Best Sellers Retail (India) Private Limited v. Aditya Birla Nuvo Limited And Others

Supreme Court Of India
May 8, 2012
Important Paras
Please sign up to view Important Paras.
Smart Summary (Beta)

Factual and Procedural Background

Aditya Birla Nuvo Ltd. (“Respondent 1”) markets readymade garments under various brand names. In 1995 it appointed Liberty Agencies, a partnership firm, as its agent for the “Louis Philippe” brand. A fresh agreement dated 2 March 2005 guaranteed Liberty Agencies exclusive use of the suit premises for twelve years, payment of a fixed monthly commission, and a negative covenant not to sell products other than those supplied by Respondent 1. An addendum dated 1 July 2008 increased the commission.

Alleging multiple contractual breaches and financial loss, Respondent 1 issued a notice on 6 February 2010. Liberty Agencies replied on 26 February 2010 that partner A.C. Thirumalaraj had retired, that he (as owner of the premises) had terminated Liberty Agencies’ tenancy, and that possession had been transferred to Best Sellers Retail (India) P Ltd.

Respondent 1 filed OS No. 1533 of 2010 in the City Civil Court, Bangalore, seeking specific performance and, in the alternative, damages of ₹20,12,44,398. It also sought a temporary injunction under Order 39 Rules 1 & 2 CPC restraining Liberty Agencies and its partners from leasing, sub-leasing or otherwise encumbering the suit property. On 24 April 2010 the trial court granted the injunction.

A.C. Thirumalaraj challenged the injunction in MFA No. 4060 of 2010 before the High Court of Karnataka. During the appeal, the High Court passed an interim order on 16 July 2010 restraining Best Sellers Retail (India) P Ltd. from operating a “Jack & Jones” store in the premises. Ultimately, by judgment dated 25 August 2010, the High Court dismissed the appeal but directed Respondent 1 to undertake to compensate the appellants if it failed in the suit.

A.C. Thirumalaraj and Best Sellers Retail (India) P Ltd. filed the present civil appeals in the Supreme Court under Article 136 of the Constitution.

Legal Issues Presented

  1. Whether the trial court and the High Court correctly applied the settled principles governing grant of a temporary injunction under Order 39 Rules 1 & 2 CPC—namely, prima facie case, balance of convenience, and irreparable injury.
  2. Consequently, whether the temporary injunction restraining the appellants from dealing with the suit premises should be sustained or vacated.

Arguments of the Parties

Appellants’ Arguments

  • Invoked Kishorsinh Ratansinh Jadeja v. Maruti Corporation to stress that an injunction requires proof of prima facie case, balance of convenience, and irreparable injury.
  • Because Respondent 1 itself claimed substantial damages (₹20+ crores) as an alternative relief, any loss is compensable and therefore not “irreparable.”
  • Under Sections 14(1)(b), (c) and (d) and Section 41(e) of the Specific Relief Act, 1963, the agency agreement is:
    • too detailed/personal to be specifically enforced,
    • determinable after six years, and
    • involves continuous duties the court cannot supervise; hence no injunction should issue to enforce it.
  • Cited Indian Oil Corp. Ltd. v. Amritsar Gas Service and Percept D’Mark (P) Ltd. v. Zaheer Khan to show that determinable or fiduciary contracts are not specifically enforceable and cannot attract injunctive relief.
  • The agreement confers no proprietary interest on Respondent 1; therefore, the owner (A.C. Thirumalaraj) cannot be restrained from dealing with his property.
  • Since possession had already been delivered to a third party (Best Sellers), the injunction was improper without impleading that third party and without considering its interest.

Respondent 1’s Arguments

  • Clause B-2 of the agreement warrants that Liberty Agencies owns and will retain possession of the premises for the agreement’s term; Clause D fixes a twelve-year duration expiring only in 2017.
  • Only Respondent 1, not Liberty Agencies, holds a contractual right (Clause E-2) to terminate after six years; hence the agreement is not determinable by Liberty Agencies.
  • Even if specific performance of an agency agreement is normally unavailable, Section 42 of the Specific Relief Act allows enforcement of a negative covenant—here, the bar on selling non-Aditya Birla products—by injunction.
  • Cited Bowstead & Reynolds on Agency and Donnell v. Bennett to show courts may enforce negative obligations despite the difficulty of enforcing the entire contract.
  • Urged that a strong prima facie case arose from Liberty Agencies’ admitted transfer of possession, justifying the injunction.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Kishorsinh Ratansinh Jadeja v. Maruti Corporation, (2009) 11 SCC 229 Three-fold test for interim injunction: (i) prima facie case, (ii) balance of convenience, (iii) irreparable injury. Supreme Court adopted this test to review the orders of the trial court and High Court.
Indian Oil Corp. Ltd. v. Amritsar Gas Service, (1991) 1 SCC 533 Determinable contracts are not specifically enforceable. Cited by appellants; Court noted but found it unnecessary to decide enforceability because the matter concerned only a temporary injunction.
Percept D’Mark (India) (P) Ltd. v. Zaheer Khan, (2006) 4 SCC 227 (relying on Page One Records Ltd. v. Britton, 1968 1 WLR 157) In fiduciary contracts, courts decline injunctions where duties are personally enforceable. Referenced by appellants; not relied upon in the Court’s final reasoning.
Donnell v. Bennett, (1883) 22 Ch D 835 Negative stipulations can be enforced by injunction even if specific performance of the whole contract is impossible. Invoked by Respondent 1 to support grant of injunction; Court ultimately focused on irreparable injury instead.
Dalpat Kumar v. Prahlad Singh, (1992) 1 SCC 719 Even with a prima facie case, injunction must be refused if injury is compensable in money. Relied upon by Supreme Court to hold that Respondent 1's claimed losses were compensable, negating irreparable injury.
Attorney General v. Hallett, (1857) 16 M & W 569 Definition of “irreparable injury” as damage that cannot later be compensated. Quoted by Supreme Court to underscore that monetary compensation would suffice for Respondent 1.

Court's Reasoning and Analysis

The Supreme Court first observed that Section 37 of the Specific Relief Act directs that temporary injunctions are governed by the Code of Civil Procedure, rendering arguments on specific-performance provisions largely irrelevant for the interim stage.

Applying the Kishorsinh Ratansinh Jadeja test:

  1. Prima facie case: Clauses B-2, D, and E-2 of the agreement showed Liberty Agencies warranted continued possession and had no right to terminate prior to 2017. Their letter of 26 February 2010 transferring possession breached these terms; therefore Respondent 1 had a strong prima facie case.
  2. Balance of convenience: The Court did not find the lower courts’ analysis perverse but emphasised that the decisive factor becomes irreparable injury where financial loss is quantifiable.
  3. Irreparable injury: Citing Dalpat Kumar, the Court held that injury is not irreparable if it can be adequately compensated. Respondent 1 itself pleaded an alternative claim for damages of over ₹20 crores, itemising projected profits, goodwill, relocation costs, etc. This admission demonstrated that money would suffice to remedy any loss, negating irreparable injury. Assertions of “hardship and mental agony” by a corporate plaintiff were rejected as unfounded.

Because one essential limb of the injunction test was missing, the trial court and the High Court had misapplied the law. The Supreme Court therefore set aside both orders.

Holding and Implications

Holding: The orders of the trial court granting a temporary injunction and of the High Court affirming it (MFA No. 4060 of 2010 and order dated 16 July 2010) are SET ASIDE. The civil appeals are allowed, with no order as to costs.

Implications: The appellants are no longer restrained from leasing, sub-leasing or otherwise dealing with the suit premises pending the suit. Respondent 1 must pursue its substantive claims in the trial court, where damages remain an available remedy. The decision reiterates that where a plaintiff quantifies and claims monetary compensation, courts should be cautious in characterising the alleged harm as “irreparable” for purposes of interim relief; however, it does not establish new legal principles beyond reaffirming settled standards for temporary injunctions.

Show all summary ...

A.K Patnaik, J.— Leave granted. These are appeals by way of special leave under Article 136 of the Constitution of India against the judgment and order dated 25-8-2010 of the High Court of Karnataka in A.C Thirumalaraj v. Aditya Birla Nuvo Ltd. MFA No. 4060 of 2010

2. The relevant facts briefly are that Aditya Birla Nuvo Ltd., Respondent 1 in both the appeals, filed a suit OS No. 1533 of 2010 against Liberty Agencies, a partnership firm and its partners, in the Court of the City Civil Judge at Bangalore. The case of Respondent 1 in the plaint was as follows: Respondent 1 was engaged in the business of readymade garments and accessories under various reputed brand names and in the year 1995 had appointed Liberty Agencies as an agent to conduct its business of readymade garments and accessories with the reputed brand name “Louis Philippe”.

3. Thereafter, on 2-3-2005 Respondent 1 entered into a fresh agreement with Liberty Agencies under which Liberty Agencies agreed to sell the products of Respondent 1 in the suit schedule property and also agreed to retain the possession of the suit schedule property until the expiry of the term of agreement and Liberty Agencies was not to sell any other articles or goods other than that supplied by Respondent 1. Under the agreement dated 2-3-2005 (for short “the agreement”), Liberty Agencies was entitled to a fixed commission of Rs 7,50,000 per month and by an addendum dated 1-7-2008 the fixed commission payable to Liberty Agencies was increased to Rs 9,62,500.

4. Thereafter, Respondent 1 notified to Liberty Agencies various breaches of the terms and conditions of the agreement but Liberty Agencies did not set right the breaches. As a result, Respondent 1 suffered huge financial losses. Respondent 1 issued a legal notice on 6-2-2010 calling upon Liberty Agencies to comply with the terms of the agreement.

5. Liberty Agencies, however, sent a letter dated 26-2-2010 claiming that the constitution of the partnership firm has changed and that its partner A.C Thirumalaraj had retired and that A.C Thirumalaraj as the owner of the suit schedule property had terminated the tenancy of the suit schedule property in favour of Liberty Agencies and initiated a collusive eviction proceeding with an intention to defeat the claim of Respondent 1.

6. Respondent 1 thus prayed for specific performance of the agreement and in the alternative for damages for expenses and losses amounting to Rs 20,12,44,398 if the specific performance of the agreement was refused by the Court.

7. Along with the suit, Respondent 1 also filed an application under Order 39 Rules 1 and 2 read with Section 151 of the Code of Civil Procedure (for short “CPC”) praying for a temporary injunction restraining the defendants from leasing, sub-leasing, alienating or encumbering the suit schedule property in any manner pending disposal of the suit. Liberty Agencies and A.C Thirumalaraj filed their objections to the application for temporary injunction and stated, inter alia, in their objections that the possession of the suit schedule property had been delivered to Best Sellers Retail (India) (P) Ltd.

8. The Additional City Civil Judge heard the parties and by order dated 24-4-2010 allowed the application for temporary injunction and restrained Liberty Agencies and its partners including A.C Thirumalaraj from leasing, sub-leasing, alienating or encumbering the suit schedule property in any manner pending disposal of the suit.

9. Aggrieved, A.C Thirumalaraj filed a miscellaneous appeal under Order 43 Rule 1 CPC against the order of temporary injunction before the High Court. While the miscellaneous appeal was pending, it was brought to the notice of the High Court in IA No. 1 of 2010 that in spite of the temporary injunction granted in favour of Respondent 1, A.C Thirumalaraj and Best Sellers Retail (India) (P) Ltd., were opening a shop in the suit schedule property in the name of “Jack & Jones” and by an order dated 16-7-2010 the High Court restrained Best Sellers Retail (India) (P) Ltd. from carrying on business in the suit schedule property until further orders of the High Court. Best Sellers Retail (India) (P) Ltd. then filed an application MC No. 12036 of 2010 for vacating the interim order dated 16-7-2010.

10. By the impugned judgment MFA No. 4060 of 2010, however, the High Court dismissed the miscellaneous appeal and rejected the appeal for vacating the interim order but directed Respondent 1 to give an undertaking to the trial court that in case Respondent 1 fails in the suit, it will compensate the loss to A.C Thirumalaraj and Best Sellers Retail (India) (P) Ltd. for not using the suit schedule property.

11. Aggrieved, A.C Thirumalaraj and Best Sellers Retail (India) (P) Ltd. have filed these civil appeals.

12. Mr Altaf Ahmed and Mr A.K Ganguli, learned Senior Counsel appearing for the two appellants, submitted relying on the decision of this Court in Kishorsinh Ratansinh Jadeja v. Maruti Corpn. (2009) 11 SCC 229 that while passing an order of temporary injunction under Order 39 Rules 1 and 2 CPC, the Court is to consider:

(i) whether the plaintiff has a prima facie case;
(ii) whether balance of convenience is in favour of the plaintiff; and
(iii) whether the plaintiff will suffer irreparable loss and injury if an order of injunction was not passed.

13. The learned counsel submitted that Respondent 1 itself has claimed damages of Rs 20,12,44,398 as alternative relief in the event the suit for specific performance of the contract is not decreed. They argued that as the plaintiff itself had made a claim for damages for the alleged breach of the agreement by the defendants, the Court should not have granted the temporary injunction in favour of the plaintiff.

14. The learned counsel for the appellants further submitted that Section 14(1) of the Specific Relief Act, 1963 provides in clause (b) that: a contract which runs into such minute or numerous details or which is so dependent on the personal qualifications or volition of the parties, or otherwise from its nature is such, that the court cannot enforce specific performance of its material terms, such a contract cannot be specifically enforced. They submitted that similarly Section 14(1) in clause (d) provides that: a contract, the performance of which involves the performance of a continuous duty which the court cannot supervise, is a contract which cannot be specifically enforced. They submitted that the agreement between Liberty Agencies and Respondent 1 is a contract of agency and is covered under clauses (b) and (d) of Section 14(1) of the Specific Relief Act, 1963 and is one which cannot be specifically enforced.

15. The learned counsel for the appellants submitted that Section 14(1) of the Specific Relief Act, 1963 in clause (c) further provides that a contract which is in its nature determinable cannot be specifically enforced. They argued that on completion of six years from the date of the agreement, Liberty Agencies could terminate the agreement and the six years' period had expired in the year 2011 and hence the Court cannot specifically enforce the contract. They submitted that Section 41(e) of the Specific Relief Act, 1963 clearly provides that an injunction cannot be granted to prevent breach of a contract, the performance of which would not be enforced.

16. The learned counsel for the appellants cited the decision in Indian Oil Corpn. Ltd. v. Amritsar Gas Service (1991) 1 SCC 533 in which this Court has held that a contract which is in its nature determinable cannot be enforced by the court. They also cited the decision in Percept D'Mark (India) (P) Ltd. v. Zaheer Khan (2006) 4 SCC 227 in which this Court has held relying on the judgment of the Chancery Division in Page One Records Ltd. v. Britton (1968) 1 WLR 157, (1967) 3 All ER 822, that where the totality of the obligations between the parties give rise to a fiduciary relationship injunction would not be granted because the performance of the duties imposed on the party in the fiduciary relationship could not be enforced at the instance of the other party.

17. The learned counsel for the appellants further submitted that the agreement between Liberty Agencies and Respondent 1 was an agency agreement and it did not create any interest whatsoever in the suit schedule property and, therefore, Respondent 1 was not entitled to any injunction restraining the owner of the suit schedule property from dealing with the property in any manner with a third party.

18. The learned counsel submitted that in any case since the defendants had clearly stated in their objections to the application for temporary injunction that possession of the suit schedule property had already been delivered to a third party, Best Sellers Retail (India) (P) Ltd., the trial court should not have granted any injunction without the third party being impleaded as a defendant. The learned counsel for the appellants submitted that the interest of the third party has been totally ignored by the trial court and the High Court and this is a fit case in which the order of temporary injunction should be set aside.

19. Mr K.K Venugopal, learned Senior Counsel appearing for Respondent 1, on other hand, submitted that under Clause B-2 of the agreement, Liberty Agencies had given a warranty that the suit schedule property is owned by it and that it will retain possession of the suit schedule property until the expiry of the agreement. He submitted that under Clause D of the agreement the duration of the agreement was for a period of twelve years from the date of the agreement and this period was to expire in 2017 and, therefore, it is not correct, as has been contended by the learned counsel for the appellants, that the period of the agreement has expired.

20. Mr Venugopal argued that under Clause E-2 of the agreement only Respondent 1 Company had the right to terminate the agreement by giving a written notice of not less than three months after the end of six years from the date of the agreement and hence Liberty Agencies had no right to terminate the agreement.

21. The learned Senior Counsel for Respondent 1 submitted that no contention can, therefore, be raised on behalf of Liberty Agencies that the contract was determinable in nature or that the contract had expired.

22. In reply to the contention that under Sections 14(1)(b) and (d) of the Specific Relief Act, 1963 the agreement cannot be specifically enforced, Mr Venugopal cited Bowstead and Reynolds on Agency for the proposition that in exceptional cases specific performance of a contract of agency can also be decreed by the court. He argued that Section 42 of the Specific Relief Act, 1963 makes it abundantly clear that where a contract comprises an affirmative agreement to do a certain act, coupled with a negative agreement, express or implead, not to do a certain act, the circumstances that the court is unable to compel specific performance of the affirmative agreement shall not preclude it from granting an injunction to perform the negative agreement.

23. The learned Senior Counsel also cited the decision of the Chancery Division in Donnell v. Bennett (1883) 22 Ch D 835 where it has been held that where there is a negative clause in the agreement, the Court has to enforce it without regard to the question of whether specific performance could be granted of the entire contract.

24. Mr Venugopal referred to Clause B-5 of the agreement which provides that Liberty Agencies shall only sell the products supplied by Respondent 1 Company and shall not sell any other articles/products manufactured by any other person/company/firm in the premises during the period of the agreement unless approved by Respondent 1 Company. He submitted that this is not a case where the appellants are entitled to any relief from this Court under Article 136 of the Constitution of India.

25. It is not necessary for us to deal with the contentions of the learned counsel for the parties based on the provisions of Sections 14, 41 and 42 of the Specific Relief Act, 1963 because Section 37 of the said Act makes it clear that temporary injunctions are to be regulated by CPC and not by the provisions of the Specific Relief Act, 1963. In fact, the application for temporary injunction of Respondent 1 before the trial court is under the provisions of Order 39 Rules 1 and 2 read with Section 151 CPC.

26. It has been held by this Court in Kishoresinh Ratansinh Jadeja v. Maruti Corpn. (2009) 11 SCC 229 that it is well established that while passing an interim order of injunction under Order 39 Rules 1 and 2 CPC, the Court is required to consider:

(i) whether there is a prima facie case in favour of the plaintiff;
(ii) whether the balance of convenience is in favour of passing the order of injunction; and
(iii) whether the plaintiff will suffer irreparable injury if an order of injunction would not be passed as prayed for.

Hence, we only have to consider whether these well-settled principles relating to grant of temporary injunction have been kept in mind by the trial court and the High Court.

27. On a reading of Clause B-2 of the agreement, we find that Liberty Agencies had given a warranty that the suit schedule property was owned by it and that it will retain the possession of the suit schedule property until the expiry of the agreement. Clause D of the agreement clearly stipulated that the duration of the agreement shall be for a period of twelve years from the date of the agreement unless terminated in accordance with the provisions of the agreement. Clause E-2 further provides that Respondent 1 and not Liberty Agencies could terminate the agreement by giving a notice of not less than three months after the end of six years from the date of the agreement and Respondent 1 had not terminated the agreement under this clause.

28. Before the expiry of six years from the date of the agreement, Liberty Agencies sent the letter dated 26-2-2010 to Respondent 1 committing a breach of Clause B-2 of the agreement which provided that Liberty Agencies will retain possession of the suit schedule property until the expiry of the agreement. This was the breach of the agreement which was sought to be prevented by the trial court by an order of temporary injunction. The trial court and the High Court were thus right in coming to the conclusion that Respondent 1 had a prima facie case.

29. Yet, the settled principle of law is that even where prima facie case is in favour of the plaintiff, the Court will refuse temporary injunction if the injury suffered by the plaintiff on account of refusal of temporary injunction was not irreparable.

30. In Dalpat Kumar v. Prahlad Singh (1992) 1 SCC 719 this Court held:

“5. … Satisfaction that there is a prima facie case by itself is not sufficient to grant injunction. The Court further has to satisfy that non-interference by the Court would result in ‘irreparable injury’ to the party seeking relief and that there is no other remedy available to the party except one to grant injunction and he needs protection from the consequences of apprehended injury or dispossession. Irreparable injury, however, does not mean that there must be no physical possibility of repairing the injury, but means only that the injury must be a material one, namely, one that cannot be adequately compensated by way of damages.”

31. In the present case, Respondent 1 itself had claimed in the plaint the alternative relief of damages to the tune of Rs 20,12,44,398 if the relief for specific performance was to be refused by the Court and break-up of the damages of Rs 20,12,44,398 claimed in the plaint was as follows:

“(i) Net book stock amount on 28-2-2010 is Rs 1,15,97,638.
(ii) Loan amount due as on 27-1-2010 is Rs 44,81,584.
(iii) Amount due as per the statement of accounts as on 28-2-2010 is Rs 20,65,176.
(iv) Projected loss of profit on sales, for the balance seven-year term of the agency agreement amounts to a sum of Rs 10,31,00,000.
(v) Loss of goodwill, reputation including amount spent on advertisement Rs 2,00,00,000.
(vi) Loss of amount which the plaintiff would incur for relocating the store to other place in Brigade Road, Bangalore and to continue its business for rest of the term of seven years would amount to Rs 6,00,00,000 along with simple interest at the rate of 24% p.a from the date of payment till realisation as the same being a commercial transaction.”

32. Mr Venugopal, learned counsel appearing for Respondent 1, however, submitted that future profits and loss of goodwill of Respondent 1 cannot be calculated in terms of the money, but the aforesaid statement of damages claimed by Respondent 1 in the plaint would show that Respondent 1 has itself calculated a projected loss of profit for the balance seven-year term of the agreement as Rs 10,31,00,000 and has also assessed loss of goodwill at Rs 2,00,00,000 besides the loss of Rs 6,00,00,000 in relocating the store to another place in Brigade Road, Bangalore.

33. Despite this claim towards damages made by Respondent 1 in the plaint, the trial court has held that if the temporary injunction as sought for is not granted, Liberty Agencies may lease or sub-lease the suit schedule property or create third-party interest over the same and in such an event, there will be multiplicity of proceedings and thereby Respondent 1 will be put to hardship and mental agony, which cannot be compensated in terms of money. Respondent 1 is a limited company carrying on the business of readymade garments and we fail to appreciate what mental agony and hardship it will suffer except financial losses.

34. The High Court has similarly held in the impugned judgment that if the premises is let out, Respondent 1 will be put to hardship and the relief claimed would be frustrated and, therefore, it is proper to grant injunction and the trial court has rightly granted injunction restraining the partners of Liberty Agencies from alienating, leasing, sub-leasing or encumbering the property till the disposal of the suit.

35. The High Court lost sight of the fact that if the temporary injunction restraining Liberty Agencies and its partners from allowing, leasing, sub-leasing or encumbering the suit schedule property was not granted, and Respondent 1 ultimately succeeded in the suit, it would be entitled to damages claimed and proved before the court. In other words, Respondent 1 will not suffer irreparable injury.

36. To quote the words of Alderson, B. in Attorney General v. Hallett (1857) 16 M & W 569, 153 ER 1316: (ER p. 1321)

“… I take the meaning of irreparable injury to be that which, if not prevented by injunction, cannot be afterwards compensated by any decree which the court can pronounce in the result of the cause.”

37. For the aforesaid reasons, we set aside the order of temporary injunction passed by the trial court as well as the impugned judgment MFA No. 4060 of 2010 and the order dated 16-7-2010 of the High Court.

38. The appeals are allowed with no order as to costs.