Tamil Nadu Electrici... v. Chakkaravarthy

Madras High Court
Jan 20, 2005
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

The plaintiff is an agriculturist in Kiliruppu Village, Panruti Taluk, who held an electricity service connection (S.C. No.102) from the Tamil Nadu Electricity Board (TNEB) and had been paying charges regularly. A complaint was lodged by the Assistant Engineer, Rural South, TNEB, resulting in registration of a criminal case (Crl.No.236 of 1989) for alleged theft of electric energy by illegal tapping. The second defendant issued a show-cause notice dated 26.6.1989 alleging illegal extraction of energy and use of a 7.5 H.P. motor. The first defendant subsequently issued an assessment notice dated 21.8.1989 demanding payment of Rs.66,166 as extra levy for stolen energy on or before 5.9.1989.

The plaintiff denied the allegations, challenged the notices as arbitrary and violative of natural justice, and filed a civil suit seeking declaration that the letters dated 26.6.1989 and 21.8.1989 were null and void. The trial Court (District Munsif, Panruti) dismissed the suit. The lower appellate Court (Additional Subordinate Judge, Cuddalore) reversed that decision and allowed the plaintiff's appeal. Aggrieved, the defendants filed this second appeal challenging the appellate court's judgment and seeking a determination of whether the civil suit was maintainable in the face of statutory remedies under electricity law.

Legal Issues Presented

  1. Whether the suit filed by the consumer/respondent in the context of the provisional assessment of the consumption charge is maintainable in law, and whether the conditions of supply agreed are binding on the parties.
  2. Whether the lower appellate Court was correct in holding that the plaintiff is entitled to a decree on the ground that he was not found guilty in the criminal proceedings initiated by the appellant.
  3. Whether, in the context of alleged theft of energy from the service connection, the appellant (Electricity Board) is not entitled to initiate recovery of proper consumption charges and penalty under the contract and the rules of the Indian Electricity Act.

Arguments of the Parties

Appellants' Arguments (Defendants / TNEB)

  • There is a specific statutory and contractual machinery under the electricity laws (including appellate remedies) for challenging provisional assessments; the plaintiff bypassed those remedies and therefore the civil suit is not maintainable.
  • The plaintiff should have availed the departmental appellate remedy (appeal to the Superintending Engineer, Cuddalore Electricity Distribution Circle) rather than approach the Civil Court.
  • The assessment and calculations made by the Board are correct as per TNEB rules and regulations; there is no requirement to give prior notice of a surprise inspection under the Act.
  • The appellants relied on binding precedents (including Punjab State Electricity Board v. Ashwani Kumar and other decisions) to argue that civil courts are impliedly barred from entertaining suits where a complete alternate statutory machinery exists.

Respondent's Arguments (Plaintiff)

  • The show-cause notice dated 26.6.1989 and the assessment letter dated 21.8.1989 were issued arbitrarily and in violation of the principles of natural justice.
  • The plaintiff denied committing theft of energy and sought civil relief declaring the notices null and void.
  • The respondent relied on certain Supreme Court decisions (e.g., Municipal Corporation of Delhi v. Ajanta Iron and Steel Co. and Firm Seth Radha Kishan v. Administrator Municipal Committee, Ludhiana) to support the contention that the Civil Court can entertain the suit, though the High Court observed these decisions were not applicable to the facts at hand.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Punjab State Electricity Board v. Ashwani Kumar, (1997) 5 S.C.C. 120 The Civil Court is not justified in entertaining suits challenging assessments by an Electricity Board where remedies are provided under the Indian Electricity Act and related regulations; parties should be directed to avail of statutory remedies. The High Court relied on this Supreme Court decision to support the proposition that the suit is not maintainable and that the plaintiff should avail the departmental appellate remedy instead of approaching the Civil Court.
The Superintending Engineer, Coimbatore & others v. S.N. Srinivasan, (2002) 2 L.W. 544 When terms and conditions of supply and an alternate statutory machinery (including appellate provisions) exist, the jurisdiction of the Civil Court is impliedly barred; the supply conditions form a code that prescribes remedies and procedures. The Court invoked this authority to reiterate that a special enactment creating rights/liabilities and providing alternate remedies implies exclusion of Civil Court jurisdiction, supporting the conclusion that the suit was not maintainable.
Dhulahbai v. State of Madhya Pradesh, (1968) 2 S.T.C. 416 When a special statutory scheme provides an alternative machinery, Civil Court jurisdiction may be impliedly barred (principle cited to show implied exclusion of civil jurisdiction). Used as an established principle (as discussed in S.N. Srinivasan) to support that existence of a comprehensive alternate remedy implies barring of Civil Court jurisdiction.
Mafatlal Industries Ltd. v. Union of India, (1998) 3 S.T.C. 467 Reaffirmation that when a special enactment provides alternate remedies, the Civil Court's jurisdiction can be impliedly barred (authority cited for legal principle). Cited (via S.N. Srinivasan) to reinforce the settled legal position that statutory schemes with complete machineries exclude civil jurisdiction by necessary implication.
The Tamilnadu Electricity Board v. Shanmuga Engineering College & Shanmuga Polytechnic, (1999) 3 M.L.J. 566 The Civil Court has no jurisdiction to entertain a suit for declaration that an order of assessment by the Electricity Board is invalid in law; the plaintiff must exhaust the remedy before the appellate authority. The Court relied upon this earlier decision to support the proposition that the plaintiff must exhaust departmental remedies and therefore is not entitled to relief without doing so.
Municipal Corporation of Delhi v. M/s. Ajanta Iron and Steel Co. (P) Ltd., A.I.R. 1990 S.C. 882 (Cited by the respondent) Authority sometimes relied upon to support Civil Court jurisdiction where fundamental fairness of procedure is in issue. The High Court observed that the decisions cited by the respondent (including this case) were not applicable to the present facts and therefore did not alter the conclusion on maintainability.
Firm Seth Radha Kishan (deceased) represented by Hari Kishan & others v. Administrator Municipal Committee, Ludhiana, A.I.R. 1963 S.C. 1547 (Cited by the respondent) A precedent sometimes invoked in contexts concerning jurisdiction and procedural fairness. The Court held this authority was not applicable to the facts and legal context of the present appeal and therefore it did not affect the decision on maintainability.

Court's Reasoning and Analysis

The Court framed the central question as the maintainability of the civil suit. It examined the appellants' contention that a statutory and contractual scheme exists under the electricity laws (including terms and conditions of supply framed under Section 49 of the Electricity (Supply) Act, 1948 and related codes) which furnishes a complete alternate machinery for detection of violations, issue of show-cause notices, assessment procedures and appellate remedies.

The Court analyzed earlier decisions of superior courts. It noted the Supreme Court's holding in Punjab State Electricity Board v. Ashwani Kumar that Civil Courts should not entertain suits challenging departmental assessments when the statutory scheme and Board instructions provide a remedy and, by necessary implication, exclude civil jurisdiction. The Court further relied on this High Court's own decision in S.N. Srinivasan which emphasized that the terms and conditions operate as a code and that where a complete alternate machinery exists the jurisdiction of the Civil Court is impliedly barred — a position supported by the principles in Dhulahbai and Mafatlal Industries.

The Court considered the respondent's reliance on certain cases but concluded those decisions were inapplicable to the present factual and legal matrix. After weighing the arguments and the settled ratio in the cited precedents, the Court concluded that there are sufficient reasons to hold that the civil suit was not maintainable because the statutory scheme provided an exclusive and appropriate remedy which the plaintiff had not exhausted.

Procedurally, the Court accordingly allowed the second appeal, set aside the judgments and decrees of both lower Courts, and dismissed the suit as not maintainable. The Court also provided a specific procedural direction as a remedial accommodation to the respondent: liberty to invoke the departmental appellate remedy within one month of receipt of the order and a directive that the Appellate Authority dispose of such appeal within one month of its filing (if filed within the granted time).

Holding and Implications

Holding: The second appeal is allowed; the civil suit is not maintainable and is dismissed.

Implications and immediate consequences:

  • The consequential judgments and decrees of both lower Courts (trial Court and lower appellate Court) are set aside.
  • The plaintiff/respondent is granted liberty to invoke the appellate remedy available under the electricity law within one month from receipt of the High Court's order.
  • If the respondent files such an appeal within the time permitted, the Appellate Authority is directed to dispose of the appeal within one month thereafter.
  • No costs were awarded.
  • The decision applies existing precedents to affirm that where a special statutory scheme provides a comprehensive remedial machinery, Civil Court jurisdiction is impliedly excluded; the Court did not purport to lay down a new legal principle beyond these authorities.

This summary is produced exclusively from the contents of the provided opinion and does not add or infer information beyond what the opinion expressly states.

Show all summary ...

1. Aggrieved by the judgment and decree of the Additional Subordinate Judge, Cuddalore, passed in A.S.No.18 of 1993 dated 29.11.1993 reversing the judgment and decree of the District Munsif, Panruti passed in O.S.No.668 of 1989 dated 23.11.1992, the defendants have filed this second appeal.

2. The case of plaintiff-in-brief is as follows:

Plaintiff is an agriculturist and is doing agricultural operations at Kiliruppu Village, Panruti Taluk. For irrigating the land, he obtained an electricity service connection bearing S.C.No.102 from the Tamil Nadu Electricity Board. He was regular in payment of electricity consumption charges to the Board without any default. That being the position, the plaintiff came to know about a complaint lodged by the Assistant Engineer, Rural South, Tamil Nadu Electricity Board and the same was registered as a case in Crl.No.236 of 1989 on the file of Kadampuliyur police station for committing theft of electric energy by way of illegal tapping of energy from a main line. Thereafter, the second defendant issued a show-cause notice to the plaintiff by letter dated 26.6.1989, wherein, it has been stated that the plaintiff extracted energy by means of illegal tapping and also used 7.5 H.P. allotted for agricultural purpose. For that the plaintiff sent a reply stating that he has not committed any energy theft. Subsequently, the first defendant, Executive Engineer, Operation and Maintenance, TNEB, Panruti, issued a letter dated 21.8.1989 to the plaintiff, by which, the plaintiff was asked to pay extra levy for the stolen energy to the tune of Rs.66,166 on or before 5.9.1989 in one lump sum. The show-cause notice issued by the second defendant and the letter sent by the first defendant are vexatious and arbitrary. The plaintiff denied that he never committed any theft of energy. The orders of the first and second defendants and the calculation made therein are against law. The principles of natural justice have been violated by the defendants 1 and 2. Hence, the letters issued by the first and second defendants dated 26.6.1989 and 21.8.1989 are declared to be null and void and the same have to be set aside.

3. The averments made in the written statement filed by the second defendant, which was adopted by the defendants 1 and 3, are as follows:

On 24.5.1989, the theft of electrical energy by means of illegal tapping from L.T. lines pole location 1808 of Kiliruppu village by running a 7.5 H.P. motor, which was installed in the borewell in Survey 8/7 of Killiruppu village, which belongs to the plaintiff, was detected by the Assistant Executive Engineer, Anti-power-theft squad. At the time of inspection, the tapping of electricity energy from the main line by way of connecting a PVC wire was detected by the said squad. Thereafter, a complaint was lodged by Assistant Executive Engineer (Rural) about the tapping of electric energy by the plaintiff. A case was registered at Kadampuliyur police station against the plaintiff. In furtherance of the same, a show-cause notice was issued to the plaintiff as per the approved TNEB terms and conditions. The plaintiff gave a reply denying that he never committed any theft of electric energy. Since the reply given by the plaintiff was not convincing, the first defendant by virtue of power vested in him issued an assessment notice directing the plaintiff to pay a sum of Rs.66,166. There is no rule or provision in the act to give notice to the plaintiff with regard to surprise inspection. The calculations made by the first defendant is a correct one and is binding on the plaintiff as per the TNEB Rules and Regulations. Further, there is an opportunity for the plaintiff to prefer an appeal to the Superintending Engineer, Cuddalore Electricity Distribution Circle after the payment of levy. But the plaintiff without exhausting the said remedy available under the Electricity Laws, he approached the Civil Court and therefore, the suit instituted by the plaintiff is liable to be dismissed.

4. On the basis of the oral and documentary evidence, though the trial Court dismissed the suit, the lower appellate Court allowed the appeal filed by the plaintiff reversing the judgment and decree of the trial Court. Hence, the second appeal by defendants.

5. The second appeal was admitted on the following substantial questions of law for consideration:

(a) Whether the suit filed by the consumer/respondent in the context of the provisional assessment of the consumption charge is maintainable in law and if so, the conditions of the supply agreed are not binding on the parties.

(b) Was the lower appellate Court correct in holding that the plaintiff is entitled to decree in the context that he was not found guilty in the criminal proceedings initiated by and on behalf of the appellant herein.

(c) In the context of the theft of energy from the service connection, is not the appellant entitled to initiate action to recovery of the proper consumption charges as well as penalty for the same in view of the contract entered into and the rules of the Indian Electricity Act.

6. The only point to be decided in this appeal is whether the suit filed by the respondent/plaintiff is maintainable or not.

7. The learned counsel appearing for the appellants would submit that when there is a

specific provision under the Act to prefer an appeal to the appellate authority to redress the grievance of the plaintiff, he ought not have by-passed such remedy. Therefore, the learned counsel would submit that the suit by the plaintiff is not at all maintainable under law when there is a clear provision with regard to appellate remedy, the plaintiff can very well put forth his grievances if any in regard to the extra levy for committing the theft of electric energy to the tune of Rs. 66,166.

8. In support of his contention, the learned counsel appearing for the appellants/defendants relied of the following decisions for deciding the second appeal.

9. In Punjab State Electricity Board and another v. Ashwani Kumar Punjab State Electricity Board and another v. Ashwani Kumar Punjab State Electricity Board and another v. Ashwani Kumar (1997)5 S.C.C. 120, the Supreme Court held as follows:

8. The question then arises whether the Civil Court would be justified in entertaining the suit and issue injunction as prayed for. It is true, as contended by Shri.Goyal, learned senior counsel, that the objections were raised in the written statement as to the maintainability of the suit but the same were given up. Sec.9 of the C.P.C. provides that the civil court shall try all suits of civil nature, subject to pecuniary jurisdiction, unless their cognizance is expressly or by necessary implication barred. Such suit would not be maintainable. It is true that ordinarily, the Civil Court has jurisdiction to go into and try the disputed questions of civil nature, where the fundamental fairness of procedure has been violated. The statutory circulars adumbrated above do indicate that a fundamental fairness of the procedure has been prescribed in the rules and is being followed. By necessary implication, the cognizance of the civil cause has been excluded. As a consequence, the Civil Court shall not be justified in entertaining this suit and giving the declaration without directing the party to avail of the remedy provided under the Indian Electricity Act and the Indian Electricity (Supply) Act and the instructions issued by the Board in that behalf from time to time as stated above.

9. Shri Goyal has contended that the authorities do not hear the parties, nor give a reasoned order. Therefore, the parties cannot be precluded to avail of the remedy of a suit. We cannot accept such a broad and generalized proposition. When the provision for appeal by way of review has been provided by the statutory instructions, and the parties are directed to avail of the remedy, the authorities are enjoined to consider all the objections raised by the consumer and to pass, after consideration, the reasoned order in that behalf, so that the aggrieved consumer, if not satisfied with the order passed by the Board/appellate authority, can avail of the remedy available under Art.226 of the Constitution. Therefore, by necessary implication, the appropriate competent authority should hear the parties, consider their objections and pass the reasoned order, either accepting or negativing the claim. Of course it is not like a judgment of a Civil Court. It is then contended that the respondent has been subjected to pay huge amount of bill in a short period; hence, it is a case for interference. We find no force in the contention. May be that due to the advice given by the counsel, the respondent obviously has availed of the remedy of the suit, instead of departmental appeal. In our view, by necessary implication the suit is not maintainable. Therefore, the respondent is at liberty to avail the remedy of appeal within six weeks from today and raise the factual objections before the Board and the Board/appellate authority would consider and dispose of them, as indicated earlier, on merits .

10. Following the above decision of the Supreme Court, in The Superintending Engineer, Coimbatore and others v. S.N.Srinivasan The Superintending Engineer, Coimbatore and others v. S.N.Srinivasan The Superintending Engineer, Coimbatore and others v. S.N.Srinivasan (2002)2 L.W.544, this Court, after discussing the relevant provisions of the Act, held as follows:

3. As stated already, the only one rather the substantial question of law to be decided in the case is as to the maintainability of the suit in respect of the demand made by the department for unauthorized excess connection. The terms and conditions of supply of electricity are framed by invoking the powers under Sec.49 of the Electricity (Supply) Act, 1948 (Central Act 54 of 1948). The terms and conditions are the Code by themselves in respect of requisition, supply of electricity, categories of supply, tariff, earnest money deposit, current consumption deposit, installation of capacitors, billing and payment, unauthorized supply of energy, violation of conditions of service connections and further providing for the appellate provisions. Para.6.01 provides that on detection of violation, the officer authorized to issue show-cause notice as per Clause 10 of this Schedule, will issue a notice to the consumer asking him to remove the violation within 24 hours or seven days as the case may be, failing which the supply will be disconnected and to show-cause why the compensation charges should not be levied for having committed the violation. Reply to show-cause notice shall be sent by the consumer within seven days from the date of receipt of notice. Para. 6.02 provides that if the consumer fails to send the explanation within the stipulated time or if the explanation is not satisfactory, the officer authorized to issue the show-cause notice will send a report to the Assessing Officer. The officer authorized to make assessment will, if convinced that there has been a violation, assess the compensation charges payable and intimate it to the consumer directing him to pay the charges in four equal monthly instalments. Para.6.03 provides for an appellate remedy to the effect that if the consumer desires to prefer an appeal to the appellate authority, he may do so within 60 days from the date of receipt of the assessment notice issued to him, Thus a complete alternate machinery is available under the Act. It is now very well settled that when a special enactment creates rights and liabilities to the parties and the alternative machineries are provided therein, even if there is no explicit provision for bar of jurisdiction the jurisdiction of the Civil Court is impliedly barred. This is the law laid down by the Supreme Court in the Constitution Bench judgment in Dhulahbai v. State of Madhya Pradesh Dhulahbai v. State of Madhya Pradesh Dhulahbai v. State of Madhya Pradesh (1968)2 S.T.C.416, which has been reaffirmed by the nine Judges Bench of the Supreme Court in Mafatlal Industries Limited v. Union of India (1998)3 S.T.C.467. The point in issue is also directly covered by the judgment of the Supreme Court in Punjab State Electricity Board v. Ashwani Kumar (1997)5 S.C.C.120, wherein the provisions of the Punjab Electricity Board Act has been considered by the Supreme Court and held that the suit is not maintainable.

11. In yet another similar case in The Tamilnadu Electricity Board by its Chairman represented by its Superintending Engineer, Thanjavur and others v. Shanmuga Engineering College and Shanmuga Polytechnic, Vallam, Thanjavur The Tamilnadu Electricity Board by its Chairman represented by its Superintending Engineer, Thanjavur and others v. Shanmuga Engineering College and Shanmuga Polytechnic, Vallam, Thanjavur The Tamilnadu Electricity Board by its Chairman represented by its Superintending Engineer, Thanjavur and others v. Shanmuga Engineering College and Shanmuga Polytechnic, Vallam, Thanjavur (1999)3 MLJ. 566, this Court held as follows:

In the above circumstances, it cannot be contended that the appellants have no right to advance arguments on the question of jurisdiction of the Court In view of the latest judgment of the Apex Court referred to above, the Civil Court has no jurisdiction to entertain the suit for declaration that the order of assessment made by the Electricity Board is not valid in law. The question whether the plaintiff is entitled to insist the defendants to fix the demand of supply meter to service connection 102 will not arise at this stage without exhausting the remedy before the appellate authority. Therefore, the plaintiff is not entitled to the relief in respect of prayer (b), (c) and (e). The plaintiff is at liberty to avail the remedy of appeal and after exhausting the said remedy, he is entitled to file the suit, if necessary.

12. Per contra, the learned counsel appearing for the respondent/appellant would submit that the show-cause notice issued by the second defendant to the plaintiff on 26.6.1989 and the letter sent by the first defendant, dated 21.8.1989 directing the plaintiff to pay extra levy for stolen energy to the tune of Rs.66,166 on or before 5.9.1989 in one lump sum are declared to be null and void for the reason that those notices were issued by the authorities arbitrarily.

13. Moreover, those two letters are against the principles of natural justice and therefore, the plaintiff has approached the Civil Court to declare the notice and the letter of the first and second defendants respectively as null and void.

14. During the course of argument, the learned counsel appearing for the respondent relied on the following decisions: Municipal Corporation of Delhi v. M/s. Ajanta Iron and Steel Company (P) Limited A.I.R. 1990, S.C.882. Firm Seth Radha Kishan (deceased) represented by Hari Kishan and others v. Administrator Municipal Committee, Ludhiana Firm Seth Radha Kishan (deceased) represented by Hari Kishan and others v. Administrator Municipal Committee, Ludhiana Firm Seth Radha Kishan (deceased) represented by Hari Kishan and others v. Administrator Municipal Committee, Ludhiana A.I.R. 1963 S.C.1547.

15. When considering the law laid down by the Supreme Court, the decisions referred to above by the learned counsel for the respondent are not applicable to the case on hand.

16. On a careful analysis of the arguments advanced by the learned counsel appearing for the appellants/defendants and considering the valid reasons and legal position, this Court is of the view that there are sufficient reasons for allowing this appeal in favour of the appellants.

17. In view of the above settled position of law, the question of law framed as to the

maintainability has to be answered in favour of the appellants herein and by necessary corollary, the suit filed by the plaintiff is not maintainable and therefore, the suit is dismissed as not maintainable and the consequential judgment and decree of both the Courts below are set aside.

18. In result, the second appeal is allowed. However, it is open to the respondent herein, if he is so advised to invoke the appellate remedy within a period of one month from the date of receipt of a copy of this order. If the appeal is filed within the time granted, the Appellate Authority is directed to dispose of the appeal within a month thereafter. With this observation, the second appeal is allowed. No costs.