Hisar Ram Nagar Co-Op House Building Society Ltd. Hisar Petitioners v. State Of Haryana & Ors. S
Judgment Summary — M.M. Kumar J. (09.02.2010)
Factual and Procedural Background
The petitioner is a society registered under the Punjab Cooperative Societies Act, 1961 as applicable to Haryana. The society purchased land from Chaudhary Bhajan Lal and his wife by a registered sale deed dated 16.05.1990 (the opinion also contains a later reference to 16.06.1990). The land comprises several khasra numbers within the municipal limits of Hissar and is described in the opinion as a fully developed area with commercial and residential facilities. The land purchased by the petitioner totals approximately nine kanals (details of kanal/marla splits are recorded in the opinion).
The land had been the subject of repeated acquisition attempts under Sections 4 and 6 of the Land Acquisition Act, 1894:
- Notification under Section 4 dated 15.11.1969 (published 23.12.1969) — allowed to lapse.
- Notification under Section 4 dated 25.08.1974 — allowed to lapse.
- Notification under Section 4 dated 01.09.1977 and a declaration under Section 6 dated 12.08.1980 — both were quashed by this Court on 19.02.1982 in Ghansham Dass Goyal & ors. v. State of Haryana & anr (1982 PLJ 146).
- Notification under Section 4 dated 23.05.1983 and a declaration under Section 6 dated 20.11.1984 — those proceedings resulted in release of certain lands (including lands of influential persons) and the rest of the acquisition was upheld by a Full Bench (reported AIR 1986 P&H 207).
After purchase by the society, the State again issued a notification under Section 4 dated 21.03.1991 (Annexure P7) and a declaration under Section 6 dated 18.03.1992 (Annexure P8). The petitioner filed objections under Section 5-A, alleging mala fide acquisition and discrimination (pointing out earlier exclusion of adjacent khasra numbers and that plots had been allotted to its members and some construction had been raised). The petitioner sought quashing of the 1991 notification and the 1992 declaration. A Division Bench granted interim stay of dispossession on 31.07.1992; the petition was later admitted for hearing on 05.11.1992.
Legal Issues Presented
- Whether the notification dated 21.03.1991 (Annexure P7) under Section 4 and the declaration dated 18.03.1992 (Annexure P8) under Section 6 of the Land Acquisition Act, 1894, can be quashed as liable to be set aside.
- Whether land that was earlier released from acquisition can be re‑acquired for the same purpose in the absence of a change in circumstances.
- Whether the acquisition of the petitioner’s land was vitiated by mala fide action or discriminatory treatment (particularly in light of adjacent khasra numbers being excluded earlier and the alleged preferential treatment of influential persons).
- Whether allotment of small plots (about 160 sq. yards) to low-income members and subsequent construction on those plots affects the validity of acquisition notifications for the same purpose.
Arguments of the Parties
Petitioner's Arguments (Mr. Jaswant Jain)
- Once land has been released from acquisition, it cannot be re-acquired for the same purpose unless there is a change in circumstances warranting re-acquisition. Reliance was placed upon observations in Paragraph 8 of Roshan Lal & ors. v. State of Haryana & ors (2003-3 PLR 199).
- The society had carved out plots of about 160 sq. yards and allotted them to its members; construction on these plots had already been raised, so acquisition would result in demolition and serious hardship.
- Reliance on the Supreme Court decision in Ghaziabad Sheromani Sahkari Avas Samiti Ltd. v. State of U.P. (AIR 1990 S.C. 645) and on this Court’s earlier Single Judge decision in National Fertilizers Employees Cooperative Housing Society Limited v. State of Haryana ((1998) 3 PLR 618) to contend that acquisition in such circumstances is liable to be quashed.
- Allegation of discrimination and mala fide: the land was not acquired while it remained with Chaudhary Bhajan Lal and his wife, but was targeted after purchase by the petitioner-society; adjacent khasra numbers had been excluded earlier.
- Pointed to selective release of some plots (e.g., Tara Singh and Gurcharan Singh) as evidence of inconsistent or discriminatory treatment.
Respondents' Arguments (State — Mr. Kamal Sehgal, Addl. A.G.)
- The State’s case, as set out in the written statement, did not dispute the basic facts but explained the lapses of earlier notifications on administrative grounds (e.g., scheme of Urban Estate-II not being completed, limited plot sales under that scheme).
- The State denied mala fide: earlier notifications lapsed for administrative reasons and not out of improper motive.
- The explanation for the release of certain lands in 1984 was that those lands were close to municipal and HUDA disposal works and therefore were excluded because they were unsuitable for residential allotment.
- The petitioner's land had been included in the Section 6 notification on the ground that it had “C” class construction, whereas only areas with “A & B” class construction were released from acquisition (reference to Paragraph 20 of the written statement).
- The State denied that the petitioner itself had filed objections under Section 5-A (though the record showed some plot holders had filed objections and that some plot holders’ lands were released from acquisition).
Table of Precedents Cited
| Precedent | Rule or Principle Cited For | Application by the Court |
|---|---|---|
| Ghansham Dass Goyal & ors. v. State of Haryana & anr — 1982 PLJ 146 | Earlier notifications (01.09.1977 & 12.08.1980) were quashed by this Court in this matter. | The Court recounts that the 1977/1980 notifications were quashed by this Court on 19.02.1982 and that later Full Bench proceedings (AIR 1986 P&H 207) upheld the remaining acquisition while recording that certain fields were excluded from acquisition. |
| Ghansham Dass Goyal & ors. v. State of Haryana & anr — AIR 1986 P&H 207 (Full Bench) | Full Bench treatment of the challenge to 1983/1984 acquisition; explains release/exclusion of certain lands. | The Court relies on this history to show that the specific land at issue had previously been excluded from acquisition in the 1984 declaration on stated grounds (proximity to disposal works), a fact recorded in Paragraphs 15–16 of that judgment. |
| Roshan Lal & ors. v. State of Haryana & ors — (2003-3) PLR 199 | Observation (Paragraph 8) that supports the proposition that land released from acquisition should not be re-acquired for the same purpose unless there is a change in circumstances. | The Court draws support from Paragraph 8 of Roshan Lal to hold that once land was released earlier, it could not now be re-acquired for the same purpose absent cogent evidence of change in circumstances. |
| Ghaziabad Sheromani Sahkari Avas Samiti Ltd. v. State of U.P. — AIR 1990 S.C. 645 | Supreme Court quashed acquisition notifications after recording satisfaction about the genuineness of grievances made by members of house-building societies intended to serve low-income groups. | The Court considered the Supreme Court's approach to quash notifications in similar factual circumstances (allotment of small plots for low-income members and construction raised) and applied the same reasoning to the present facts to conclude the impugned acquisition could not be sustained. |
| National Fertilizers Employees Cooperative Housing Society Limited v. State of Haryana — (1998) 3 PLR 618 | This Court’s prior Single Judge decision followed the Ghaziabad Sheromani principle in a similar context. | The Court notes that this Court has earlier followed the Supreme Court’s approach and uses that consistency to support quashing the acquisition in the present case. |
Court's Reasoning and Analysis
The Court’s reasoning proceeded in sequential factual and legal steps, applying established principles cited in authority and as recorded in the record:
- Repeated attempts to acquire the land over a long period (since 1969) were material to the Court’s view. The Court observed that issuance of repeated notifications for acquisition tends to depress and “peg down” the market price and is not judicially acceptable. The opinion recounts multiple notifications which were allowed to lapse or were later quashed.
- The Court emphasized the prior release of this specific land from acquisition in the 1984 declaration on the stated administrative ground that it was close to municipal and HUDA disposal works (and therefore unsuitable for residential allotment). That decision to release the land was recorded in the Full Bench judgment in Ghansham Dass Goyal.
- The Court accepted the petitioner’s factual position that after release the society purchased the land and parceled it into small plots (approximately 160 sq. yards) which were allotted to many members and that construction had already been raised on several of those plots.
- On the legal question whether the State may re-acquire land earlier released, the Court relied on the proposition (drawn from Roshan Lal) that once land is released it cannot be re-acquired for the same purpose unless there is a demonstrable change in circumstances. The Court found no pleadings or cogent evidence of any change in circumstances that would justify re-acquisition.
- The Court applied the Supreme Court’s approach in Ghaziabad Sheromani Sahkari Avas Samiti Ltd. — where notifications were quashed because of the genuine grievances of membership-based societies (particularly for low-income groups) and the fact of plot allotment and construction — and noted that this Court had previously followed that approach in National Fertilizers.
- The Court also observed that two members’ plots (Tara Singh and Gurcharan Singh) had been released from acquisition by order dated 16.01.2008, reinforcing the pattern of selective release and the fact that some released plots were recognized by later administrative orders.
- Considering all these factors together — repeated failed acquisition attempts, prior administrative exclusion of the land, allotment and construction of small residential plots to many low-income members, and supportive precedent — the Court concluded that the impugned acquisition notifications could not be sustained.
Holding and Implications
Holding: The Court allowed the writ petition. In particular, the Court QUASHED the notifications dated 21.03.1991 (Annexure P7) and 18.03.1992 (Annexure P8) issued under Sections 4 and 6 of the Land Acquisition Act, 1894. The parties were directed to bear their own costs.
Implications:
- Direct effect: The immediate legal consequence is that the two impugned acquisition instruments are declared void and the petition succeeds — the State may not proceed with acquisition based on those instruments as quashed by this Court.
- Practical consequence for the parties: The petitioner’s challenge is upheld so that the previously allotted plots and constructions are protected from dispossession pursuant to the quashed notifications (the opinion grounds this result on the Court’s reasoning and cited precedents).
- Precedential/ broader implications: The opinion relies on existing authorities (including the Supreme Court’s decision in Ghaziabad Sheromani and this Court’s earlier decisions) and applies those principles to the facts. The judgment does not purport to create a new legal doctrine beyond applying settled principles that land released from acquisition should not be re-acquired for the same purpose without a change in circumstances; the decision is thus grounded on prior case law and the specific factual matrix of this petition.
Judge: M.M. Kumar J. (opinion). The two-judge bench entry also records "sailesh (Jitendra Chauhan) Judge" at the end of the record.
M.M Kumar J.
The petitioner has approached this Court with a prayer for quashing Notification dated 21.03.1991(Annexure P7) issued under Section 4 of the Land Acquisition Act, 1894 (for brevity ‘the Act’). A declaration was made under Section 6 of the Act on 18.03.1992 (Annexure P8).
Brief facts of the case which has led to the filing of th instant petition are that the petitioner is a Society registered uner the Punjab Cooperative Societies Act, 1961 as applicable to th State of Haryana. The Society has purchased the land measuring 9 canals from Chaudhary Bhajan Lal, former Chief Minister, Haryana and his wife, Smt. Jasma Devi vide a registered sale deed dated 16.05.1990 The land purchased from Chaudhary Bhajan Lal is agricultural land measuring 3 kanal and 8 marlas situated at Hisar bearing Hadbast No. 146 of Hisar Town bearing khasra No. 4700/1 (1-10), 4702/1 (0-8) 4699/2 (0-15) and 15/127th share out of the land 6 kanals 7 marlas bearing khasra No. 4705/1 which comes to 15 marlas. Similarly, the land measuring 5 kanals 12 marlas was purchased from Smt. Jasma Devi wife of Ch. Bhajan Lal, Chief Minister, Haryana bearing khasra No. 4705/1 (6-7) having 112/127 share which comes to 5 kanals 12 marlas. The land is within the municipal limits of Hissar which is fully developed area, bounded by two main-roads, viz., Hissar-Delhi road which is a national highway and Hissar-Toshina road which is State highway. The fully developed modern commercial and residential modern town is in existence which is across the road, the model town has all facilities of well developed markets, schools, banks, various Government offices, sewerage, water supply, electricity, telephone facilities etc. It is thus claimed that the land belonging to the petitioner is highly valuable.
The petitioner has alleged that the land in dispute has been subjected to repeated notification for acquisitions. The first notification under Section 4 of the Act was issued on 15.11.1969 which was published in the Haryana Government Gazette on 23.12.1969 (Annexure P1). However, it was allowed to lapse and no notification could be issued within a period of 3 years. Thereafter, agin, another notification under Section 4 of the Act was issued on 25.08.1974, proposing to acquire 2.16 acres of land which again was allowed to lapse. Another attempt was made by issuing notification dated 01.09.1977 under section 4 of the Act proposing to acquire the same land for the alleged public purpose of development and its utilization as residential area by the Haryana Urban Development Authority (Annexure P3). It is also alleged that no steps was taken for completing the acquisition. However, few days before the expiry of 3 years period, a declaration under Section 6 of the Act was made on 12.08.1980, acquiring 2.12 acres of land (Annexure P4). The land owners challenged the aforesaid notification before this Court and both the notifications dated 01.09.1977 and 12.08.1980 (Annexures P3 & P4) were quashed by this Court on 19.02.1982 in the case of Ghansham Dass Goyal & ors. v. State of Haryana & anr. 1982 PLJ 146.
Once again, fourth attempt was made and notification under Section 4 of the Act was again issued on 23.05.1983 (Annexure P5). The respondent-authorities issued declaration dated 20.11.1984 under Section 6 of the Act (Annexure P6) for releasing the land belonging to influential persons which included the land belonging to persons like Chaudhary Bhajan Lal and his relations. Even other prominent persons like Bhagwat Swaroop and Mani Ram Mittal, who were affected by notification under Section 4 of the Act were granted benefit as their land was excluded from the notification issued under Section 6 of the Act. Again, both the notifications were challenged before this Court by various land owners. The matter was referred to Full Bench of this Court which dismissed all the writ petitions. The judgment is reported name by Ghansham Dass Goyal & ors. v. State of Haryana & anr. AIR 1986, Punjab & Haryana High court, 207. However, the land belonging to Chaudhary Bhajan Lal, the former Chief Minister of Haryana and his wife, which were purchased by the petitioner was left out from acquisition. The aforesaid fact has been recorded in Paragraphs 15-16 of the judgment which reads as under:
“15. Mr. Jaswant Jain, learned counsel, appearing in CWP Nos. 5627 & 5628 of 1984 sought to raise an additional argument that a discriminatory treatment has been meted out to the petitioners, inasmuch as the land beneath the houses of the petitioners is being acquired, while the land of some other persons on which houses are standing; has been left out. In support of his contention, reference was made to the averments made in para 14 of the writ petition, which reads as under:
“That to the surprise of the petitioners, the respondents authority issued yet another notification dated 20.11.1984 under S. 6 of the Act whereby the land measuring 159.75 acres was finally acquired and the said land included the lands/houses of the petitioners. It is pertinent to mention here that the houses of Bhagwat Sarup and that of wife of Mani Ram Mittal bearing the same Khasra No. i.e 4693 Min. where the houses of the petitioners are situated and where these houses belonging to the petitioners which are in between the houses of Bhagwat Sarup and Mani Ram Mittal have been left from acquisition. Similarly, Tara Chand and Balbir's houses situated in between the houses of the petitioners have been left from acquisition. Similarly land bearing Khasra Nos. 4698, 4702, 4703 and 4704 belonging to the Chief Minister, Haryana, Chaudhary Bhajan Lal and his relations and other co-sharers have been left from acquisition while issuing notifications under S. 6 of the Act. The aforesaid Khasra Nos. were excluded while issuing notification under S. 6 of the Act and thus the petitioners have been discriminated as against those whose houses/lands have been left from acquisition while issuing notification under S. 6 of the Act. Moreover, the notification under S. 6 of the Act has been issued without considering the objections filed by the petitioners under S. 5-A of the Act and without affording them any opportunity of hearing. A copy of the notification issued under S. 6 of the Act, dt. 20 of November, 1984 is attached herewith as Annexure-P/7 of this writ petition.”
16. The reply to the aforesaid para is in the following terms:-
“That in reply to para No. 14 of the writ petition it is submitted that the land and the houses which could be adjusted in the layout plan were adjusted and released from acquisition proceedings. The averment of the petitioners that houses belonging to them are in between the houses of Bhagwat Sarup and Mani Ram Mittal is miconceived, hence denied being incorrect. As already submitted, there is no residential house belonging to the petitioners on the spot. Rather there is only factory shed and boundary walls. It is further submitted that Khasra Nos. 4702, 4703 and 4704-min were excluded from the notification under S. 6 of the Act as these Khasra Nos. were situate close to the Municipal and H.U.D.A Disposal works and so it was thought advisable to drop acquisition proceedings qua this particular land, as nobody would like to be allotted residential plots near the disposal works, because of its foul and nasty smell. Due to this reason even land other than these 3 fields Nos. viz. 4702, 4703 and 4704 min have also not been included in the notification issued under S. 6 of the Act. As regards Khasra Nos. 4698 and 4704, it is submitted that parts of these khasra Nos. are also being acquired by the respondent. As regards the residential house of Sh. Balbir Singh and Sh. Tara Chand these were located on Delhi Road and about one furlong away from the land of the petitioners. The residential houses of these two persons were left out of acquisition being a standard construction and these could be adjusted in the proposed layout plan. The averments of the petitioners that they have been discriminated against and that notification under S. 6 of the Act has been issued without considering the objections under S.5-A of the Act are highly misconceived, hence denied being incorrect.”
The basic reason for excluding the land from acquisition was that it was situated close to the municipal and HUDA disposal works. Therefore, it was thought well to drop the acquisition proceedings in respect of this land as no one would like allotment of residential plots near the disposal works on account of its foul and nasty smell.
After the purchase of land by the petitioner on 16.05.1990, the respondent-State again resorted to acquisition by issuing notification dated 21.03.1991 under Section 4 of the Act (Annexure P7) and eventually, acquiring the same by issuing declaration dated 18.03.1992 (Annexure P8). It is appropriate to mention that the petitioner-Society filed objection under Section 5-A of the Act. A specific objection was raised that the land has been purchased by the petitioner-Society because it was released from after a conscious decision was taken to exclude it from the notification issued under Section 6 as the land was situated close to the municipal and HUDA disposal works. Meanwhile, the land has been allotted in the shape of small plots to its members for construction of their residential houses and construction on the allotted plots by some members have already been raised. The petitioner also requested for grant of personal hearing to the objections submitted by it. However, the declaration was issued under Section 6 of the Act on 18.03.1992 The petitioner has also leveled allegations of mala fide inasmuch as it has been stated that as long as the land remain with the former Chief Minister, Chaudhary Bhajan Lal and his wife, then it was not acquired but after the purchase of the same by the petitioner-Society, the same has been sujected to acquisition. The petitioner also pleaded discrimination inasmuch as the site plan, khasra numbers adjacent to the acquired land have been excluded. For illustration, Khasra No. 4700.Min. South, 4701/1, 4702.Min. South, 4703, 4704 and 4705.Min. South have been cited which are marked with red colour on the site plan (Annexure P9).
In the written statement filed by respondents, facts have not been disputed. With regard to allowing the notification to lapse, which was issued on 23.12.1969 (Annexure P1), the justification given is that the Government took a decision at a later stage that the land in question along with other land would be acquired if the scheme for Urban Estate- II has been executed. Similar explanation has been furnished with regard to notification issued on 28.05.1974 It has been clarified that the scheme of Urban Estate- II which was likely to be concluded up to the end of 1975, could not be completed till then. It has been submitted that only 600 plots out of 3137 plots were sold under that scheme. The allegation of mala fide in allowing the scheme to lapse has been denied. It has also not been disputed that the notification issued on 01.09.1977 and 12.08.1980 were quashed by this Court on 19.02.1982 in the case of Ghansham Dass Goyal (supra) 1982 PLJ 146. With regard to releasing the land of influential persons as alleged by the petitioner, the respondent has submitted that the land and houses which could be adjusted in the scheme were released from acquisition and vide notification dated 20.11.1984, issued under Section 6 of the Act, land measuring 159.75 acres were finally acquired. It has also been denied that any objection under Section 5-A was filed by the peitioner against the impugned notification. However, some of the plot holders of the petitioner-Society had filed their objection under Section 5-A. It has also not been disputed that the land of some of the plot holders have been released from acquisition.
At the stage of motion hearing, a Division Bench of this Court had stayed dispossession of the petitioner vide order dated 31.07.1992 The stay order continued to operate when the petition was admitted for hearing on 05.11.1992
We have heard the learned counsel for the parties at considerable length.
Mr. Jaswant Jain, learned counsel for the petitioner, has argued that once the land was released from acquisition, then it cannot be acquired once again for the same purpose unless there is change in circumstances warranting acquisition of land. For the aforesaid proposition, Mr. Jain has placed reliance upon the observation made by this Court in Paragraph 8 of the judgment rendered in the case of Roshan Lal & ors. v. State of Haryana & ors. (2003-3) PLR 199. He has further submitted that when the land is sought to be acquired for a purpose for which it has already been utilized by the petitioner, then it is not proper to acquire the land for a similar purpose by the respondent-State. In support of his submission, learned counsel has placed reliance on a judgment of Hon'ble the Supreme Court rendered in the case of Ghaziabad Sheromani Sahkari Avas Samiti Limited etc. v. State of U.P etc. AIR 1990 S.C 645 and a judgment of this Court rendered by learned Single Judge in the case of National Fertilizers Employees Cooperative Housing Society Limited v. State of Haryana, (1998) 3 PLR 618. Learned counsel has placed reliance on the facts that plot measuring about 160 Sq. yards (with variations in one or two plots) have already been allotted to the members of the petitioner-Society and they have also raised construction. According to the learned counsel, once the petitioner-Society has allotted the plots and its members have built the same, it would not be proper to acquire the land which would result into demolition of huge construction. Mr. Jain has concluded his argument by submitting that discrimination is writ large as the plots belonging to the members of the petitioner-Society, S/Sh. Tara Singh and Gurcharan Singh were released from acquisition who have filed CWP No. 850 & 851 of 1994 which have been disposed of. However, the respondent-State has released the acquired land of S/Sh. Tara Singh and Gurcharan Singh by order dated 16.01.2008 (Annexure P13).
Mr. Kamal Sehgal, Addl. A.G, Haryana has argued that the case of the petitioner was considered and only that area which had A & B Class construction was released from acquisition. According to the learned counsel for the State, the petitioners' land had been included in notification under Section 6 of the Act because it had ‘C’ Class construction. In that regard, he has drawn our attention to Paragraph 20 of the written statement.
After hearing learned counsel for the parties and perusing the record, we are of the view that the acquisition proceedings in respect of the land belonging to the petitioners, initiated by the respondent-State cannot be sustained. It is well settled that the issuance of repeated notifications for acquisition of land results into pegging down the price and it is not judicially aceptable. In the present case, the land in dispute is sought to be acquired since 1969 and the first notification was allowed to lapse by the respondent-State on the excuse that the scheme concerning Urban Estate II was in the process of completion. It did not require much imagination that the scheme was unlikely to complete when the notification under Section 4 of the Act was issued in 1969. The respondent, however, preferred to again issue notification under Section 4 of the Act in 1974 which again was permitted to lapse. The third attempt which resulted into issuance of notification under Sections 4 & 6 of the Act on 01.09.1977 and 12.08.1980 did not succeed as the acquisition was quashed by this High Court on 19.02.1982 When the land was sought to be acquired fourth time in 1983 and in 1984 (Annexures P5 & P6), then the land belonging to the petitioner was released on the ground that no body was likely to have a plot allotted near the municipal and HUDA disposal works. The acquisition of the rest of the land was upheld along with the release of this land by a Full Bench of this Court in the case of Ghansham Dass Goyal(Supra). Thereafter, the land was purchased by the petitioner-Society vide registered sale deed on 16.06.1990 The respondent yet again issued impugned notification on 21.03.1991 and 18.03.1992 (Annexures P7 & P8). The purpose of purchase of land by the Society was to develop a residential colony by allotting the plots to its members. The plots have already been allotted as is evident from the site plan (Annexure P10). The plot measures about 160 Sq. yards and construction have also been raised on these plots. It was in somewhat similar circumstances that Hon'ble the Supreme Court in the case of Ghaziabad Sheromani Sahkari Avas Samiti Limited's case (supra) has quashed the notification issued under Section 4 & 6 of the Act after recording its satisfaction about the genuineness of the grievance made by the members of various house building societies which were to cater to the need of low pay group. In the present case also, 160 Sq. yards plot is to be allotted to the members and the purpose of acquisition is also similar to the one for which the Society has carved out the plots. The aforesaid view of Hon'ble the Supreme Court has been followed by this Court in National Fertilizers Employees Co-operative House Building Society Limited's (supra) case. Therefore, the writ petition deserves to be allowed on this short ground alone because the plot of 160 Sq. yards is sought to be allotted to large number of employees who are in the lower income group. Moreover, the land was earlier released on the pretext that it was situated close to the Municipal Committee and HUDA disposal works. No change in the facts and circumstances has been pleaded. Therefore, once the land was released, then it cannot be acquired for the same purpose unless it is shown by cogent evidence that there is change in circumstances. For the aforesaid view, we draw support from the observation made in Paragraph 8 of the judgment in Roshan Lal's case (supra). Another aspect of the matter is that plots of two members stands already released from acquisition as is evident from the perusal of order dated 16.01.2008 According to the aforesaid order, the Government had decided to release the land measuring 288 Sq. yards belonging to S/Sh. Tara Singh and Gurcharan Singh who are members of the petitioner-Society.
For the reasons aforementioned, this petition succeeds. The notification dated 21.03.1991 (Annexure P7) and 18.03.1992 (Annexure P8), issued under Section 4 & 6 of the Act, are hereby quashed. The parties are left to bear their own costs.
(M.M Kumar) JUDGE