Factual and Procedural Background

By notifications dated 8-9-1998 (under Section 4(1) read with Sections 17(1) & 17(4)) and 7-9-1999 (under Section 6(1) read with Section 17(1)) the State Government acquired about 103 bighas of land in District Banda for the “Tulsi Nagar Residential Scheme” of the Banda Development Authority (BDA). 80% of the compensation (Rs. 63,47,855.07) was deposited on 5-6-2000 and the revenue authorities prepared a panchnama showing delivery of possession to BDA on 30-6-2001. An award was passed on 14-6-2002 and BDA thereafter developed the land, carved out plots/flats for various income groups and effected allotments between 2002 and 2006.

Respondent 1 (Motilal Agarwal), who had purchased 5 bighas 5 biswas in Plot No. 795 in 1982, first filed Civil Suit No. 52/2003 seeking fresh acquisition proceedings after sub-dividing the plot. The suit was dismissed on 1-9-2007 and the first appeal was withdrawn. On 24-3-2008 he filed a writ petition before the Allahabad High Court contending that the entire acquisition had lapsed owing to the award not being made within two years as mandated by Section 11-A of the Land Acquisition Act, 1894. The High Court accepted that plea and quashed the acquisition in 2010. The present appeal by BDA/State challenges that decision.

Legal Issues Presented

  1. Whether the High Court could entertain, after nearly nine years, a writ petition seeking to invalidate the acquisition when the land had been taken possession of, developed, and third-party rights had been created.
  2. Whether an acquisition made by invoking emergency provisions under Sections 17(1) and 17(4) lapses under Section 11-A for non-passing of the award within two years when possession has already been taken.
  3. What acts amount to “taking possession” of acquired land, and whether the panchnama dated 30-6-2001 constituted actual possession.

Arguments of the Parties

Appellant’s Arguments (State of U.P. & BDA)

  • The writ petition was grossly belated (filed nine years after Section 6 declaration and six years after the award) and should have been dismissed on grounds of laches.
  • Section 11-A does not apply to acquisitions under the emergency clauses of Section 17 where possession is taken; hence the High Court erred in holding that the acquisition had lapsed.
  • Actual possession was taken on 30-6-2001, evidenced by the panchnama, field book and subsequent development works; describing it as “paper possession” is incorrect.
  • During the intervening years BDA spent large sums, developed the land, and created third-party rights, which the High Court failed to consider.

Respondent 1’s Arguments

  • Physical possession remained with him until July 2002, as shown by khasra entries for Fasli years 1407–1409; therefore the award passed in June 2002 was beyond the two-year limit under Section 11-A.
  • Symbolic or paper possession on 30-6-2001 could not relieve the Land Acquisition Officer of the statutory obligation to pass the award in time.
  • Relied on precedents holding that delay does not bar relief when possession has not been actually taken and when symbolic possession is insufficient.
  • Contended that no objection regarding delay was raised before the High Court and hence cannot be pressed in appeal.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Satendra Prasad Jain v. State of U.P. (1993) 4 SCC 369 Section 11-A inapplicable where land is acquired under Section 17 and possession has been taken. Relied upon to reverse the High Court and hold that the acquisition did not lapse.
Awadh Bihari Yadav v. State of Bihar (1995) 6 SCC 31 Same principle as above regarding Section 11-A. Cited in support of appellant’s contention that Section 11-A does not apply.
Pratap v. State of Rajasthan (1996) 3 SCC 1 Reaffirmed inapplicability of Section 11-A to emergency acquisitions. Used to reinforce the validity of the acquisition.
Allahabad Development Authority v. Nasiruzzaman (1996) 6 SCC 424 Emergency acquisition insulated from Section 11-A lapse. Cited to buttress appellant’s case.
Govt. of A.P. v. Kollutla Obi Reddy (2005) 6 SCC 493 Same principle on Section 11-A. Relied upon by appellants; accepted by Supreme Court.
Nahar Singh v. State of U.P. (1996) 1 SCC 434 Acquisition lapses where possession not taken and award not passed within two years. Distinguished; Court held facts here different as possession had been taken.
NTPC Ltd. v. Mahesh Dutta (2009) 8 SCC 339 Difficulty in assuming possession not taken after deposit of 80% compensation. Supported conclusion that possession stood transferred to BDA.
Anil Kumar v. State of U.P. (2008) 2 All WC 1832 (All HC) Symbolic possession insufficient to avoid Section 11-A. Relied on by respondent; not accepted by Supreme Court.
Sushil Kumar v. State of U.P. (1999) 1 All WC 764 (All HC) Similar to above. Relied on by respondent; rejected.
Vyalikaval Housebuilding Coop. Society v. V. Chandrappa (2007) 9 SCC 304 Fraud can override delay objections. Held inapplicable as no fraud alleged here.
Babu Ram v. State of Haryana (2009) 10 SCC 115 Moderate delay may not defeat relief where possession not taken. Distinguished; here delay was nine years and possession had been taken.
State of M.P. v. Bhailal Bhai AIR 1964 SC 1006 Delay and laches: limitation for civil suits is a yardstick for writs. Formed core of reasoning to deny writ relief owing to nine-year delay.
Ajodhya Bhagat v. State of Bihar (1974) 2 SCC 501 Writs challenging acquisition after development should be refused. Applied to stress prejudice to third-party rights.
State of Rajasthan v. D.R. Laxmi (1996) 6 SCC 445 Court may refuse relief despite void order when delay exists. Reinforced discretionary refusal of writ relief.
Girdharan Prasad Missir v. State of Bihar (1980) 2 SCC 83 Delay of 17 months enough to deny writ. Cited illustratively on delay.
Municipal Corpn. Greater Bombay v. Industrial Development Investment Co. (1996) 11 SCC 501 Court should not quash acquisition after award & possession. Supported appellant’s stance.
Urban Improvement Trust v. Bheru Lal (2002) 7 SCC 712 Writ filed two years late dismissed. Cited on delay principle.
Ganpatibai v. State of M.P. (2006) 7 SCC 508 Five-year delay fatal; suit-cum-writ sequence rejected. Analogous to present facts; followed.
State of Bihar v. Dhirendra Kumar (1995) 4 SCC 229 Suit not maintainable against acquisition; remedy is writ. Referred while discussing respondent’s earlier suit.
Sawaran Lata v. State of Haryana (2010) 4 SCC 532 Seven-year delay sufficient to dismiss writ. Quoted to show petitioner’s presumed knowledge of acquisition.
Balwant Narayan Bhagde v. M.D. Bhagwat (1976) 1 SCC 700 Nature of “taking possession” under the Act; panchnama method. Guided the Court in upholding possession via panchnama.
Balmokand Khatri Educational Trust v. State of Punjab (1996) 4 SCC 212 Panchnama is accepted mode of taking possession; later occupation unlawful. Applied to negate respondent’s claim of continued possession.
P.K. Kalburqi v. State of Karnataka (2005) 12 SCC 489 Symbolic possession adequate where land is vacant. Cited to validate panchnama on fallow land.
Sita Ram Bhandar Society v. NCT of Delhi (2009) 10 SCC 501 For large tracts, possession can be taken via panchnama. Applied in holding possession had vested.
Omprakash Verma v. State of A.P. (2010) 13 SCC 158 Same principle as above. Referred while formulating general tests for possession.
Brij Pal Bhargava v. State of U.P. (2011) 5 SCC 413 Panchnama sufficient for large-scale acquisitions. Supported conclusion on possession.
Parsinni v. Sukhi (1993) 4 SCC 375 Section 11-A not attracted to emergency acquisitions. Cited in list reaffirming inapplicability of Section 11-A.

Court's Reasoning and Analysis

The Supreme Court undertook a two-fold analysis:

  1. Delay and Laches: Drawing on a line of authorities beginning with Bhailal Bhai, the Court held that a nine-year delay from the Section 6 declaration and a six-year delay from the award were fatal. Even absent an explicit plea by the State, the High Court was obliged to refuse relief because: (a) the land had been fully developed for a public residential scheme; (b) substantial expenditure had been incurred; and (c) third-party rights had crystallised through allotments.
  2. Possession and Section 11-A: Reviewing the panchnama of 30-6-2001, field-book entries, affidavits of revenue officials, photographs and admissions in the respondent’s own plaint, the Court found that actual possession had been taken and delivered to BDA. Applying principles distilled from Balwant Narayan Bhagde and related cases, it ruled that for vacant land a spot visit and panchnama constitute lawful possession. Once possession is taken under Section 17, the land vests absolutely in the State, and, as authoritatively held in Satendra Prasad Jain and kindred precedents, Section 11-A cannot divest that title. Accordingly, the High Court’s conclusion that the acquisition lapsed for want of an award within two years was pronounced “ex-facie erroneous”.

The Court also articulated five general propositions on how possession may be validly taken, emphasising the sufficiency of a panchnama for large or vacant tracts and the presumption of possession where 80% compensation is deposited and substantial utilisation follows.

Holding and Implications

HOLDING: The appeal is allowed; the impugned judgment of the Allahabad High Court is set aside and Respondent 1’s writ petition is dismissed with costs of Rs. 1,00,000 to be paid to the appellant within two months.

Implications: The Tulsi Nagar Residential Scheme remains undisturbed and third-party allotments stand protected. The judgment fortifies two doctrinal points: (1) writ petitions challenging land acquisition after substantial delay will ordinarily be dismissed, especially where the land has been developed; and (2) where possession is taken under the emergency provisions, Section 11-A does not cause the acquisition to lapse. The decision thus discourages belated challenges and clarifies acceptable modes of proving possession in large-scale public acquisitions.

Show all summary ...

G.S Singhvi, J.— Leave granted. The question which arises for consideration in this appeal is whether the Division Bench of the Allahabad High Court was justified in entertaining and allowing the writ petition filed by Respondent 1, Moti Lal Agarwal in 2008 for nullifying the acquisition of his land by the State Government vide Notification dated 8-9-1998 issued under Section 4(1) read with Sections 17(1) and 17(4) of the Land Acquisition Act, 1894 (for short “the Act”) which was followed by a declaration dated 7-9-1999 issued under Section 6(1) read with Section 17(1) on the ground of non-passing of the award within the time prescribed under Section 11-A.

2. By the notifications referred to in the preceding paragraph, the State Government acquired 103 bighas of land situated in Ladakapurwa and Bhawanipur Villages, Pargana and District Banda for Tulsi Nagar Residential Scheme of Banda Development Authority (for short “BDA”). Both the notifications were published in the manner prescribed under Sections 4(1) and 6(2) respectively.

3. On 5-6-2000, the Secretary of BDA deposited Rs. 63,47,855.07 towards 80% of the compensation payable in lieu of the acquisition of 103 bighas of land. This was in compliance with the mandate of Section 17(3-A). The authorities concerned of the State delivered possession of the acquired land to BDA on 30-6-2001. The officers of the Revenue Department visited the site on 4-9-2001 and prepared the field book, copy of which has been produced before this Court along with an affidavit dated 19-1-2011 of Shri Biri Singh, Executive Engineer, BDA. The Special Land Acquisition Officer passed the award dated 14-6-2002 for the acquired land including Plot No. 795 of which 5 bighas 5 biswas was purchased by Respondent 1 vide registered sale deed dated 4-10-1982.

4. In the meanwhile, BDA prepared layout for the acquired land which was sanctioned by its Board on 8-5-2002. Thereafter, the land was developed in a phased manner and plots were carved out for economically weaker sections and LIG, MIG and HIG categories. BDA also constructed flats for economically weaker sections and those belonging to lower income group. The plots and flats were allotted to the eligible persons who had applied in response to different advertisements issued by BDA between 2-11-2002 and 26-4-2006.

5. After more than three years of publication of the declaration issued under Section 6(1), Respondent 1 filed a suit being OS No. 52 of 2003 in the Court of the Civil Judge (Senior Division), Banda, and prayed that the defendants be directed to start the acquisition proceedings afresh and disburse compensation after sub-dividing and numbering Plot No. 795 in accordance with Para 63 of the Land Records Manual. The suit was dismissed on 1-9-2007 in view of the bar contained in the Uttar Pradesh Zamindari Abolition and Land Reforms Act and the Land Acquisition Act. Respondent 1 challenged the order of the trial court in First Appeal No. 364 of 2007 but withdrew the same by stating that the writ petition filed by him was pending.

6. In the writ petition filed by him on 24-3-2008, Respondent 1 challenged the Notifications dated 8-9-1998 and 7-9-1999 mainly on the ground that the acquisition proceedings will be deemed to have lapsed because the award was not passed within two years from the date of last publication of the declaration issued under Section 6(1). Respondent 1 pleaded that though Plot No. 795 had not been sub-divided and demarcated and physical possession thereof was not taken, the authorities concerned prepared kabja hastantaran praman patra dated 30-6-2001 and thereby took paper possession of his land. He also claimed that Plot No. 795/3 owned by him had not been notified, but the authorities concerned colluded with Smt Shashi Devi and other interested persons and reflected him as tenure-holder of that plot.

7. The thrust of the affidavits filed by Shri Mam Chand, Executive Engineer and Shri Har Govind Swarnkar, Assistant Engineer on behalf of BDA was that after taking possession of the acquired land, BDA constructed roads and nalis, laid pipelines for supply of water and also erected poles for electric lines and plots carved out from the acquired land were allotted to people belonging to different categories. In Paras 2, 3 and 4 of his affidavit, Shri Har Govind Swarnkar, Assistant Engineer, averred as under:

“2. That present supplementary counter-affidavit has been necessitated as the petitioner through rejoinder-affidavit to the counter-affidavit filed on behalf of Respondents 1, 2 and 3 has brought on record the copies of khasra for the years 1407-1411 fasli.
3. That 1407 fasli is from 1-7-1999 to 30-6-2000 to 30-6-2001. Similarly, 1409 fasli is for the year 2001-2002, 1410 fasli is for the year 2002-2003, 1411 and 1412 fasli are for the years 2003-2004 and 2004-2005.
4. The perusal of these khasras shows that there is no entry of sowing any crop in 1410-1412 fasli, namely, no crop was sown and they were, admittedly, not in possession from July 2002 towards (sic onwards). Possession has been taken from the petitioner on 30-6-2001. 30-6-2001 corresponds to end of 1408 fasli. It is thus clear that the petitioner was not in possession after 30-6-2001. Entry of sowing any crop in the khasra in 1409 fasli is patently erroneous since in 1409 fasli i.e from 1-7-2001 the petitioner was not in possession. This entry is incorrect and no crop has been sown after possession was taken on 30-6-2001.”

8. In a separate affidavit, Shri Girish Kumar Sharma, Tahsildar (J), Banda, supported the stand taken by BDA. He categorically averred that possession of the acquired land was handed over to BDA on 30-6-2001 for the purpose of implementation of the residential scheme. Along with his affidavit, Shri Girish Kumar Sharma annexed a photostat copy of the report dated 14-7-2001 prepared by the Naib Tahsildar, Banda, who had visited the spot and inspected the site.

9. Although Respondent 1 did not question the acquisition proceedings on the ground of non-compliance with Section 7 of the Act, the Division Bench of the High Court suo motu observed that the acquisition proceedings can be quashed on the ground of non-compliance with that section. The Division Bench then referred to the entries made in the revenue records and held that the acquisition proceedings will be deemed to have lapsed because neither physical possession of the land was taken nor was the award passed within two years as per the mandate of Section 11-A. The High Court distinguished the judgment of this Court in Satendra Prasad Jain v. State of U.P (1993) 4 SCC 369 by observing that physical possession of the acquired land had not been taken for more than two years after publication of the declaration issued under Section 6(1).

10. Shri P.S Patwalia, learned Senior Counsel for the appellant argued that the High Court was not at all justified in entertaining and allowing the writ petition filed after nine years of publication of the declaration issued under Section 6(1) and six years of the passing of award by the Special Land Acquisition Officer and that too by ignoring that during the intervening period BDA carried out development, carved out plots and allotted the same to the eligible applicants including the members of economically weaker sections and also constructed flats for the economically weaker sections and lower income groups. Shri Patwalia submitted that Respondent 1 cannot justify belated filing of the writ petition on the ground that he was prosecuting the case in the civil court because in the suit he had not prayed for quashing the notifications issued under Sections 4(1) and 6(1).

11. The learned Senior Counsel relied upon the judgments of this Court in Satendra Prasad Jain v. State of U.P (1993) 4 SCC 369, Awadh Bihari Yadav v. State of Bihar (1995) 6 SCC 31, Pratap v. State of Rajasthan (1996) 3 SCC 1, Allahabad Development Authority v. Nasiruzzaman (1996) 6 SCC 424 and Govt. of A.P v. Kollutla Obi Reddy (2005) 6 SCC 493 and argued that Section 11-A is not applicable to the cases in which the land is acquired by invoking the emergency provisions contained in Sections 17(1) and 17(4). He submitted that the High Court committed serious error by quashing the acquisition proceedings on the premise that physical possession of the acquired land had not been taken on 30-6-2001. The learned counsel referred to a letter dated 5-6-2000 vide which BDA deposited a sum of Rs. 63,47,855.07 towards the compensation payable to the landowners and submitted that the exercise undertaken for taking possession of the acquired land by the authorities concerned of the State and delivery thereof to BDA could not have been brushed aside by the High Court by describing it as symbolic/paper possession.

12. Shri W.H Khan, learned Senior Counsel appearing for Respondent 1 supported the order under challenge and argued that the High Court rightly annulled the acquisition proceedings because physical possession of the land was taken only on 30-7-2002 and the award was passed after more than two years of publication of the declaration issued under Section 6(1). The learned Senior Counsel relied upon the khasra land records of fasli years 1407, 1408 and 1409, which have been filed with IA No. 3 of 2011 to show that physical possession of the acquired land continued with Respondent 1 till July 2002 and argued that the document prepared by the State authorities showing delivery of possession to BDA cannot be made basis for recording a finding that physical possession of the acquired land was taken on 30-6-2001. The learned Senior Counsel relied upon the judgments of this Court in Nahar Singh v. State of U.P (1996) 1 SCC 434, NTPC Ltd. v. Mahesh Dutta (2009) 8 SCC 339 as also the judgments of the Allahabad High Court in Anil Kumar v. State of U.P (2008) 2 All WC 1832 and Sushil Kumar v. State of U.P (1999) 1 All WC 764 and submitted that symbolic/paper possession taken by the State authorities on 30-6-2001 was not sufficient for relieving the Land Acquisition Officer of the obligation to pass the award within two years of the last publication of the declaration issued under Section 6(1). Shri Khan then referred to the judgments of this Court in Vyalikaval Housebuilding Coop. Society v. V. Chandrappa (2007) 9 SCC 304 and Babu Ram v. State of Haryana (2009) 10 SCC 115 and argued that Respondent 1 should not be non-suited on the ground of delay because no such objection was raised before the High Court.

13. We have considered the respective submissions. In the suit filed by him, Respondent 1 had unequivocally declared that he did not have any objection to the acquisition of land or the plots which were the subject-matter of the acquisition. The only grievance made by Respondent 1 was that the notification had been issued without sub-dividing Plot No. 795. He also claimed that Defendant 3 had delivered possession to Defendant 4 on papers and they were trying to start construction after taking possession of his land. This is evident from Paras 5, 6, 8, 10 and 11 of the plaint, which are extracted below:

“5. That description of the disputed plot which was acquired by the gazette notification is given as Plot No. 795 rakba 12 bighas and 795/2 rakba 5 bighas, 5 biswas. At the time of acquisition proceedings this fact came to light that Plot No. 795 has not been sub-divided. Without sub-division of the plot it was not possible to acquire and give its compensation. Defendant 3 called for a report from the Tahsildar, Banda regarding Plot No. 795 on the basis of possession and sub-division. After due inspection on the spot the Tahsildar sent its detailed report dated 30-3-2001 to Defendant 3 stating clearly the sub-divided shares as follows:
Sl. No. Plot No. Rakba Farmer's name 1. 795/1 06-16-10 Nathu, Shakhawat and Srikrishna 2. 795/2 09-08-05 Smt Shashi Devi 3. 795/3 05-05-00 Motilal 4. 795/4 04-03-05 Shiv Devi 5. 795/5 12-00-00 Nathu, Shakhawat and Srikrishna
6. That according to the Land Records Manual the provision to enter numbers in an account is to start numbering viz. 1, 2, 3, 4 from north-west to south-east. In accordance with this provision only the abovesaid sub-division was done which is also lawful. The plaintiff has no objection with the sub-division.
8. That it is important to clarify here that the plaintiff does not have any objection to the acquisition proceedings or the plot nos. which are subject to acquisition. The plaintiff only states that acquisition be done only after sub-division of Plot No. 795 according to the rules. The proceedings were initiated on the basis of the report of the Tahsildar dated 30-3-2001 and the compensation for Plot No. 795/2 was prepared in the name of Shashi Devi and she was only shown as the kastkaar in the said land and accordingly Akar Part 11 was prepared and the notice under Section 14 was given to Shashi Devi. Afterwards at (sic some) subsequent stage records were manipulated and the plaintiff was shown as the kastkaar of Plot No. 795/2. The plaintiff had filed several objections, personally met with the officials of the defendants and given applications. In spite of some decisions of inquiries in favour of the plaintiff he has not been given any relief and due to the fact that Defendant 3 has delivered possession to Defendant 4 on papers, the defendants are trying to start construction after taking possession of the land of the plaintiff and are shying away from their legal duty.
10. That in the interest of justice it is necessary that the defendants be ordered that the acquisition and disbursement of compensation be done only after due inspection of Plot No. 795 and thereafter numbering it in accordance with law on the basis of possession. Because the defendants are not paying any heed to the justified claim of the plaintiff so this suit is being filed.
11. That the defendants are going to start construction on the site very soon and they have demarcated the land by embedding stones from which it is clear that they are going to possess the disputed land. In all these circumstances the notice under Section 80 CPC cannot be served upon the defendants and with the permission of the Hon'ble Court, this suit is being filed without the notice.”
(emphasis is ours)

14. The main and substantive prayer made in the plaint, which is extracted below, also shows that Respondent 1 had not questioned the acquisition proceedings:

“That the defendants be directed by an order of mandatory injunction to start afresh the proceedings of acquisition and disbursement of compensation after sub-dividing and numbering Plot No. 795 in accordance with Para 63 of the Land Records Manual. In the alternative, to acquire the land from all the account-holders and thereby proportionally pay them respective compensation.”

15. The above extracted portions of the plaint unmistakably show that Respondent 1 had no complaint against the acquisition of land or taking of possession by the State Government and delivery thereof to BDA and the only prayer made by him was that the defendants be directed to undertake fresh acquisition proceedings after sub-dividing Plot No. 795 so that he may get his share of compensation. He filed writ petition questioning the acquisition proceedings after almost 9 years of publication of the declaration issued under Section 6(1) and about six years of the pronouncement of award by the Special Land Acquisition Officer. During this interregnum, BDA took possession of the acquired land after depositing 80% of the compensation in terms of Section 17(3-A), prepared the layout, developed the acquired land, carved out plots, constructed flats for economically weaker sections of the society, invited applications and allotted plots and flats to the eligible persons belonging to economically weaker sections as also LIG, MIG and HIG categories. Unfortunately, the High Court ignored all this and allowed the writ petition on the specious ground that the acquired land did not vest in the State Government because physical possession of the land belonging to Respondent 1 was not taken till 31-7-2002 and the award was not passed within two years as per the mandate of Section 11-A.

16. In our view, even if the objection of delay and laches had not been raised in the affidavits filed on behalf of BDA and the State Government, the High Court was duty-bound to take cognizance of the long time gap of nine years between the issue of declaration under Section 6(1) and filing of the writ petition, and declined relief to Respondent 1 on the ground that he was guilty of laches because the acquired land had been utilised for implementing the residential scheme and third-party rights had been created. The unexplained delay of about six years between the passing of award and filing of the writ petition was also sufficient for refusing to entertain the prayer made in the writ petition.

17. It is true that no limitation has been prescribed for filing a petition under Article 226 of the Constitution but one of the several rules of self-imposed restraint evolved by the superior courts is that the High Court will not entertain petitions filed after long lapse of time because that may adversely affect the settled/crystallised rights of the parties. If the writ petition is filed beyond the period of limitation prescribed for filing a civil suit for similar cause, the High Court will treat the delay unreasonable and decline to entertain the grievance of the petitioner on merits.

18. In State of M.P v. Bhailal Bhai AIR 1964 SC 1006 the Constitution Bench considered the effect of delay in filing writ petition under Article 226 of the Constitution and held: (AIR pp. 1011-12, paras 17 & 21)

“17. … It has been made clear more than once that the power to give relief under Article 226 is a discretionary power. This is specially true in the case of power to issue writs in the nature of mandamus. Among the several matters which the High Courts rightly take into consideration in the exercise of that discretion is the delay made by the aggrieved party in seeking this special remedy and what excuse there is for it. … It is not easy nor is it desirable to lay down any rule for universal application. It may however be stated as a general rule that if there has been unreasonable delay the court ought not ordinarily to lend its aid to a party by this extraordinary remedy of mandamus.
21. … The learned counsel is right in his submission that the provisions of the Limitation Act do not as such apply to the granting of relief under Article 226. It appears to us however that the maximum period fixed by the legislature as the time within which the relief by a suit in a civil court must be brought may ordinarily be taken to be a reasonable standard by which delay in seeking remedy under Article 226 can be measured. This Court may consider the delay unreasonable even if it is less than the period of limitation prescribed for a civil action for the remedy but where the delay is more than this period, it will almost always be proper for the court to hold that it is unreasonable.”

19. In matters involving challenge to the acquisition of land for public purpose, this Court has consistently held that delay in filing the writ petition should be viewed seriously and relief denied to the petitioner if he fails to offer plausible explanation for the delay. The Court has also held that the delay of even few years would be fatal to the cause of the petitioner, if the acquired land has been partly or wholly utilised for the public purpose.

20. In Ajodhya Bhagat v. State of Bihar (1974) 2 SCC 501 this Court approved dismissal by the High Court of the writ petition filed by the appellant for quashing the acquisition of his land and observed:

“23. The High Court held that the appellants were guilty of delay and laches. The High Court relied on two important facts. First, that there was delivery of possession. The appellants alleged that it was a paper transaction. The High Court rightly rejected that contention. Secondly, the High Court said that the Trust invested several lakhs of rupees for the construction of roads and material for development purposes. The appellants were in full knowledge of the same. The appellants did not take any steps. The High Court rightly said that to allow this type of challenge to an acquisition of large block of land piecemeal by the owners of some of the plots in succession would not be proper. If this type of challenge is encouraged the various owners of small plots will come up with writ petitions and hold up the acquisition proceedings for more than a generation. The High Court rightly exercised discretion against the appellants. We do not see any reason to take a contrary view to the discretion exercised by the High Court.”
(emphasis supplied)

21. In State of Rajasthan v. D.R Laxmi (1996) 6 SCC 445 this Court referred to Administrative Law by H.W.R Wade (7th Edn.) at pp. 342-43 and observed:

“10. The order or action, if ultra vires the power, becomes void and it does not confer any right. But the action need not necessarily be set at naught in all events. Though the order may be void, if the party does not approach the Court within reasonable time, which is always a question of fact and have the order invalidated or acquiesced or waived, the discretion of the Court has to be exercised in a reasonable manner. When the discretion has been conferred on the Court, the Court may in appropriate case decline to grant the relief, even if it holds that the order was void. The net result is that extraordinary jurisdiction of the Court may not be exercised in such circumstances.”

22. In Girdharan Prasad Missir v. State of Bihar (1980) 2 SCC 83, the delay of 17 months was considered as a good ground for declining relief to the petitioner. In Municipal Corpn. of Greater Bombay v. Industrial Development Investment Co. (P) Ltd. (1996) 11 SCC 501 this Court held:

“9. … It is thus, well-settled law that when there is inordinate delay in filing the writ petition and when all steps taken in the acquisition proceedings have become final, the Court should be loathe to quash the notifications. The High Court has, no doubt, discretionary powers under Article 226 of the Constitution to quash the notification under Section 4(1) and declaration under Section 6. But it should be exercised taking all relevant factors into pragmatic consideration. When the award was passed and possession was taken, the Court should not have exercised its power to quash the award which is a material factor to be taken into consideration before exercising the power under Article 226. The fact that no third-party rights were created in the case, is hardly a ground for interference. The Division Bench of the High Court was not right in interfering with the discretion exercised by the learned Single Judge dismissing the writ petition on the ground of laches.”

23. In Urban Improvement Trust v. Bheru Lal (2002) 7 SCC 712 this Court reversed the order of the Rajasthan High Court and held that the writ petition filed for quashing of acquisition of land for a residential scheme framed by the appellant Urban Improvement Trust was liable to be dismissed on the ground that the same was filed after two years.

24. In Ganpatibai v. State of M.P (2006) 7 SCC 508, the delay of 5 years was considered unreasonable and the order passed by the High Court refusing to entertain the writ petition was confirmed. In that case also the petitioner had initially filed a suit challenging the acquisition of land. The suit was dismissed in 2001. Thereafter, the writ petition was filed. This Court referred to an earlier judgment in State of Bihar v. Dhirendra Kumar (1995) 4 SCC 229 and observed: (Ganpatibai case (2006) 7 SCC 508)

“9. In State of Bihar v. Dhirendra Kumar (1995) 4 SCC 229 this Court had observed that the civil suit was not maintainable and the remedy to question notification under Section 4 and the declaration under Section 6 of the Act was by filing a writ petition. Even thereafter the appellant, as noted above, pursued the suit in the civil court. The stand that five years after the filing of the suit, the decision was rendered does not in any way help the appellant. Even after the decision of this Court, the appellant continued to prosecute the suit till 2001, when the decision of this Court in 1995 had held that suit was not maintainable.”

25. In Sawaran Lata v. State of Haryana (2010) 4 SCC 532 the dismissal of writ petition filed after seven years of the publication of declaration and five years of the award passed by the Collector was upheld by the Court and it was observed:

“11. In the instant case, it is not the case of the petitioners that they had not been aware of the acquisition proceedings as the only ground taken in the writ petition has been that substance of the notification under Section 4 and declaration under Section 6 of the 1894 Act had been published in the newspapers having no wide circulation. Even if the submission made by the petitioners is accepted, it cannot be presumed that they could not be aware of the acquisition proceedings for the reason that a very huge chunk of land belonging to a large number of tenure-holders had been notified for acquisition. Therefore, it should have been the talk of the town. Thus, it cannot be presumed that the petitioners could not have knowledge of the acquisition proceedings.”

26. In the instant case, the acquired land was utilised for implementing Tulsi Nagar Residential Scheme inasmuch as after carrying out necessary development i.e construction of roads, laying electricity, water and sewer lines, etc. BDA carved out plots, constructed flats for economically weaker sections and lower income group, invited applications for allotment of the plots and flats from general as well as reserved categories and allotted the same to eligible persons. In the process, BDA not only incurred huge expenditure but also created third-party rights. In this scenario, the delay of nine years from the date of publication of the declaration issued under Section 6(1) and almost six years from the date of passing of award should have been treated by the High Court as more than sufficient for denying equitable relief to Respondent 1.

27. The two judgments relied upon by the learned counsel for Respondent 1 are not helpful to the cause of his client. In Vyalikaval Housebuilding Coop. Society v. V. Chandrappa (2007) 9 SCC 304 this Court held that where the acquisition was found to be vitiated by fraud and mala fide, the delay in filing the writ petition cannot be made a ground for denying relief to the affected person. In Babu Ram v. State of Haryana (2009) 10 SCC 115 this Court held that the appellant cannot be denied relief merely because there was some delay in filing the writ petition. The facts of that case were that 34 kanals 2 marlas of land situated at Jind (Haryana) was acquired by the State Government under Section 4 read with Sections 17(2)(c) and 17(4) for construction of sewage treatment plant. Notification under Section 4 was issued on 23-11-2005 and declaration under Section 6 was issued on 2-1-2006. Mitaso Educational Society, Narwana, filed a suit for injuncting the State from constructing the sewage treatment plant in front of the school. On 15-2-2006, the trial court passed an order of injunction. In another suit filed by one Jagroop similar order was passed by the trial court. After some time, the appellant filed writ petition under Article 226 of the Constitution. Before this Court it was argued that relief should be denied to the appellant because there was delay in filing the writ petition. Rejecting this argument, the Court observed: (Babu Ram case (2009) 10 SCC 115)

“32. Since Section 5-A of the LA Act had been dispensed with, the stage under Section 9 was arrived at within six months from the date of the notice issued under Sections 4 and 17(2)(c) of the LA Act. While such notice was issued on 23-11-2005, the award under Section 11 was made on 23-5-2006. During this period, the appellants filed a suit and thereafter, withdrew the same and filed a writ petition in an attempt to protect their constitutional right to the property. It cannot, therefore, be said that there was either any negligence or lapse or delay on the part of the appellants.”

28. Dehors the aforesaid conclusion, we are convinced that the premise on which the High Court declared that the acquisition proceedings will be deemed to have lapsed because the award was not passed within two years is ex facie erroneous. Admittedly, the State Government had acquired the land by issuing notification under Section 4 read with Sections 17(1) and (4), which was followed by a declaration issued under Section 6(1) read with Section 17(1). By Notification dated 7-9-1999, the Governor had directed the Collector, Banda to take possession of the acquired land on the expiration of 15 days from the issue of notice under Section 9(1). In furtherance of the direction given by the Collector, the Revenue Authorities concerned took possession of the acquired land, which, as mentioned above, has already been utilised for implementing Tulsi Nagar Residential Scheme. Though, Respondent 1 succeeded in convincing the High Court that physical possession of his land had not been taken till 31-7-2002, after carefully perusing the record, we are convinced that the finding recorded on this issue is unsustainable.

29. In Paras 8 and 11 of the plaint filed by him in the Court of the Civil Judge (Senior Division), Banda, Respondent 1 had virtually admitted that possession of the acquired land was with BDA. If this was not so, there was no occasion for him to make a grievance that the land had been demarcated by putting stones and BDA was in the process of raising construction. That apart, Respondent 1 did not deny the statements contained in the affidavits filed before the High Court that the Revenue Authorities visited the spot and made entries in the field book regarding delivery of possession. The photographs produced by the parties before this Court show that after taking possession of the acquired land, BDA constructed roads, buildings, etc., laid sewer lines and erected poles for electric lines. The photographs also reveal that by taking advantage of the impugned order, Respondent 1 took possession of a portion of the land on which BDA had already carried out development. All this is sufficient to discard the claim of Respondent 1 that actual possession of the acquired land had not been delivered to BDA till July 2002.

30. What should be the mode of taking possession of the land acquired under the Act? This question was considered in Balwant Narayan Bhagde v. M.D Bhagwat (1976) 1 SCC 700. Untwalia, J. referred to the provisions contained in Order 21 Rules 35, 36, 95 and 96 of the Code of Civil Procedure, decisions of different High Courts and opined that even the delivery of so-called “symbolical” possession is delivery of “actual” possession of the right, title and interest of the judgment-debtor. Untwalia, J. further observed that if the property is land over which there is no building or structure, then delivery of possession over the judgment-debtor's property becomes complete and effective against him the moment the delivery is effected by going upon the land. The learned Judge went on to say:

“25. When a public notice is published at a convenient place or near the land to be taken stating that the Government intends to take possession of the land, then ordinarily and generally there should be no question of resisting or impeding the taking of possession. Delivery or giving of possession by the owner or the occupant of the land is not required. The Collector can enforce the surrender of the land to himself under Section 47 of the Act if impeded in taking possession. On publication of the notice under Section 9(1) claims to compensation for all interests in the land has to be made; be it the interest of the owner or of a person entitled to the occupation of the land. On the taking of possession of the land under Section 16 or 17(1) it vests absolutely in the Government free from all encumbrances. It is, therefore, clear that taking of possession within the meaning of Section 16 or 17(1) means taking of possession on the spot. It is neither a possession on paper nor a ‘symbolical’ possession as generally understood in civil law. But the question is what is the mode of taking possession? The Act is silent on the point. Unless possession is taken by the written agreement of the party concerned the mode of taking possession obviously would be for the authority to go upon the land and to do some act which would indicate that the authority has taken possession of the land. It may be in the form of a declaration by beat of drum or otherwise or by hanging a written declaration on the spot that the authority has taken possession of the land. The presence of the owner or the occupant of the land to effectuate the taking of possession is not necessary. No further notice beyond that under Section 9(1) of the Act is required. When possession has been taken, the owner or the occupant of the land is dispossessed. Once possession has been taken the land vests in the Government.”
(emphasis supplied)

31. Bhagwati, J. (as he then was), speaking for himself and Gupta, J. disagreed with Untwalia, J. and observed: (Balwant Narayan case (1976) 1 SCC 700)

“28. … We think it is enough to state that when the Government proceeds to take possession of the land acquired by it under the Land Acquisition Act, 1894, it must take actual possession of the land, since all interests in the land are sought to be acquired by it. There can be no question of taking ‘symbolical’ possession in the sense understood by judicial decisions under the Code of Civil Procedure. Nor would possession merely on paper be enough. What the Act contemplates as a necessary condition of vesting of the land in the Government is the taking of actual possession of the land. How such possession may be taken would depend on the nature of the land. Such possession would have to be taken as the nature of the land admits of. There can be no hard-and-fast rule laying down what act would be sufficient to constitute taking of possession of land. We should not, therefore, be taken as laying down an absolute and inviolable rule that merely going on the spot and making a declaration by beat of drum or otherwise would be sufficient to constitute taking of possession of land in every case. But here, in our opinion, since the land was lying fallow and there was no crop on it at the material time, the act of the Tahsildar in going on the spot and inspecting the land for the purpose of determining what part was waste and arable and should, therefore, be taken possession of and determining its extent, was sufficient to constitute taking of possession. It appears that the appellant was not present when this was done by the Tahsildar, but the presence of the owner or the occupant of the land is not necessary to effectuate the taking of possession. It is also not strictly necessary as a matter of legal requirement that notice should be given to the owner or the occupant of the land that possession would be taken at a particular time, though it may be desirable where possible, to give such notice before possession is taken by the authorities, as that would eliminate the possibility of any fraudulent or collusive transaction of taking of mere paper possession, without the occupant or the owner ever coming to know of it.”
(emphasis supplied)

32. In Balmokand Khatri Educational and Industrial Trust v. State of Punjab (1996) 4 SCC 212 the Court negatived the argument that even after finalisation of the acquisition proceedings possession of the land continued with the appellant and observed:

“4. It is seen that the entire gamut of the acquisition proceedings stood completed by 17-4-1976 by which date possession of the land had been taken. No doubt, Shri Parekh has contended that the appellant still retained their possession. It is now well-settled legal position that it is difficult to take physical possession of the land under compulsory acquisition. The normal mode of taking possession is drafting the panchnama in the presence of panchas and taking possession and giving delivery to the beneficiaries is the accepted mode of taking possession of the land. Subsequent thereto, the retention of possession would tantamount only to illegal or unlawful possession.”

33. In P.K Kalburqi v. State of Karnataka (2005) 12 SCC 489 the Court referred to the observations made by Bhagwati, J. in Balwant Narayan Bhagde v. M.D Bhagwat (1976) 1 SCC 700 that no hard-and-fast rule can be laid down as to what act would be sufficient to constitute taking of possession of the acquired land and observed that when there is no crop or structure on the land only symbolic possession could be taken.

34. In NTPC Ltd. v. Mahesh Dutta (2009) 8 SCC 339 the Court noted that appellant NTPC paid 80% of the total compensation in terms of Section 17(3-A) and observed that it is difficult to comprehend that after depositing that much amount it had obtained possession only on a small fraction of land.

35. In Sita Ram Bhandar Society v. Govt. of NCT of Delhi (2009) 10 SCC 501 and Omprakash Verma v. State of A.P (2010) 13 SCC 158 it was held that when possession is to be taken of a large tract of land then it is permissible to take possession by a properly executed panchnama. Similar view was expressed in a recent judgment in Brij Pal Bhargava v. State of U.P (2011) 5 SCC 413, (2011) 2 Scale 692

36. The judgment in Nahar Singh v. State of U.P (1996) 1 SCC 434 on which reliance was placed by the learned Senior Counsel for Respondent 1 is clearly distinguishable. In that case, the Court had found that possession of the acquired land had not been taken by the State and the award was not passed even after two years from the date of coming into force of the Land Acquisition (Amendment) Act, 1984 whereby Section 11-A was inserted in the Act.

37. The principles which can be culled out from the abovenoted judgments are:

(i) No hard-and-fast rule can be laid down as to what act would constitute taking of possession of the acquired land.
(ii) If the acquired land is vacant, the act of the State authority concerned to go to the spot and prepare a panchnama will ordinarily be treated as sufficient to constitute taking of possession.
(iii) If crop is standing on the acquired land or building/structure exists, mere going on the spot by the authority concerned will, by itself, be not sufficient for taking possession. Ordinarily, in such cases, the authority concerned will have to give notice to the occupier of the building/structure or the person who has cultivated the land and take possession in the presence of independent witnesses and get their signatures on the panchnama. Of course, refusal of the owner of the land or building/structure may not lead to an inference that the possession of the acquired land has not been taken.
(iv) If the acquisition is of a large tract of land, it may not be possible for the acquiring/designated authority to take physical possession of each and every parcel of the land and it will be sufficient that symbolic possession is taken by preparing appropriate document in the presence of independent witnesses and getting their signatures on such document.
(v) If beneficiary of the acquisition is an agency/instrumentality of the State and 80% of the total compensation is deposited in terms of Section 17(3-A) and substantial portion of the acquired land has been utilised in furtherance of the particular public purpose, then the court may reasonably presume that possession of the acquired land has been taken.

38. In the light of the above discussion, we hold that the action of the State authorities concerned to go to the spot and prepare panchnama showing delivery of possession was sufficient for recording a finding that actual possession of the entire acquired land had been taken and handed over to BDA. The utilisation of the major portion of the acquired land for the public purpose for which it was acquired is clearly indicative of the fact that actual possession of the acquired land had been taken by BDA. Once it is held that possession of the acquired land was handed over to BDA on 30-6-2001, the view taken by the High Court that the acquisition proceedings had lapsed due to non-compliance with Section 11-A cannot be sustained.

39. In Satendra Prasad Jain v. State of U.P (1993) 4 SCC 369 this Court considered the applicability of Section 11-A in cases involving acquisition of land under Section 4 read with Section 17 and observed:

“15. Ordinarily, the Government can take possession of the land proposed to be acquired only after an award of compensation in respect thereof has been made under Section 11. Upon the taking of possession the land vests in the Government, that is to say, the owner of the land loses to the Government the title to it. This is what Section 16 states. The provisions of Section 11-A are intended to benefit the landowner and ensure that the award is made within a period of two years from the date of the Section 6 declaration. In the ordinary case, therefore, when the Government fails to make an award within two years of the declaration under Section 6, the land has still not vested in the Government and its title remains with the owner, the acquisition proceedings are still pending and, by virtue of the provisions of Section 11-A, lapse. When Section 17(1) is applied by reason of urgency, the Government takes possession of the land prior to the making of the award under Section 11 and thereupon the owner is divested of the title to the land which is vested in the Government. Section 17(1) states so in unmistakable terms. Clearly, Section 11-A can have no application to cases of acquisitions under Section 17 because the lands have already vested in the Government and there is no provision in the said Act by which land statutorily vested in the Government can revert to the owner.”
(emphasis supplied)

The same view was reiterated in Awadh Bihari Yadav v. State of Bihar (1995) 6 SCC 31, Pratap v. State of Rajasthan (1996) 3 SCC 1, Parsinni v. Sukhi (1993) 4 SCC 375, Allahabad Development Authority v. Nasiruzzaman (1996) 6 SCC 424 and Govt. of A.P v. Kollutla Obi Reddy (2005) 6 SCC 493.

40. In the result, the appeal is allowed. The impugned order is set aside and the writ petition filed by Respondent 1 is dismissed with cost quantified at Rs. 1,00,000. Respondent 1 shall deposit the amount of cost with the appellant within a period of two months from today.