority, on consideration of the tenders received, accepted the tender of the petitioner and pursuant thereto an agreement dated 8.10.2002 was executed by and between the petitioner No. 1 and the Respondent No. 1. According to the petitioner, the construction works on the Parking Yard commenced and the investment as per commitments made in the tender, were made by the petitioner No. 1 and the works were duly completed. According to the petitioner, the Parking Yard was inaugurated on 9.4.2003 In terms of the agreement executed by and between the parties, the petitioner No. 1 was to operate the Parking Yard for a period of 5 years on payment of annual revenue of Rs. 43.50 lakh. The petitioner was allowed to collect parking fee from the trucks, which under the agreement was fixed at Rs. 50.00 for 8 (eight) hours. Under the specific clauses of the agreement, particularly additional clauses 5 and 9, realisation of parking fees, over and above the rates stipulated, was contemplated to be a serious violation of the terms of the agreement entailing cancellation of the contract.

4. According to the petitioner, a show cause notice dated 25.8.2003 was served on the petitioner alleging that a report has been received from the Superintendent of Police (City), Kamrup, Guwahati, to the effect that the petitioner No. 1 was indulging in extortion of money from trucks inspite of repeated warnings and that some employees of the petitioner No. 1, who were involved in such illegal activities, had been arrested by police. On the aforesaid basis, contravention of Clauses 5 and 9 of the Additional Conditions of the Contract was alleged and the petitioner No. 1 was asked to show cause as to why the agreement should not be terminated. On receipt of the aforesaid show cause notice, the petitioner No. 1, by its letter dated 28.8.2003, requested the Respondent authority for a copy of the Superintendent of Police's letter referred to in the show cause notice dated 25.8.2003 so as to enable it to file an effective reply against the show cause notice in question. By a letter dated 8.9.2003, the respondent No. 1 informed the petitioner that the letter of the Superintendent of Police sought for, cannot be furnished to the petitioner and that has reply should be submitted on or before 12.9.2003 The writ petitioner, in the aforesaid circumstances, obtained a copy of the F.I.R dated 4.8.2003, reference to which had been made in the show cause notice dated 25.8.2003 and thereafter on 12.9.2003 filed its reply to the show cause notice in question. Thereafter the impugned order dated 7.10.2003 was issued cancelling the contract agreement and ordering for taking over the possession of the Parking Yard from the petitioner No. 1, which direction, on the materials on record, appear to have been duly effected.

5. The challenge against the order dated 7.10.2003, has been pleaded by the writ petitioner to be illegal and void for non-compliance with the principles of natural justice. According to the writ petitioner, a full opportunity to show cause was not afforded, inasmuch as, the letter of the Superintendent of Police, which was the basis of the show cause notice issued, was not made available to the writ petitioner. Additionally, it has been pleaded that the petitioner having made investments in the Parking Yard to the extent of Rs. 1,07,06,125.00, the take over affected on the basis of the order dated 7.10.2003, without reimbursing the petitioner any amount whatsoever, amounts to illegal confiscation of the property belonging to the petitioner, thereby infringing the rights of the petitioner under Article 300A of the Constitution of India.

6. An affidavit has been filed on behalf of the Respondents wherein a preliminary objection to the maintainability of the writ petition has been raised on the ground that the contract between the parties being determinable in nature, the remedy of the writ petitioner, if any, is to sue for damages. In the affidavit filed, the investment of Rs. 1,07,06,125.00, alleged to have been made by the writ petitioner, has been denied. It has been further stated in the affidavit filed on behalf of the Respondents that under the contract agreement between the parties, no notice prior to cancellation by invoking Additional Clauses 5 and 9 is contemplated; yet the petitioner was given an opportunity and there being sufficient materials to satisfy the authority that the actions of the writ petitioner No. 1 had contravened Clauses 5 and 9 of the Additional Conditions of Contract, the impugned cancellation order dated 7.10.2003 would not suffer from any legal infirmity, as alleged.

7. Elaborate arguments have been advanced on behalf of both the parties by the learned counsels representing them.

8. Mr. N. Dutta, learned senior counsel appearing for the writ petitioner has contended that the affidavit filed by the Respondents would go to show that in respect of the incident in question, after the F.I.R was filed on 4.8.2003, the allegations made were enquired into by the Ofiicer-in-Charge of the Jalukbari Police Station, who submitted a report dated 7.8.2.2003 to the Superintendent of Police (City), Guwahati. It is on the aforesaid basis that the Superintendent of Police (City), Guwahati had written the letter dated 8.8.2003 to the Respondent No. 1, whereafter the impugned show cause notice dated 25.8.2003 was issued. Neither the report of the Officer-in-Charge, Jalukbari Police Station dated 7.8.2003, nor the letter of the Superintendent of Police (City), Guwahad dated 8.8.2003 was furnished to the writ petitioner along with the show cause notice. In fact the letter dated 8.8.2003 of the Superintendent of Police (City), Guwahati though specifically asked for, was refused to the writ petitioner. That apart, according to the learned counsel for the petitioners, the impugned cancellation made by order dated 7.10.2003 has been resorted to on the basis of another complaint/report of the Superintendent of Police (City) dated 15.9.2003 containing similar allegations of extortion. However, no copy of the aforesaid report and no opportunity to show cause in respect of the aforesaid allegation was afforded to the writ petitioner prior to the impugned order dated 7.10.2003 Learned counsel, therefore, submits that the impugned order was passed in fragrant violation of the principles of natural justice and consequently on the aforesaid question alone, this writ petition should be allowed and the matter be sent back to for a de novo consideration by the Respondent No. 1, after giving the petitioner a full opportunity to show cause.

9. The arguments advanced on behalf of the petitioner have met with stiff resistance from the learned counsel appealing on behalf of the Respondents.

10. Mr. K.N Chaudhury, learned senior counsel for the Respondents, has argued that the contract being terminable on the happening of certain contingencies must be understood to be determinable in nature and, therefore, under section 14(1)(C) of the Specific Relief Act, 1963, this Court ought not to pass any orders, which will have the effect of restoration of the contract in question. A decision of the Apex Court in the case of Indian Oil Corporation Ltd. v. Amritsar Gas Service, reported in (1991) 1 SCC 533 as well as a decision of this Court in the case of Star India Ltd. v. Arup Bora, reported in (2003) 1 GLR 619 has been relied upon by the learned counsel for the respondents in support of the above stated proposition. Learned counsel for the respondents has further argued that under Article 226 of the Constitution, there can be no scrutiny of actions taken in the execution of the contract merely because one of the contracting parties is the State. The parties in such a situation must be left to the remedy of a civil action wherein the grievances may be expressed. Two decision of the Apex Court reported in (1977) 3 SCC 457 (M/S Radha Krishna Agarwal v. State of Bihar) and (1990) 3 SCC 752 (Mahavir Auto Stores v. Indian Oil Corporation) have been relied upon in this regard. The judgment of the Apex Court, in the case of Shrilekha Vidyarthi v. State of U.P, reported in (1991) 1 SCC 212 : AIR 1991 SCC page 537 has been sought to be explained by the learned counsel for the respondents by contending that the writ scrutiny of matters in execution of the contract would be available, as held by the Apex Court in Shrilekha (supra), only if the contract discloses a public element. In support of the aforesaid argument, reliance has been placed on another decision of the Apex Court in the case of Assistant Exercise Commissioner v. Issac Peter, reported in (1994) 4 SCC 104. Mr. Chaudhury, learned senior counsel appearing for the Respondents, has further submitted that though notice prior to cancellation as per Clauses 5 and 9 of the Additional Conditions of Contract was not required, in the instant case, notice was given to the writ petitioner, who submitted its reply to the same. The question of adequacy of notice, according to the learned counsel, would hardly be a relevant question, inasmuch as, cancellation of an agreement is not quasi judicial act requiring any prior notice. Reliance in this regard has been placed on a judgment of this Court in the case of Jarban v. Assam Fisheries Development Corporation Limited, reported in (1999) 1 GLR page 1 as well as an Apex Court judgment in the case of State of Gujrat v. M.R Shah Charitable Trust, reported in (1994) 3 SCC 552.

11. The arguments of the learned counsel for the respondents with regard to the maintainability of the writ petition has been sought to be answered by Mr. N. Dutta, learned counsel for the writ petitioner in his reply argument, by asserting that only contracts which are terminable at the volition of the parties, would be contracts detenninable in nature within the meaning of Section 14(1)(c) of the Specific Report Act. This, learned counsel has argued, is the true ratio of the law laid down by the Apex Court in the case of Amritsar Gas Service (supra). The instant contract is terminable only on the happening of certain contingencies and not on the volition of the parties. That apart, learned counsel for the petitioner in his reply argument, has contended that the instant contract having been entered into by the G.M.D.A in exercise of its statutory powers under Section 36 of the G.M.D.A Act, 1985, the requirement of compliance with the principles of natural justice in every action of the statutory authority would be mandatory.

12. The rival submissions advanced on behalf of the parties have been duly considered. In Amritsar Gas (supra), there were two clauses in the agreement which visualised cessation thereof. Under Clause 27, the contract was terminable on the happening of certain contingencies whereas under Clause 28, the contract was terminable at the volition of either party by giving 30 days notice. The Indian Oil Corporation had terminated the contract with Amritsar Gas Service by invoking Clause 27. The Arbitrator to whom, a reference of the dispute was made, held Clause 27 to be not applicable as the occurrence of the contingencies for application of Clause 27, was held by the learned Arbitrator to have been wrongly decided by the Indian Oil Corporation. On that basis, restoration of the contract was ordered by the Arbitrator. A careful perusal of the judgment of the Apex Court in the above case, reveals that the Apex Court held that restoration of the contract could not have been ordered as Clause 28 provided for termination of the contract between the parties merely by giving of 30 days notice by either party. It is, by relying on the aforesaid law laid down by the Apex Court, that the rationale behind the statutory bar imposed by Section 14 of the Specific Relief Act was sought to be understood by this Court in Star India v. Arup Bora (supra). In the said case also, the contract was terminable on the happening of certain contingencies or by giving of requisite notice by either side without any such contingency occurring.

13. In the present case, the contract between the parties was made terminable only on the happening of certain events, in the absence of which, the contract was to run for its full duration of 5 years. On the ratio of the law laid down by the Apex Court in the case of Amtirsar Gas Service (supra), such a contract would not be determinable in nature within the meaning of the said expression as appealing in Section 14(1)(e) of the Specific Relief Act, unless there is a provision in the contract agreement for its termination at the volition of the parties, which is conspicuously lacking. The preliminary objection with regard to the maintainability of the writ petition, therefore, cannot find favour with this Court.

14. Consistent with the multifarious role that a modern day State has to perform, there is ever increasing foray by the State into non-conventional areas that were hitherto outside State activities. Gone are the days when the State was concerned only with the exercise of “sovereign functions”. The modern State is a dynamic businessman engaged in several spheres of commercial activities. Is the State to be understood to have shed its character as a “State” while being engaged in commercial activity with its citizens so as to make it free from the constitutional obligations under Part-III of the Constitution ? Is the State, in the sphere of such activities to be governed by the private law governing contractual relations between two individuals ? Such questions have frequently confronted the Courts. The answer is far more complex than what has been contended by Shri K.N Chaudhury, learned senior counsel for the Respondents, who would like this Court to hold that while the constitutional mandate under Article 14 would apply only at the threshold, i.e, at the time of grant of the contract, once the contract is entered into, the relationship of the parties is to be governed only by the law of contract. Neither the decision in Radhakrishna Agarwal (supra) nor in Mahavir Auto (supra) are authorities laying down any such general proposition. In Radhakrishna Agarwal (supra), a clear exception was carved out in respect of a contract entered into by the state in exercise of its statutory powers. Reference in this regard has been made to an earlier decision of the Apex Court in the case of D.F.O, South Kheri v. …… reported in (1971) 3 SCC 864, a case which has also been relied upon by the learned counsel for the petitioner by contending that the instant contract is in exercise of powers under Section 36 of the G.M.D.A Act, 1985, a contention, which this Court finds to be correct. In Mahavir Auto's case, even a long subsisting relationship, resembling a contract for supply of lubricants, which was sought to be terminated by cessation of supply, was held to be required to be made after giving an adequate opportunity/notice. In Shrilekha's case (supra), it has been held by the Apex Court that a contract, even sans the public element, is amenable to scrutiny on the anvil of Article 14. It would be appropriate to quote herein the following passage from the judgment of the Apex Court in Shrilekha's case as contained in paragraphs 18 and 19 of the judgment:

“18. The scope of judicial review permissible in the present case, does not require any elaborate consideration since even the minimum permitted scope of judicial review on the ground of arbitrariness or unreasonableness or irrationality, once Art. 14 is attracted, is sufficient to invalidate the impugned circular as indicated later. We need not, therefore, deal at length with the scope of judicial review permissible in such cases since several nuances of that ticklish question do not arise for consideration in the present case.

19. Even otherwise and sans the public element so obvious in these appointments, the appointment and its concomitants viewed as purely contractual matters after the appointment is made, also attract Art. 14 and exclude arbitrariness permitting judicial review of the impugned State action. This aspect is dealt with hereafter.”

15. The arguments advanced on behalf of the respondents that Issac Peter's case (supra) strikes a different note and clarifies the law laid down in Shrilekha's case by holding that the scrutiny of the Writ Court on the basis of Article 14, to actions in execution of a contract, would only be available when the contract discloses a public element, proceeds on a somewhat unacceptable understanding of the decision in Issac Peter's case. What was really held in Issac Peter's case is that the decision in Srilekha's case is not an authority for the proposition that the doctrine of fairness and reasonableness inherent in Article 14, could be invoked to require the State to perform an act, which was not contemplated in the agreement between the parties.

16. For the aforesaid reasons, the argument advanced that the present attempt to invoke the writ scrutiny in respect of the actions leading to termination of the contract must fail at the threshold as no such scrutiny is permissible, must be rejected.

17. Coming to next point urged, what must be noticed is that though the respondents had afforded to the writ petitioner an opportunity to show cause, yet it is now contended that no such opportunity was required as the act of cancellation made by the order dated 7.10.2003 is not a quasi judicial act. Even assuming that the aforesaid contention would be open for argument by the respondents, what this Court notices is that the authorities relied upon in support of the aforesaid argument cannot be understood to be laying down any such law of general application. While in the case of Jarban Das v. Assam Fisheries Development Corporation (1991) 1 GLR page 1, this Court did not decide the said question and proceeded, by assuming that the principles of natural justice were applicable to hold the notice afforded to be adequate and sufficient, the facts of the case of State Gujrat v. M.P Shah Charitable Trust ((1994) 3 SCC 552) must be noticed. In M.P Shall Cheritable Trust, the Trust was granted the absolute discretion to fill up 12 seats in a Medical College established in the year 1954 on a payment of Rs. 15,00.000.00 made by one M.P Shah, the predecessor of the Trust. The said privilege continued in favour of the Trust uninterruptedly since the year 1954 and continued to remain in force notwithstanding the negation of any such right by the Apex Court in the case of J.P Unikrishnan v. State of Andhra Pradesh (1993) 1 SCC 645. The privilege was brought to an end and it is in that context that the Apex Court held that such a cancellation would not involve a quasi judicial act requiring prior notice. The law laid down by the Apex Court must be understood in that context and can hardly have any application to the facts of the present case where a statutory contract has been sought to be terminated by a statutory authority by contending that certain contingencies, as contemplated, had occurred.

18. This would bring us to the last limb of the case, i.e, whether the notice/opportunity afforded to the writ petitioner was adequate. The requirement of notice/opportunity being a principle of natural justice, cannot be entrapped in any strait jacket formula. Much would depend on the facts of a case and it is by having regard to all relevant facts that the question of adequacy/sufficiency of the notice must be decided keeping in mind the cardinal principle involved, i.e, that the person proceeded against must have all reasonable opportunity to answer the allegations levelled.

19. In the instant case, a perusal of the records produced in original by the learned counsel for the respondents would go to show that after the F.I.R dated 4.8.2003 was filed, the Officer-in-Charge of the Jalukbari Police Station had himself made an enquiry in respect of the incident and had submitted a detailed report to the Superintendent of Police (City) on 7.8.2003 The said report, which is available in the record, would go to show that there are specific details revealed by the enquiry, including the names of the persons responsible for the acts alleged and their relationship with the petitioner No. 1. The report of the Superintendent of Police (City) dated 8.8.2003 though based on the said report of the Officer-in-Charge of Jalukbari Police Station, omits the details available in the report of the Officer-in-Charge of Jalukbari Police Station. The order passed in the note-sheet recommending cancellation, places reliance on the report of the Officer-in-Charge as well as the letter of the Superintendent of Police (City) dated 7.8.2003 and 8.8.2003 respectively. Yet the petitioner was not given a copy of either the report or the letter in question. The order recommending cancellation as available in the note-sheet, which was approved by the Chairman of the G.M.D.A, would further go to show that the cancellation was recommended relying on a second report of the Superintendent of Police (City) dated 15.9.2003 containing similar allegations of extortion against the petitioner No. 1. The aforesaid second report of the Superintendent of Police (City) dated 15.9.2003 finds mention in the order of cancellation dated 7.10.2003 Yet the allegations contained in the aforesaid second report of the Superintendent of Police (City) dated 15.9.2003 were not even pointed out to the writ petitioner. The materials available with the respondents, in their view, may be adequate to sustain a satisfaction that the contract ought to be cancelled, but such satisfaction cannot be unilaterally reached without affording the writ petitioner an opportunity of controverting the same or to put forward its version of the matter. The facts narrated above, as evident from the record in original, leaves the Court with an indelible impression that the writ petitioner was not afforded a full, complete and adequate opportunity to meet the allegations leveled. Having reached the aforesaid conclusion, this court must hold that the impugned order dated 7.10.2003 would stand vitiated in law for breach of the principles of natural justice. The said order is, therefore, being interfered with and the matter is left open to be re-decided by the Respondent No. 1 after giving the writ petitioner an opportunity in conformity with the directions contained herein. Such re-determination will be completed at the earliest and in any case within a period of 30 days from the date of receipt of a certified copy of this order. In view of the limited duration of time fixed by this Court within which the exercise will now have to be completed and having regard to the allegations leveled against the petitioner from which the petitioner is yet to be absolved, I am of the considered view that until the matter is finalised as directed, the writ petitioner need not be put back into possession of the Parking Yard in question.

20. The Writ Petition shall accordingly stand allowed to the extent as indicated above.