B. John Bunyan v. State Of Andhra Pradesh And Another
Judgment Summary — Jaganmohan Reddy, J.
Factual and Procedural Background
The petitioner was a Supervisor employed by the City Improvement Board (C.I.B.), under the Local Self-Government Department of the Government of Hyderabad, with twenty years' service. Allegations of irregularities and shortages in materials (cement and others) led to the framing of charges by the Superintending Engineer on 20-5-1953. After exchanges of correspondence, inquiries and charge-sheets between 1952 and 1954, the petitioner was suspended and ultimately dismissed by Government order dated 12-1-1956, and an amount of Rs. 10,354/- was ordered to be recovered.
The petitioner filed a writ petition under Article 226 of the Constitution seeking a writ of certiorari (or other appropriate direction) to quash the order of dismissal. He alleged procedural infirmities including denial of reasonable opportunity under Article 311(2), unlawful composition of enquiry officers, mala fide suspension and dismissal, and improper denial of assistance during the inquiry.
The Government filed a detailed counter denying these contentions and describing the inspection, alleged irregularities, the sequence of notices, charge-sheets, inquiries and the steps taken by the Superintending Engineer, Executive Engineer and the Secretary, Local Self-Government, culminating in the dismissal order. The petitioner also pursued an appeal to the Chief Minister which was not entertained on the ground that no appeal lay to the Minister or Chief Minister in the circumstances.
Legal Issues Presented
- Whether the enquiry and dismissal complied with the requirements of Article 311(2) of the Constitution (i.e., whether the petitioner was given a reasonable opportunity to show cause and defend himself).
- Whether the enquiry conducted (and dismissal imposed) by Government, rather than by the Superintending Engineer under the Civil Services Rules, was impermissible — specifically the contention that the 1955 Rules required the Superintending Engineer to conduct the enquiry and impose penalties rather than the Government.
- Whether the delegation of enquiry functions to subordinate officers (Superintending Engineer and Executive Engineer) amounted to an impermissible delegation of the appointing authority's power.
- Whether allegations of mala fides against the enquiring officers (Executive Engineer and Superintending Engineer) invalidated the proceedings.
- Whether the suspension order under Rule 16 was valid, including the effect of the duration of suspension and which authority suspended the petitioner.
Arguments of the Parties
Petitioner's Arguments (as presented in the opinion)
- The enquiry and dismissal should have been conducted by the Superintending Engineer under the Civil Services (Classification, Control and Appeal) Rules which, petitioner’s counsel argued, were operative and required the Superintending Engineer to be the authority to impose penalties (contention based on the 1955 Rules).
- Dismissing the petitioner by Government denied him the right of appeal.
- There was mala fides on the part of the enquiring officers (Executive Engineer and Superintending Engineer); the officers who were the subject of allegations should not have been permitted to conduct the enquiry.
- The suspension order was invalid (bad).
- Procedural defects: denial of assistance (request for Assistant Accountant Swaminathan was refused) and lack of reasonable opportunity to defend under Article 311(2).
Government's Arguments (as set out in the counter and the opinion)
- The Executive Engineer and Superintending Engineer followed departmental procedure: inspections revealed missing muster rolls, stock irregularities, questionable disbursement amounts and alleged bogus entries; these matters were properly followed up with demands for explanation and charge-sheets.
- The Executive Engineer had recommended closure at one stage, but subsequent directions (including from the Secretary) required item-by-item explanation of press allegations leading to renewed inquiries.
- The enquiry was conducted under the Civil Services (Classification, Control and Appeal) Rules, 1952 (in force at the time of the enquiry), not under the 1955 Rules.
- The enquiring officers acted under orders of superior authority; delegation to them was appropriate and did not violate principles of law.
- The petitioner was given full opportunity to defend, including being allowed assistance (he was told he could bring anyone to examine records); Swaminathan was not concerned with the relevant accounts and therefore his refusal to assist did not deny opportunity.
- The suspension orders were issued by the proper authority (the Secretary/Government) under Rule 16; the petitioner’s suspension and its duration were lawful.
- Because the case involved disputed questions of fact, the proper remedy after service of Section 80 notice was a regular suit (i.e., the Government pointed to alternative remedies).
- The petitioner had applied for leave preparatory to retirement and therefore was not to be treated as in service for some contentions (as pleaded by Government).
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Pradyat Kumar Bose v. C.J. of Calcutta H.C., 1956 SCJ 259; AIR 1956 SC 285 | Administrative decision-makers may obtain and act upon material collected by others provided the affected party is given a fair opportunity to correct or contradict any relevant and prejudicial material. | The court relied on this authority to hold that delegation of fact-finding or collection of material to subordinate officers does not invalidate the enquiry so long as a fair opportunity to the affected person to meet the material is provided; thus the delegation objection to the enquiry was rejected. |
| Board of Education v. Rice, (1911) AC 179 | Illustration (by the House of Lords) that administrative functionaries may obtain material in a feasible manner, subject to fair opportunity for the affected party. | The court quoted the House of Lords' statement (via Pradyat Kumar Bose) to support the proposition that administrative authorities can rely on material gathered by others and still satisfy principles of fairness. |
| Local Government Board v. Arlidge, (1915) AC 120 | Speech of Lord Chancellor describing limits and manner in which administrative inquiries and delegation are permissible. | The court cited the speech to reinforce that delegation of inquiry functions did not amount to an improper delegation of the appointing authority's power and to reject the contention that delegation made the dismissal invalid. |
Court's Reasoning and Analysis
The court conducted a step-by-step analysis grounded in the chronological facts and the applicable rules. Key points of reasoning as set out in the opinion are:
- Rules and timing: The court emphasised that the Civil Services (Classification, Control and Appeal) Rules, 1955 came into force on 1 December 1955, whereas the inquiry and earlier proceedings were governed by the Rules of 1952 (in force from 3 April 1952). Consequently, the petitioner's contention that the 1955 Rules required the Superintending Engineer to conduct the inquiry was found untenable because the relevant inquiry had been conducted under the 1952 Rules.
- Appointing authority and delegation: The court examined the scheme of delegation and appointing power. It found that insofar as the petitioner’s post had been placed under the Superintending Engineer category, the Minister, Local Government, was the appointing authority for such supervisors under the delegation in force. The Minister had appointed the Superintending Engineer to act as enquiring officer and had acted upon the Superintending Engineer’s report. The Rules of 1952 did not require that the appointing authority itself undertake the inquiry.
- Permissibility of delegation: Relying on authority (Pradyat Kumar Bose and earlier House of Lords authorities), the court held that the delegation of fact-gathering or enquiry tasks to subordinate officers does not amount to an unlawful transfer of the appointing authority's power. An administrative authority may obtain material "in such manner as may be feasible and convenient" provided the affected party gets a fair opportunity to correct or contradict prejudicial material. Therefore, the objection that delegation transformed the appointing authority’s function into an invalid exercise failed.
- Article 311(2) compliance: The court distilled the essential requirement of Article 311(2): the servant must be told the charges and the materials, be given an opportunity to answer, and be given a chance to show cause against the proposed punishment. Applying the facts, the court found that charges were framed, the petitioner was given multiple opportunities to reply (written replies, chance for oral explanation, statements recorded), and a show-cause notice was issued. The court concluded that the enquiry was fair and that the petitioner had been given the fullest opportunity to present his defence.
- Effect of Government as punishing authority and appeal: The court acknowledged that since the Government itself imposed the penalty under the 1952 Rules, the petitioner was deprived of an appellate remedy as a matter of the rules in force; however, deprivation of an appeal under the particular rules did not vitiate the proceedings, and the petitioner could not claim an appeal as a right unless the rules provided for it.
- Allegations of mala fides: The court addressed the petitioner's claim that the enquiring officers were biased and had acted mala fide. The opinion noted an absence of supportive affidavit material from the petitioner on this point, and the record showed that the Executive Engineer who conducted parts of the inquiry was not the same person implicated by the petitioner. The court found no substance in the mala fides allegation.
- Suspension under Rule 16: The court considered Rule 16(1) which authorised suspension where an enquiry is contemplated or pending, or where a criminal investigation/trial is in progress, and Rule 16(5) which prescribed reporting to Government if final orders were not passed within six months when suspension was by an authority other than Government. The court found the petitioner was suspended by Government (the appointing authority), so sub-rule (5) was inapplicable and the suspension order was valid.
- Conclusion of law applied to facts: Having found that the enquiry complied with Article 311(2), that delegation of inquiry functions was permissible, that mala fides allegations were unsupported, and that suspension was valid, the court dismissed the petition.
Holding and Implications
Holding: The petition under Article 226 is dismissed. The petition fails and is dismissed with costs; advocate's fee fixed at Rs. 100.
Implications and consequences:
- The immediate, direct effect is that the order of dismissal dated 12-1-1956 and the associated recovery direction (Rs. 10,354/-) were not quashed by the High Court; the writ petition seeking certiorari was dismissed.
- The court found no procedural infirmity sufficient to set aside the enquiry or the dismissal: Article 311(2) requirements were treated as satisfied, delegation of fact-finding/enquiry to subordinate officers was permissible, and the suspension under Rule 16 was valid.
- The opinion does not purport to create any novel legal principle beyond applying established authorities (as cited) to the facts; no broader or new precedent is stated in the opinion beyond the court's application of existing authorities to reject the petitioner's contentions.
Jaganmohan Reddy, J.:— This is a petition under Article 226 of the Constitution for the issue of a Writ of Certiorari or any other direction quashing the order of dismissal of the petitioner dated 12-1-1956. The petitioner was a Supervisor in the service of the City Improvement Board which is under the Local Self-Government Department of the Government of Hyderabad. He has to his credit a service of twenty years.
2. In the discharge of his duties as a Supervisor it was found that there had been certain irregularities and shortage in materials cement etc. regarding which charges were framed by the Superintending Engineer on 20-5-1953. The petitioner submitted his reply to the Executive Engineer who on 2-7-1953 recommended the case to be closed. The petitioner alleges that the case was closed and later after a lapse of one year, the same charges were repeated by the same Executive Engineer on 21-4-1954, an oral enquiry was held and in spite of the fact that the petitioner asked for the assistance of one Swaminathan, Assistant Accountant, that request was denied and no reasonable opportunity to defend was given under Article 311(2) of the Constitution of India.
3. He further alleged that the Superintending Engineer and the Executive Engineer both took upon themselves as enquiry officers to individually call upon the petitioner for an oral enquiry; that the Secretary of the Local Self-Government also took upon himself to be a third enquiry officer and under the circumstances the entire proceedings were illegal. The petitioner also alleged that he was suspended by an order of the Secretary of the Local Self Government under R. 16 of the Civil Services (Classification, Control and Appeal) Rules, 1955 and was kept under suspension for two years before the final disposal of the case, which is also alleged to be illegal and mala fide.
4. The Government in its counter stated in detail that on December 22, 1952 the Executive Engineer, C.I.B, inspected the section of the petitioner and found that he has neither maintained the Muster Rolls for the year 1952–1953, nor maintained the stock register of raw materials such as sand, lime, gum, jute, etc., that through his memo dated 20-12-1952 he sought the permission for disbursement to labour of Rs. 2,420/-, but when the actual disbursement was made by the Executive Engineer the total amount came to only O.S Rs. 1,785/-; and that a number of bogus entries were also found.
5. The Executive Engineer consequently through his letter No. 5736 dated 24-12-1952 called for the explanation of the petitioner. The Superintending Engineer consequent upon a report published in the Iqdam News Paper dated 21-3-1953 alleging that the petitioner has misappropriated thousands of rupees in connection with the alterations of Special Quarters at Agapura and had earned about Rs. 40,000/- etc., called for a report from the Executive Engineer.
6. The Secretary, Local Self Government also had written to the Superintending Engineer to submit his report in the matter. The petitioner submitted a reply to the letter of the Executive Engineer referred to above on 30-4-1953. He also submitted another application to the Superintending Engineer on 6-5-1953 enclosing a copy of the reply submitted to the Executive Engineer on 30-4-1953.
7. After receiving this explanation a detailed charge sheet was served on the petitioner through the Executive Engineer, Hyderabad Municipality where the petitioner had been transferred on 22-5-1953. Thereafter the petitioner requested for time on 25-5-1953 for 15 days in order to submit his reply which request was granted. On 8-6-1953 the petitioner submitted his reply to the Executive Engineer and the same day it was forwarded by him to the Superintending Engineer C.I.B
8. The Executive Engineer C.I.B was asked by the Superintending Engineer to offer his comments thereon and he recommended the case to be closed on 2-7-1953 which recommendation was accordingly made by the Superintending Engineer on 2-11-1953 to the Secretary, Local Self Government Department; but the Secretary by his letter dated 5-12-1953 wrote and directed that the allegations made in the Iqdam Newspaper should be replied item by item.
9. The Superintending Engineer was again asked on 11-1-1954 to report on certain items of works such as fixing expanded metal frames in the Special Class Houses at Agapura, who in turn called upon the Executive Engineer to obtain the explanation of the petitioner, frame charges and submit a detailed report by 20-3-1954. In compliance with this direction, the Executive Engineer wrote to the petitioner on 1-4-1954 to present himself in his office the next day, but the petitioner on the plea of his being ill asked for a questionnaire.
10. A regular charge-sheet was accordingly handed over to him and the petitioner by his application dated 22-4-1954 requested the Superintending Engineer to instruct the Executive Engineer to furnish him with the concerned records and also give him the assistance of the Asst. Accountant, Swaminathan who was concerned with the accounts as the petitioner was unable to take note of the records personally. The Superintending Engineer accordingly directed the Executive Engineer to permit a clerk to assist the petitioner.
11. Due information of the same was given by the Executive Engineer to the petitioner through his letter dated 30-4-1954. The petitioner submitted his replies on 5-5-1954 and the Executive Engineer forwarded the same to the Superintending Engineer with his remarks and the Superintending Engineer in his turn forwarded the same to the then Secretary, Local Self Government Department on 4th June, 1954.
12. Thereafter the Superintending Engineer recorded the statement of the petitioner also and he was afforded a chance of oral explanation; but the petitioner adopted a recalcitrant attitude and even refused to sign his statement whereupon it was attested by two witnesses in whose presence it was recorded and was then forwarded by the Superintending Engineer to the Secretary, Local Self Government Department.
13. After these proceedings the Secretary, issued a notice on 23-5-1955 to show cause within a period of one month from the date of the receipt of the notice as to why he should not be dismissed from service and as to why a sum of Rs. 10,354/- be not recovered from him. The petitioner thereupon asked for details of the said sum and the same were furnished to him through a letter dated 19-8-1955.
14. The petitioner submitted a detailed explanation on 15th September, 1955 and after due consideration the Government passed orders of dismissal and for recovery of Rs. 10,354/- on 12-1-1956. An appeal was presented by the petitioner before the Chief Minister on 22-6-1956 which was forwarded to the Minister, Local Self-Government for disposal, but inasmuch as he had been dismissed under the orders of the Minister himself no appeal lay to the Minister or the Chief Minister and the petitioner was duly informed of this through a letter dated 25-8-1956.
15. The counter further stated that the enquiry was conducted by the Superintending Engineer under the orders of the Secretary, Local Self-Government and the Executive Engineer being a subordinate of the Superintending Engineer, simply did what he was ordered to do by the Superintending Engineer in the matter and no action was taken by the Executive Engineer by himself; that the suspension orders were issued by the proper authority, namely, the Secretary, Local Self-Government; that the petitioner was given full opportunity for his defence; that he never requested for an oral enquiry and on that account he cannot question the validity of the proceedings.
16. It was further stated that the petitioner having already served a notice on the Government under Section 80 of the CPC the proper remedy for him was to institute a regular suit especially in view of the fact that the case involves disputed questions of fact; and that the petitioner having applied on 30-1-1953 on the basis of a medical certificate for six months privilege leave preparatory retirement, there is no question of considering the petitioner as in service.
17. The facts as alleged in the counter are fully substantiated by the correspondence and documents filed by the petitioner himself. It is true that the Executive Engineer in his letter No. 4432 dated 2-7-1953 recommended the case to be close after going through the replies given by the petitioner and though he admitted that there were certain irregularities committed by him, the Executive Engineer thought that they had been committed by him due to heavy work, largeness of area entrusted to him and worries as stated by him.
18. It was also stated that the petitioner was not in a position to produce proper record of account at the time of the inspection and due to these irregularities he was transferred to the Chikkadpalli section as a punishment and was subsequently transferred to the Hyderabad Municipal Corporation Re-assessment Section. The petitioner by his letter dated 30-12-1952 stated with reference to the letters of the Executive Engineer calling on him to explain, that due to worries he must have made mistakes in marking the muster rolls which were found by the Executive Engineer on 24-12-1952.
19. He therefore asked to be excused and promised that such things will never happen again. The Superintending Engineer by his letter No. 7163 dated 2-11-1953 referring to the report of the Executive Engineer sent by him on 13-8-1953 also recommended that “Since the irregularities were of minor character and in consideration of his long service of 20 years in the C.I.B and his nice behaviour and good work in the past” his case be closed.
20. This recommendation was, however, not accepted as will be seen from the letter No. 526.C dated 5-12-1953 of the Secretary, Local Self-Government with reference to the letter of the Superintending Engineer dated 2-11-1953. The Secretary stated that the allegations appearing in the Iqdam have not been, clarified and contradicted item by item and consequently he requested him to send a report dealing item by item.
21. Prior to that the Superintending Engineer on 20-5-1953 had served a charge-sheet on the petitioner through the Executive Engineer to submit his replies so as to reach his office not later than 26th instant and it was specifically stated therein that this charge sheet was again served upon him as the petitioner had mentioned in his letter dated 6-5-1953, that under his instructions the petitioner had given a short statement in reply which, according to the Superintending Engineer was entirely false.
22. The petitioner asked for time and it was given to him and thereafter he sent his replies which were forwarded to the Superintending Engineer on 8-6-1953. It was upon this that the Superintending Engineer by his letter dated 2-11-1953 recommended the case to be closed which was not accepted by the Government. The Secretary Local Self Government. Shri Mirza Najaf Ali Khan in his D.O No. 17.C dated 11-1-1954 called upon the Superintending Engineer to expedite his report fixing the responsibility with regard to certain items such as fixing of wooden lattices, painting them, roof repairs and fixing of expanded metal frames in the special class houses at Agapura.
23. A report was thereupon called by the Superintending Engineer by his letter No. 109.C dated 8-3-1954 after calling for the explanation of the petitioner and after framing charges against him. Charges were again framed by the Superintending Engineer and the petitioner's explanation was called for by the Executive Engineer. The petitioner by his letter dated 1-4-1954 in reply to the Executive Engineer's letter of the same date asked for a questionnaire as he was sick.
24. A questionnaire was personally handed over to the petitioner as is evident from his letter dated 22-4-1954 in which he asked for the assistance of Swaminathan, an Assistant Accountant who was concerned with the accounts. The petitioner was informed in reply to this request by the Executive Engineer on 26-4-1954 that the Asst. Accountant, Swaminathan, has shown his inability to assist him in his case; as such he was requested to bring some other person to give assistance to him in the case.
25. The petitioner makes a grievance of this refusal, but it is clear from the record that Swaminathan was not concerned with these accounts and in any case it cannot be said that the petitioner was not given an opportunity to examine the records. In fact he was specifically told that he can bring any one he likes to examine the records.
26. Learned Advocate for the petitioner contends that (1) under the Civil Services (Classification, Control and Appeal) Rules which were enforced on 1st of December 1955, the enquiry and dismissal should have been made by the Superintending Engineer and not the Government in the Local Self Government Department; (2) that the effect of dismissal by the Government is to deny him the right of appeal; and (3) that there is mala fides on the part of the enquiring officers as the petitioner has made allegations against them and consequently it was contrary to the principles of natural justice that they should have made the enquiry; and (4) that the order of suspension is bad.
27. The contention based upon the Civil Services (Classification, Control and Appeal) Rules, 1955 is untenable in that the rules were enforced as from 1st December, 1955, while in fact the enquiry was held under the Rules of 1952 which came into force on 3rd April, 1952. No doubt under Schedule III of the 1955 Rules, the Superintending Engineer is not only the appointing authority, but also the authority empowered to impose all the penalties specified in R. 12 on Supervisors working under the Superintending Engineer, C.I.B
28. The appellate authority is the Government. However, in the rules of 1952 the appointing authority and the authority empowered to impose penalties with respect to such supervisors has not been mentioned and under proviso to R. 14 in cases of posts not included in col. I of Schs. III and IV, the authority having power to make first appointments may impose any penalty specified in R. 9 upon the holder or holders of such posts.
29. Learned advocate for the petitioner contends that these posts have been shown in Sch. III under the Public Works Department, where the appointing authority is the Chief Engineer, and the authority empowered to impose all the penalties under R. 9 is also the Chief Engineer. The appellate authority is the Secretary to Government in the Public Works Department.
30. It is seen that the Supervisors specified in Sch. III under the Public Works Department are the Supervisors, Roads, Buildings, and Irrigation, but the petitioner was not a supervisor working in the Roads, Buildings and Irrigation Section of the P.W.D It is clear from the delegation of powers sanctioned by the Chief Minister as communicated to the Accountant-General of Hyderabad State by letter No. 788.K dated 2-12-1950, that the Superintending Engineer, Local Govt. and the Secretary, Local Government, were given power to appoint on posts carrying a maximum salary of Rs. 225, while the Minister for Local Government was given power to appoint on posts in the non-gazetted cadre carrying a maximum of Rs. 400 as well as to appoint officers in junior scale II through the Public Service Commission.
31. It will be seen from notification No. 74/63.E-CFD/- 52 dated 12-7-1952 that the Supervisors' grade I was O.S Rs. 175-5-205-E.B.-7½-250-EB-10-360 and the revised grade was I.G 140-300. In these circumstances the appointing authority of the Supervisor under the Superintending Engineer, in which category the petitioner actually has been placed is the Minister, Local Government.
32. The enquiry was ordered by the Minister, Local Government, whose orders were communicated by the Secretary, Local Government. There is no merit in the contention of the learned advocate for the petitioner that it was the Secretary who was the enquiring officer or the Superintending Engineer. The Minister had appointed the Superintending Engineer as the enquiring officer to assist him in the enquiry and upon whose report he has acted.
33. The Rules of 1952 do not require that the appointing authority should itself make the enquiry. This is not a case of a Judicial Tribunal prevented from delegating its function unless it is enabled expressly to do so or by necessary implication. The power to appoint or dismiss an officer is not the exercise of a Judicial Power, but is of an administrative one. Their Lordships of the Supreme Court in the case of Pradyat Kumar Bose v. C.J of Calcutta H.C, 1956 SCJ 259 : ((S) AIR 1956 SC 285 (A)), observed at p. 266 (of SCJ): (at p. 291 of AIR):
“………As pointed out by the House of Lords in Board of Education v. Rice, (1911) AC 179 at p. 182 (B), a functionary who has to decide an administrative matter, of the nature involved in this case, can obtain the material on which he is to act in such manner as may be feasible and convenient, provided only the affected party has a fair opportunity to correct or contradict any relevant and prejudicial material.”
34. After setting out the speech of Lord Chancellor in the case of Local Government Board v. Arlidge, 1915 AC 120 at p. 133 (C), their Lordships observed that “in view of the above clear statement of law the objection to the validity of the dismissal on the ground that the delegation of the enquiry amounts to the delegation of the power itself is without any substance and must be rejected.”
35. The essential requirement under Article 311(2) is that the member of a service should be given a reasonable opportunity to show cause against any action proposed, that is, he must be told what the charge or charges against him are and the materials upon which the charge has been framed and given him an opportunity to answer those charges after which he must be asked to show cause against the proposed action to be taken against him.
36. In this case charges have been framed, full opportunity has been given as has already been seen and on considering the report a notice was given to show cause why the petitioner should not be dismissed. The enquiry was a fair one, the petitioner having been given the fullest opportunity at every stage to adduce such evidence in his favour as he desired.
37. The fact that the Government itself held the enquiry under the Civil Services (Classification, Control and Appeal) Rules, 1952, no doubt has the effect of depriving the petitioner of appeal, but he cannot claim it as a matter of right unless rules so provided. The Government having taken the action as a punishing authority there can be no appeal against it. That does not, however, vitiate the proceedings, nor has it been shown which provisions of the Rules have not been complied with.
38. With respect to the third point of imputing mala fides to the enquiring officer, it is contended that the petitioner made certain allegations against the Executive Engineer by a confidential note alleged to have been handed over to the Superintending Engineer by the petitioner on 8-6-1953, in which he tried to give an account of the various short-falls in materials which according to him were supplied to several high placed officers under the verbal orders of the Executive Engineer including some materials sent to the Executive Engineer himself.
39. Nothing has been stated in the affidavit of the petitioner with respect to this matter and consequently the Government was not in a position to say anything in its counter. We have, however, seen the records from which we find that the Executive Engineer who made the enquiry was not the same Executive Engineer and in any case the Government seems to have made certain enquiries and obtained their explanations etc.
40. We are not, however, concerned with this matter. There is no substance in the allegation that because he made these charges, the Executive Engineer and the Superintending Engineer have, in order to cover themselves, recommended the closing of the case. The petitioner in our view has merely raised this bogey as a last arrow in the quiver.
41. With respect to the last point, namely, that the suspension is bad, this also is without force, because R. 16(1) clearly authorises the appointing authority or any authority to which it is subordinate or any other authority empowered by the Government in this behalf, may place a Government servant under suspension where, (a) an enquiry into his conduct is contemplated, or is pending, or (b) a complaint against him or any criminal offence is under investigation or trial.
42. Sub-rule (5) of R. 16 further states that where a Government servant has been suspended by an authority other than Government and final orders in the enquiry pending against him have not been passed within a period of six months from the date of order of suspension, the case shall be reported to Government for such orders as it may deem fit.
43. In this case, the appointing authority being the Government, the petitioner was suspended by the Government itself and sub-r. (5) does not, therefore, apply to him. The order of suspension is, in our view, valid.
44. In the result this petition fails and is dismissed with costs. Advocate's fee Rs. 100.
M.K.S
45. Petition dismissed.