R.K Mandal v. Shree Ramayan Singh

Patna High Court
Dec 18, 1996
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Structured Summary of the Opinion (Radha Mohan Prasad, J.)

Factual and Procedural Background

The petitioners sought quashing of the criminal prosecution pending as Special Case No. 169 of 1983 (arising out of Vigilance P.S. Case No. 53 of 1979) before the Special Judge, Vigilance, Patna. The sole ground relied on in the writ petition was that the prosecution had continued for more than seventeen years and thereby infringed the petitioners' right to a speedy trial guaranteed by Article 21 of the Constitution.

Procedurally, a Division Bench of this Court had earlier allowed the writ petition and quashed the impugned proceedings by judgment and order dated 29 June 1995. The State of Bihar challenged that order by filing S.L.P. (Crl.) 4203 of 1995 in the Supreme Court, which was registered as Criminal Appeal No. 621 of 1996. The writ petition in this Court had initially been filed in the context of Full Bench decisions of this Court (Madheshwar Dhari Singh v. State of Bihar and State of Bihar v. Maksudan Singh), the operation of which had been stayed by the Supreme Court; this Court had stayed its own hands pending Supreme Court decisions. The Division Bench's quashing had relied on S.G. Nain v. Union of India, but the Supreme Court set aside that order and directed disposal in light of the principles laid down in Abdul Rehman Antuley (Antuley) and other Supreme Court authorities. The matter was ultimately heard and decided by the Single Judge delivering this opinion.

Substantive factual allegations are that, on a written report dated 18.9.1979, prosecution was instituted on 19.9.1979 under Sections 420, 120B, 467, 468, 409 IPC and Sections 5(2) and 5(1)(d) of the Prevention of Corruption Act read with Section 109 IPC. The prosecution alleged that officers of the Irrigation Department (the petitioners), in conspiracy with others including Shri A.M.S. Zoha, auctioned scrap iron at an undervalue and allowed removal of useful iron, resulting in alleged excess removal of material (14.136 MT allegedly in excess of records) and loss to government funds.

The investigation reportedly took about seven years; a charge-sheet was filed on 5.9.1986 and the court took cognizance on 20.9.1986. Supplementary material before this Court included departmental enquiry records showing that the petitioners were absolved in departmental proceedings. During the pendency of the writ petition, petitioner No.1 (R.K. Mandal) died on 26.2.1988.

Legal Issues Presented

  1. Whether the continued prosecution of the petitioners for over seventeen years (with an investigation period of seven years before filing the charge-sheet) infringes their constitutional right to a speedy trial under Article 21 of the Constitution.
  2. Whether the reasons and explanations offered by the prosecution (paucity of staff, delay due to other investigations, delay in obtaining sanction for prosecution, intervening general election and interim court orders) suffice to justify the delay and thereby preclude quashing of the prosecution.

Arguments of the Parties

Petitioners' Arguments

  • The petitioners were present in court throughout and did not cause any delay in trial proceedings.
  • Their continued prosecution for more than seven years from institution of the case (and more than seventeen years overall) violated their right to a speedy trial under Article 21.
  • They relied on the Supreme Court's decision in Abdul Rehman Antuley (Antuley) and argued that the prosecution should be quashed on the sole ground of infringement of Article 21.
  • A departmental enquiry had exonerated the petitioners of the charges; petitioner No.1 had died; and a material witness/approver (Superintending Engineer Zoha) was not sent for trial.

Respondent's Arguments

  • The nature of the offences (alleged misappropriation by public servants) made investigation time-consuming; various factors (number of accused, witnesses, court workload, means of communication and other circumstances) must be considered under the Antuley framework.
  • Delay in investigation was reasonably explained by paucity of staff, simultaneous engagement of investigating officers in other matters, delay in obtaining sanction for prosecution (letter dated 9.3.1984) and interruption due to general elections in which police personnel were on deputation.
  • Part of the delay occurred because of an order of stay of this Court (interim judicial orders), and therefore the prosecution should not be quashed; instead a direction could be issued to the trial court to conclude the trial within a specified reasonable period (for example, one year).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Madheshwar Dhari Singh v. The State of Bihar (1985 PLJR 767) Full Bench decision of this High Court relevant to sanction and delay issues in prosecution of public servants (basis for earlier writ filings in this Court). Referenced as one of the Full Bench authorities that prompted the filing of the writ petition; the Court noted that those Full Bench decisions had been taken to the Supreme Court and their operation had been subject to stay.
State of Bihar v. Maksudan Singh (1986 PLJR 946) Full Bench decision of this High Court relevant to prosecution/sanction issues (context for petitioners' approach to this Court). Noted as part of the background: the petition was filed mainly in view of these Full Bench judgments, which were under challenge in the Supreme Court.
State of Bihar v. Madheswardhari Singh and Dilip Kumar Dey The Supreme Court consideration which the High Court awaited before deciding criminal writ jurisdiction matters. The High Court had stayed its hands pending the Supreme Court decision in that matter; this formed part of the procedural history of the instant petition.
S.G. Nain v. Union of India (AIR 1992 S.C. 603) Authority relied upon by the Division Bench of this Court to treat a prosecution as stale. The Division Bench had relied on this decision to quash the impugned proceeding; however, the Supreme Court directed reconsideration in light of Antuley and set aside the Division Bench's order.
Abdul Rehman Antuley v. R.S. Nayak (reported AIR 1992 S.C. 1701 / 1992 (1) PLJR (SC) 41) Supreme Court Constitution Bench decision setting out principles for invocation of Article 21 in relation to delay in investigation and trial; factors to be weighed include nature of offence, number of accused, witnesses, court workload, and whether delays are in good faith. The Court applied the principles of Antuley: it examined whether the prosecution's explanations sufficed and concluded that unexplained delay (seven years in investigation and over 17 years of pendency) infringed the petitioners' right to speedy trial under Article 21.
Santosh De v. Archna Guha (AIR 1994 S.C. 1229) Following Antuley, held that an unexplained delay of eight years in commencement of trial infringes the accused's right to speedy trial. Used as supporting authority: the Court relied on Santosh De to reinforce that unexplained long delays infringe Article 21 and justify quashing of proceedings.
Biswanath Prasad Singh v. State of Bihar (1994 Suppl. (3) SCC 97) Supreme Court decision applying a stricter view in misappropriation-of-public-funds cases; unacceptable unexplained delay in filing the charge-sheet (five years) justified interference where prejudice and extensive delay were evident. Relied upon to show that in cases of alleged misappropriation of public funds, unexplained long delays in investigation and prosecution justify interference and quashing; the Court found the present case analogous in that no satisfactory explanation was shown for seven years' delay in investigation.

Court's Reasoning and Analysis

The court proceeded in structured fashion:

  1. It first recited the procedural history: earlier Division Bench quashed the proceedings relying on S.G. Nain; the Supreme Court set aside that order and instructed disposal according to the principles in Antuley's case. The matter was then heard finally.
  2. The court recounted the material factual timeline and prosecution sequence established on the record: proposal and approval for auction (1976), auction (22.9.1978), alleged over-removal and weighment discrepancies (late 1978–March 1979), F.I.R. lodged 19.9.1979, investigation taking about seven years, charge-sheet on 5.9.1986 and cognizance on 20.9.1986.
  3. The court considered the petitioners' core contention: delay in investigation and prosecution violated their right to speedy trial under Article 21. It also considered the State's counter-explanations (paucity of staff, other investigations occupying the investigating officers, delay in obtaining sanction, intervening general election and an interim stay).
  4. Applying the Antuley framework (and subsequent Supreme Court decisions), the court examined whether the explanations justified counting the delay as reasonable or in good faith. The court found that for the period after 16.12.1986 some delay may be attributable to circumstances not directly imputable to the prosecution; however, for the prior seven-year period of investigation no reasonable explanation was given in the record that would justify the lengthy delay.
  5. The court emphasized that the Apex Court had held that proceedings taken in good faith to vindicate rights would not be treated as delaying tactics; conversely, unexplained prolonged delays are not tolerated. The court found no record of active steps by the prosecution to expedite the investigation or the case during the crucial seven-year period.
  6. The court also took into account prejudicial and practical considerations: petitioner No.1 had died during pendency, the Superintending Engineer who approved the auction had not been sent up for trial, petitioners had been exonerated in departmental enquiries, and the considerable passage of time would make a fair trial difficult and risk further delay and prejudice.
  7. On these bases, and having regard to the cited Supreme Court authorities (Antuley, Santosh De, Biswanath Prasad Singh), the court concluded that the petitioners' right to speedy trial under Article 21 had been infringed and that the prosecution ought to be quashed.

Holding and Implications

Holding:

DISPOSED OF — The writ application is allowed and the impugned proceeding of Special Case No. 169 of 1983 pending in the court of the Special Judge, Vigilance, Patna is quashed.

Implications:

  • Direct effect: The criminal prosecution in Special Case No. 169 of 1983 (arising out of Vigilance P.S. Case No. 53 of 1979) against the petitioners is quashed; the petitioners are thereby relieved from further criminal proceedings in that special case.
  • Practical consequences cited by the court included recognition that, after a very long lapse of time, a fair trial would be difficult (witness presentation problems, death of a petitioner, absence of a key public official from the trial), and that continuation would amount to harassment and waste of public time and resources.
  • Broader precedent: The opinion applied and followed Supreme Court authorities (Antuley and subsequent decisions) rather than announcing any novel legal principle; the decision is an application of those precedents to the facts of this case. The opinion does not purport to establish a new precedent beyond applying existing Supreme Court law to the facts before the Court.

Note: The concurring opinion of D.P. Wadhwa, C.J. recorded agreement with the judgment.

Show all summary ...

Radha Mohan Prasad, J.:— In this writ petition the prayer on behalf of the petitioners is for quashing of the entire criminal prosecution pending against them before the Special Judge, Vigilance, Patna, being Special Case No. 169 of 1983 arising out of Vigilance P.S Case No. 53 of 1979.

2. The sole ground taken in the writ petition for quashing of the said criminal prosecution is its continuance for more than seventeen years allegedly infringing their fundamental rights of speedy trial guaranteed under Article 21 of the Constitution of India.

3. Earlier a Division Bench of this Court, vide judgment and order dated 29th June, 1995, had allowed the writ petition and quashed the impugned proceeding of Special Case No. 169 of 1983. Against the said judgment of the Division Bench of this Court, the State of Bihar preferred S.L.P (C.R.L) 4203 of 1995 in the Supreme Court in which leave was granted and the said S.L.P was registered as Criminal Appeal No. 621 of 1996.

4. The writ petition was filed mainly in view of the Full Bench judgments of this Court in Madheshwar Dhari Singh v. The State of Bihar (1985 PLJR 767) and State of Bihar v. Maksudan Singh (1986 PLJR 946). Against the said judgment State had gone in appeal to the Supreme Court in which special leave was granted and until further orders, the operation of the judgment and order of this Court was stayed by the Supreme Court. In view of the said order, this Court, vide order dated 20th March, 1987, considered proper to stay its hands till the correctness of the ratio of the aforementioned two judgments of this Court had been tested in the final court. Accordingly, this Court directed that all the criminal writ jurisdiction cases shall await the judgment of their Lordships of the Supreme Court in the case of State of Bihar v. Madheswardhari Singh and Dilip Kumar Dey.

5. It appears that the Division Bench of this Court, while hearing this matter, quashed the impugned proceeding on the ground that it was stale relying upon the judgment of the Supreme Court in the case of S.G Nain v. Union Of India. (AIR 1992 S.C 603). The Supreme Court, noticing the fact that even though the writ petition of the respondents was to await the judgment in Madheshwar Dhari Singh's case—obviously for disposal in terms thereof—and that case had already been disposed of with another batch of writ petitions (Abdul Rehman Antuley v. R.S Nayak—(1992) 1 SCC 225 : 1992 (1) PLJR (SC) 41), neither of the parties brought these facts to the notice of this Court at the time of hearing of the writ petition as also the fact that the judgment in Antuley's case (supra) was delivered by a Bench of five Judges and that too after disposal of Nain's case (supra), set aside the impugned order and directed the Court to dispose of the writ petition in the light of the principles laid down in Antuley's case (supra). Accordingly, now this matter has been finally heard by us.

6. It is pertinent to note two facts giving rise to the special case in question. The said case was instituted against the petitioners and others on a written report of Shri Sudarshan Prasad Singh, Additional Superintendent of Police, Vigilance dated 18.9.1979 under Sections 420, 1208, 467, 468, 409 I.P.C and 5(2) and 5(1)(d) of the Prevention of Corruption Act read with 109 I.P.C on 19.9.1979

7. The prosecution case, in brief, is that the petitioners, who are officers of the Irrigation Department, along with other officer Shri A.M.S Zoha in conspiracy with each other auction sold scrap iron from the Yantrik Karamshala of the Department at Dehri-on-Sone to Shri Ram Milan Singh of Pashupati Iron Stores, Varanasi at a much lower price than the actual price. It is also alleged that instead of scrap iron useful irons were allowed to be taken out by the buyer from the said Karamshala, the weight of which was about 14.136 Metric Tonnes (M.T) more than what was shown in the record. This way the accused persons caused illegal loss of about Rs. 1 lac forty thousand to the Government of Bihar and illegal gain to themselves. The investigation took about seven years, whereafter the charge sheet was submitted on 5.9.1986 against the petitioners and said Ram Milan Singh, who was the auction purchaser. However, Shri A.M.S Zoha, Superintending Engineer, Irrigation Department, who had approved the auction, was not sent up for trial. On 20th September, 1986, the court took cognizance of the case under Sections 420, 120B, 467, 468, 409 I.P.C and 5(2) and 5(2)(d) of the Prevention of Corruption Act.

8. The petitioners claimed that they had all along been present in the court and did not cause any delay in the trial of the instant case. It is submitted by them that their continued prosecution for a long period of more than seven years from the date of the institution of the case is illegal and violative of Article 21 of the Constitution inasmuch as the petitioners have fundamental rights to speedy trial and as such their continued prosecution for more than seven years is clearly an infringement of their fundamental rights.

9. Supplementary affidavit has been filed on behalf of the petitioners in which true copies of the ordersheets of Vigilance Case No. 53/79 have been annexed as Annexure 3. An additional supplementary affidavit has also been filed on their behalf in which it is stated that the departmental proceedings were held against the petitioners for the same allegations for which the aforementioned Vigilance P.S Case was instituted and in the said departmental enquiry the petitioners have been absolved of the charges levelled against them by the enquiry officer as the same were not found proved. In the meantime, petitioner no. 1, R.K Mandal, died on 26.2.1988

10. A counter affidavit has been filed on behalf of the respondent in which the aforementioned facts have not been disputed. However, it is stated that the very nature of the offences against the high servants and high public officials took some longer time to investigate and the final progress report was ultimately submitted by the I.O through proper channel soliciting sanction for prosecution which was ultimately granted in the year 1986. It is further stated that there is paucity of hand with the investigating agency and in concluding the investigation in some other case the progress in the investigation of the present case suffered for some time which, according to the respondent, was complete by the end of 1983. The sanction of the State Government was solicited, vide letter no. 492 dated 9.3.1984, whereafter the opinions of different departments, ministers and other constitutional functionaries were obtained and ultimately the sanction was notified. It is also pleaded that to crown all these, the general election intervened in which all the police personnel, including the I.O, were on deputation. The culminating effect of all these resulted in delay in the submission of the final form before the court.

11. The other plea taken by the respondent in the said counter affidavit is that an order of stay of this Court partly caused delay at the instance of the accused. Accordingly it is submitted that the allegation levelled in the present case against the high public official should not be allowed to go unprosecuted on the ground of systematic delay, particularly in the teeth of the fact that the court had found prima facie case against the accused and took cognizance long back. It is also submitted that there is nothing on the record to suggest that the investigation was not taken in good faith and that in order to do complete justice it would be appropriate to issue a direction to the trial court to conclude the trial within a period of one year or any further reasonable time than to drop or quash the proceeding.

12. Mr. Gouranga Chatterjee, learned counsel appearing for the petitioners submitted that petitioner no. 1, who has conducted the auction, died during the pendency of the writ application and the Superintending Engineer Shri Zoha, who had accorded approval of the matter, was not sent up for trial. In the meantime, in the departmental enquiry, the petitioners have been absolved of the charges levelled against them by the enquiry officer as he found the allegations to be not proved. By now it is more than 17 years since the institution of the First Information Report against the petitioners. As such, according to him, this case is squarely covered by the principles laid down by the apex Court in Antuley's case (supra) and the prosecution against the petitioners is fit to be quashed on the sole ground of violation of the fundamental right emanating from Article 21 of the Constitution for an early investigation and a speedy and fair trial.

13. On the other hand, Mr. B.P Pandey, learned counsel appearing for the respondent submitted that according to the Supreme Court decision in Antuley's case, the nature of offence has got to be considered for invoking Article 21 of the Constitution of India, besides other factors like the number of accused involved, the number of witnesses in the case, the work load in the particular court, means of communication and several other circumstances have to be kept in mind. According to him, the delay in investigation has been reasonably explained. The allegations against the petitioners are of serious misappropriation and embezzlement of public fund by public servant and that trial could not be completed because of the interim order granted by this Court on 16.12.1986

14. There may be some substance in the submission of the learned counsel for the respondent with respect to the delay in disposal of the trial after 16.12.1986 for which the respondent may not be held responsible, but for the period prior to that which is seven long years in completing the investigation of the case, no reasonable explanation can be said to have been given by the prosecution.

15. Undisputed facts are that on 6.6.1976 the Executive Engineer sent proposal for auction of iron scraps to the Superintending Engineer. On 19.11.1976, Shri Zoha, Superintending Engineer accepted the proposal and accorded approval for holding of auction. On 22.9.1978 the auction was held at Patna and Rs. 321/- per metric tonne was decided to be the rate for auction in favour of Ram Milan Singh. Petitioner no. 1 was the Executive Engineer. No specific role has been alleged as against petitioners no. 2 and 3. Petitioners no. 4 and 5 had merely submitted survey report on 14.10.1974 with respect to the auction. On 17.10.1978, the Executive Engineer constituted weighment Committee which included petitioners no. 2 to 5. The contractor was allowed to take the material by truck between 30.1.1978 to 20.12.1978 However, in 13th trip being taken on 22nd December, 1978, it is alleged that the employee seized the truck and got the materials unloaded in a room. In March, 1979 materials were weighed and 42 Kgs. were found to be in excess out of 10 M.T Thus, the difference was hardly 4%. The weighment was done by one tonne machine. Without rebuttal 14.136 M.T was allegedly recovered in excess of seizure, the value of which is about Rs. 4,200/-. Thereafter, as already mentioned above, the F.I.R was lodged on 19.9.79, charge sheet was submitted on 5.9.1986 and the cognizance was taken on 20.9.1986

16. It is difficult to accept the aforementioned explanation given in the counter affidavit for meeting the charge against the prosecution in causing delay in investigation. In the instant case, it is not alleged that prior to 1986 the delay had occurred on account of any laches on the part of the accused petitioners. The only explanation for the delay of seven years in the counter affidavit is paucity of hand with the investigating agency and the suffering of the present case due to investigation in Bokaro Steel City Case No. 24(7)76 which was to be positively concluded by 15.4.1982 as per the direction of the Ranchi Bench of this Court. The other explanation is delay in getting the sanction for prosecution of the public servant.

17. None of the aforementioned circumstances has been considered by the apex Court to be not to invoke the right to speedy trial flowing from Article 21 of the Constitution. The Supreme Court held that the proceeding taken by either party in good faith to vindicate their rights and interest, as perceived by them, is not to be treated as delaying tactics nor the time taken in pursuing such proceeding is to be counted towards delay. In the instant case, I find that the petitioners had approached this Court in the present writ petition on account of the law laid down by the Full Bench of this Court with respect to according sanction of such prosecution after lapse of seven years. Thereafter the matter went to the Supreme Court and the same was finally disposed of and decided by the apex Court on 10.12.1991 in the case of A.R Antuley (supra) which decision is reported in AIR 1992 S.C 1701 : 1992 (1) PLJR (SC) 41.

18. From the record there is nothing to indicate that any effort was made at the instance of the prosecution for early disposal of this matter. As such, it is difficult to hold that the petitioners had not been vindicating their rights and interest in this proceeding in good faith. After such a long lapse of time even the prosecution may have difficulties in presenting the witnesses on their behalf which naturally would cause further delay especially in view of the work load of the court concerned.

19. In the case of Santosh De v. Archna Guha (AIR 1994 S.C 1229) the Supreme Court following the principles laid down in Antuley case held that unexplained delay of eight years in commencement of the trial by itself infringes the right of the accused to speedy trial. The accused in the said case was a public servant alleged to have possessed disproportionate assets to the tune of Rs. 2,00,000/-. Delay was not attributed to the accused. As such, the proceeding quashed against the accused was upheld. In the case of Biswanath Prasad Singh v. State Of Bihar. (1994 Suppl. (3) SCC 97), the apex Court was dealing with a case relating to misappropriation of public fund for which F.I.R was filed on 10.12.1977 and charge sheet was filed on 5.2.1983 The court framed the charges on 25.4.1989 but thereafter not much progress was made in the case. Appellant had already been dismissed from service. The Supreme Court, noticing that in such a case stricter view should be taken as indicated in the Constitution Bench decision in Antuley's case (supra), interfered in the matter mainly on the ground that even though F.I.R was issued on 10.12.1977, the charge sheet was filed on 5.2.1983 i.e, after lapse of five years, no explanation was forthcoming for the extraordinary delay. The apex Court held that may be, this being a case of misappropriation of public fund, the investigation may have taken a longer time but cannot certainly take five years, having regard to the facts and circumstances of the case. Accordingly, it was held that calling upon the accused to enter upon defence after 16 years, in all the facts and circumstances of the case, is bound to cause prejudice to him. In the present case, nothing has been pointed out by the learned State Counsel to justify the delay of seven years in completing the investigation, except the aforementioned plea taken in the counter affidavit.

20. In the present case which is also relating to alleged misappropriation of public funds, the investigation took seven years to be completed. The explanation aforementioned for the delay is virtually no explanation in the eye of law. In any view of the matter, it is now difficult to get over the facts that the prosecution against the petitioners has been pending for more than 17 years and petitioner no. 1 died during the pendency of the writ application in the year 1988 and the Superintending Engineer, who accorded the approval for the auction purchase, has not been sent up. Further, the petitioners have been exonerated of the charge in the departmental enquiry. It is, thus, impossible to arrange a fair trial after lapse of long time and, in my opinion, it would be sheer waste of public time and money, apart from causing harassment to the petitioners.

21. For the aforementioned reasons, I am of the opinion that the petitioners' right to speedy trial has been infringed in this case and the prosecution launched against them is, thus, liable to be quashed.

22. In the result, the writ application is allowed and the impugned proceeding of Special Case No. 169 of 1983 pending in the court of Special Judge, Vigilance, Patna is quashed.

23. D.P Wadhwa, C.J:— I agree.