The Madura Municipality Through Its Commissioner v. K. Alagirisami Naidu

Madras High Court
Mar 13, 1939
Smart Summary (Beta)

Factual and Procedural Background

This appeal arises from a suit instituted by the Madura Municipality seeking recovery of a balance of Rs. 5220-7-1 due from the defendant for rights to take rubbish and night-soil for the years 1928-29 and 1929-30, along with interest at 12% per annum. The defendant was the highest bidder in auctions for these years, having paid the full amount for the first year except for a small interest balance, for which a decree was passed in favor of the Municipality without appeal. For the second year, a balance remained unpaid. The trial court held no valid contract existed for the second year due to non-compliance with mandatory requirements of Ss. 68 and 69 of the District Municipalities Act but considered recovery possible under Ss. 65 and 70 of the Contract Act. However, on merits, the trial court dismissed the suit for the second year. The Municipality has appealed this decision.

Legal Issues Presented

  1. Whether the agreement executed by the defendant and signed by the Municipality officials after the auction was valid and binding, given the statutory requirements under Ss. 68 and 69 of the District Municipalities Act.
  2. Whether the Municipality could recover the balance amount despite the contract being unenforceable under the statutory provisions, by invoking the principles under Ss. 65 and 70 of the Contract Act.
  3. The applicability and interpretation of the doctrine of ratification and relation back to contracts entered without prior sanction of the Municipality.
  4. The measure of compensation payable to the Municipality under the Contract Act where the contract is unenforceable but benefits have been conferred.

Arguments of the Parties

Appellant's Arguments

  • The Municipal Council’s resolution passed in July 1930 ratified the auction held in April 1929 and related back to the date of the agreement signed by the Chairman and Councillors, making the contract valid.
  • It would be unnecessary for the Municipal Council to sanction every individual transaction exceeding Rs. 1000 before it is made; instead, specific delegation for particular transactions would suffice.

Respondent's Arguments

  • The contract was invalid because the mandatory statutory requirements under Ss. 68 and 69 of the District Municipalities Act were not complied with, particularly the need for prior sanction of the Municipality for contracts exceeding Rs. 1000.
  • The final bid by the defendant was a mere offer that had to be accepted within a reasonable time, which was not done before the contract period expired.
  • Even if unenforceable as a contract, the Municipality was entitled to recover compensation under Ss. 65 and 70 of the Contract Act for the benefit conferred on the defendant.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Bolton v. Lambert (1889) 41 Ch D 295 Doctrine of ratification of contracts entered without authority The court noted this case was relied upon but not approved by the Privy Council and held it inapplicable due to statutory prohibitions in the District Municipalities Act.
Fleming v. Bank of New Zealand (1900) AC 577 Ratification principles in contracts The Privy Council did not approve Bolton v. Lambert fully; court used this to support its view on ratification limitations.
Phillips v. Homfrey (1871) 6 Ch A 770 Time limit for exercising option of ratification Cited to show ratification must occur within a reasonable time, which was not the case here.
Morrell v. Studd (1913) 2 Ch 648 Ratification must be timely Supported the principle that ratification after expiry of the contract period is invalid.
Raman Chetti v. Municipal Council, Kumbakonam (1907) 30 Mad 290 Effect of unenforceable agreements under statutory requirements Earlier cases held unenforceable agreements barred recovery; court noted a shift to more equitable views in later cases.
Ramaswami Chetti v. Municipal Council, Tanjore (1906) 29 Mad 360 Same as above Similar precedent to Raman Chetti case cited for historical context.
Palaniswami Goundan v. English and Scottish Co-operative Wholesale Societies 20 AIR (1933) Mad 145 Equitable relief under Contract Act for unenforceable agreements Supported the application of S. 65 Contract Act to recover compensation despite unenforceable contract.
Arunachala Nadar v. Srivilliputtur Municipal Council 21 AIR (1934) Mad 480 Same as above Reinforced the equitable principle allowing recovery under S. 65 Contract Act.
Madura Municipality v. Raman Servai 23 AIR (1936) Mad 98 Same as above Supported the view that unenforceable contracts may still give rise to restitution claims.
Harnath Kunwar v. Indar Bahadur Singh 9 AIR (1922) PC 403 Interpretation of S. 65 Contract Act covering void agreements Privy Council held S. 65 applies to agreements void from inception; court relied on this for equitable relief.
Ledu Coachman v. Hiralal Bose 3 AIR (1916) Cal 266 Limitations on S. 65 where agreements are illegal Cited to distinguish cases of illegal contracts from unenforceable ones; court held it inapplicable here.
Nathu Khan v. Sewak Koeri (1911) 15 CWN 408 Same as above Distinguished illegal contracts from unenforceable contracts for purposes of relief under S. 65.
Young & Co. v. Mayor and Corporation of Royal Leamington Spa (1883) 8 AC 517 English law on unenforceable contracts Noted to have limited application due to differing Indian statutory law; court relied on Indian statutes and precedents instead.
Municipal Committee, Gujranwala v. Fazl Din 16 AIR (1929) Lah 742 Application of Ss. 65 and 70 Contract Act in municipal contracts Supported the view that equitable relief is available for unenforceable municipal contracts.
Municipal Committee, Lahore v. Miran Baksh 20 AIR (1933) Lah 15 Same as above Reinforced the equitable approach to unenforceable municipal contracts.
Zulaing v. Yamethin District Council 19 AIR (1932) Rang 176 Same as above Further precedent supporting equitable relief under Contract Act.
Mohammad Ebrahim Molla v. Commissioners for Port of Chittagong 11 AIR (1927) Cal 465 Same as above Supported the principle of restitution under S. 65 Contract Act.
Pallonjee Eduljee & Sons v. Lonavala City Municipality 24 AIR (1937) Bom 417 Same as above Reinforced the application of equitable relief for unenforceable municipal contracts.
Municipal Board, Lucknow v. S.C. Deb 19 AIR (1932) Oudh 193 Contrary view on the application of Ss. 65 and municipal acts The court respectfully disagreed with this decision, finding its reasoning unpersuasive.

Court's Reasoning and Analysis

The court first examined the validity of the contract under Ss. 68 and 69 of the Madras District Municipalities Act, which require prior sanction of the Municipality for contracts exceeding Rs. 1000. The agreement in question was executed after the auction period and without prior sanction, rendering it invalid and unenforceable as a contract. The court rejected the appellant's contention that ratification by a later resolution could validate the contract, holding that ratification must occur within a reasonable time and cannot cure an unauthorized contract made in contravention of statutory provisions.

Despite the contract's invalidity, the court considered whether the Municipality could recover compensation under Ss. 65 and 70 of the Contract Act. These sections allow restitution or compensation when an agreement is unenforceable but benefits have been conferred. The court distinguished unenforceable contracts from illegal ones, noting that equitable relief is available when the agreement fails due to statutory formalities rather than illegality or immorality.

The court emphasized that the special municipal law and the general Contract Act provisions are not in conflict but complementary, with the Contract Act providing relief where municipal contracts fail for statutory reasons. It rejected the view that seeking relief under S. 65 is an indirect attempt to enforce a forbidden contract.

Regarding the measure of compensation, the court held that the defendant must pay the amount agreed for the previous year (Rs. 53,500), adjusted for payments already made. The defendant had admitted no price reduction for the second year and the Municipality's delay in changing contract conditions justified this approach. The court declined to grant interest due to the absence of a valid contract.

Finally, the court noted procedural concerns about illegible evidence records but this did not affect the substantive decision.

Holding and Implications

The court held that there was no valid contract between the parties for the second year due to non-compliance with mandatory statutory requirements under Ss. 68 and 69 of the District Municipalities Act.

However, the Municipality was entitled to recover compensation under Ss. 65 and 70 of the Contract Act for the benefit conferred on the defendant by allowing removal of rubbish and night-soil.

The court decreed a sum of Rs. 2181-7-1 in favor of the Municipality, representing the balance due after adjusting payments made. No interest was awarded due to the absence of a valid contract. The parties were ordered to bear their own costs in both courts.

This decision clarifies that statutory formalities in municipal contracts are mandatory for enforceability but do not bar equitable relief for restitution where benefits have been conferred under unenforceable agreements. The ruling does not establish new precedent beyond the application of existing statutory and equitable principles and primarily affects the parties by granting partial recovery to the Municipality.

Show all summary ...

Abdur Rahman, J.

1. This appeal arises out of a suit instituted on behalf of the Madura Municipality for the recovery of a balance of Rs. 5220-7-1 alleged to have been due from the defendant in respect of the rights of taking rubbish and night-soil for the years 1928-29 and 1929-30; and for interest calculated at 12 per cent. per annum. It was asserted in the plaint that the defendant was the highest bidder in auctions held by the Sales Committee of the Madura Municipality for both these years, the defendant's bid being Rs. 53,500 for the first year and Rs. 55,500 for the second one. The defendant had, it was admitted, paid the whole of the amount for the first year leaving a balance of Rupees 146-7-0 for interest and the greater portion of the amount due for the second year leaving a balance of Rs. 4181-7-1 for principal and Rs. 892-9.0 for interest. So far as the first year was concerned, a decree for Rs. 146-7-0 was passed in favour of the Municipality and no appeal has been filed by the defendant against that portion of the decree. As for the balance of Rupees 5074-0-1, the trial Court held that there was no valid contract between the parties as the mandatory requirements of Ss. 68 and 69, District Municipalities Act, were not complied with, but the plaintiff would be entitled to recover the amount if it was found to be due on the principles underlying Ss. 65 and 70, Contract Act. The trial Court was not however satisfied on merits that the Municipality had succeeded in establishing its claim. The suit was therefore dismissed in regard to the second year. The Municipality has preferred this appeal in consequence.

2. The first point which arises for determination relates to the validity of the agreement executed by the defendant and signed by the Chairman 6f the Municipality and some of its members on 8th April 1929 (Ex. B) after the second auction had been held. It may not be very material in this case but it is rather interesting to find that most of the terms of the printed agreement which the defendant was asked to sign and signed had nothing to do with the sale of rubbish and night-soil. The Municipal clerk who was entrusted with the duty of having the agreement prepared appears to have selected a wrong printed form for the purpose and got it executed by the defendant. The mistake does not seem to have been detected even when the Chairman or the other members were signing. The document thus had led to some confusion but in view of the conclusions to which we have arrived, this mistake has not-proved to be material.

3. The agreement on which reliance was primarily placed in the plaint was not sanctioned by the Municipality until a few months after the expiry of the period for which the second auction was held. It has not been denied and indeed it cannot be disputed that the value or amount of the contract, Ex. B, exceeds Rs. 1000. The question then is if the Chairman or any other person could enter into this contract without the previous sanction of the Municipality. An examination of the provisions contained in S. 68, Madras District Municipalities Act, would show that the Municipality is authorized to delegate to the Chairman or Committee consisting of two or more members the power of making on its behalf any contract whereof the value or amount does not exceed Rs. 1000, but when the value or amount of the contract exceeds Rs. 1000 the sanction of the Municipality has to be taken for the making of the con. tract before the same is made. This means that no contract of the value or amount exceeding Rs. 1000 can be entered into or made by any person before the sanction of the Municipality has been obtained. It was contended by Mr. Patanjali Sastri on behalf of the Municipality that it would be unnecessary for the Municipal Council to' sanction every individual transaction before it is made and that it would be enough if instead of delegating an authority generally to either the Chairman or to a Committed consisting of two or more members of the Municipal Council as permitted by S. 68, sub-cl. (1), it confers the power of entering into or making a contract in regard to a particular transaction. In other words, the point of distinction according to him between sub-cl. (1) and sub-cl. (2) of the Section is that while delegation of the power under sub-cl. (1) might be general in regard to contracts of less than Rupees 1000 the power of making contracts in regard to transactions exceeding that figure must be specific, although he contends that in neither case would it be necessary for the Municipal Council to know the exact terms on which the contract was to be entered into.

4. We cannot accept this contention and are of opinion that S. 68 (2) could not be construed in that manner. The omission of any reference in that sub-section to the persons on whom this power could be conferred, if it could be conferred at all, is significant. Moreover, the necessity to obtain the sanction of the Council for the making of a contract before the same is made implies that the Council must be made aware not only of the matter in regard to which the contract would be entered into but also in regard to its terms and conditions. The sanction has to precede and not follow the making of every con. tract which exceeds Rs. 1000. This could only be possible if the whole of the proceedings, which culminated in the highest bids made by the defendant, are, before the necessary sanction is obtained, considered to be in the nature of an offer which has to be placed before the Municipality and could mature into a contract after that has been accorded. Once the proposal is sanctioned by the Municipality all that would remain to make the contract enforceable would be to express it in a manner recognized by law. The penalty for entering into a contract which contravenes the provisions of S. 68 is contained in sub-cl. (2) of S. 69 and the result is that any contract entered into in contravention of the provisions of Sec. 68 (2) would not bind the Municipal Council. It must therefore follow that this contract could not be deemed to have come into existence after the auction was finished: and the final bid given by the defendant must be in the circumstances regarded as a mere offer. This had to be accepted within a reasonable time and could not be held to have remained open even after the period for which it was made. The acceptance of the offer by the Municipal Council in July 1930 was in our opinion misconceived.

5. It was argued by the learned counsel for the appellant that the resolution passed by the Municipality in July 1930 must at all events be*taken to have ratified the auction held in April 1929 and must be taken to relate back to the date on which the agreement was signed by the Chairman and other Municipal Councillors. It is hardly necessary to consider the correctness of the argument in regard to the doctrine of relation back as applied to contracts entered into by certain persons on behalf of others without their knowledge or authority particularly when the decision in Bolton v. Lambert, (1889) 41 Ch D 295 = 58 LJ Ch 425 = 60 LT 687 = 37 W R 434 on which reliance was placed by Mr. Patanjali Sastri in this connexion although not disapproved by their Lordships of the Privy Council in Fleming v. Bank of New Zealand, (1900) AC 577 = 69 LJPC 120 = 83 LT 1 = 16 TLR 469 at p. 587, was yet not approved of by them, and when we find that S. 68, District Municipalities Act, imposes a disability and thus forbids every person other than the Municipality from entering into or sanctioning a contract which exceeds Rs. 1000 in value. S. 196, Contract Act, refers to contracts which have been entered into by persons on behalf of others without their knowledge or authority but not to contracts which have been expressly forbidden either by those persons who are alleged to have ratified them later or by law. Moreover, an option of ratification could be held to be capable of being exercised within a reasonable time of the act purported to be ratified as held in Phillips v. Homfrey, (1871) 6 Ch A 770 and Morrell v. Studd, (1913) 2 Ch 648 = 83 LJ Ch 114 = 109 LT 628 = 58 S J 12 and not after the expiry of the period for which the option was open or as in this case three months after the expiry of the period for which the bid was given by the defendant. It is true that a distinction has been made at times between 'executed' and 'executory' contracts (See Leake on Contracts, Edn. 5, pp. 415-416), but S. 68, Madras District Municipalities Act, which we have now been called upon to construe, draws no such distinction and the word "contracts" used in that Section must be held to cover both "executed" and 'executory" contracts. We would therefore hold that there was no valid contract between the parties and the view taken by the lower Court on this point was correct.

6. This is however not enough to dispose of the case. The defendant had admittedly taken the rubbish and night soil from the Municipal depots for the whole year and has already paid, as stated above, a large portion of the amount out of what he had agreed to pay. Should the Municipality be held disentitled then to recover the balance or any other sum which may be found to be due either on the basis of quantum valabat or on the principle embodied in S. 70, Contract Act, on the ground that the contract has been found to be unenforceable? There was a divergence of opinion on this point so far as this Court is concerned and some of the cases had gone to the length of deciding that when an agreement was found to be unenforceable for want of fulfilment of statutory requirements the whole suit should be dismissed: See Raman Chetti v. Municipal Council, Kumbakonam, (1907) 30 Mad 290 and Ramaswami Chetti v. Municipal Council, Tanjore, (1906) 29 Mad 360. But a more equitable view has been taken in later cases. See Palaniswami Goundan v. English and Scottish Co-operative Wholesale Societies, 20 AIR (1933) Mad 145 = 145 IC 412, Arunachala Nadar v. Srivilliputtur Municipal Council, 21 AIR (1934) Mad 480 = 151 IC 46 = 58 Mad 65 = 67 MLJ 38 and Madura Municipality v. Raman Servai, 23 AIR (1936) Mad 98 = 161 IC 46 = 43 M L W 39. The language of S. 65, Contract Act, has been held by their Lordships of the Privy Council in Harnath Kunwar v. Indar Bahadur Singh, 9 AIR (1922) PC 403 = 71 IC 629 = 50 IA 69 = 45 All 179 = 26 O C 223 to include agreements which are destitute of legal effect from their inception, and would therefore cover a case like the present where the agreement in pursuance of which the defendant took delivery of the rubbish and night-soil has been discovered to be of no legal effect from the beginning. There are certain cases which appear to hold that S. 65 would have no application where the void character of the agreement was known to the party: see Ledu Coachman v. Hiralal Bose, 3 AIR (1916) Cal 266 = 29 IC 625 = 43 Cal 115 = 21 C LJ 537 = 19 CWN 919; Nathu Khan v. Sewak Koeri, (1911) 15 CWN 408 = 9 IC 161. But these cases were decided on the principle that the contracts being either immoral or opposed to public policy were inherently illegal and the parties being in pari delicto the Courts could not render any assistance in enforcing them. The same cannot be said however of cases where agreements are held to be merely unenforceable on account of a failure to comply with certain forms or for want of giving expression to an agreement in the manner prescribed by law. The reason for this difference is obvious. It is impossible for a Court to give effect to or recognize an illegal transaction either by enforcing it or by ordering restitution to a party after it has been wholly or partially carried out. But when an agreement is discovered to be unenforceable and not illegal and when a party has not been guilty of any conduct which would disentitle him to come to Court there appears to be no reason why the principle underlying S. 65 should not be given effect to.

7. It is hardly necessary to refer to English cases in this connexion. Apparently, the language employed in S. 65 is much wider than the one employed in the Act of Parliament which came up for construction before Lindley L. J. in Young & Co. v. Mayor and Corporation of Royal Leamington Spa, (1883) 8 AC 517 = 52 LJ QB 713 = 49 LT 1 = 30 W R 500 and since the statutory law of India is different from that which prevailed in England, the English decisions could not be of much value in interpreting the Indian statute. While examining Ss. 65 and 70, Contract Act, a number of Indian decisions came to our notice and since most of them have taken the view which we ourselves take of these Sections it would be supererogatory to do anything more than cite them : see Municipal Committee, Gujranwala v. Fazl Din, 16 AIR (1929) Lah 742 = 121 IC 187 = 11 Lah 121 = 81 P LR 403, Municipal Committee, Lahore v. Miran Baksh, 20 A 1 R (1933) Lah 15 = 140 IC 621 = 13 Lah 561 = 33 P LR 1051, Zulaing v. Yamethin District Council, 19 AIR (1932) Rang 176 = 140 IC 737 = 10 Rang 522, Mohammad Ebrahim Molla v. Commissioners for Port of Chittagong, 11 AIR (1927) Cal 465 = 103 IC 2 = 54 Cal 189 and Pallonjee Eduljee & Sons v. Lonavala City Municipality, 24 AIR (1937) Bom 417 = 171 IC 660 = ILR (1937) Bom 782 = 39 Bom LR 835. A Pull Bench case of the Lucknow Chief Court, Municipal Board, Lucknow v. S.C. Deb, 19 AIR (1932) Oudh 193 = 137 IC 574 = 8 Luck 1 = 9 CWN 461 (F B) takes a different view however. Having given our careful attention to the matter and with deference to the learned Chief Judge who wrote the leading judgment in that case we have not been impressed by the reasons underlying that decision. If the English cases on which reliance was placed are not taken into account, as they cannot be for the reason which has been mentioned above, the decision if analyzed will be found to have been arrived at mainly on two grounds:

(1) that in the event of a divergence between a special law and the general law of the country the former has to be preferred and

(2) that a man cannot be allowed to do by indirect means what he is forbidden by law to do directly.

8. The propositions advanced by the learned Chief Judge may be sound but did they have any application to the facts of that case ? Is the special law in any way different from what has been described to be the general law of the country ? According to the learned Chief Judge there is a conflict between the general law of the country as laid down in S. 65, Contract Act and the so-called special law in S. 97, United Provinces District Municipalities Act. We do not agree with this statement. The special law in the United provinces municipalities act is almost the same except in regard to certain minor details as contained in Ss. 68 and 69, Madras District Municipalities Act (4 of 1884) and defines how certain contracts between the municipalities and private individuals have to be made or expressed in order to be binding. S. 65, Contract Act, on the other hand only provides for the devolution of an obligation on a person who has received some advantage under an agreement which has been discovered to be void or unenforceable from the very beginning. The Sections of the two Acts were framed by Legislatures with entirely different objects and one cannot be said to be in conflict with the other. S. 65, Contract Act, was meant to cover those agreements as well which are discovered to be void from their inception while Ss. 96 and 97, United Provinces District Municipalities Act or Ss. 68 and 69, Madras District Municipalities Act (4 of 1884), apply to contracts only. The distinction between an agreement and a contract must not be lost sight of. It would thus appear that the provisions of S. 65, Contract Act, were only intended to come into play when an agreement was discovered to be unenforceable at law according to the rules laid down in Ss. 96-97, United Provinces District Municipalities Act or Ss. 68 and 69, Madras District Municipalities Act. The result is that instead of their being any conflict between* the special and general laws we find that the general law would permit a party to get relief when on account of a special law the agreement cannot be considered to be enforceable or in other words characterized as a contract.

9. So far as the second ground for the decision is concerned, the underlying assumption appears to be that a party in asking for restoration or compensation under S. 65, Contract Act, on account of the agreement having been denied the status of a contract, is nonetheless enforcing the same. This is not correct. In a suit on the basis of a contract, a party is trying to enforce its terms while in a suit under S. 65, a party merely asks for restoration or compensation as the agreement has not matured into a contract and he wants to be placed in the position in which he would have been if no agreement had been entered into. Moreover, a perusal of these Sections in the District Municipalities Act would show that the Municipalities or their officers and members were not forbidden to enter into contracts. What they appear to lay down is that if a certain contract is entered into either by a person not mentioned in these Sections or without the formalities regarded by them to be indispensable it would not be binding on the Board or the Municipality. First of all the rule only safeguards the interests of the Municipalities and does not specifically lay down that the contracts would not be enforceable at their instance. But even if the doctrine of mutuality is held to be applicable the only inference would be that the contracts could not be enforced by either party. It cannot be legitimately contended that in asking for a relief under S. 65, Contract Act, they are doing the same thing indirectly as was forbidden by the Municipalities Act. It would be extremely inequitable to find that when a contract has not been entered into by authorized persons or is found to be unenforceable for want of certain formalities, the advantage gained by a party should not be, when it was not intended to be gratuitous, restored or compensated. The Courts in India are and have been administering both law and equity and there is no reason why this equitable relief, which since the passing of Judicature Acts is grantable even by the Courts in England, should not be grantable here. The relief which a person asks for under S. 65 Contract Act, has not been forbidden by any law and it cannot be legitimately argued that in trying to secure such a relief he is attempting to do indirectly what he had been forbidden by law to do directly. By asking for an equitable relief he cannot; ' be said to have got round the law. Indeed; he ought to be taken to have admitted that the law does not permit such agreements to be enforced and it is only then that he asks the Courts to exercise its equitable jurisdiction in restoring the parties to the position in which they were before these infructuous agreements came into existence. We will be, by holding S. 65, Contract Act, to be applicable, giving effect to both the letter and the spirit of the law.

10. The same conclusion would be arrived at if we hold that the contracts did not exist in the eye of law. In the absence of such a contract S. 70, Contract Act could well be applied. It cannot be said that there was anything unlawful in permitting the defendant to remove the rubbish or night-soil. It was certainly not intended to be done gratuitously and the benefit was on the defendant's own showing enjoyed by him. We must therefore hold that as the defendant is unable to restore the rubbish and the night-soil which he had taken from the Municipal depots he must make compensation for it to the plaintiff Municipality. The next point for determination is the amount of compensation to which the plaintiff is entitled under Ss. 65 and 70, Con. tract Act. The defendant had agreed to purchase the rubbish and night-soil for the year 1928-29 for a sum of Rs. 53,500. He offered to purchase the same for the year 1929-30 for a sum of Rupees 55,500? The increase in the offer was not apparently due to any increase in the market rates but in all probability to the fact that the Municipality had invited tenders for the removal of rubbish and night-soil by motor lorries instead of by Municipal carts : see Exs. J and J-l. A remark in Ex. Q that the depot for collections would be removed to the new site near Mathukattinam tank, Yandiyur limits leads as to think that this was also one of the factors which had induced the defendant to make a higher bid in the auction. The contract for the removal of rubbish and night-soil by motor lorries was given after a few months and the depots were not shifted to the new site during the whole of the period in which he removed them. If the defendant had not been convinced of these facts it is improbable that he would have exceeded the bid which he had given in the previous year. On account of the delay on the part of the Municipality in carrying out these changes we are inclined to hold that the proper measure of compensation would be the amount which the defendant had agreed to pay for the previous year particularly when the defendant has admitted in his statement as a witness that the prices of the rubbish and night-soil had not fallen during the year 1929-30. The defendant has not produced all the accounts which were in his possession and in the absence of the original chits in which the accounts were kept we are not prepared to believe that the accounts produced by him relate to all the supplies which were made to him from various depots. We must therefore hold that he was liable to pay Rupees 53,500 as compensation to the Municipality. Having paid Rs. 51,318-8-11 he is liable to pay balance Rs. 2181-7-1. In the absence of any contract, there is no liability to pay any interest and the same cannot be decreed. We would therefore pass a decree for Rs. 2181-7.1 in favour of the Municipality. As the parties have partly succeeded and partly failed the proper order in the circumstances appears to be that they should bear their own costs both here and in the Court below.

11. Before parting with this case we must however advert to the illegible handwriting in which the evidence was recorded by the learned Subordinate Judge. We had occasion to refer to it during the course of the argument to verify the printed statements and we found it impossible to read them or to decipher as to what had been written by him. It may not be possible to insist on the handwriting being good but it must be legible. It is a surprise to us how the record of evidence which is almost indecipherable was at all printed. We hope that the learned Subordinate Judge would take steps in future to see that the statements recorded by him are not difficult to read.